The Attachment 4_Submittal Register.xlsx is a comprehensive document detailing preconstruction, product data, sample, test report, and closeout submittals for the Sustain Restroom and Office, B822 project. The submittal register covers multiple specification sections including site preparation (01 series), demolition (02 41 00), gypsum board (09 29 00), flooring (09 65 00 and 09 68 00), painting (09 90 00), toilet fixtures (10 21 13), and electrical systems (26 05 00.00 40).
Key submittals include preconstruction items like Entry Authorization Request, Existing Conditions Pictures, Project Schedule, Accident Prevention Plan, and Contractor Quality Control Plan. Product-specific submittals require documentation for materials such as gypsum board, resilient flooring, carpet, coating, electrical components, and toilet enclosures. The register mandates various classifications of submittals, including Government review (G) and For Information Only (FIO) types, with requirements for product data, samples, test reports, warranties, manufacturer's instructions, and closeout documentation like as-built drawings and final construction waste diversion reports.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | CONTRACTOR | |||||||||||||||||
| Sustain Restroom and Office, B822 | ||||||||||||||||||
| ACTIVITY NO | TRANSMITTAL NO | SPEC SECT | DESCRIPTION ITEM SUBMITTED | PARAGRAPH # | CLASSIFICATION GOVT OR A/E REVWR | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | ACTION CODE | DATE OF ACTION | ||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 11 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Entry Authorization Request | 1.4 | FIO | ||||||||||||||||
| 01 30 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Existing Conditions Pictures | 1.3 | FIO | ||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Preliminary Project Schedule | 1.1.2 | G | ||||||||||||||||
| Initial Project Schedule | 1.1.3 | G | ||||||||||||||||
| Periodic Schedule Update | 1.1.4 | G | ||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Submittal Register | 1.7 | G | ||||||||||||||||
| 01 35 26 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Accident Prevention Plan (APP) | 1.7 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Accident Reports | 1.11.1 | FIO | ||||||||||||||||
| 01 45 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Contractor Quality Control (CQC) Plan | 1.5.2 | G | ||||||||||||||||
| 01 74 19 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Waste Management | 1.6 | G | ||||||||||||||||
| Plan | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Final Construction Waste | 1.9 | G | ||||||||||||||||
| Diversion Report | ||||||||||||||||||
| 01 78 00 | SD-03 Product Data | |||||||||||||||||
| Warranty Management Plan | 1.3.1 | FIO | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| As-Built Drawings | 3.1 | G |
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | CONTRACTOR | |||||||||||||||||
| Sustain Restroom and Office, B822 | ||||||||||||||||||
| ACTIVITY NO | TRANSMITTAL NO | SPEC SECT | DESCRIPTION ITEM SUBMITTED | PARAGRAPH # | CLASSIFICATION GOVT OR A/E REVWR | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | ACTION CODE | DATE OF ACTION | ||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 02 41 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Existing Conditions | 1.10 | FIO | ||||||||||||||||
| 09 29 00 | SD-03 Product Data | |||||||||||||||||
| Gypsum Board | 2.1.1 | FIO | ||||||||||||||||
| Asbestos Free Materials | 2.1 | FIO | ||||||||||||||||
| 09 65 00 | SD-03 Product Data | |||||||||||||||||
| Resilient Flooring & Accessories | 2.1,2.2 | G | ||||||||||||||||
| Adhesives | 2.3 | FIO | ||||||||||||||||
| 09 65 00 | SD-04 Samples | |||||||||||||||||
| Resilient Flooring & Accessories | 2.8 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Moisture, Alkalinity, and Bond | 3.3 | G | ||||||||||||||||
| Tests | ||||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Warranty | 1.7 | FIO | ||||||||||||||||
| 09 68 00 | SD-04 Samples | |||||||||||||||||
| Carpet | 2.1 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Warranty | 1.4 | FIO | ||||||||||||||||
| 09 90 00 | SD-03 Product Data | |||||||||||||||||
| Coating | 2.1 | G | ||||||||||||||||
| Product Data Sheets | 2.1 | FIO | ||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Color | 2.2 | G |
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | CONTRACTOR | |||||||||||||||||
| Sustain Restroom and Office, B822 | ||||||||||||||||||
| ACTIVITY NO | TRANSMITTAL NO | SPEC SECT | DESCRIPTION ITEM SUBMITTED | PARAGRAPH # | CLASSIFICATION GOVT OR A/E REVWR | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | |||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | ACTION CODE | DATE OF ACTION | DATE FWD TO APPR AUTH/ | |||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | ACTION CODE | DATE OF ACTION | ||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| SD-07 Certificates | ||||||||||||||||||
| Indoor Air Quality for Paints and | 1.5.4 | FIO | ||||||||||||||||
| Primers | ||||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Mixing | 2.1 | FIO | ||||||||||||||||
| Manufacturer's Safety Data | 1.7.1 | FIO | ||||||||||||||||
| Sheets | ||||||||||||||||||
| 10 21 13 | SD-03 Product Data | |||||||||||||||||
| Toilet Enclosures | 2.3.1 | FIO | ||||||||||||||||
| Urinal Screens | 2.3.2 | FIO | ||||||||||||||||
| SD-04 Samples | ||||||||||||||||||
| Colors and Finishes | 2.7 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Warranty | 1.6 | FIO | ||||||||||||||||
| 26 05 00.00 40 | SD-03 Product Data | |||||||||||||||||
| Conduits and Raceways | 2.1.1 | G | ||||||||||||||||
| Wire and Cable | 2.2.1 | G | ||||||||||||||||
| Switches | 2.2.3 | G | ||||||||||||||||
| Receptacles | 2.2.4 | G | ||||||||||||||||
| Outlet Boxes, Pull Boxes and | 2.1.3 | G | ||||||||||||||||
| Junction Boxes | ||||||||||||||||||
| Device Plates | 2.2.2 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Continuity Test | 3.2 | G | ||||||||||||||||
| Ground-Fault Resistance Test | 3.2 | G |