Attachment 4 - Submittal Register.pdf
PDF 822 KB Posted
- Attached to
- HVAC B395 March ARB Federal contract opportunity
- Solicitation number
- FA466420B0001
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
95% Design Submittals 2
100% Design Submittals 2
As-Built Drawings 2
O&M Manuals 2
HVAC split system 2 2 2 1 2 2 2 2 2
C o lo r
Se le ct io n
M an u fa ct u re r' s R e co m m e n d at io n
M an u fa ct u re r' s W ar ra n ty
C at al o g D at a
Solicitation / Contract Number:
Remarks
(To be completed by Project Engineer)
O p e ra ti n g In st ru ct io n s
Sc h e d u le s, L is ti n g s, R e p o rt s, P la n s
Project Number: PDPG 20-1012 & PDPG201012
Li n e N u m b e r
R e q u ir e d S u b m is si o n D at e
Item or Description of Item, Contract
Reference, Type of Submittal
C e rt if ic at e o f C o m p lia n ce
Sh o p D ra w in g s
R e tu rn
S u sp e n se
D at e
Te ch n ic al D at a
Number of Copies Required
D at e R e ce iv e d in
C o n tr ac ti n g
Fi e ld R e p o rt s
Project Description: REPAIR HVAC BLDG 395 CONTROL TOWER CAB and ELECTRONICS
EQ ROOM
Te st
R e p o rt s
D at e t o C iv il
En g in e e ri n g
Sa m p le s
Date Contractor
Notified
(To be completed by Contract Administrator)
Su b m it ta l N u m b e rs
C o n tr ac to r R e su b m it ta l
Fi n al A p p ro va l
Attachment 4
FA466420B0001
File details come from the government source that posted it. Updated .