This document is a Project Manual containing construction specifications for a ramp addition project at the Ralph H. Johnson VA Medical Center Fisher House in Charleston, South Carolina. The project is owned by Fisher House Charleston with architectural services provided by Thomas and Denzinger Architects. The specifications cover multiple construction disciplines organized by CSI divisions, including temporary facilities and controls, demolition, metals, finishes, exterior improvements, and site work.
The construction specifications establish requirements for temporary site facilities (fencing, utilities, erosion control, security), selective demolition with careful protection of existing conditions, decorative metal railings fabricated to AWS standards, dimension bluestone flooring with specific finish requirements, exterior painting of galvanized metal using acrylic systems with semigloss topcoats (Sherwin-Williams Pro Industrial specified as basis of design), site clearing and earth moving with specified soil compaction requirements, concrete work for sidewalks and site elements (3,000 psi compressive strength for sidewalks), and turf establishment using Bermudagrass sod with 30-day maintenance period. Key submittals required include mix designs for concrete, shop drawings for metal railings and stone flooring, paint samples for color verification, erosion control plans, and stormwater pollution prevention plans. All materials require manufacturer approval prior to ordering, with independent testing laboratory verification of concrete compressive strength and field grading. The specifications emphasize protection of existing vegetation and structures during construction, compliance with ACI standards for concrete, and adherence to erosion control requirements throughout the project duration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 2023
PROJECT MANUAL
Ralph H. Johnson VA Medical Center Fisher House
RAMP ADDITION
CONSTRUCTION DOCUMENTS
150 WENTWORTH ST,
CHARLESTON, SC 29401
OWNER
Fisher House Charleston
150 Wentworth St
Charleston, SC 29401
ARCHITECT
Thomas and Denzinger Architects
138 St Philip St #200, Charleston, SC 29403
Phone: (843) 723-6651 https://www.google.com/search?rlz=1C1CHBF_enUS911US911&q=thomas+and+denzinger+phone&ludocid=12017828513210623113&sa=X&ved=2ahUKEwjbqJbV_OX7AhVBTDABHbNzDkwQ6BN6BAhTEAI https://www.google.com/search?q=thomas+and+denzinger&rlz=1C1CHBF_enUS911US911&oq=thomas+and+denzinger&aqs=chrome.0.0i355i512j46i175i199i512j0i22i30j0i390j69i61l2.6044j0j15&sourceid=chrome&ie=UTF-8
Ralph H. Johnson VA Medical Center Fisher House - Ramp Addition
2- PAGE 1 OF 1
Division Section Title Pages
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
000107 SEALS PAGE 1
000115 LIST OF DRAWING SHEETS 1
SPECIFICATIONS GROUP
Facility Construction Subgroup
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION 5
DIVISION 05 - METALS
057000 DECORATIVE METAL RAILINGS 6
DIVISION 09 - FINISHES
096340 STONE FLOORING 6
099114 EXTERIOR PAINTING (MPI STANDARDS) 6
Site and Infrastructure Subgroup
DIVISION 32 - EXTERIOR IMPROVEMENTS
321613 SITE WORK CONCRETE PART 1 - GENERAL 7
END OF TABLE OF CONTENTS
000107-SEALS PAGE PAGE 1 OF 1
DOCUMENT 000107 - SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
BUILDING
ARCHITECT
Thomas and Denzinger Architects
Bryan Matthew Bolin
No. 8225
The following Sections:
Architectural Sections in
Divisions 09 - 10
000115-LIST OF DRAWING SHEETS PAGE 1 OF 1
DOCUMENT 000115 - LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of
Contents page of the separately bound drawing set titled James Simons School – Third Floor, as modified by subsequent Addenda and Contract modifications.
B. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:
ARCHITECTURAL
T100 COVER SHEET, SHEET INDEX
V100 SURVEY
A100 DEMO & NEW SITE PLAN
A101 ENLARGED PLAN
A300 SECTION
A500 DETAILS
A700 EROSION CONTROL PLAN AND DETAILS
END OF DOCUMENT 000115
015000-TEMPORARY FACILITIES AND CONTROLS PAGE 1 OF 6
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.
1.3 USE CHARGES
A. Installation, removal, and use charges for temporary facilities shall be included in the Contract
Sum unless otherwise indicated. Allow other entities engaged in the Project to use temporary services and facilities without cost, including, but not limited to, Owner's construction forces, Architect, occupants of Project, testing agencies, and authorities having jurisdiction.
