This document contains a projected submittal list for a federal construction contract to pave trails at Lake Mary in Rocky Mountain Arsenal National Wildlife Refuge. Key details include:

  • The contract is for paving Phase 2 of trails at Lake Mary in Colorado's Rocky Mountain Arsenal National Wildlife Refuge. The submittal list outlines requirements for schedule of values, construction schedule, construction access plan, waste records, closeout documents, concrete mix designs, steel reinforcement samples, joint filler materials, digital photos, and an erosion control plan and waste management plan. It provides a column to note approval status for each required submittal.

  • The related federal contract opportunity is a 100% small business set-aside for poured concrete foundation and structure work with a NAICS code of 238110 and size standard of $16.5 million. The construction project is estimated between $250,000 to $500,000. Interested contractors must submit a price proposal, technical proposal and relevant past performance by August 1st, 2022 to be considered for the firm-fixed price contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET 1 OF 1

PROJECT NAME: LAKE MARY TRAIL PAVING - PHASE 2 ENGR. PROJECT NO.: 22-028

LOCATION: ROCKY MOUNTAIN ARSENAL NWR CONTRACT NO.:

CONTRACTOR:

Spec.

Section Number

Spec.

Paragraph No. Comments

011000 1.6.B.4 012900 1.2.A.1 013100 1.3 013200 1.4 013233 1.2 013300 1.3 014000 1.4 015000 1.3 017419 1.3 017419 1.4 017700 1.3 033000 1.2.B 033000 2.2 033000 2.7

321500.1 2.1 Gravel Surfacing

Waste records Closeout documents Concrete mix Steel Reinforcement Joint Filler Materials

Digital photos Submittal schedule Test agency information Erosion control plan Waste management plan

PROJECTED SUBMITTAL LIST

Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)

Schedule of Values Subcontract list and information Construction schedule

Construction Access Plan

A - Approved as Submitted.

B - Approved, Except as Noted. No Resubmission Required.

C - Approved, Except as Noted. Resubmission Required.

D - No Action Taken. See Comments. Resubmission Required.

E - disapproved. See Comments. Resubmission Required.