About this file
This document is an Air Force Form 66 (Schedule of Material Submittals) for the "Repair Wastewater Pipes, B665" project with solicitation number XDAT 23-1045. The form outlines two key material submittal requirements for the wastewater pipe repair project: 1) a construction schedule that must be submitted prior to the start of work (marked as "PW"), and 2) closeout documents to be submitted 10 days after work completion (marked as "CL"). The form provides a comprehensive tracking template for the project engineer and contract administrator to document and manage material submittals, including spaces for certification, shop drawings, samples, manufacturer's documentation, warranty information, catalog data, operating instructions, tests, and reports.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER SOLICITATION/CONTRACT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS XDAT 23-1045
PROJECT TITLE
Repair Wastewater Pipes, B665
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR
NUMBER OF COPIES REQUIRED
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E 'S
R
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
'S
W A
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
IN
S
T R
U C
T
IO
N S
T E
S T
S
R E
P O
R T
S
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N
D
T
T E
R E
C E
IV
E
D I
C
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S
T E
F O
L L
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
APPROVED DISAPROVED
Construction schedule
PW
Closeout documents
CL
13 Legend of Submittals: PW - Submit prior to start of work
14 CL - Submit 10 days after completion of work
AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED