Attachment 4 Upgrade Elevators Phase II Project Drawings.pdf

PDF 14 MB Posted

Attached to
Z1DA--Upgrade Elevators Phase II
Solicitation number
36C24623B0032
Issued by

About this file

This document provides details on a federal contract opportunity to upgrade elevators at a Veterans Affairs facility. The solicitation number is 36C24623B0032 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The project title is Upgrade Elevators Phase II with project number 658-22-103. Attachment 4 to the solicitation provides the project drawings for the elevator upgrade work. No other details on products, services, pricing, or response dates are included in this document.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING CODES AND STANDARDS

STRUCT. STRUCTURAL

SUSP. SUSPENDED

WALL TYPE

WALL TYPE INDICATOR

EQUIPMENT INDICATOR

EQUIPMENT NUMBER

A

KEYNOTE INDICATOR

KEYNOTE NUMBER

WINDOW INDICATOR

ROOM NAME

ROOM NUMBER

ROOM NAME

SHEET NUMBER

DETAIL NUMBER

INTERIOR ELEVATIONS

COLUMN NUMBER

COLUMN INDICATOR

00000.001

DETAIL NUMBER

SHEET NUMBER

SECTION INDICATOR

A A100

* MULTIPLE DOORS PER ROOM

DOOR DESIGNATION

DOOR NUMBER

A A100

SHEET NUMBER

DETAIL NUMBER

EXTERIOR ELEVATION

ALT.16

ALTERNATE INDICATOR

ALTERNATE NUMBER

CEILING TYPE

CEILING HEIGHT

NOT ALL SYMBOLS ARE USED IN THIS DRAWING SET

CEILING INDICATOR

3 PHOTO DETAIL

NEW WORK NOTE

DEMOLITION NOTE

ROOM

NAME

A

WINDOW

DESIGNATION

4AE1002

PROJECT INFORMATION

RENOVATE ELEVATORS

SALEM VA MEDICAL CENTER

1970 ROANOKE BOULEVARD

SALEM, VA 24153-6404

VA PROJECT NUMBER: 658-18-103

SCOPE OF WORK

SAMPLING AND DETECTING FOR ASBESTOS CONTAINING MATERIAL (ACM) WITHIN THE

AREA AFFECTED BY THIS CONSTRUCTION PROJECT HAVE BEEN COMPLETED. ACM'S

WERE FOUND TO BE PRESENT WITHIN THE CONSTRUCTION LIMITS. SEE REPORT TITLED:

"LIMITED HAZARDOUS MATERIALS SURVEY SVAMC Elevator Upgrade Buildings 2, 2A and 11 H&P Project 20181871. PERFORMED BY MS. MARY BETH WRISTON. VIRGINIA ASBESTOS

INSPECTOR LICENSE NUMBER 3303 003466. CONDUCTED ON DECEMBER 6, 2018

THE CONTRACTOR SHALL BE REQUIRED TO PROPERLY ABATE AND DISPOSE OF THESE

MATERIALS IN ACCORDANCE WITH STATE AND FEDERAL ASBESTOS ABATEMENT

GUIDELINES PRIOR TO ANY INTERIOR WORK.

THE BUILDING SHALL BE OCCUPIED THROUGH OUT THE CONSTRUCTION PROCESS. THE

CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT OCCUPIED

AREAS DURING ABATEMENT AND DEMOLITION. PERFORM AIR SAMPLING WITHIN

BUILDING TO ENSURE OCCUPIED AREAS ARE SUITABLE FOR USE BY THE OWNER.

COORDINATE ANY DISRUPTIONS TO DAILY OPERATIONS WITH PROJECT ENGINEER.

THE OWNER HAS PERFORMED SURVEYS OF THE EFFECTED PORTIONS OF THE BUILDING

WHERE WORK ON THE ELEVATOR SYSTEMS WILL BE PERFORMED. THE SURVEYS WERE

CONDUCTING IN COMPLIANCE WITH THE REQUIREMENTS OF THE ENVIRONMENTAL

PROTECTION AGENCY (EPA) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR

POLLUTANTS (NESHAP) AS DETAILED IN 40 CFR, PART 61, SUBPART M REGULATIONS.

ASBESTOS INFO

BUILDING SUMMARY

OCCUPANCY CLASSIFICATION: INSTITUTIONAL

USE: HEALTHCARE / HOSPITAL

CONSTRUCTION TYPE:

FIRE RESISTANCE RATING FOR BUILDING ELEMENTS (HOURS)

BEARING WALL EXTERIOR - 2

BEARING WALL INTERIOR - 2

NON-BEARING WALL - 0

PRIMARY STRUCTURAL FRAME - 2

FLOOR CONSTRUCTION - 2

ROOF CONSTRUCTION - 1

THIS DESIGN EFFORT INCLUDES DESIGN /RENOVATION OF ELEVATORS IN BUILDINGS 1, 2, 2A, 4,5,10, 11, 76, AND 143. (THIS BID 2 AND 2A ONLY) THE ORDER OF PRIORITY SHALL BE: BUILDING 2A, BUILDING 143 (TO INCLUDE ALL PASSENGER ELEVATORS AND DUMBWAITERS), BUILDING 2, BUILDING 10, BUILDING 11, BUILDING 4, BUILDING 5, BUILDING 76, AND BUILDING 1. THE ELEVATORS HAVE BEEN NOTED AS PAST LIFE EXPECTANCY AND NEED OF REPLACEMENT AND UPGRADE. A COMPLETE DESIGN PACKAGE SHALL

PROVIDE FULLY FUNCTIONAL ELEVATORS IN RESPECTIVE BUILDINGS TO ENSURE THE MEDICAL

CENTER REMAINS CAPABLE OF PROVIDING SAFE, HIGH QUALITY CARE TO OUR VETERAN POPULATION.

INFECTIOUS CONTROL NOTES

INFECTIOUS CONTROL PROCEDURES

1. CONTRACTOR SHALL PROVIDE EVERYTHING NEEDED FOR INFECTIOUS

CONTAINMENT/CONTROL SYSTEM. SOME ITEMS MAY INCLUDE, BUT NOT LIMITED TO;

CONSTRUCTION ZONE SIGNS, HEPA FILTERS, AIR SCRUBBERS, ETC. CONTACT RESIDENT

ENGINEER, FACILITY INFECTIOUS CONTROL RISKS ASSESSMENT TEAM (ICRA) FOR FULL

PROCEDURE REQUIREMENTS.

2. IT IS RECOMMENDED THAT THE CONTRACTOR UTILIZES MOVEABLE CONTAINMENT SYSTEM,

CONSTRUCTED OF A MINIMUM 6ML POLY OR PREFABRICATED ZIP WALL THAT CAN BE SEALED

TO WORK AREAS. THE INTEGRITY OF THE BARRIER WALLS MUST ASSURE A COMPLETE SEAL

OF THE CONSTRUCTION AREA FROM ADJACENT AREAS.

3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT CONTAINMENT/CONTROL

SYSTEM PLAN TO COR FOR APPROVAL, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT

TO THE VA RESIDENT ENGINEER AND FACILITY ICRA TEAM FOR REVIEW FOR COMPLIANCE

WITH CONTRACT REQUIREMENTS. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION SHALL

BE EDUCATED AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE

MEDICAL CENTER AND SHALL FOLLOW INFECTION CONTROL PROCEDURES.

4. IN EACH CONSTRUCTION AREA, THE CONTRACTOR SHALL UTILIZE A 120V HEPA FILTER

EQUIPPED AIR SCRUBBER MACHINE.

5. DO NOT REMOVE CONSTRUCTION BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT

IS SIGNED OFF BY COR AND VA'S INFECTION CONTROL DEPARTMENT.

6. PROVIDE DUST “STICKY” MAT AT ENTRANCE/EXIT OF CONSTRUCTION AREA AND REPLACE OR

CLEAN WHEN NO LONGER EFFECTIVE.

7. ALL FURNITURE AND EQUIPMENT SHALL BE PROTECTED DURING DEMOLITION AND

CONSTRUCTION.

MEDICAL WASTE

1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE,

INCLUDING SHARP CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR TO THE

START OF THE PROJECT.

2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF

IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOURAGED.