B. Water Service: Owner will pay water-service use charges for water used by all entities for construction operations.
C. Electric Power Service: Owner will pay electric-power-service use charges for electricity used by all entities for construction operations.
D. Water and Sewer Service from Existing System: Water from Owner's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
E. Electric Power Service from Existing System: Electric power from Owner's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.
1.4 INFORMATIONAL SUBMITTALS
A. Site Utilization Plan: Show temporary facilities, temporary utility lines and connections, staging areas, construction site entrances, vehicle circulation, and parking areas for construction personnel.
B. Implementation and Termination Schedule: Within 15 days of date established for commencement of the Work, submit schedule indicating implementation and termination dates of each temporary utility.
015000-TEMPORARY FACILITIES AND CONTROLS PAGE 2 OF 6
C. Project Identification and Temporary Signs: Show fabrication and installation details, including plans, elevations, details, layouts, typestyles, graphic elements, and message content.
D. Fire-Safety Program: Show compliance with requirements of NFPA 241 and authorities having jurisdiction. Indicate Contractor personnel responsible for management of fire-prevention program.
E. Noise and Vibration Control Plan: Identify construction activities that may impact the occupancy and use of existing spaces within the building or adjacent existing buildings, whether occupied by others, or occupied by the Owner. Include the following:
1. Methods used to meet the goals and requirements of the Owner.
2. Concrete cutting method(s) to be used.
3. Location of construction devices on the site.
4. Show compliance with the use and maintenance of quieted construction devices for the duration of the Project.
5. Indicate activities that may disturb building occupants and that are planned to be performed during non-standard working hours as coordinated with the Owner.
1.5 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.
B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each temporary utility before use. Obtain required certifications and permits.
C. Accessible Temporary Egress: Comply with applicable provisions in the United States Access
Board's ADA-ABA Accessibility Guidelines and ICC/ANSI A117.1.
1.6 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Engage Installer of each permanent service to assume responsibility for operation, maintenance, and protection of each permanent service during its use as a construction facility before Owner's acceptance, regardless of previously assigned responsibilities.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Portable Chain-Link Fencing: Minimum 2-inch (50-mm), 0.148-inch- (3.8-mm-) thick, galvanized-steel, chain-link fabric fencing; minimum 6 feet (1.8 m) high with galvanized-steel pipe posts; minimum 2-3/8-inch- (60-mm-) OD line posts and 2-7/8-inch- (73-mm-) OD corner and pull posts, with 1-5/8-inch- (42-mm-) OD top and bottom rails. Provide galvanized-steel bases for supporting posts.
015000-TEMPORARY FACILITIES AND CONTROLS PAGE 3 OF 6
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the
Work.
1. Locate facilities to limit site disturbance as specified in Section 011000 "Summary."
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.
3.2 TEMPORARY UTILITY INSTALLATION
A. General: Install temporary service or connect to existing service.
1. Arrange with utility company, Owner, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.
B. Water Service: Install water service and distribution piping in sizes and pressures adequate for construction.
C. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water service facilities in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.
D. Sanitary Facilities: Provide temporary toilets, wash facilities, safety shower and eyewash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.
E. Electric Power Service: Connect to Owner's existing electric power service. Maintain equipment in a condition acceptable to Owner.
F. Electric Power Service: Provide electric power service and distribution system of sufficient size, capacity, and power characteristics required for construction operations.
1. Connect temporary service to Owner's existing power source, as directed by Owner.
G. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.
1. Install and operate temporary lighting that fulfills security and protection requirements without operating entire system.
3.3 SUPPORT FACILITIES INSTALLATION
A. Traffic Controls: Comply with requirements of authorities having jurisdiction.
015000-TEMPORARY FACILITIES AND CONTROLS PAGE 4 OF 6
1. Protect existing site improvements to remain, including curbs, pavement, and utilities.
2. Maintain access for fire-fighting equipment and access to fire hydrants.
B. Parking: Provide temporary offsite parking areas for construction personnel.
C. Storage and Staging: Provide temporary offsite area for storage and staging needs.
D. Dewatering Facilities and Drains: Comply with requirements of authorities having jurisdiction.
Maintain Project site, excavations, and construction free of water.
1. Dispose of rainwater in a lawful manner that will not result in flooding Project or adjoining properties or endanger permanent Work or temporary facilities.
2. Remove snow and ice as required to minimize accumulations.
E. Project Signs: Provide Project signs as indicated. Unauthorized signs are not permitted.
1. Identification Signs: Provide Project identification signs as indicated on Drawings.
2. Temporary Signs: Provide other signs as indicated and as required to inform public and individuals seeking entrance to Project.
a. Provide temporary, directional signs for construction personnel and visitors.
3. Maintain and touch up signs, so they are legible at all times.
F. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction.
Comply with progress cleaning requirements in Section 017300 "Execution."
G. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.
1. Truck cranes and similar devices used for hoisting materials are considered "tools and equipment" and not temporary facilities.
3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Protection of Existing Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Project site and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities.
1. Where access to adjacent properties is required in order to affect protection of existing facilities, obtain written permission from adjacent property owner to access property for that purpose.
B. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
1. Comply with work restrictions specified in Section 011000 "Summary."
C. Temporary Erosion and Sedimentation Control: Provide measures to prevent soil erosion and discharge of soil-bearing water runoff and airborne dust to undisturbed areas and to adjacent
015000-TEMPORARY FACILITIES AND CONTROLS PAGE 5 OF 6
properties and walkways, according to erosion- and sedimentation-control Drawings requirements of EPA Construction General Permit or authorities having jurisdiction, whichever is more stringent.
1. Verify that flows of water redirected from construction areas or generated by construction activity do not enter or cross tree- or plant-protection zones.
2. Inspect, repair, and maintain erosion- and sedimentation-control measures during construction until permanent vegetation has been established.
3. Clean, repair, and restore adjoining properties and roads affected by erosion and sedimentation from Project site during the course of Project.
4. Remove erosion and sedimentation controls, and restore and stabilize areas disturbed during removal.
D. Stormwater Control: Comply with requirements of authorities having jurisdiction. Provide barriers in and around excavations and subgrade construction to prevent flooding by runoff of stormwater from heavy rains.
E. Tree and Plant Protection: Comply with requirements specified in Section 015639 "Temporary
Tree and Plant Protection."
F. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees to protect vegetation from damage from construction operations. Protect tree root systems from damage, flooding, and erosion.
G. Pest Control: Engage pest-control service to recommend practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals, so Project will be free of pests and their residues at Substantial
Completion. Perform control operations lawfully, using materials approved by authorities having jurisdiction.
H. Site Enclosure Fence: Before construction operations begin Prior to commencing earthwork, furnish and install site enclosure fence in a manner that will prevent people from easily entering site except by entrance gates.
1. Extent of Fence: As required to enclose entire Project site or portion determined sufficient to accommodate construction operations.
I. Security Enclosure and Lockup: Install temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security. Lock entrances at end of each workday.
J. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.
3.5 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.
B. Maintenance: Maintain facilities in good operating condition until removal.
015000-TEMPORARY FACILITIES AND CONTROLS PAGE 6 OF 6
1. Maintain operation of temporary enclosures, heating, cooling, humidity control, ventilation, and similar facilities on a 24-hour basis where required to achieve indicated results and to avoid possibility of damage.
C. Temporary Facility Changeover: Do not change over from using temporary security and protection facilities to permanent facilities until Substantial Completion.
D. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial
Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.
1. Materials and facilities that constitute temporary facilities are property of Contractor.
Owner reserves right to take possession of Project identification signs.
2. Remove temporary roads and paved areas not intended for or acceptable for integration into permanent construction. Where area is intended for landscape development, remove soil and aggregate fill that do not comply with requirements for fill or subsoil. Remove materials contaminated with road oil, asphalt and other petrochemical compounds, and other substances that might impair growth of plant materials or lawns. Repair or replace street paving, curbs, and sidewalks at temporary entrances, as required by authorities having jurisdiction.
3. At Substantial Completion, repair, renovate, and clean permanent facilities used during construction period. Comply with final cleaning requirements specified in
Section 017700 "Closeout Procedures."
END OF SECTION 015000
015723-TEMPORARY STORM WATER POLLUTION
CONTROL
SECTION 015723 - TEMPORARY STORM WATER POLLUTION CONTROL
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Temporary stormwater pollution controls.
1.3 STORMWATER POLLUTION PREVENTION PLAN
A. The Stormwater Pollution Prevention Plan (SWPPP) is part of the Contract Documents and is bound into this Project Manual.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Meet with Owner, Architect, and earthwork subcontractor.
2. Review requirements of the SWPPP, including permitting process, worker training, and inspection and maintenance requirements.
1.5 INFORMATIONAL SUBMITTALS
A. Stormwater Pollution Prevention Plan (SWPP): Within 15 days of date established for commencement of the Work, submit completed SWPPP.
B. EPA authorization under the EPA's "2017 Construction General Permit (CGP)."
C. Stormwater Pollution Prevention (SWPP) Training Log: For each individual performing Work under the SWPPP.
D. Inspection reports.
015723-TEMPORARY STORM WATER POLLUTION
CONTROL
1.6 QUALITY ASSURANCE
A. Stormwater Pollution Prevention Plan (SWPPP) Coordinator: Experienced individual or firm with a record of successful water pollution control management coordination of projects with similar requirements.
1. SWPPP Coordinator shall complete and finalize the SWPPP form.
2. SWPPP Coordinator shall be responsible for inspections and maintaining of all requirements of the SWPPP.
B. Installers: Trained as indicated in the SWPPP.
PART 2 - PRODUCTS
2.1 TEMPORARY STORMWATER POLLUTION CONTROLS
A. Provide temporary stormwater pollution controls as required by the SWPPP.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Comply with all best management practices, general requirements, performance requirements, reporting requirements, and all other requirements included in the SWPPP.
B. Locate stormwater pollution controls in accordance with the SWPPP.
C. Conduct construction as required to comply with the SWPPP and that minimize possible contamination or pollution or other undesirable effects.
1. Inspect, repair, and maintain SWPPP controls during construction.
a. Inspect all SWPPP controls not less than every seven days, and after each occurrence of a storm event, as outlined in the SWPPP.
D. Remove SWPPP controls at completion of construction and restore and stabilize areas disturbed during construction.
END OF SECTION 015723
024119-SELECTIVE DEMOLITION PAGE 1 OF 5
SECTION 024119 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Demolition and removal of selected portions of building or structure.
2. Salvage of existing items to be reused or recycled.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and dispose of them off-site unless indicated to be salvaged or reinstalled.
B. Remove and Salvage: Detach items from existing construction, in a manner to prevent damage, and deliver to Owner ready for reuse or store.
C. Remove and Reinstall: Detach items from existing construction, in a manner to prevent damage, prepare for reuse, and reinstall where indicated.
D. Existing to Remain: Leave existing items that are not to be removed and that are not otherwise indicated to be salvaged or reinstalled.
E. Dismantle: To remove by disassembling or detaching an item from a surface, using gentle methods and equipment to prevent damage to the item and surfaces; disposing of items unless indicated to be salvaged or reinstalled.
1.4 MATERIALS OWNERSHIP
A. Unless otherwise indicated, demolition waste becomes property of Contractor.
B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to
Owner that may be uncovered during demolition remain the property of Owner.
1. Carefully salvage in a manner to prevent damage and promptly return to Owner.
024119-SELECTIVE DEMOLITION PAGE 2 OF 5
1.5 QUALITY ASSURANCE
A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
1.6 FIELD CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not be disrupted.
B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.
1. Before selective demolition, Owner will remove the following items:
a. All school property not fixed to floors, walls and ceilings.
C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the
Work.
1. Hazardous materials will be removed by Owner before start of the Work.
2. If suspected hazardous materials are encountered, do not disturb; immediately notify
Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.
E. Hazardous Materials: Present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation is specified elsewhere in the Contract Documents.
2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.
3. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.
F. Storage or sale of removed items or materials on-site is not permitted.
G. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
1. Maintain fire-protection facilities in service during selective demolition operations.
1.7 COORDINATION
A. Arrange selective demolition schedule so as not to interfere with Owner's operations.
024119-SELECTIVE DEMOLITION PAGE 3 OF 5
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped before starting selective demolition operations.
B. Review Project Record Documents of existing construction or other existing condition and hazardous material information provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in Project Record Documents.
3.2 PROTECTION
A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.
2. Provide temporary weather protection, during interval between selective demolition of existing construction on exterior surfaces and new construction, to prevent water leakage and damage to structure and interior areas.
3. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.
4. Cover and protect furniture, furnishings, and equipment that have not been removed.
5. Comply with requirements for temporary enclosures, dust control, heating, and cooling specified in Section 015000 "Temporary Facilities and Controls."
B. Remove temporary barricades and protections where hazards no longer exist.
3.3 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:
024119-SELECTIVE DEMOLITION PAGE 4 OF 5
1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.
2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.
3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
5. Maintain fire watch during and for at least 1 hours after flame-cutting operations.
6. Maintain adequate ventilation when using cutting torches.
7. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.
8. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
9. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
10. Dispose of demolished items and materials promptly.
B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
C. Removed and Salvaged Items:
1. Clean salvaged items.
2. Pack or crate items after cleaning. Identify contents of containers.
3. Store items in a secure area until delivery to Owner.
4. Transport items to Owner's storage area designated by Owner.
5. Protect items from damage during transport and storage.
D. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.
024119-SELECTIVE DEMOLITION PAGE 5 OF 5
3.4 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.
1. Do not allow demolished materials to accumulate on-site.
2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
4. Comply with requirements specified in Section 017419 "Construction Waste
Management and Disposal."
B. Burning: Do not burn demolished materials.
3.5 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.6 SELECTIVE DEMOLITION SCHEDULE
A. Remove: SEE DEMOLITION NOTES ON PLAN.
B. Remove and Salvage: SEE DEMOLITION NOTES ON PLAN.
C. Remove and Reinstall: SEE DEMOLITION NOTES ON PLAN.
D. Existing to Remain: SEE DEMOLITION NOTES ON PLAN.
E. Dismantle: SEE DEMOLITION NOTES ON PLAN.
END OF SECTION 024119
057000-DECORATIVE METAL RAILINGS PAGE 1 OF 6
SECTION 057000 - DECORATIVE METAL RAILING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Decorative handrails.
1.3 COORDINATION
A. Coordinate installation of anchorages for decorative metal items. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product, including finishing materials.
1. Include plans, elevations, component details, and attachment details.
2. Indicate materials and profiles of each decorative metal member, fittings, joinery, finishes, fasteners, anchorages, and accessory items.
1.6 INFORMATIONAL SUBMITTALS
A. Qualification Data: For fabricator.
B. Welding certificates.
057000-DECORATIVE METAL RAILINGS PAGE 2 OF 6
1.7 QUALITY ASSURANCE
A. Fabricator Qualifications: A firm experienced in producing decorative metal similar to that indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.
B. Installer Qualifications: Fabricator of products.
C. Welding Qualifications: Qualify procedures and personnel according to the following:
1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."
2. AWS D1.2/D1.2M, "Structural Welding Code - Aluminum."
3. AWS D1.3/D1.3M, "Structural Welding Code - Sheet Steel."
4. AWS D1.6/D1.6M, "Structural Welding Code - Stainless Steel."
D. Mockups: Build mockups to verify selections made under Sample submittals, to demonstrate aesthetic effects, and to set quality standards for fabrication and installation.
1. Build mockups for the following types of decorative metal:
a. One post and 8” of handrail all connected.
2. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Store decorative metal in a well-ventilated area, away from uncured concrete and masonry, and protected from weather, moisture, soiling, abrasion, extreme temperatures, and humidity.
B. Deliver and store cast-metal products in wooden crates surrounded by enough packing material to ensure that products are not cracked or otherwise damaged.
1.9 FIELD CONDITIONS
A. Field Measurements: Verify actual locations of walls and other construction contiguous with decorative metal by field measurements before fabrication and indicate measurements on Shop
Drawings.
PART 2 - PRODUCTS
2.1 METALS, GENERAL
A. Metal Surfaces, General: Use materials with smooth, flat surfaces unless otherwise indicated.
Use materials without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.
057000-DECORATIVE METAL RAILINGS PAGE 3 OF 6
2.2 STEEL AND IRON
A. Tubing: ASTM A500/A500M (cold formed) or ASTM A513, Type 5 (mandrel drawn).
B. Bars: Hot-rolled, carbon steel complying with ASTM A29/A29M, Grade 1010.
C. Plates, Shapes, and Bars: ASTM A36/A36M.
D. Cast Iron: Either gray iron, ASTM A48/A48M, or malleable iron, ASTM A47/A47M unless otherwise indicated.
E. Steel Sheet, Cold Rolled: ASTM A1008/A1008M, either commercial steel or structural steel, exposed.
2.3 MISCELLANEOUS MATERIALS
A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.
1. For aluminum, provide type and alloy as recommended by producer of metal to be welded and as required for color match, strength, and compatibility in fabricated items.
B. Brazing Rods: For copper alloys, provide type and alloy as recommended by producer of metal to be brazed and as required for color match, strength, and compatibility in fabricated items.
C. Etching Cleaner for Galvanized Metal: Complying with MPI#25.
D. Galvanizing Repair Paint: High-zinc-dust-content paint complying with SSPC-Paint 20 and compatible with paints specified to be used over it.
2.4 FABRICATION, GENERAL
A. Assemble items in the shop to greatest extent possible to minimize field splicing and assembly.
1. Disassemble units only as necessary for shipping and handling limitations.
2. Clearly mark units for reassembly and coordinated installation.
3. Use connections that maintain structural value of joined pieces.
B. Make up wire-rope assemblies in the shop to field-measured dimensions with fittings machine swaged.
1. Minimize amount of turnbuckle take-up used for dimensional adjustment so maximum amount is available for tensioning wire ropes.
