Attachment 5 - A04 40522418 Scope of Work.docx
DOCX document 33 KB Posted
- Attached to
- Unleaded and Blended Diesel for Yellowstone
- Solicitation number
- 140P1421Q0057
About this file
This document outlines the scope of work for a federal contract solicitation seeking unleaded and blended diesel fuel deliveries to Yellowstone National Park. The contract requires the delivery of various fuel types including unleaded gasoline, blended diesel fuels 1 and 2, red dye number two heating oil to park locations from June 2021 through May 2022. The contractor must be experienced in fuel delivery with all required licenses and permits and comply with environmental regulations. Fuel quantities listed are estimates only with no minimum purchase guaranteed. The contractor must provide references, allow for site visits, respond within four hours for emergencies and one day for non-emergencies, and ensure deliveries occur Monday through Friday between 7am and 5pm. Winter blended diesel is also required from September 2021 through May 2022 meeting cold weather specifications. Invoices are to be submitted electronically monthly.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1421Q0057_Amd_0001.pdf | ||
| Sol_140P1421Q0057.pdf | ||
| Attachment 1 - Heating Oil Tank Inventory 2-12-2019.xlsx | XLSX spreadsheet | |
| Attachment 2 - Fueling Station and Generator Inventory.xlsx | XLSX spreadsheet | |
| Attachment 3 - Road Opening-Closing Schedule.docx | DOCX document | |
| Attachment 4 - Fuel Station Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 5
SCOPE OF WORK
YELLOWSTONE NATIONAL PARK
UNLEADED, DIESEL AND BLENDED DIESEL DELIVERIES
SOLICITATION #140P1421Q0057
DESCRIPTION OF WORK:
· Yellowstone National Park requires fuel deliveries to above grade, below grade and truck to truck deliveries. The fuel storage tank is managed and maintained by YNP Facilities Management at various Park locations (see Attachment #4 for locations).
· The Vendor shall provide the following:
· Unleaded gasoline regular, generally 87 Octane
· Blended diesel 1 and 2
· Red dye number two heating oil
· Vehicle blend
Fuel Usage for Yellowstone National Park:
Fuel type and usage:
| DS-1 | DS-2 | Heating Oil | Unleaded | Year | ||
| 52,450-gal | 152,563-gal | 124,709-gal | 11,7161 gal | 2020 | ||
| 31,628-gal | 162,289-gal | 126,692-gal | 13,0773 | gal | 2019 | |
| 43,625-gal | 157,144-gal | 117,807-gal | 12,0497 | gal | 2018 | |
| 28,210-gal | 165,888-gal | 114,978-gal | 13,0307 | gal | 2017 |
· All deliveries performed under this contract shall be conducted in accordance with all applicable Federal and State laws, and environmental regulations.
· The fuel storage tanks shall be on an automatic fill scheduled program
· The term of the contract will be for one-year period, beginning on June 1, 2021.
· Quotes shall include fuel cost, and other costs associated with deliverables and shall be provided as indicated on the attached “Fuel Price Schedule.”
· It is the sole responsibility of the awarded Vendor to maintain all required licenses and permits as required by the Federal Government, States of Idaho, Montana and Wyoming, Local and County entities necessary to fulfill this contract agreement. All associated fees shall be the responsibility of the Vendor.
· Vendor shall provide quality unleaded and diesel fuel that meets the specification and requirement standards as required by the Federal, local, and State Regulations. The diesel blend-stock shall meet the part per million (PPM) sulfur requirements as specified in ASTM D6751.
· There is no guarantee that the quantities listed above will be purchased under this contract. The quantities indicated are informational only.
1. Prior Experience/References:
· Vendor shall be regularly engaged in the business of providing the products described herein. A minimum of 5 years’ experience is required.
· Vendor shall provide a minimum of three (3) customer references, for which Vendor has provided similar product and/or services as described herein.
· The National Park Service reserves the right to contact the references provided. The reference information shall include company names, email addresses, contact name, telephone numbers, type of product(s) provided and service dates from first to last delivery.
· Vendor shall employ qualified personnel/drivers that understand and exercise applicable safety standards.
· Vendor shall be capable of delivering and pumping fuel into both underground, above ground, truck to truck and directly into generator storage tanks.
2. Site Visit:
· Offerors are strongly encouraged to visit all proposed fuel sites to become familiar with; physical locations, access conditions and/or any other physical site conditions.
· Any failure by the offeror to acquaint themselves with the available information contained herein shall not relieve them of the responsibility to carry out all contract
3. Delivery Requirements:
· Vendor shall provide the Government with the most cost-effective, quality fuel available, while meeting the specifications and requirements described herein. Therefore, Vendors can quote branded or unbranded fuel, or both.
· The fuel storage tanks shall be on an automatic fill scheduled program.
· All items supplied shall comply with the current applicable occupational safety and health standards of the State in which it is delivered.
· Vendor shall use reasonable care to avoid damage or contamination of existing buildings, equipment, asphalt, soil or vegetation, at all delivery sites. If the Vendor causes damage or contamination, he shall replace the damaged items or repair the damage at no expense to the Government and to the satisfaction of the National Park Service Yellowstone.
· Vendor shall be responsible for clean-up and shall remove any debris generated during deliveries. The Vendor shall not discard chemicals, parts, equipment, or debris into any National Park Service refuse container.
· Vendor shall coordinate with the Facility Maintenance Supervisors or designated representative to clearly mark all work areas that might reasonably be expected to endanger the health and safety of the employees of the National Park Service. Vendor shall provide such signs, markers and barricades as required to identify all work areas and minimize inherent dangers.
· Delivery/Shipment shall be FOB (Freight on Board) Destination. The term FOB Destination shall mean delivered and un-loaded on-site at the designated address with title to the goods remaining with the awarded Vendor, until the product is delivered, accepted and all services are completed.
· Delivery Timeframe: Product shall be delivered within a four (4) hour response time during emergency situations, and one (1) business day during non-emergency periods excluding weekends and Federal holidays unless there is an emergency. Deliveries shall be made between the hours of 7:00 a.m. and 5:00 p.m. Mountain Time, Monday through Friday, excluding weekends and Federal holidays. Vendor shall contact the Facilities Management representative within thirty (30) minutes of initial call and provide estimated time for arrival at the facility.
· If delivery is not accomplished within the time frame specified above, the National Park Service reserves the right to procure the product(s) elsewhere and may bill the Vendor, for the variance in price if higher thank the contract amount.
· Vendor shall not be liable for any failure or delay in delivering the product due to causes beyond its reasonable control (excusable delays) including but not limited to Acts of God or any other force majeure event.
· Entrance / Exit Procedures: The Vendor's representative shall check in and out with Park Service staff at the site when providing delivery services.
· Upon completion of the job, Vendor shall provide the Contractor Officer and COR with a signed job ticket. The ticket shall include, but not be limited to the following information:
a. Company name;
b. Name of Service Technician; Name shall be printed and legible.
c. Date of service;
d. Fuel Level (Before Service Delivery)
e. Fuel Level (After Service Delivery)
f. Fuel Type
g. Percentage of the blended product, fuel grade, diesel, or renewable diesel (If applicable)
h. Amount of Fuel Delivered
i. Other services, products, goods, provided or delivered.
j. Meter Stamp of Fuel Delivered.
4. Hauling:
· All vehicles and equipment to be used shall be washed prior to start of hauling to the area. Particular attention shall be shown to the under carriage and any surface where soil containing exotic weed seeds may exist.
· Equipment found to be violating these standards will not be removed from the project.
· Total longitudinal dimension of any vehicle or combination of vehicles, including power unit or any load holding device shall not exceed 75’ combined length in a truck-tractor, semi-trailer, trailer combination. Maximum individual lengths: 48’maximum for semi-trailer and 40’ maximum for trailer. Trailer dimensions do not include connecting mechanism.
· This section applies to all motor vehicles with a gross vehicle weight rating of (10,001 pounds or more), operated on Park Service roads and equipped with engine compression brake devices. An engine compression brake device is any device that uses the engine and transmission to impede the forward motion of the motor vehicle by compression of the engine.
· The driver of a motor vehicle equipped with a device that uses the compression of the motor vehicle engine shall not use the device within the boundaries of National Park Service Yellowstone.
· All medium and heavy trucks shall comply with federal code 205 - transportation equipment noise emission controls, subpart B.
5. Invoicing:
· All information shall be legible for verification and payment of invoices:
· Invoice(s) for services shall be sent electronically to IPP (Invoice Payment Platform) upon the satisfactory completion and acceptance of all services called for under this contract and the supporting documentation has been provided once a month.
· No partial or advance payments shall be made.
· Invoices shall contain all the information deemed necessary for auditing and processing of payment, including but not limited to purchase order number, description of services, goods, and products provided, date service was provided, and total cost. Failure to provide this information will delay the processing of the invoice for payment.
· The National Park Service will not be responsible for any interest charges and/or late fees as a result of the delayed payment due to inadequate or incomplete information provided for authorization and payment of invoices
6. Winter Blend Requirements:
All Storage tank facility location in the Park require the delivery of diesel to transition from: (Number 2 diesel summer blend) to (Number 1 winter blend diesel):
| · Start date for winter blend: | September 1, 2021 |
| · End date for winter blend: | May 15, 2022 |
· The ASTM D 975 standard: The cloud point be no more than 6 °C higher than the 10th percentile minimum ambient temperature for the month the fuel will be used. The 10th percentile temperature corresponds to the minimum temperature that would be reached no more than 3 days out of 30 for the month (decile).
· The ASTM D 975 contains overview maps that show the expected tenth percentile temperature for every month for each state.
· Winter blend is blended 70% No .2 diesel with 30% No.1 diesel.
· Winterized diesel is the No.1 diesel - it has been treated with additives by the diesel Vendor.
· Truck to truck winter blend mix will be 70% No.2 diesel and 30% No. 1 diesel blend (gallons used with this blend (not to exceed 45,000 gallons)) for example, during Spring Plowing operations.
· DSS 30/70: 30% No. 1 clear diesel with 70% No. 2 diesel
7. Winterized Diesel Fuel:
· Winterized diesel fuel is a combination of #1 and #2 fuels. These fuels are used during the months when it becomes too cold to use #2 grade alone.
· The combination of both grades of fuel should contain enough energy components and lubricant properties to reduce the chance of the chemical mix gelling in colder temperatures. The temperature extremes for our area are as low as a negative 40-degrees Fahrenheit.
· Grant, East Entrance, and South Entrance locations require winter blend 12 month a year.