ENVIRONMENTAL CONTROL

1. ISOLATE HVAC SYSTEM IN AREA WERE WORK IS TO BE DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR

SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE

ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS

INCLUDING (EFFECTIVE FOR POLLEN, MOLD SPORES

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Corporate Office:

766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location Sheet of

FINAL SUBMISSION

V et er an s A ffa irsApproved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

1/

/2

9:

:2

A

M

Revisions: Date:

UPGRADE ELEVATORS

BUILDING 2 & 2A

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

NOT TO SCALE

2A 2

LEGENDS, SYMBOLS

AND ABBREVIATIONS

GI002

SDRD

(I-2)

TYPE II (222) PER NPFA 220 TABLE 4.1.1 (FULLY SPRINKLED)

DEFINITIONS:

CUTTING: REMOVAL OF IN-PLACE CONSTRUCTION NECESSARY TO PERMIT INSTALLATION

OR PERFORMANCE OF OTHER WORK.

PATCHING: FITTING AND REPAIR WORK REQUIRED TO RESTORE SURFACES TO ORIGINAL

CONDITIONS AFTER INSTALLATION OF OTHER WORK.

REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF

THEM OFF-SITE, UNLESS INDICATED TO BE SALVAGED OR REMOVED AND REINSTALLED.

SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO

OWNER READY FOR REUSE.

REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE

THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.

EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE

REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND

SALVAGED, OR REMOVED AND REINSTALLED.

GENERAL NOTES:

1. DEPICTION OF EXISTING CONDITIONS BASED ON ORIGINAL CONSTRUCTION

DOCUMENTS AND LIMITED FIELD OBSERVATIONS. EXISTING ELEMENTS AND

CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT

OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE DEMOLITION WORK IS

COMPLETE, REPORT ANY CONFLICTS TO COR/RE.

2. VAMC EQUIPMENT SUPPLIER TO REMOVE EXISTING UNMOUNTED AND MOUNTED

EQUIPMENT PRIOR TO CONSTRUCTION. ONCE OWNER & EQUIPMENT SUPPLIER HAS

REMOVED EQUIPMENT, PHOTOGRAPHICALLY DOCUMENT ENTIRE AREA OF NEW WORK.

TAKE NOTE OF ANY DAMAGED SURFACES OR ELEMENTS. PREPARE WRITTEN AND

PHOTOGRAPHIC REPORT OF SURVEY AND SUBMIT TO OWNER AND DESIGNER.

3. PROTECT ALL EXISTING FINISHES AND ELEMENTS TO REMAIN. REPAIR OR REPLACE

DAMAGED SURFACES TO MATCH ADJACENT FINISHES.

1. PATIENT/STAFF CIRCULATION SHALL BE COORDINATED WITH THE VA. PROVIDE TEMPORARY BARRIERS

TO ENSURE THE SAFE PASSAGE OF PEOPLE AROUND THE CONSTRUCTION AREA. CONDUCT

OPERATIONS TO PREVENT DAMAGE OF FALLING DEBRIS OR OTHER CAUSE TO ADJACENT SPACES.

2. DO NOT CLOSE OR OBSTRUCT CORRIDOR OR OCCUPIED SPACES WITHOUT PERMISSION FROM COR, PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC.

3. UTILITY OUTAGE SHALL BE DETERMINED BY CONTRACTOR AND COORDINATED WITH THE VA AT LEAST

TWO WEEKS IN ADVANCE.

4. CONSTRUCTION PERIOD TESTING REQUIREMENTS AS PER VA STANDARD CRITERIA.

5. INSPECTION REQUIREMENTS AS PER VA CRITERIA.

6. STAGGING/STORAGE AREAS AND CONSTRUCTION ROUTES FOR DELIVERY AND REMOVAL OF

MATERIALS SHALL BE COORDINATED AND APPROVED BY THE COR.

7. PROMPTLY REPAIR DAMAGE CAUSED TO ALL AREAS BY DEMOLITION/CONSTRUCTION OPERATIONS AT

NO COST TO THE VA.

8. MAINTAIN EXITING UTILITIES; KEEP IN SERVICE AND PROTECT AGAINST DAMAGE DURING DEMOLITION

AND CONSTRUCTION OPERATIONS.

9. DO NOT INTERRUPT EXISTING UTILITY SERVICE TO OCCUPIED SPACES EXCEPT WHEN AUTHORIZED BY

COR.

10.CONTRACTOR SHALL PROVIDE CONSTRUCTION ZONE SIGNS, NEGATIVE PRESSURE ZONE WITH

HEPA FILTERS, AIR SCRUBBERS STICKY MATS, DUST BARRIER; SEAL AIR OUTLETS, SEAL DOORS

BETWEEN CONSTRUCTION ZONE AND HOSPITAL. CONTRACTOR SHALL CONTACT COR FOR A

COMPLETE LIST OF INFECTION CONTROL PROCEDURES.

11.PROVIDE TEMPORARY ENCLOSURES AND OTHER SUITABLE METHODS AS NECESSARY TO LIMIT THE AMOUNT OF DUST AND DIRT RISING AND SCATTERING IN THE AIR TO THE LOWEST LEVELS OF AIR POLLUTION PRACTICAL FOR THE CONDITION OF WORK. WRAP EITHER DUCT OR OPENINGS OR OUTLET

WITH BLUE CELLOPHANE TO PREVENT DUST FROM ENTERING. COMPLY WITH GOVERNMENT

REGULATIONS.

12.CONTRACTOR SHALL PROVIDE NON-DESTRUCTIVE IMAGING AT ALL REQUIRED PENETRATIONS AT

EXISTING FLOORS AND ROOFS.

CLEANING

1. THE CONSTRUCTION ZONE AND ADJACENT AREAS SHALL BE MAINTAINED IN A CLEAN AND

SANITARY MANNER BY THE CONTRACTORS AND SHALL BE SWEPT AND MOPPED DAILY OR

MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION.

2. ALL EQUIPMENT, TOOLS, MATERIAL, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL

BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WIPE DOWN. USING HEPA

VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.

ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL CENTER SHALL BE

VACUUMED AND WET MOPED AT THE END OF EACH WORKDAY.

3. ALL DEBRIS SHALL BE REMOVED AS IT IS GENERALIZED DURING LOW TRAFFIC HOURS OR

AFTER HOURS IN A CLEAN, COVERED, SEALED CART; APPROVED BY THE COR. NO DEBRIS

SHALL BE HAULED THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR

AND THE MEDICAL CENTER. WHEN, APPROVED, DEBRIS SHALL BE HAULED IN ENCLOSED DUST

PROOF, TIGHTLY FITTED CONTAINERS, USING SPECIFIC TRAFFIC PATTERNS DAILY. PROJECT

SUPERINTENDENT SHALL OVERSEE THIS AFTER APPROVAL FROM RESIDENT ENGINEER.

1. CLOTHING SHALL BE FREE FROM DUST AND DEBRIS PRIOR TO EXITING THE CONSTRUCTION

ZONE.

2. PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELD, GLOVES AND N95

RESPIRATORS SHALL BE UTILIZED AS APPROPRIATE.

3. ALL CONSTRUCTION PERSONNEL ENTERING STERILE/INVASIVE PROCEDURE AREAS, SHALL

WEAR A DISPOSABLE JUMPSUIT, HEAD COVERED AND SHOE COVERINGS WHICH MUST BE

REMOVED PRIOR TO EXITING THE WORK AREA. CONTACT FOR SPECIFIC INSTRUCTIONS.

PROJECT COMPLETION

1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

3. WET MOP WORK AREA WITH DISINFECTANT.

4. REMOVE ISOLATION OF HVAC SYSTEMS IN AREAS WHERE WORK IS BEING PERFORMED.

5. WIPE CASEWORK AND HORIZONTAL AND VERTICAL SURFACES AT COMPLETION OF PROJECT.

SUBMITTALS

1. CONTRACTOR IS TO REVIEW INFECTIOUS CONTROL PROCEDURES PROVIDED BY THE VA'S

INFECTION CONTROL DEPARTMENT, INCLUDING LOCATION AND DETAILS OF BARRIERS PRIOR

TO START OF PROJECT.