2. Tag wire-rope assemblies and fittings to identify installation locations and orientations for coordinated installation.
C. Form decorative metal to required shapes and sizes, true to line and level with true curves and accurate angles and surfaces. Finish exposed surfaces to smooth, sharp, well-defined lines and arris.
057000-DECORATIVE METAL RAILINGS PAGE 4 OF 6
D. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch (1 mm) unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.
E. Mill joints to a tight, hairline fit. Cope or miter corner joints. Fabricate connections that will be exposed to weather in a manner to exclude water.
F. Provide weep holes where water may accumulate. Locate weep holes in inconspicuous locations.
G. Provide necessary rebates, lugs, and brackets to assemble units and to attach to other work. Cut, reinforce, drill, and tap as needed to receive finish hardware, screws, and similar items unless otherwise indicated.
H. Comply with AWS for recommended practices in shop welding and brazing. Weld and braze behind finished surfaces without distorting or discoloring exposed side. Clean exposed welded and brazed joints of flux, and dress exposed and contact surfaces.
1. Where welding and brazing cannot be concealed behind finished surfaces, finish joints to comply with NOMMA's "Voluntary Joint Finish Standards" for Type 1 Welds: no evidence of a welded joint.
I. Provide castings that are sound and free of warp, cracks, blowholes, or other defects that impair strength or appearance. Grind, wire brush, sandblast, and buff castings to remove seams, gate marks, casting flash, and other casting marks.
2.5 FINISHES, GENERAL
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
2.6 STEEL AND IRON FINISHES
A. Galvanizing: Hot-dip galvanize products made from rolled, pressed, and forged steel shapes, castings, plates, bars, and strips indicated to be galvanized to comply with
ASTM A123/A123M.
1. Hot-dip galvanize steel and iron hardware indicated to be galvanized to comply with
ASTM A153/A153M.
2. Do not quench or apply post-galvanizing treatments that might interfere with paint adhesion.
3. Fill vent and drain holes that will be exposed in finished Work, unless indicated to remain as weep holes, by plugging with zinc solder and filing off smooth.
B. Preparing Galvanized Items for Shop Priming: After galvanizing, thoroughly clean decorative metal of grease, dirt, oil, flux, and other foreign matter, and treat with etching cleaner.
057000-DECORATIVE METAL RAILINGS PAGE 5 OF 6
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of decorative metal.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION, GENERAL
A. Provide anchorage devices and fasteners where needed to secure decorative metal to in-place construction.
B. Perform cutting, drilling, and fitting required to install decorative metal. Set products accurately in location, alignment, and elevation, measured from established lines and levels. Provide temporary bracing or anchors in formwork for items to be built into concrete, masonry, or similar construction.
C. Fit exposed connections accurately together to form tight, hairline joints or, where indicated, uniform reveals and spaces for sealants and joint fillers. Where cutting, welding, and grinding are required for proper shop fitting and jointing of decorative metal, restore finishes to eliminate evidence of such corrective work.
D. Do not cut or abrade finishes that cannot be completely restored in the field. Return items with such finishes to the shop for required alterations, followed by complete refinishing, or provide new units as required.
E. Install concealed gaskets, joint fillers, insulation, and flashings as work progresses.
F. Restore protective coverings that have been damaged during shipment or installation. Remove protective coverings only when there is no possibility of damage from other work yet to be performed at same location.
1. Retain protective coverings intact; remove coverings simultaneously from similarly finished items to preclude nonuniform oxidation and discoloration.
G. Field Welding: Comply with applicable AWS specification for procedures of manual shielded metal arc welding and requirements for welding and for finishing welded connections in
"Fabrication, General" Article. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations.
H. Field Brazing: Comply with requirements for brazing and for finishing brazed connections in
"Fabrication, General" Article. Braze connections that are not to be left as exposed joints but cannot be shop brazed because of shipping size limitations.
I. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.
057000-DECORATIVE METAL RAILINGS PAGE 6 OF 6
1. Coat concealed surfaces of aluminum that will be in contact with grout, concrete, masonry, wood, or dissimilar metals, with a heavy coat of bituminous paint.
3.3 CLEANING AND PROTECTION
A. Unless otherwise indicated, clean metals by washing thoroughly with clean water and soap, rinsing with clean water, and drying with soft cloths.
