This submittal register and related federal contract opportunity are for an incinerator building project for the Judicial Investigation Organization in Costa Rica. The solicitation seeks construction services for an incinerator building with a period of performance of 168 calendar days from notice to proceed and a project magnitude between $1,000,000 to $5,000,000. Key dates include a pre-proposal conference on July 15, 2021, site visit on July 19, 2021, questions due by July 30, 2021 and proposals due by August 23, 2021. The solicitation is issued by the Department of State Office of Acquisition Management. The submittal register outlines over 30 items the contractor must submit at various stages for government review and approval related to the construction of the incinerator building, including inspection plans, schedules, certifications, material samples, designs, and construction documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19AQMM21R0215 QA.pdf | ||
| Attachment 2 SOW 0001.pdf | ||
| Attachment 4 Submittal Register 0001.xlsx | XLSX spreadsheet | |
| 19AQMM21R0215 0001.pdf | ||
| Attachment 6 Past Performance Questionnaire (PPQ).docx | DOCX document | |
| Attachment 5 Firm and Project Information 0001.pdf | ||
| Attachment 1 Specification.pdf | ||
| 19AQMM21R0215 B-M.pdf | ||
| 19AQMM21R0215.pdf | ||
| Attachment 3 Drawings.zip | ZIP file | |
| Attachment 6 - Past Performance Questionnaire (PPQ).docx | DOCX document | |
| Attachment 5 Firm and Project Information.pdf | ||
| Attachment 2 SOW.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMIT
APPROVAL
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM
OTHER
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) Contractor Inspection System Initial Project Execution Schedule Certification of Boundary Markers Liability Insurance Policy (Poliza de Responsabilidad Civil Contractual) Work Risck Ensurance (Póliza de Riesgos del Trabajo) Certification CCSS (Ceritificación CCSS) List of Proposed Subcontractors
7.3.3 Warning Signs
7.3.4 Temporary Structures
7.4.8 Compacted backfilling with natural soil
7.4.9 Compacted backfilling with granular material
8.2 Properties and characteristics of concrete
8.2.2 Cement
8.2.3 Sand (fine aggregate)
8.2.4 Gravel (coarse aggregate)
8.2.5 Water
8.2.6 Additives
8.2.7 Hand mixing
8.2.10 Sleeves in concrete
8.2.11 Anchors and fittings
8.2.12 Construction Joints
8.2.13 Concrete casting and vibration
8.2.14 Concrete strength
8.2.15 Strength testing
8.3 Formwork
8.3.6 Formwork construction
8.3.7 Non-exposed concrete formwork
T R A N S M I T T A L
N O
A C T I V I T Y
N O
MAILED
TO
CONTR/
DATE
RCD
FROM
APPR
AUTH REMARKS
CONTRACTOR:
TITLE AND LOCATION: INCINERATOR
BUILDING - COSTA RICA
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V I E W
P A R A G R A P H
#DESCRIPTION ITEM SUBMITTED
S P E C S
S E C
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM
OTHER
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
8.3.8 Formwork erection
8.3.9 Formwork removal
8.3.10 Formwork reuse
8.4 Reinforcement Steel
8.4.8 Samples and testing
9.3 Metal fabrication
9.3.1 Material handling
9.3.2 Resistance and specifications
9.3.3 Materials
9.3.4 Fabrication and labor
9.4 Construction and assembly
9.4.1 Fabrication and mounting
9.4.2 Reference standards and materials
9.4.3 Joints
9.5 Welding
9.5.2 Welding procedures
9.5.3 Quality Control
9.6 Metal surface finish
9.7 Erection and assembly
9.7.1 Anchoring of metal columns
10.3.1 Concrete Masonry Units
10.3.2 CMU mortar
10.3.3 Sand
10.3.4 Water
10.3.5 Concrete fill
10.5 Mortar preparation and CMU cell filling
10.5.3 Mortar
11 Metal deck 12 Precast Concrete Panels
MAILED
TO
CONTR/
DATE RCD
FROM
APPR
AUTH REMARKS
TITLE AND LOCATION: INCINERATOR
BUILDING - COSTA RICA
CONTRACTOR:
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C S
S E C
T DESCRIPTION ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O
A E
R E V I E W
CONTRACTOR SCHEDULE DATES CONTRACTOR
ACTION
NEEDED BY
MATERIAL
NEEDED BY
A C T I O N
C O D E
DATE OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM
OTHER
REVIEWER
A C T I O N
C O D E
DATE OF
ACTION
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
13.1.1 Incinerator Equipment Foundations
13.1.2 Anchorage
14.2.1 Sub-base construction
14.2.2 Base construction
15 Roof Cover
15.2 Exterior roof cover
15.3 Interior roof cover (Mezzanine)
16.2 Hardener concrete
16.3 Broom Finished Concrete
16.4 Sidewalk floors
17 Painting
18.3 Fine plaster
18.4 Tiling
19.1 Sealants and water repellants
20 Geotextile
21.3 Potable Water System
21.4 Sewer and Storm Systems
22 Fire Detection System 23 A C Equipment 24 Electrical System 25 Tele comunications 26 Ionizing Type Lighting Conductor
27.1 Cyclone mesh enclosure
28.1 Doors
28.2 Window system
28.3 Equipment Anchoring
C L A S S I F I C A T I O N
G O
A E
R E V I E W
CONTRACTOR SCHEDULE DATES
CONTRACTOR
ACTION
MAILED
TO
CONTR/
DATE RCD
FROM
APPR
AUTH REMARKS
TITLE AND LOCATION: INCINERATOR
BUILDING - COSTA RICA
CONTRACTOR:
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C S
S E C
T DESCRIPTION ITEM SUBMITTED
P A R A G R A P H
File details come from the government source that posted it. Updated .