2. CONTRACTOR SHALL SUBMIT PRODUCT DATA FOR REVIEW.

PRODUCTS AND MATERIALS

1. CONSTRUCTION BARRIERS SHALL CONSIST OF 6 MILL. THICK FIRE RETARDANT PLASTIC

SHEETS, OR PREFABRICATED ZIP WALLS WITH 120V HEPA FILTER EQUIPPED AIR SCRUBBER.

2. DISINFECTANT AS APPROVED BY VA HOSPITAL.

1. DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE COORDINATED WITH THE VA (IN

CONJUNCTION WITH ANY NECESSARY INTERIM LIFE SAFETY MEASURES) FOR THE PROJECT.

2. ALL EGRESS PATHWAYS SHALL BE FREE OF DEBRIS.

3. UNAUTHORIZED PERSONNEL SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA.

4. ONLY DESIGNATED ELEVATORS SHALL BE USED FOR CONSTRUCTION DURING SCHEDULED

TIMES.

5. WHEN USING DEMOLITION CHUTES, CHUTE OPENINGS SHALL BE SEALED WHEN NOT IN USE.

THE CHUTE AND DAMPER SHALL BE SPRAYED WITH WATER, AS NECESSARY, TO MAINTAIN

DUST CONTROL.

6. ANY CEILING ACCESS PANELS OPENED FOR INVESTIGATION BEYOND SEALED AREAS SHALL BE

CLOSED IMMEDIATELY WHEN UNATTENDED.

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Corporate Office:

766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location Sheet of

FINAL SUBMISSION

V et er an s A ffa irsApproved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

1/

/2

9:

:2

A

M

Revisions: Date:

UPGRADE ELEVATORS

BUILDING 2 & 2A

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

NOT TO SCALE

2A 2

GENERAL NOTES

GI003

SDRD

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Corporate Office:

766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location Sheet of

FINAL SUBMISSION

V et er an s A ffa irsApproved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

1/

/2

9:

:2

A

M

Revisions: Date:

UPGRADE ELEVATORS

BUILDING 2 & 2A

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

NOT TO SCALE

2A 2

PHASING PLAN

PH101

SD

RD

BLDG 2: REPLACING 2 HYDRAULIC ELEVATORS

BLDGS 2 & 2A: NORTH BIRD'S EYE VIEW

BLDG 11: NORTH BIRD'S EYE VIEW

BLDG 2A: REPLACING 2 TRACTION ELEVATORS

BLDGS 2 & 2A: WEST BIRD'S EYE VIEW

CAMPUS MAP

v.a. medical center, salem, va no scale

FF

EE

DD

AA

BB

T

NN

Z

U Y

W

X

V

Q

P

O

N

LL

OO

PP

KK

K

JJ

J

HH

M

R

S

GG

F

E

A

G

C

D

B

CC

To City of Salem

To City of Roanoke

Navy Way

Patriot Blvd.

Ai r F or ce

C irc le

Garden Sq.

Marine Corps Drive

Roanoke Blvd.

Patriot Circle

Ar my

R oa d

Co as t G ua rd La ne

MM

Patriot Circle

Patriot Circle

Patriot Circle

BUILDING FUNCTIONS

1 DIRECTOR, POLICE

2 EXTENDED CARE, NUCLEAR MED, DENTAL, K.T., P.T., O.T.

2A ADMISSIONS, EMER. RM., PATHOLOGY, RADIOLOGY IMAGING

4 MAIN KITCHEN, CANTEEN, MEDICAL MEDIA

5 AUDITORIUM

7 LONG TERM EXTENDED PSYCHIATRIC, SOCIAL WORK

8 SUBSTANCE ABUSE, ACUTE PSYCHIATRIC

9 SUBSTANCE ABUSE, P.T.S.D.

10 CENTRALIZED FEE

17 LEASED SPACE

18 OFFICES

29 SWIMMING POOL

34 STORAGE

77 CREDIT UNION, EDUCATION ,

ENVIRONMENTAL MGMT,

STUDENT QUARTERS

80 GREENHOUSE (WEST)

T85 SHEET METAL SHOP

121 GREENHOUSE

130 GRANDSTAND

131 ELECTRICAL SUBSTATION

133 GOLF CLUBHOUSE

138 EMERGENCY GENERATOR BLDG

139 EMERGENCY GENERATOR BLDG

140 EMERGENCY GENERATOR BLDG

141 EMERGENCY GENERATOR BLDG

142 EMERGENCY GENERATOR BLDG

143 MAIN HOSPITAL, OUTPATIENT,

INPATIENT, CLINICAL NURSING UNIT.

144 CHAPEL

145 PLUMBING SHOP

146 CHAPEL OFFICES

148 MOTOR VEHICLE SHOP

150 SMOKING SHELTER

151 SMOKING SHELTER

11 MENTAL HYGIENE, DAY TREATMENT,

PSYCHIATRY/PSYCHOLOGY ADMIN.

12 HOPTEL, PROSTHETICS, AFGE, EMP. HEALTH, C & P

13 BOILER/ CHILLED WATER PLANT

14 LAUNDRY

15 SOILED LINEN, VET. INDUST., ENG./MED. REC. STOR.

16 VISN 6 OFFICES, ADR, AC SHOP, LANDSCAPE

19 OFFICES

23 SEWAGE PUMP HOUSE

25 DUPLEX HOUSE (LEASE)

26 6-CAR GARAGE

27 5-CAR GARAGE

28 5-CAR GARAGE

35 IMPLEMENT SHED

46 FLAGPOLE

72 STORAGE

74 FMS, LOGISTICS, SAFETY, HRM, IRS

75 WHEELCHAIR CLINIC, REGION OFFICE STO, FISCAL, FITNESS CNTR

76 RESEARCH, NATIONAL AFGE, CARPENTRY & ELECTRIC SHOPS,

TRANSITIONAL LVG

153 EMERGENCY GENERATOR BLDG

154 EMERGENCY GENERATOR BLDG

155 PUMP HOUSE

156 EMERGENCY GENERATOR BLDG

157 EMERGENCY GENERATOR BLDG

158 SMOKING SHELTER

159 SMOKING SHELTER

160 OPEN FRONT SMOKING SHELTER

161 SMOKING SHELTER

162 ROANOKE CITY WATER MAIN BLDG

163 SALEM WATER MAIN BLDG

164 GREENHOUSE

165 OPEN SMOKING SHELTER

168 CENTER FOR TRAUMATIC STRESS

170 ACUTE INPATIENT PSYCHIATRIC UNIT

171 POLICE SUB STATION

172 WVWA PUMP HOUSE

173 CITY OF SALEM PUMP HOUSE

174 WATER TOWER

175 BOILER PLANT

176 SALT SHED

152 SMOKING SHELTER

Building

Parking Lot

Connecting Corridor

Underground Service Tunnel

2A

H

L

"EE"

"1"

CAMPUS MAP SCOPE OF WORK

AE100

DR

RD

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Corporate Office:

766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location Sheet of

FINAL SUBMISSION

V et er an s A ffa irsApproved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

1/

/2

9:

:2

A

M

Revisions: Date:

UPGRADE ELEVATORS

BUILDING 2 & 2A

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

6 24

7 24

8 24

9 24

10 24

B

3"

B

BB B

GENERAL NOTES

MITERED ELBOWS.

E. INSTALL TURNING VANES IN ALL 45 AND 90 DEGREE

SPIN-IN COLLAR WITH SCOOP AND DAMPER.

TO RECTANGULAR OR SQUARE DUCT WITH A

D. FLEXIBLE OR ROUND DUCT SHALL BE CONNECTED

DIMENSIONS.

C. DUCT SIZES SHOWN ARE ACTUAL INSIDE

SENSORS 48 INCHES ABOVE FINISHED FLOOR.

SPACE THERMOSTATS, HUMIDISTATS AND

B. UNLESS OTHERWISE INDICATED, INSTALL ALL

PRIOR TO INSTALLATION.