B. Clean copper alloys according to metal finisher's written instructions in a manner that leaves an undamaged and uniform finish matching approved Sample.
C. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing to comply with ASTM A780/A780M.
D. Restore finishes damaged during installation and construction period so no evidence remains of correction work. Return items that cannot be refinished in the field to the shop; make required alterations and refinish entire unit, or provide new units.
END OF SECTION 057000
096340-STONE FLOORING PAGE 1 OF 6
SECTION 096340 - STONE FLOORING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Dimension stone exterior flooring.
2. Dimension stone stair treads and risers.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.4 ACTION SUBMITTALS
A. Product Data: For each stone accessory, and manufactured product.
B. Shop Drawings: Include plans, sections, details, and attachments to other work.
1. Show locations and details of joints both within stone flooring and between stone flooring and other finish materials.
2. Show direction of veining, grain, or other directional patterns.
C. Samples for Initial Selection: For joint materials involving color selection.
D. Samples for Verification:
1. For each stone type indicated, in sets of Samples not less than 12 inches (300 mm) square.
2. For each color of grout mortar required.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For fabricator.
096340-STONE FLOORING PAGE 2 OF 6
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: For stone flooring to include in maintenance manuals. Include product data for stone-care products used or recommended by Installer and names, addresses, and telephone numbers of local sources for products.
1.7 QUALITY ASSURANCE
A. Fabricator Qualifications: Shop that employs skilled workers who custom fabricate stone flooring.
B. Installer Qualifications: Fabricator of stone flooring.
C. Installer Qualifications: A firm or individual experienced in installing stone flooring similar in material, design, and extent to that indicated for this Project, whose work has a record of successful in-service performance.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Store and handle stone and related materials to prevent deterioration or damage due to moisture, temperature changes, contaminants, corrosion, breaking, chipping, and other causes.
1. Lift stone with wide-belt slings; do not use wire rope or ropes that might cause staining.
Move stone, if required, using dollies with cushioned wood supports.
2. Store stone on wood A-frames or pallets with nonstaining, waterproof covers. Arrange to distribute weight evenly and to prevent damage to stone. Ventilate under covers to prevent condensation.
B. Mark stone units, on surface that is concealed after installation, with designations used on Shop
Drawings to identify individual stone units. Orient markings on vertical panels, so that they are right side up when units are installed.
C. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp.
1.9 FIELD CONDITIONS
A. Maintain air and material temperatures to comply with requirements of installation material manufacturers, but not less than 50 deg F (10 deg C) during installation and for seven days after completion.
B. Cold-Weather Requirements for Exterior Stone Flooring: Do not use frozen materials or materials mixed or coated with ice or frost. Do not build on frozen substrates. Remove and replace unit masonry damaged by frost or by freezing conditions. Comply with cold-weather construction requirements contained in ACI 530.1/ASCE 6/TMS 602.
C. Hot-Weather Requirements for Stone Flooring: Comply with hot-weather construction requirements contained in ACI 530.1/ASCE 6/TMS 602 and with the following:
096340-STONE FLOORING PAGE 3 OF 6
1. Maintain temperature of materials below 100 deg F (38 deg C).
2. Do not apply mortar to substrates with temperatures of 100 deg F (38 deg C) and above.
3. When the ambient temperature exceeds 90 deg F (32 deg C), fog spray installed stone flooring until damp at least three times a day until flooring is three days old.
PART 2 - PRODUCTS
2.1 BLUESTONE SELECT BLUE, THERMAL FINISH
A. Description: dimensional bluestone mimic
B. Sources: Subject to compliance with requirements, provide the following:
1. Bluestone Select Blue, thermal. From SiteOne Landscape Supply, Inc
2.2 MORTAR MATERIALS
A. Colored Portland Cement-Lime Mix: Packaged blend of portland cement, hydrated lime, and mortar pigments. Mix shall produce color indicated or, if not indicated, as selected from manufacturer's standard colors. Pigments shall not exceed 10 percent of portland cement by weight.
B. Water: Potable.
2.3 ACCESSORIES
A. Cleaner: Stone cleaner specifically formulated for stone types, finishes, and applications indicated, as recommended by stone producer and by sealer manufacturer. Do not use cleaning compounds containing acids, caustics, harsh fillers, or abrasives.
B. Floor Sealer: Colorless, slip- and stain-resistant sealer that does not affect color or physical properties of stone surfaces, as recommended by stone producer for application indicated.
2.4 FABRICATION OF STONE
A. Select stone for intended use to prevent fabricated units from containing cracks, seams, and starts that could impair structural integrity or function.
