Attachment 4 - Technical Worksheet.docx
DOCX document 32 KB Posted
- Attached to
- S&RTS Gulfport, MS Federal contract opportunity
- Solicitation number
- HTC711-20-R-R010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Gulfport Questions for Military 2020 APR 27.pdf | ||
| Attachment 2 - 2020 Apr 22 - SOR-Gulfport (00002).xlsx | XLSX spreadsheet | |
| Attachment 1 - 2020 APR 22 Gulfport PWS (00002).pdf | ||
| HTC711-20-R-R010-00002.pdf | ||
| Gulfport Questions for Military 2020 APR 22.pdf | ||
| Attachment 1 - 2020 APR 15 Gulfport PWS (0001).pdf | ||
| HTC711-20-R-R010-00001.pdf | ||
| 2020 Apr 02 RFP HTC711-20-R-R010 (Correction).pdf | ||
| 2020 MAR 30 RFP HTC711-20-R-R010.pdf | ||
| Attachment 6 - Wage Determination.pdf | ||
| Attachment 2 - SOR-Gulfport.xlsx | XLSX spreadsheet | |
| Attachment 5 - SB Subcontracting Plan.doc | DOC document | |
| Attachment 3 - SRTS General Compliance Tool.xlsx | XLSX spreadsheet | |
| Attachment 1 - 2020 MAR 30 Gulfport PWS (Final).pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Attachment 4 – HTC711-20-R-R010
Source Selection Information – See FAR 2.101 and 3.104
TECHNICAL WORKSHEET PROPOSAL
Gulfport, Mississippi S&RTS
Instructions:
· When completing this technical evaluation worksheet, the Offeror shall assume the Government has no prior knowledge of the Offeror’s experience.
· The Proposal shall not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet each item in the worksheet in accordance with the PWS. Statements that the Offeror understands, can or will comply with the PWS; statements paraphrasing the PWS or parts thereof; flowcharts simply listing activities related to performance of the PWS; and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., without a description of how services will be performed shall be considered unacceptable.
· The entire submission of this Technical Worksheet shall not exceed 25 pages (a single-side is equal to 1-page).
· If more than 25 pages are received, only the first 25 pages will be evaluated and all other pages will be removed and therefore not evaluated.
· Documentary evidence (photos) and Material Handling Equipment (MHE) lists will not count against the page limits.
· Failure to complete this document in its entirety or failure to attach all requested documentation may result in the offeror’s proposal being ineligible for award.
MHE, Labor, and Overall Management of Operations A. Describe your capability to provide all labor (including labor during a shortage due to competing requirements) and equipment necessary to handle multiple classes of supply and multiple vessels while conducting stevedoring operations within required timeframes at all port locations listed in the requirement. As an attachment to this worksheet, provide a list of all MHE in your inventory at each port. Include any equipment which is currently in your inventory and any equipment that you have the ability to provide for this requirement. If you do not currently have certain equipment, explain how you will obtain it if required.
(1) Port of Gulfport:
Click here to enter text.
Stevedoring Services
B. Describe your capabilities to successfully conduct stevedoring & related terminal services without damage and in accordance with stow plans and applicable safety regulations, to include:
(1) Loading and Discharging
(2) Receipt and Disposition
(3) Stuffing and Unstuffing
(4) Tally & Checking
(5) Inoperable or Deadline Equipment: Explain your capability of retrieving inoperable or deadline vehicles (tracked and wheeled) in excess of 150,000 lbs. (70,000 kg) IAW PWS 5.15.1 and 6.5.4.
File details come from the government source that posted it. Updated .