Attachment_5_Bid_Schedule_1.pdf

PDF 102 KB Posted

Attached to
CO-ROCKY MTN ARSNL NWR-TRAIL PAVING PH 2
Solicitation number
140F0122R0081
Issued by

About this file

This document contains an independent government cost estimate and solicitation for a construction project. The project involves paving surfaces at Rocky Mountain Arsenal National Wildlife Refuge in Commerce City, Colorado. The base project scope includes mobilization, site preparation, concrete and trail work, and gravel shoulders. An option is provided for a picnic shelter and additional concrete and trail work. The solicitation is issued by the U.S. Fish and Wildlife Service and is set aside for small businesses under NAICS code 238110 with a size standard of $16.5 million. Proposals are due by August 1st, 2022 and the contract value is estimated between $250,000 to $500,000. Any requests for information or site visits must be received by July 22nd via email.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEPENDENT GOVERNMENT COST ESTIMATE

22‐028 ‐ Lake Mary Trail Paving

ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE

COMMERCE CITY, COLORADO

Unit Total QTY Unit Cost Cost

LAKE MARY TRAIL

1 1 LS

2 1 LS

3 1 LS

4 1 LS

5 42 CY

6 154 CY

Lake Mary Trail Total (BASE)

Unit Total QTY Unit Cost Cost

OPTION 1: PICNIC SHELTER AND TRAIL CONCRETE

1 1 LS

2 1 LS

3 Option 1 Gravel Shoulder 2 CY

4 18 CY

Option 1: Picnic Shelter and Trail Concrete

BASE PROJECT (BP) + OPTION

Construction Access Road

Project Description: Pave surfaces as described in the drawings and specifications at Rocky Mountain Arsenal NWR.

Furnish all labor, materials, and equipment to complete the following work in accordance with the attached specifications.

Option 1 Site preparation

Option 1 Concrete and Trail

Option 1 Mobilization/Demobilization, Bonding, Overhead, & Profit

Mobilization/Demobilization, Bonding, Overhead, & Profit Remove Wood Edging Site Preparation

Concrete and Trail Gravel Shoulder, Transitions, and Base

File details come from the government source that posted it. Updated .