1. Repairs that are characteristic of the varieties specified are acceptable provided they do not impair structural integrity or function and are not aesthetically unpleasing, as judged by Architect.
B. Fabricate stone to comply with requirements indicated and with the following references:
1. For granite, comply with recommendations in NBGQA's "Specifications for Architectural
Granite."
2. For limestone, comply with recommendations in ILI's "Indiana Limestone Handbook."
096340-STONE FLOORING PAGE 4 OF 6
3. For marble, comply with recommendations in MIA's "Dimension Stone - Design
Manual VII."
4. For stone not otherwise indicated, comply with recommendations in MIA's "Dimension
Stone - Design Manual VII."
C. Pattern Arrangement: Fabricate and arrange stone units with veining and other natural markings to comply with the following requirements:
1. Cut stone from one block or contiguous, matched blocks in which natural markings occur.
2. Arrange four units adjoining center point of room in two-way book match, and arrange surrounding units in side-slip and end-slip pattern.
3. Number stone units and note numbers on Shop Drawings to designate installation location of each unit.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine surfaces to receive stone flooring and conditions under which stone flooring will be installed, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of stone flooring.
B. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of stone flooring.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Vacuum concrete substrates to remove dirt, dust, debris, and loose particles.
B. Remove substances from concrete substrates that could impair mortar bond, including curing and sealing compounds, form oil, and laitance.
C. Where indicated, prepare substrates to receive waterproofing by applying a reinforced mortar bed that complies with ANSI A108.1A and is sloped 1/4 inch per foot (1:50) toward drains.
D. Before setting stone, clean dirty or stained stone surfaces by removing soil, stains, and foreign materials. Clean stone by thoroughly scrubbing with fiber brushes and then drenching with clear water. Use only mild cleaning compounds that contain no caustic or harsh materials or abrasives.
3.3 INSTALLATION, GENERAL
A. Do necessary field cutting as stone is set. Cut lines straight and true, and finish field-cut edges to match shop-cut edges.
096340-STONE FLOORING PAGE 5 OF 6
1. Use power saws with diamond blades to cut stone.
B. Set stone to comply with requirements indicated.
C. Scribe and field cut stone as necessary to fit at obstructions. Produce neat joints of size specified or indicated.
D. Provide control and expansion joints of widths and at locations indicated. Keep control and expansion joints free of mortar, grout, and other rigid materials.
3.4 INSTALLATION TOLERANCES
A. Variation in Line: For positions shown in plan for edges of flooring, ramps, steps, changes in color or finish, and continuous joint lines, do not exceed 1/8 inch in 10 feet (3 mm in 3 m), 1/4 inch in 20 feet (6 mm in 6 m), or 3/8 inch (10 mm) maximum.
B. Variation in Joint Width: Do not vary from average joint width more than plus or minus 1/16 inch (1.5 mm) or one-fourth of nominal joint width, whichever is less.
C. Variation in Surface Plane: Do not exceed 1/8 inch in 10 feet (3 mm in 3 m), 1/4 inch in 20 feet
(6 mm in 6 m), or 3/8 inch (10 mm) maximum from level or slope indicated.
D. Variation in Plane between Adjacent Units (Lipping): Do not exceed 1/32-inch (0.8-mm) difference between planes of adjacent units.
3.5 INSTALLATION OF STONE BONDED TO CONCRETE
A. Saturate concrete with clean water several hours before placing setting bed. Remove surface water about one hour before placing setting bed.
B. Apply mortar-bed bond coat to damp concrete and broom to provide an even coating that completely covers the concrete. Do not exceed 1/16-inch (1.5-mm) thickness. Limit area of mortar-bed bond coat to avoid its drying out before placing setting bed.
1. Place reinforcing wire mesh over concrete, lapped at joints by at least one full mesh and supported so mesh becomes embedded in middle of mortar bed. Hold edges back from vertical surfaces about 1/2 inch (13 mm).
C. Apply mortar bed immediately after applying mortar-bed bond coat. Spread, tamp, and screed to uniform thickness at elevations required for setting stone to finished elevations indicated.
D. Mix and place only that amount of mortar bed that can be covered with stone before initial set.
Cut back, bevel edge, and discard material that has reached initial set before stone can be placed.
E. Place stone before initial set of mortar occurs. Immediately before placing stone on setting bed, apply uniform 1/16-inch- (1.5-mm-) thick bond coat to mortar bed or to back of each stone unit.
F. Tamp and beat stone with a wooden block or rubber mallet to obtain full contact with mortar bed and…