Attachment 5 1B20 Proofer Roll-In.docx

DOCX document 53 KB Posted

Attached to
Preventive Maintenance and Unscheduled Repairs of Miscellaneous Food Processing Equipment Commissary Group 46
Solicitation number
HQC00423Q0026
Issued by

About this file

This document is a technical specification for a roll-in proofer required by the Defense Commissary Agency. The specification requires a stainless steel interior and exterior proofer not exceeding 100 inches high, 39 inches wide, and 44 inches deep for a single door model or 100 inches high, 79 inches wide, and 44 inches deep for a double door model. The proofer must have one rack per door, magnetic door gaskets, insulation, interior bumpers, electronic controls for temperature and humidity, an interior light, reversible doors, be flush and level with the floor, and have water inlet and drain connections. Additional requirements include UL and NSF certification, a one-year parts and labor warranty, and the ability to be shipped split for assembly through a 36 inch opening with utility connections and immediate use. The related federal contract opportunity is for preventive maintenance and unscheduled repairs of miscellaneous food processing equipment for Commissary Group 46 under solicitation number HQC00423Q0026 issued by the Defense Commissary Agency.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INITIATED

11/29/17

CED

BAKERY

DEPARTMENT

Minimal Acceptable Standards

REVISION

xx/xx/xx

1B20
Proofer, roll-in
PAGE 3 of 3

Purpose of this Equipment: To provide optimum atmosphere (temperature and humidity) for proofer stage of production of bakery products.

1 Federal Supply Class: 7310

2 General Operating Specifications:

2.1 Dimensions:

2.1.1 1B20-A (1 door): Not to exceed 100 inches high, 39 inches wide, 44 inches deep.

2.1.2 1B20-B (2 doors): Not to exceed 100 inches high, 79 inches wide, 44 inches deep.

2.2 Salient Characteristics that shall be provided:

2.2.1 Stainless steel construction interior and exterior (aluminum top acceptable).

2.2.2 One rack per door only.

2.2.3 Magnetic door gaskets.

2.2.4 Insulated.

2.2.5 Interior bumpers.

2.2.6 Electronic controls for adjusting temperature and humidity.

2.2.7 Interior Light.

2.2.8 Reversible door.

2.2.9 Must be flush and level with floor.

2.2.10 Water inlet and drain connections.

2.3 Industry Standards / Requirement(s):

2.3.1 Industry Standards: Underwriters Laboratory (UL) listed and National Sanitation Foundation (NSF) certification, or approved equivalent. Conformité Européene

2.3.2 Warranty period shall be for (1) year from date of delivery against defective material and workmanship and shall include parts, service and labor.

2.4 Information Technology requirements: N / A

2.5 Color Requirement(s): N / A

3 Electrical Requirements:

3.1 _____Standard U.S.A electrical specifications: 208 V/ 60 HZ/ 3 PH and

120 V/ 60 HZ/ 1 PH

3.2 _____U.S.A. electrical specifications: 240 V/ 60 HZ/ 3 PH and

120 V/ 60 HZ/ 1 PH

3.3 _____U.S.A. electrical specifications: 480 V/ 60 HZ/ 3 PH and

120 V/ 60 HZ/ 1 PH

3.4 _____ Pacific Theater stores 208/230 V / 50 HZ / 1 PH (Applies to these stores only: Atsugi, Misawa, Sagami, Sagamihara, Yokosuka, Yokota, Camp Zama, and Kanto Plains CDC. All other stores are standard U.S.A. 60 cycle voltages.)

3.5 NOTE: the operating range for 120 volts is 110 to 120 volts; the operating range for 220 volts is 208 to 230 volts.

Standard Contractor Requirements:

3.6 Must be shipped split, ready to assemble, able to fit through a 36 inch opening, make utility connections, and use.

3.7 De-installation of old equipment is required.

3.8 This equipment requires disposal: Contractor to remove from commissary and dispose.

3.9 Installation required by an authorized service technician.

3.10 Operational testing is required.

3.11 Startup assistance required.

3.12 Provide familiarization training.

3.13 Information to be provided by the Contractor to the commissary at the time of delivery:

3.13.1 Point of Contact for Service

3.13.2 Installation and Operating Instructions

3.13.3 Parts List

3.14 Maintenance Sustainability Requirements: Continued parts support is required for the projected life cycle of the equipment plus 5 years.

Special Coordinating / Safety Instructions: De-installation of existing proofer and removal from premises for disposal is requested.

STORE ORDER REQUEST

STORE NAME: __________________________ DODAAC: ____________________

SINGLE OR DOUBLE: _________ QUANTITY: _______

1. DOOR: RIGHT HAND____________________, LEFT HAND________________

1. DRAIN LOCATED FRONT________________, REAR_______________________

1. ADDITIONAL RACKS: ___________________

1. CURRENT PROOFER TO BE REMOVED:

MANUFACTURER______________________ BARCODE____________________

SERIAL NUMBER_______________________ MFR YEAR___________________

FY16r.05 image1.jpeg image2.jpeg

File details come from the government source that posted it. Updated .