A. COORDINATE ALL WORK WITH OTHER TRADES

M001SNS SNS

DESIGN CONDITIONS

UNIT AREA

INSIDE OUTSIDE

HEAT. COOLING HEAT. COOLING

DB F WB F DB F DB F WB F

72.7 92.2 16.8 62.5 75.0 70.0 BUILDING 2

DB F

BUILDING 2A 70.0 75.0 62.5 16.8 92.2 72.7

AHU-2

AHU-2A1 TO AHU-2A3

LEGEND & ABBREVIATIONS

ABBREVIATION SYMBOL DESCRIPTION ABBREVIATION DESCRIPTION

ABOVE FINISHED FLOOR AFF

A/C ABOVE CEILING

AIR HANDLING UNIT AHU

AP

BTUH

ACCESS PANEL

BRITISH THERMAL UNITS PER HOUR

CUBIC FEET PER MINUTE CFM

CLG CEILING

DOWN DN

DWGS DRAWINGS

EXHAUST AIR EA

EF EXHAUST FAN

ELECTRIC ELEC

EX. EXISTING

GALLONS PER MINUTE GPM

HVAC HEATING VENTILATING & AIR CONDITIONING

MAXIMUM MAX

MIN MINIMUM

TRANSFER GRILLE TG

TYP TYPICAL

VARIABLE AIR VOLUME UNIT VAV

CTE CONNECT TO EXISTING

HWS

HWR

MBV

GV

CV

RL/RS/RHG

D

MOV

FD

MLD/MD

HOT WATER SUPPLY

HOT WATER RETURN

METERED BALANCING VALVE

GATE VALVE

CHECK VALVE

CONDENSATE DRAIN LINE

MOTOR OPERATED (2-WAY) VALVE

STRAINER

UNION

FIRE DAMPER

SINGLE LINE DUCT

FLEXIBLE DUCT

DUCT TRANSITION

ROUND

PIPE UP

PIPE OR DUCT DOWN

DIRECTION OF FLOW

MANUAL DAMPER

ROUND DUCT

FLAT OVAL WIDTH X DEPTH

RECTANGULAR DUCT WIDTH X DEPTH

MISSING)

RECTANGULAR ELBOWS WITH VANES EVEN IF SYMBOL IS

VANED ELBOW ( PROVIDE ALL SQUARE OR

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

HWS

HWR

OR

WXD"

WXD

S-15

CR-15 LOW PRESSURE STEAM CONDENSATE RETURN

S-15

DUCT MOUNTED SMOKE DETECTOR

SKD SKD

ETR EXISTING TO REMAIN

UH

HP HEAT PUMP

ROOF HOOD

UNIT HEATER

RH

CR-15

D

REFRIGERANT LINE SET RL/RS/RHG

CO CLEAN OUT

LOW PRESSURE STEAM (15 PSIG AND BELOW)

2A

LEGEND, ABBREVIATIONS - BLDG 2,

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of

FINAL SUBMISSION

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

Revisions: Date:

BUILDING 2 & 2A

UPGRADE ELEVATORS

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

KEY PLAN

NOT TO SCALE

ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR2A 2

FP

KEEPING

HOUSE

CB-1A

KEEPING

HOUSE

RM

ELEVATOR

ELECTRICAL

DN

FP

SOILED UNIT

344A

ELEVATORELEVATOR

LINEN

CLEAN

LOBBY

C3-1

STAIR

LOUNGE

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of

FINAL SUBMISSION

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

Revisions: Date:

BUILDING 2 & 2A

UPGRADE ELEVATORS

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

KEY PLAN

NOT TO SCALE

ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR2A 2

PLAN - BLDGS 2, 2A

ENLARGED HAVC DEMOLITION

SNS SNS MD101

1 ENLARGED HVAC DEMOLITION PLAN - BASEMENT - BLDG 2

MD101 MD101

ENLARGED HVAC DEMOLITION PLAN - PENTHOUSE - BLDG 2A2

DEMOLITION PLAN NOTESDEMOLITION PLAN NOTES

REMAIN. SHOWN FOR COORDINATION.

5. EXISTING EQUIPMENT LOCATED AT GRADE TO

DRAWINGS FOR MORE INFORMATION.

4. ELEVATOR EQUIPMENT. REFER TO EQUIPMENT

WALL PENETRATION.

REMOVE GRAVITY BACKDRAFT, CAP, AND SEAL

3. EXISTING COMBINATION LOUVER TO REMAIN.

ROOF PENETRATION AND MAKE WEATHER TIGHT.

BE REMOVED AND DISPOSED OF PROPERLY. CAP

2. EXISTING EXHAUST FAN LOCATED ON ROOF, SHALL

FOR MORE INFORMATION.

OPENING TO BE FILLED. REFER TO ARCHITECTURAL

PROPERLY DISPOSED OF. EXISTING WINDOW TO

1. EXISTING EXHAUST FAN SHALL BE REMOVED AND

EXISTING TO BE REMOVED

EXISTING TO REMAIN

5 5

5 5

SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0"

TUNNEL

FP

KEEPING

HOUSE

CB-1A

KEEPING

HOUSE

RM

ELEVATOR

ELECTRICAL

CORRIDOR

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of

FINAL SUBMISSION

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

Revisions: Date:

BUILDING 2 & 2A

UPGRADE ELEVATORS

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

KEY PLAN

NOT TO SCALE

ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR2A 2

DN

FP

SOILED UNIT

344A

ELEVATORELEVATOR

LINEN

CLEAN

LOBBY

C3-1

STAIR

LOUNGE

SNS SNS MH101

1 ENLARGED HVAC PLAN - BASEMENT - BLDG 2

MH101

MH101

ENLARGED HVAC PLAN - PENTHOUSE - BLDG 2A2

HP

AHU

AHU

2A2

HP

2A2

PLAN NOTES

RL/RS/RHG

D

R L /R

S /R

H G

D

AHU

2A1

HP

2A1

R L /R

S /R

H G

D

AHU

2A3

HP

2A3

R L /R

S /R

H G

D

VERIFY DRAIN LOCATION.

LOCATED IN AIR WELL. FIELD

ROUTE CONDENSATE TO DRAIN

ROUTE DOWN TO ROOF BELOW.

5 5 5

3 3

2 2

SCALE: 1/4" = 1'-0"

SCALE: 1/4" = 1'-0"

EQUIPMENT RAILS.

5. UNIT LOCATED ON ROOF. INSTALL UNIT ON

2/MH401 FOR EQUIPMENT PAD DETAIL.

4. INSTALL UNIT ON EQUIPMENT PAD. REFER TO

RECOMMENDATIONS.

IN ACCORDANCE WITH MANUFACTURER'S

OUTDOOR UNIT. SIZE AND INSTALL REFRIGERANT LINE

3. ROUTE REFRIGERANT LINE OUT ASSOCIATED

UNIT. ROUTE TO EXTERIOR AS SHOWN.

2. CONDENSATE DRAIN FULL SIZE OF CONNECTION AT

MANUFACTURER'S RECOMMENDATIONS.

1. MOUNT UNIT ON WALL IN ACCORDANCE WITH

EXISTING TO REMAIN

NEW WORK

2A

ENLARGED HVAC PLAN - BLDGS 2,

2.34m

2D

DX COIL

RA

48" [1200mm] AFF.

ROOM TEMPERATURE SENSOR, WALL MOUNTED

OR BEND OVER END 5D

WELD HEAD TO PLATE

FLOOR

[75mm] MIN.)

