Attachment 4 - AF66 B665 Sewer Repair Project.pdf

PDF 94 KB Posted

Attached to
PKA B665 REPAIR WASTEWATER PIPES
Solicitation number
FA442725R0017
Issued by

About this file

This document is an Air Force Form 66 (Schedule of Material Submittals) for the "Repair Wastewater Pipes, B665" project with solicitation number XDAT 23-1045. The form outlines two key material submittal requirements for the wastewater pipe repair project: 1) a construction schedule that must be submitted prior to the start of work (marked as "PW"), and 2) closeout documents to be submitted 10 days after work completion (marked as "CL"). The form provides a comprehensive tracking template for the project engineer and contract administrator to document and manage material submittals, including spaces for certification, shop drawings, samples, manufacturer's documentation, warranty information, catalog data, operating instructions, tests, and reports.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER SOLICITATION/CONTRACT NUMBER

SCHEDULE OF MATERIAL SUBMITTALS XDAT 23-1045

PROJECT TITLE

Repair Wastewater Pipes, B665

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINSTRATOR

NUMBER OF COPIES REQUIRED

L

IN

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C

M P

L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E 'S

R

C O

M M

E N

D A

T

IO

N S

M A

N U

F A

C T

U R

E

'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

O P

E R

A T

IN

G

IN

S

T R

U C

T

IO

N S

T E

S T

S

R E

P O

R T

S

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N

D

T

T E

R E

C E

IV

E

D I

C

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

G

IN

E E

R

IN

G

R E

T U

R N

S U

S P

E N

S

T E

F O

L L

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N T

R A

C T

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

APPROVED DISAPROVED

Construction schedule

PW

Closeout documents

CL

13 Legend of Submittals: PW - Submit prior to start of work

14 CL - Submit 10 days after completion of work

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED