This document is a Bid Schedule for a wastewater pipe repair project at Travis Air Force Base (TAFB), with a 90-day performance period. The bid schedule details multiple line items across three primary categories: Landscaping, Sanitary Sewer Piping, and Sanitary Sewer Structures. Landscaping tasks include topsoil preparation, seeding, and sodding. Sanitary Sewer Piping work encompasses extensive pipe rehabilitation activities such as cutting and patching asphalt and concrete, hydro jetting, root removal, cured-in-place lining, pipe replacement via open trench, video inspection, and new pipe installation. Sanitary Sewer Structures tasks involve manhole-related services including cleaning, root cutting, cover replacement, frame repairs, channel restoration, chemical sealing, and applying corrosion protection coatings.
The bid schedule is structured to allow contractors to price each line item, with provisions for additional cost components including general conditions, onsite field personnel, general contractor overhead, bonds and insurance, and contractor profit. All line items are listed with a quantity of 1 and measured in lump sum (LS), indicating a comprehensive approach to the entire project scope. The document is marked as Controlled Unclassified Information (CUI) and is associated with Solicitation Number FA442725R0017 for the Department of the Air Force Air Mobility Command's project to repair wastewater pipes at Building 665 on Travis Air Force Base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule TAFB - Repair Wastewater Pipes, B665
Period of Performance: 90 Days
Landscaping Topsoil & Planting Beds 1 LS Seeding, Sprigging & Sodding 1 LS
Sanitary Sewer Piping Cut and patch asphalt 1 LS Cut and patch concrete 1 LS Clean piping via hydro jetting 1 LS Remove roots from piping 1 LS Cured in place Lining 1 LS Replace pipe via Open Trench 1 LS Point repair pipe 1 LS Video Inspection 1 LS New Pipe via Open Trench 1 LS New Force Main Pipe Via Open Trench 1 LS
Sanitary Sewer Structures Manhole cleaning 1 LS Manhole root cutting 1 LS Remove and replace manhole cover 1 LS Replace chimney frame and cover 1 LS Bench and Channel repair 1 LS Chemical sealing of barrel 1 LS Apply corrosion protection barrier coating to entire manhole interior 1 LS
Subtotal
General Conditions / Onsite Field Personnel %
Subtotal
General Contractor Overhead %
Subtotal
Bonds and Insurance %
Subtotal
Contractor Profit %
Subtotal
Total
Line TotalDescription Quantity Unit