PIPE SLEEVE (5D, 3"

BOLT (TYP)

ANCHOR

CONCRETE BASE

EQUIPMENT BASE PLATE

DOWEL BASE TO FLOOR

O.C. EACH WAY IN THE BASE &

PROVIDE #3 BARS 12" [300mm]

BOLT NUT & WASHER

TYPICAL ANCHOR

SYMBOL

TYPE

TOTAL CFM

LOCATION

REMARKS

CHARACTERISTICS

ELECTRICAL

208V 1PH

BLDG 2

95.0

62.5

75.0

36,000

WALL MOUNT

18.8

70.0

92.5

PRESSURE, IN. H 0

EXTERNAL STATIC

BTU/HR

TOTAL CAPACITY,

30,350 CAPACITY, BTU/HR

SENSIBLE

17.0

2.5

22,400

AIR, CFM

MINIMUM OUTSIDE

BTU/HR

TOTAL CAPACITY

MINIMUM COP

H E

A T I

N G

C O

O L I

N G

DUCTLESS HEAT PUMP

AHU-2 HP-2

MINIMUM SUCTION

COND. AMBIENT

AMBIENT AIR

SEER

MINIMUM

MH401SNS SNS

208V 1PH

BLDG 2A

95.0

62.5

75.0

36,000

WALL MOUNT

18.8

70.0

30,350

17.0

2.5

22,400

AHU-2A1 HP-2A1

208V 1PH

BLDG 2A

95.0

62.5

75.0

36,000

WALL MOUNT

18.8

70.0

30,350

17.0

2.5

22,400

AHU-2A2 HP-2A2

FAN

T-1

TT

PC

3. ALARM IF SPACE TEMPERATURE OUTSIDE OF RANGES.

2. MODULATE CONDENSER TO MAINTAIN SPACE SET POINT AND FAN SHALL CYCLE W/TEMPERATURE.

1. FAN COIL UNIT SHALL OPERATE CONTINUOUSLY

DUCTLESS SPLIT SYSTEM SEQUENCE OF OPERATION (HEAT PUMP)

RL/RS/RHG

FILTER

1 CONTROL DIAGRAM AND SEQUENCE

DUCTLESS SPLIT SYSTEM HEAT PUMP

SCALE: NTSMH401

92.5 92.5

1 1 1

THERMOSTAT.

BAFFLE FOR LOW AMBIENT CONTROL, AND PROGRAMMBALE WIRED

EQUAL. UNIT SHALL HAVE A MCA/MCB OF 25A/30A. PROVIDE UNIT WITH WIND

BASIS OF DESIGN IS MITSUBISHI PKA/PUZ. DAIKIN AND LG ARE APPROVED

208V 1PH

BLDG 2A

95.0

62.5

75.0

36,000

WALL MOUNT

18.8

70.0

30,350

17.0

2.5

22,400

AHU-2A3 HP-2A3

92.5

SCALE: NTSMH401

L

W

A

A

D

D m m

5D

EQUIPMENT BASE PLATE.

GREATER THAN THE

SHALL BE 6" [150mm]

L & W DIMENSIONS

NOTE:

m m

M

IN

L

CONCRETE EQUIPMENT BASE2

SCH 40 PVC OR

FLATHEAD SCREWS

FASTEN TO WALL W/

ADJACENT WALL AREAS

FINISH PAINT TO MATCH

SIZED AS REQD; SEAL W/

CUT TO TIGHTLY FIT

ESCUTCHEON PLATE

MOUNT SLEEVE AND PROVIDE ESCUTCHEON PLATE.

NOTE: WHERE PIPING IS EXPOSED AT FINISH WALLS, FLUSH

2 TYP FOR MASONRY

OR CONCRETE WALL

TYP FOR NON-INSULATED

PIPE

PIPE AND CONDUIT

NOTES:

WHERE EXPOSED

AND JACKET

INSULATION

ESCUTCHEON PLATE:

EACH PIPE

PAINT ALL SIDES

SPACE BETWEEN PIPE

CAULK AND SEAL ANNULAR

AND SLEEVE

SPACE BETWEEN PIPE

CAULK AND SEAL ANNULAR

AND SLEEVE

INTERIOR

SCH 40 PVC OR

GALV STEEL SLEEVE

SECURE TO PARTITION

INSULATION

PIPE W/OR W/OUT

EXTERIOR

SECURE TO PARTITION

GALV STEEL SLEEVE

SCALE: NTSMH401

3 PIPE PENETRATION THRU WALL DETAIL

HVAC SCHEDULES - BLDG 2, 2A

3/16" 3003-H14 ALUMINUM

PLAN

SECTION B-B

SECTION A-A (BASE NOT POURED WITH SLAB)

o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Fax: 251.990.3716

Phone: 251.990.5778

Fairhope, AL 36532

766 Middle St, Corporate Office:

Date

Project No.

Drawing No.

Location

Sheet of

FINAL SUBMISSION

V e te ra n s

A ff a ir s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

/3

/2

:2

:2

A

M

Revisions: Date:

BUILDING 2 & 2A

UPGRADE ELEVATORS

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

KEY PLAN

NOT TO SCALE

ELEVATOR ELEVATOR

ELEVATOR2A 2

ELECTRICAL NOTES

1. MATERIALS, EQUIPMENT, AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF THE AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM), LATEST EDITION OF THE NATIONAL ELECTRIC CODE (NEC). THE UNDERWRITERS LABORATORY (UL), THE NATIONAL ELECTRIC MANUFACTURER'S ASSOCIATION (NEMA), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AND OTHER NATIONALLY RECOGNIZED AGENCIES AS WELL AS APPLICABLE LOCAL CODES.

2. ANYTHING DRAWN OR SPECIFIED SHALL NOT BE CONSTRUED TO CONFLICT WITH ANY LOCAL, MUNICIPAL OR STATE LAW, REGULATION OR ORDINANCE WHICH GOVERNS THE INSTALLATION OF ANY ELECTRICAL OR RELATED WORK. ITEMS SHALL NOT BE INSTALLED IN CONFLICT WITH THE NEC. RESOLVE ANY AND ALL CONFLICTS BEFORE INSTALLATION AT NO ADDITIONAL EXPENSE TO THE OWNER.

3. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED AND LABELED FOR THE QUALIFIED USE. VERIFY CIRCUIT BREAKER INTERRUPT CAPACITY NEEDED FOR EACH PANEL WITH LOCAL UTILITY. FOR BID PURPOSES, ASSUME 25,000 AIC FOR SERVICE ENTRANCE EQUIPMENT, 14,000 AIC FOR 480/277V EQUIPMENT , AND 10,000 AIC FOR 208/120V EQUIPMENT. BALANCE THE POWER EQUALLY (+/- 10%) ON ALL PHASES.

4. THE SYSTEMS SHOWN ON DRAWINGS SHALL BE PROVIDED TO SERVE ALL FIXTURES, EQUIPMENT, AND AREAS WITHIN THE CONTRACT LIMIT LINES AS SET FORTH BY THE ARCHITECTURAL SOLUTION FOR THE PROJECT. THE BIDDING AND CONTRACT REQUIREMENTS, GENERAL REQUIREMENTS, AND GENERAL PROVISIONS SHALL APPLY TO THIS SECTION. SYSTEMS SHALL INCLUDE ALL EQUIPMENT, APPURTENANCES, SAFETY DEVICES, AND

CONTROLS NECESSARY FOR THE INTENDED SERVICE.

5. ALL PERMITS AND FEES REQUIRED FOR THE WORK SHALL BE SECURED AND PAID FOR BY THE ELECTRICAL CONTRACTOR AND INCLUDED IN BID

PRICE.

6. BIDDERS SHALL BE LICENSED CONTRACTORS IN ACCORDANCE WITH LOCAL AND STATE LAWS.

7. ALL EQUIPMENT SHALL BE NEW AND UNUSED. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS, EXCEPT WHERE THESE SPECIFICATIONS REQUIRE A HIGHER QUALITY INSTALLATION THAN RECOMMENDED BY THE

MANUFACTURER.

8. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE ON SITE. REPLACE ANY AND ALL CONTRACTOR-SUPPLIED DEFECTIVE DEVICES, ITEMS OR SYSTEMS AT CONTRACTOR'S OWN EXPENSE BEFORE COMPLETION OF THE PROJECT.

9. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED OR FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLING MANUFACTURER'S GUARANTEED EQUIPMENT. THIS CONTRACTOR'S GUARANTEE SHALL EXIST FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO DEFECTS IN MATERIAL AND TO DEFECTIVE WORKMANSHIP OF ANY

KIND.

10. VERIFY FINAL LOCATIONS FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH THE REQUIREMENTS OF THE ACTUAL EQUIPMENT TO BE

CONNECTED. VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS.

11. SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF ELECTRICAL MATERIALS AND EQUIPMENT FOR EFFICIENT FLOW OF THE WORK.

GIVE PARTICULAR ATTENTION TO LARGE EQUIPMENT REQUIRING POSITIONING PRIOR TO CLOSING-IN THE BUILDING. COORDINATE THE CUTTING AND PATCHING OF BUILDING COMPONENTS TO ACCOMMODATE INSTALLATION OF ELECTRICAL EQUIPMENT AND MATERIALS.

12. COORDINATE THE INSTALLATION OF ELECTRICAL MATERIALS AND EQUIPMENT ABOVE CEILINGS WITH SUSPENSION SYSTEM, MECHANICAL EQUIPMENT AND SYSTEMS, AND STRUCTURAL COMPONENTS. COORDINATE ELECTRICAL EQUIPMENT AND MATERIALS INSTALLATION WITH OTHER

BUILDING COMPONENTS.

13. WHERE MOUNTING HEIGHTS ARE NOT DETAILED OR DIMENSIONED, INSTALL ELECTRICAL SERVICES AND OVERHEAD EQUIPMENT TO PROVIDE THE MAXIMUM HEADROOM POSSIBLE. INSTALL ELECTRICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH MINIMUM OF INTERFERENCE WITH OTHER

INSTALLATIONS.

14. COORDINATE CONNECTION OF ELECTRICAL SYSTEMS WITH EXTERIOR UNDERGROUND AND OVERHEAD UTILITIES AND SERVICES. COMPLY WITH REQUIREMENTS OF GOVERNING REGULATIONS, FRANCHISED SERVICE COMPANIES, AND CONTROLLING AGENCIES. PROVIDE REQUIRED

CONNECTION FOR EACH SERVICE.

15. DO NOT ENDANGER OR DAMAGE INSTALLED WORK THROUGH PROCEDURES AND PROCESSES OF CUTTING AND PATCHING. ARRANGE FOR REPAIRS REQUIRED TO RESTORE OTHER WORK, BECAUSE OF DAMAGE CAUSED AS A RESULT OF ELECTRICAL INSTALLATIONS.

16. BIDDERS SHALL THOROUGHLY ACQUAINT THEMSELVES WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. THEY SHALL EXAMINE ALL SERVICES, EQUIPMENT, SURFACES, ETC., WHICH THIS WORK IS IN ANY WAY DEPENDENT UPON, AND BRING ANY DISCREPANCIES DETERMINED OR OMISSIONS FOUND IN THE DRAWINGS TO THE OWNER'S ATTENTION BEFORE SUBMITTING BID.

17. VERIFY MECHANICAL EQUIPMENT SWITCH AND CONNECTION REQUIREMENTS, ITEM BY ITEM, WITH THE MECHANICAL CONTRACTOR, BEFORE

WIRING EQUIPMENT. RESOLVE ALL DISCREPANCIES WITHOUT FURTHER COST TO OWNER.

18. ALL WIRING SHALL BE IN CONDUIT, 3/4" MINIMUM WITH STEEL COMPRESSION FITTINGS.

19. ALL WIRING SHALL BE THHN/THWN COPPER (NO. 12 AWG MINIMUM) UNLESS OTHERWISE NOTED. WIRE AND CONDUIT SIZES ARE SHOWN ON THE

PANEL SCHEDULE.

20. ALL PANELS, CONTROL DEVICES AND MISCELLANEOUS ELECTRICAL APPARATUS SHALL BE CLEARLY MARKED FOR EASY IDENTIFICATION AND SAFETY. USE BLACK PLASTIC OR BAKELITE NAME PLATE ENGRAVED WITH WHITE LETTERS 1/4" HIGH. PUNCHED TAPE IS NOT ACCEPTABLE.

21. PANELS SHALL BE PROVIDED WITH A TYPEWRITTEN DIRECTORY AFFIXED TO INSIDE OF PANEL DOOR WITH A CLEAR PLASTIC SLEEVE. . THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND ARE FOR CIRCUIT ALLOCATION ONLY. DO NOT SCALE DRAWINGS.

22. ELECTRICAL CONTRACTOR SHALL FURNISH RECORD SET OF DRAWINGS WITH ANY DEVIATIONS MARKED IN RED INK.

23. ALL MOTORS SHALL MEET VIRGINIA ENERGY EFFICIENCY CODE COMPLIANCE.

ELECTRICAL LEGEND

GENERAL NOTES & LEGEND

E001

RD JP

on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location Sheet of

FINAL SUBMISSION

V et er an s A ffa irsApproved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

1/

/2

9:

:2

A

M

Revisions: Date:

UPGRADE ELEVATORS

BUILDING 2 & 2A

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

GENERAL DEMOLITION NOTES

DEMOLITION NOTES

UP

TLT.

#4

ED101

RD JP

SCALE: 1/8" = 1'-0"

0 4' 8' 16' on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location Sheet of

FINAL SUBMISSION

V et er an s A ffa irsApproved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

1/

/2

9:

:2

A

M

Revisions: Date:

UPGRADE ELEVATORS

BUILDING 2 & 2A

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

NOT TO SCALE

2A 2

GENERAL NEW WORK NOTES

NEW WORK NOTES

UP

TLT.

#4

EP101

RD JP

SCALE: 1/8" = 1'-0"

0 4' 8' 16' on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Date

Project No.

Drawing No.

Location Sheet of

FINAL SUBMISSION

V et er an s A ffa irsApproved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

1/

/2

9:

:2

A

M

Revisions: Date:

UPGRADE ELEVATORS

BUILDING 2 & 2A

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

NOT TO SCALE

2A 2

ENCLOSURE MOUNTING VOLTAGE Ø WIRE RATING MAINS RATING RATING RATED

NOTES

NEMA 1 SURFACE 480Y/277 3 4 MLO 400 100% NO

KAIC Ø BUS N BUS SERVICE

BREAKER PHASE (KVA) PHASE (KVA) BREAKER

DESCRIPTION

LOAD

DESCRIPTION

LOAD

P TRIP A B C A B C TRIP P

EXISTING PANEL 2-ECSWBD-E

CKT

GROUND NEUTRAL PHASE

WIRE SIZE

SIZE

CONDUIT

CKT

GROUNDNEUTRALPHASE

WIRE SIZE

SIZE

CONDUIT

3-#4 1-#4 1-#8 1

ENCLOSURE MOUNTING VOLTAGE Ø WIRE RATING MAINS RATING RATING RATED

NOTES

NEMA 1 SURFACE 208Y/120 3 4 MCB 250 100% NO

KAIC Ø BUS N BUS SERVICE

BREAKER PHASE (KVA) PHASE (KVA) BREAKER

DESCRIPTION

LOAD

DESCRIPTION

LOAD

P TRIP A B C A B C TRIP P

EXISTING PANEL A

SPARE (EXST)

MACHINE ROOM RECPT (EXST)

10010

CKT

GROUND NEUTRAL PHASE

WIRE SIZE

SIZE

CONDUIT

CKT

GROUNDNEUTRALPHASE

WIRE SIZE

SIZE

CONDUIT

1-#121-#121-#123/4" P1 CAR LIGHTS

P2 CAR LIGHTS 1 20

1 20

1 20

HP-2/AHU-2 30

RECEPTACLE SPARE (EXST)

SPARE (EXST)

HOISTWAY LIGHTS (EXST)

PIT LIGHTS/PIT RECPT (EXST)

SHUNT TRIP (EXST)

ENCLOSURE MOUNTING VOLTAGE Ø WIRE RATING MAINS RATING RATING RATED

NOTES

NEMA 1 SURFACE 208Y/120 3 4 MCB 250 100% NO

KAIC Ø BUS N BUS SERVICE

BREAKER PHASE (KVA) PHASE (KVA) BREAKER

LOAD

DESCRIPTION

LOAD

P TRIP A B C A B C TRIP P

EXISTING PANEL C

15010

CKT

GROUND NEUTRAL PHASE

WIRE SIZE

SIZE

CONDUIT

CKT

1-#12

GROUNDNEUTRALPHASE

WIRE SIZE

SIZE

CONDUIT

3/4"

3-#121-#121-#123/4"

1 20

1 20

PANEL CA (EXST) 3 100

HP-2A1/AHU-2A1

HP-2A2/AHU-2A2

HP2A3/AHU-2A3

SPACE (EXST)

1-#12 1-#12

RECEPTACLE

SPACE (EXST)

SPACE (EXST)

LIGHTS G010,G011,G011A (EXST) 1

ER HALL (EXST)

ER HALL (EXST)

LIGHTS G001,G003,G004,G003C,G003D (EXST)

LIGHTS G008,G009,G09A,G09B (EXST)

LIGHTS G003,G005,G006,G007,G015 (EXST)

RECPT 1019,1004B (EXST)

RECPT 1004B SOUTH WALL (EXST)

1 LIGHTS HEM1017,1018,1004A&B, 1012 (EXST)

ELEVATOR SHAFT (EXST)

ELEVATOR P1 CAR LIGHTS

CG-8,CG-9,G006,EMS RADIO (EXST)

NARCOTICS ALARM (EXST)

RECPT G009A,G009,G010 (EXST)

RECPT G055 (EXST)

RECPT 1000,1003 (EXST)

RECPT 1004, NORTH WALL (EXST)

RECPT 1004, SOUTH WALL (EXST)

PANEL 2EELB (EXST) 3 3 PANEL 2-BEEHA (EXST)

PANEL 2EELA (EXST) 3

EXIT CONTROLLERS (EXST) 3

SPARE (EXST) 3

PANEL 2-AEEHA (EXST) 3

ELEVATOR P2 3

3 SPACE (EXST)

3 XFMR ROOM 128 (EXST)

3 SPACE (EXST)

3 2-TEP (EXST)

3 ELEVATOR P1

125 200

85 853-#41-#8 1-#41

1-#121-#121-#123/4"

22-#101-#101-#103/4"

2.88

2.88

3023-#81-#81-#83/4"

3023/4"

3023/4"

2.88

2.88

2.88

2.88

2.88

2.88

3-#81-#81-#8

3-#81-#81-#8

1-#12 3/4"1-#12 1-#12ELEVATOR P2 CAR LIGHTS20 1

ELEVATOR VOLTAGE PHASE HORSEPOWER AMPS

BLDG 2-P1 480V 3 40

ELEVATOR MOTOR SCHEDULE

BLDG 2-P2 480V 3 40

480V 3 40

480V 3 40

TYPE

TRACTION

TRACTION

BLDG 2A-P1

BLDG 2A-P2

HYDRAULIC

HYDRAULIC

15.79

15.79

15.79

15.79

15.79 15.79

LIGHTING FIXTURE SCHEDULE

CONTRACTOR SHALL PROVIDE SCHEDULED EQUIPMENT OR EQUIPMENT OF EQUAL QUALITY.

NOTE:

1. MANUFACTURER AND MODEL NUMBERS ARE PROVIDED AS BASIS OF DESIGN ONLY AND ARE NOT TO LIMIT SELECTION.

DESCRIPTIONLUMENS WATTSLAMPPART NUMBERMFGTYPE

i2Systems N/A 4LEDA439OZ-41BBD

ELEVATOR LED DOWNLIGHT

1 201-#121-#121-#123/4"

1-#12 3/4"1-#12 1-#1220 1

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

SPACE (EXST)

0.04

0.04

0.18

0.04

0.04

0.18

1-#12 3/4"1-#12 1-#12ELEVATOR P1 CONTROLLER20 1

1-#12 3/4"1-#12 1-#12ELEVATOR P2 CONTROLLER20 1

0.6

0.6

1-#12 3/4"1-#12 1-#12ELEVATOR P1 CONTROLLER

1-#12 3/4"1-#12 1-#12ELEVATOR P2 CONTROLLER

0.6

0.6

RUNNING

MOCP

PANEL SCHEDULES

E601

RD JP

o n e e i g h t h i n c o f o t t h r e e i n c h e s o t o n e a d a l f i n c h e s o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t

VA FORM 08-6231, OCT 1978

A

123456789

123456789

B

C

D

E

F

A

B

C

D

E

F

Drawing Title Project Title

CheckedBuilding Number Drawn

Corporate Office:

766 Middle St, Fairhope, AL 36532

Phone: 251.990.5778

Fax: 251.990.3716

Date

Project No.

Drawing No.

Location

Sheet of

FINAL SUBMISSION

V e t e r a n s

A f f a i r s

Approved: Associate Director

Approved: Chief of Staff

Approved: Service Chief

Approved: GEMS Coordinator

Approved: Infection Control Officer

Approved: Safety Manager

Approved: Chief of Mental Health Service

Approved: Chief of Police

Approved: Energy EngineerApproved: Patient Safety Nurse

Approved: Chief of Facility Management Svc.

Approved: Medical Center Director

DESIGN/BUILD

A

M

Revisions: Date:

UPGRADE ELEVATORS

BUILDING 2 & 2A

SALEM VA MEDICAL CENTER

658-18-103

2, 2A

2019.07.29

ALL CIRCUIT BREAKERS AND CONDUCTORS SHALL MEET INDICATED

CURRENT RATINGS AT 75°C(167°F)

ALL CIRCUIT BREAKERS AND CONDUCTORS SHALL MEET INDICATED

CURRENT RATINGS AT 75°C(167°F)

ALL CIRCUIT BREAKERS AND CONDUCTORS SHALL MEET INDICATED

CURRENT RATINGS AT 75°C(167°F)

FIRE PROTECTION ABBREVIATIONS

1. THE FIRE ALARM SCOPE OF WORK FOR THE PROJECT INVOLVES MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM SERVING THE ELEVATORS IN BUILDINGS 2 AND 2A. THERE ARE 4 ELEVATORS WHICH CONSIST OF 2 TRACTION

ELEVATORS AND 2 HYDRAULIC ELEVATORS.

2. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:

CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (DECEMBER 2015)

IBC - INTERNATIONAL BUILDING CODE, 2018

NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 70 - NATIONAL ELECTRIC CODE, 2017 EDITION

NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION

NFPA 101 - LIFE SAFETY CODE, 2018 EDITION

ASME A17.1 - SAFETY CODE FOR ELEVATOR AND ESCALATORS, 2016 EDITION

3. FOR ELEVATOR RELATED FIRE ALARM SYSTEM PROGRAMMING, SEE MATRIX OF OPERATIONS ON SHEET F501.

4. PRIOR TO PERFORMING WORK ON THE ALARM SYSTEM, THE CONTRACTOR MUST FIELD LOCATE THE FIRE ALARM CONTROL PANELS SERVING ALL AREAS AFFECTED.

5. TWO WEEKS PRIOR TO FINAL INSPECTION, CONTRACTOR SHALL DELIVER TO THE COTR 3 SETS OF AS-BUILT DRAWINGS AND ONE SET OF THE AS-BUILT DRAWING COMPUTER FILES SHOWING ALL NEW AND/OR

EXISTING CONDUIT USED FOR THE FIRE ALARM SYSTEM.

6. FINAL FIRE ALARM SYSTEM TESTING SHALL BE WITNESSED BY THE COTR.

7. FILE A "RECORD OF COMPLETION" PREPARED IN ACCORDANCE WITH NFPA 72, AND THE FIRE ALARM TEST REPORT, WITH THE COTR.

8. TAMPER SWITCHES AND FLOW SWITCHES SHALL BE INSTALLED UNDER DIVISION 21, BUT SHALL BE CONNECTED TO THE FIRE ALARM SYSTEM BY THE FIRE ALARM CONTRACTOR.

9. FIRE AND SMOKE STOP ALL PENETRATIONS THROUGH RATED ASSEMBLIES. PROVIDE THROUGH-PENETRATION FIRESTOP SYSTEM PER UL 1479 AND SPECIFICATIONS.

10. ALL NEW FIRE ALARM WIRING SHALL BE CLASS B AND INSTALLED IN METALLIC CONDUIT.

11. EXISTING FIRE ALARM CONDITIONS ARE SHOWN AS ACCURATELY AS POSSIBLE. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE ORIGINAL BUILDING DRAWINGS AND FIELD SURVEY INFORMATION COMPILED BY THE ENGINEERING DESIGN TEAM FOR THE PURPOSE OF ENGINEERING DESIGN CONCEPT. THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS EXISTING.

CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LOCATIONS AND CONDITIONS AT THE SITE AND DOCUMENT THAT ON THEIR SUBMITTALS.

FIRE ALARM GENERAL NOTES

FIRE SUPPRESSION GENERAL NOTES

1. THE FIRE PROTECTION SCOPE OF WORK INVOLVES MODIFICATIONS TO THE EXISTING FIRE SUPPRESSION SYSTEM SERVING THE ELEVATORS BEING RENOVATED.

2. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:

CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (DECEMBER 2015)

IBC - INTERNATIONAL BUILDING CODE, 2018

NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION

NFPA 70 - NATIONAL ELECTRIC CODE, 2017 EDITION

NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION

NFPA 101 - LIFE SAFETY CODE, 2018 EDITION

ASME A17.1 - SAFETY CODE FOR ELEVATOR AND ESCALATORS, 2016 EDITION

3. DRAWINGS ARE FOR REFERENCE PURPOSES ONLY. SHOP DRAWINGS ARE TO BE SUBMITTED FOR APPROVAL.

4. ALL MATERIALS AND EQUIPMENT USED FOR MODIFICATIONS SHALL BE NEW OR RELOCATED.

5. PRIOR TO PERFORMING WORK ON THE SPRINKLER SYSTEM, THE CONTRACTOR MUST FIELD LOCATE THE ZONE CONTROL ASSEMBLIES SERVING ALL AREAS AFFECTED, IN ORDER TO CLOSE VALVES AS NEEDED TO

COMPLETE THEIR SCOPE OF WORK.

6. INSTALLING CONTRACTOR SHALL PROVIDE DETAILED AND ACCURATE AS-BUILT DRAWINGS OF ALL SYSTEMS TO THE COTR IMMEDIATELY UPON COMPLETION OF ACCEPTANCE TESTING. THEY SHALL INCLUDE ALL

SYSTEM EQUIPMENT, FITTING, PIPE (INCLUDING TYPE AND SIZE), HANGERS, VALVES, SPRINKLERS, AND SPECIFIC INTERCONNECTIONS BETWEEN THE SYSTEM SWITCHES AND THE FIRE ALARM EQUIPMENT.

7. ALL SPRINKLER SYSTEM INSTALLATIONS SHALL BE COORDINATED WITH ALL OTHER TRADES PRIOR TO FABRICATION AND INSTALLATION. SYSTEM SHALL BE CONFIGURED SO THAT SPRINKLER DISCHARGE IS NOT

AFFECTED BY OBSTRUCTIONS SUCH AS, BUT NOT LIMITED TO, BEAMS, DUCTWORK, AND LIGHT FIXTURES.

8. PROVIDE TAMPER AND FLOW SWITCHES AS REQUIRED. CONNECTIONS TO THE FIRE ALARM SIGNALING LINE CIRCUITS SHALL BE MADE UNDER DIVISION 28 SPECIFICATION.

9. PIPE SLEEVES THROUGH FLOORS AND FIRE RATED BARRIERS SHALL BE SIZED BY SPRINKLER CONTRACTOR IN STRICT ACCORDANCE WITH SECTION 9.3.4 OF NFPA 13. GAPS AND VOID SPACES SHALL BE SEALED

AROUND PIPE SLEEVE AND SYSTEM PIPE WITH A UL LISTED FIRE RATED THRU STOP PENETRATION SYSTEM. WHERE CORE DRILLING IS USED IN LIEU OF SLEEVES, ALSO SEAL SPACE.

10. ALL SYSTEM VALVES AND GAUGES SHALL BE ACCESSIBLE FOR OPERATION, INSPECTION, TESTS AND MAINTENANCE. ALL VALVES AT ZONE CONTROL ASSEMBLIES SHALL BE ACCESSIBLE TO AUTHORIZED PERSONS

DURING EMERGENCIES. PERMANENT LADDERS, CLAMPED TREADS ON RISER, CHAIN OPERATED HAND WHEELS, OR OTHER ACCEPTED MEANS SHALL BE PROVIDED WHERE VALVES ARE HIGHER THAN SEVEN FOOT

ABOVE FINISHED FLOOR.

11. SPRINKLER PIPING SHALL NOT BE ROUTED THROUGH ELECTRICAL OR TELECOM ROOMS.

12. SPRINKLER GUARDS SHALL BE PROVIDED ON SPRINKLERS LOCATED LESS THAN SEVEN FEET-SIX INCHES ABOVE FINISHED FLOOR. THE SPRINKLER GUARD SHALL BE UL LISTED OR FM APPROVED FOR USE WITH THE

CORRESPONDING SPRINKLER.

13. EXISTING SUPPRESSION CONDITIONS ARE SHOWN AS ACCURATELY AS POSSIBLE. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE ORIGINAL BUILDING DRAWINGS AND FIELD SURVEY

INFORMATION COMPILED BY THE ENGINEERING DESIGN TEAM FOR THE PURPOSE OF ENGINEERING DESIGN CONCEPT. THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS EXISTING.

CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LOCATIONS AND CONDITIONS AT THE SITE AND DOCUMENT THAT ON THEIR SUBMITTALS.

AAR AUTOMATIC AIR RELEASE FT FEET

ALV ALARM CHECK VALVE GA GAUGE

AFF ABOVE FINISHED FLOOR GC GENERAL CONTRACTOR

AS AUTOMATIC SPRINKLER GPM GALLONS PER MINUTE

BATT BATTERY GR GENERATOR RUNNING

BFP BACK FLOW PREVENTER GF GENERATOR FAULT

BOR BOTTOM OF RISER HGT HEIGHT

CHV CHECK VALVE HL HI/LOW AIR SUPERVISORY

CIS COMMON INTELLIGIBILITY SCORE HT HEAT TRACING

CLG CEILING ID INSIDE DIAMETER

CONT CONTINUE/ CONTINUOUS KH KITCHEN HOOD SUPPRESSION SYSTEM

COR CONTRACTING OFFICER'S REPRESENTATIVE LH LIGHT HAZARD

CTR CENTER LOC LOCAL OPERATING CONSOLE

CV CONTROL VALVE MNS MASS NOTIFICATION SYSTEM

DACT DIGITAL ALARM COMMUNICATOR TRANSMITTER OD OUTSIDE DIAMETER

DBA DECIBEL A-WEIGHTED OH ORDINARY HAZARD

DEMO DEMOLISH, DEMOLITION PER PRIMARY ELEVATOR RECALL

DC DIRECT CURRENT PS PRESSURE SWITCH

DD DUCT SMOKE DETECTOR PSI POUNDS PER SQUARE INCH

DH DOOR HOLD R RISER/RADIUS/RETURN

DIA DIAMETER RCV RISER CONTROL VALVE

DIM DIMENSION REQ REQUIRED

DN DOWN/DROP NIPPLE RM ROOM

DP DRY PENDANT RN RISER NIPPLE

E ELEVATOR RECALL RPZ REDUCED PRESSURE ZONE

EA EACH S SUPPLY

EAR ELEVATOR ALTERNATE FLOOR RECALL SBV SUPERVISED BUTTERFLY VALVE

EB ELECTRIC BELL SCHED SCHEDULE

EF EXHAUST FAN SCV SUPERVISED CONTROL VALVE

EFF ELEVATOR FIREFIGHTER FLASHING SD SMOKE DETECTOR

EH EXTRA HAZARD SDC SMOKE DAMPER CONTROL

EJ EXPANSION JOINT SGV SUPERVISED GATE VALVE

EL ELEVATION SIM SIMILAR

ELEV ELEVATOR SO SOUND SYSTEM OVERRIDE

EMER EMERGENCY SP SPEAKER

EPR ELEVATOR PRIMARY FLOOR RECALL SPEC SPECIFICATION

EPS ELEVATOR SHUNT TRIP POWER MONITORING SPKR SPRINKLER

EQUIP EQUIPMENT SP/ST SPEAKER/ STROBE

EST ELEVATOR SHUNT TRIP SQ SQUARE

ETR EXISTING TO REMAIN SR SLEEPING ROOM

EXIST EXISTING SSI SECURITY SYSTEM INTERFACE

FA FIRE ALARM ST STROBE

FMCP FIRE ALARM/MASS NOTIFICATION CONTROL PANEL STP STANDPIPE

FD FLOOR DRAIN STOR STORAGE

FDC FIRE DEPARTMENT CONNECTION STS SHUNT TRIP SUPERVISION

FE FIRE EXTINGUISHER SYST SYSTEM

FEC FIRE EXTINGUISHER CABINET SYST-FEED SPRINKLER SYSTEM FEED MAIN

FFE FINISHED FLOOR ELEVATION TEMP TEMPERATURE

FH FIRE HAT TOR TOP OF RISER

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .