Attachment 4 - Statement of Work.docx

DOCX document 82 KB Posted

Attached to
FSR Support Services and Repair/Overhaul of R391 Propellers
Solicitation number
70Z03824RW0000002
Issued by

About this file

This document is a Performance Work Statement detailing the requirements for overhaul and repair services of the Dowty R391 propeller assemblies and components used on the USCG's HC-27J and HC-130J aircraft.

The key details include:

  • The contractor shall inspect, test, troubleshoot, clean, overhaul and repair the Dowty R391 propeller assemblies and components in accordance with OEM specifications. Repair and overhaul services are required, with overhaul zeroing the time since overhaul.
  • The contractor shall track all service bulletins, amendments, and modifications, obtaining USCG approval prior to incorporation.
  • The contractor shall provide a Dowty Field Service Representative to support the USCG, and license access to all related technical manuals and publications.
  • The performance period is one base year with four one-year option periods, to be awarded as a requirements-type contract to GE Aviation Systems LLC as the OEM.
  • The USCG intends to award this as a firm fixed price contract, with the Government not liable for any costs exceeding the firm fixed price without prior written authorization.

View the file

Other files

File Type Posted
Attachment 3 -Redacted J and A.docx DOCX document
Attachment 5 -Statement of Work FSR Attachment A.docx DOCX document
Attachment 1 - Schedule of Services.xlsx XLSX spreadsheet
Attachment 2 - Terms and Conditions.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

HC-27J R391 PROPELLER MAINTENANCE AND

FIELD SERVICE REPRESENTATIVE SUPPORT

SOLICITATION HSCG38-18-

STATEMENT OF WORK

HC-27J AND HC-130J PROPELLER ASSY AND COMPONENT OVERHAUL/REPAIR, FIELD SERVICE REPRESENATIVE, and PUBLICATIONS

1. Background

1.1 The United States Coast Guard (USCG) currently operates ten (10) HC-27J Maritime Patrol Aircraft. The aircraft is manufactured by LEONARDO SpA, Piazza Monte Grappa, Rome, Italy. The USCG currently operates seventeen (17) HC-130J Maritime Patrol Aircraft. The aircraft is manufactured by Lockheed Martin Aeronautics Co., Marietta, GA. Each HC-27J aircraft utilizes two (2) R391 Propeller Assemblies per aircraft and the HC-130J requires four (4) R391 Propeller Assemblies per aircraft. GE Aviation Systems Limited is the Original Equipment Manufacturer (OEM) of the R391 propeller and component assemblies. GE mandates an overhaul schedule requiring that the HC-27J meet a 10 year or 4,800 flight hour overhaul, whichever comes first and a 15 year or 7,500 flight hours for the HC-130J. The USCG operates the HC-130J and HC-27J at sites within the CONUS (Continental United States) Alaska and Hawaii. These aircraft are specifically equipped to perform all USCG missions which include search and rescue, maritime safety, security, and logistics, as well as national defense and protection of natural resources.

1.2 This Statement of Work (SOW) defines the HC-27J and HC-130J repair and overhaul requirements for the propeller assembly and the propeller components needed to support the USCG HC-27J and HC-130J aircraft as well as the Field Service Representative (FSR) and manual requirements in support of both aircraft. GE Aviation Systems LLC is the OEM authorized repair facility for the identified repair/overhaul services in this Statement of Work and only company capable of providing qualified FSRs. Repair of the propeller and sub-components are currently covered under contract 70Z03820DW00000001 which expires in August 2024. The HC-27J and HC-130J aircraft are operated differently from general aviation in support of USCG search and rescue missions, as well as surveillance, and reconnaissance missions. USCG HC-27J and HC-130J missions require frequent operation at lower altitudes and in salt–laden environments. These environments accelerate corrosion on airframe structures and components of the aircraft. The aircraft and its components are inspected by USCG personnel in accordance with (IAW) the (OEM) periodic requirements and in conjunction with the USCG’s specialized Asset Computerized Maintenance System (ACMS).

2. Scope

2.1 The scope of this requirement includes the overhaul and repair services for the Dowty R391 propeller and components and includes the components identified by part number in the delivery schedule. As the OEM, the data rights relative to the R391 propeller and components are proprietary to Dowty. GE is the only OEM authorized repair/overhaul facility authorized for the components identified in this requirement. This requirement includes the complete teardown, inspection, rework or overhaul, assembly, and testing of the components identified in the schedule IAW OEM specifications. This requirement also requires access to all manuals to include all updates as published/released by GE. This requirement establishes the minimum USCG requirements necessary for overhaul or repair of the propeller and propeller components, and is not intended to be all inclusive, nor detract from the procedures outlined in the manufacturer’s drawings, manuals, specifications, and service bulletins. USCG configuration control requires that applicable service bulletins and modifications for all propeller assemblies and components not previously configured, shall not be incorporated without prior written approval from the USCG Contracting Officer.

2.2 The USCG anticipates that this requirement will include unscheduled repairs, service bulletin incorporation, and possible modifications for the propeller assemblies and components, and that the terms and conditions of providing unscheduled services will be negotiated at the time of need.

2.3 This effort consists of Contractor support to include Field Service Support, Organizational Level (O-Level) support, Leading Edge Guard blade repair/replacement (and potential upgrades), and access to the OEM technical manuals and publication.

2.4 The OEM of the aircraft propellers Dowty, allows GE access to license, manuals and data and solely authorizes GE to perform overhauls and major repairs. Both companies fall under the GE Aerospace LLC umbrella. The USCG intends to award to GE a requirements type contract, with Firm Fixed Price (FFP) delivery orders. The contract will be one (1) Base years with four (4) option periods of one year each.

2.5 The Government shall not be liable for any amount expended by the Contractor in excess of the applicable firm fixed price reflected in the Schedule unless prior written authorization has been given by the Contracting Officer. Incorporation of Service Bulletins or repairs for Unusual Damage will be priced separately.

3. Requirements

3.1 The contractor shall inspect, test, troubleshoot, clean, overhaul and repair the Dowty R391 propeller assemblies and components within this scope and requirements. Overhaul and repair shall be IAW the current Dowty Manuals or other OEM Component Maintenance Manuals, revisions, temporary revisions, and specifications, including Service Bulletins, amendments, and modifications, while maintaining any USCG specific requirements for return to service in a Ready For Issue (RFI) condition and USCG operational use. The Dowty R391 propeller assemblies and components must remain configured for installation on USCG HC-27J and HC-130J aircraft.

3.2 All USCG R391 Propeller assemblies and components received by the Contractor, within this requirement, have been inspected, repaired, overhauled, and functionally within ninety (90) calendar days after receipt of materiel. Components are deemed in serviceable RFI condition or as otherwise directed by the USCG Contracting Officer with a Federal Aviation Administration (FAA) airworthiness Form 8130-3, or the OEM Certificate of Conformance, or a Certificate of Conformance IAW Federal Acquisition Regulations (FAR) clause 52.246-15. The USCG requirement also includes to have the repaired propeller assembly returned to the USCG as a full assembly on a prop stand for immediate installation or disassembled with the blades removed in a crate for long term storage. Assemblies are to be returned to the USCG assembled or disassembled as directed by the Contracting Officer on the individual task order. A critical element to effectiveness of the contract will be adherence to delivery schedule. The majority of the components covered by this requirement will be allocated to support aircraft depot maintenance.

3.3 The Contractor is responsible for all necessary functions to perform services requested. This includes, but is not limited to, required tooling, manuals, test equipment, parts, material, engineering services, management, personnel, documentation, preservation, shipping, etc.

3.4 The USCG anticipates at least two levels of service “Repair” and “Overhaul.”

3.4.1 “Repair” - “Return to Service” which is considered inspect, repair, and test as necessary. This work consists of inspection and analysis usually of a specific defective condition, repair of that condition, replacement of defective parts only as necessary, and testing to meet the OEM’s functional return to service requirements. A repair does not zero the “Time Since Overhaul” (TSO), component time continues for repaired items.

3.4.2 “Overhaul” - “High Time,” having reached one of the OEM’s airworthiness limitations any life cycle limits or having some other general condition (out-of-limit/or tolerance) such as excessive wear, tear, damage, or corrosion, as deemed to require an overhaul level of service. An “Overhaul” is considered over and above the “Repair” scope; it includes the complete teardown, inspection, rework, assembly, and testing of components, to OEM original or rebuild specifications. An overhaul zeroes the TSO and effectively restarts restoration intervals and OEM component life cycle limits as applicable. All propellers shall be overhauled unless otherwise specified.

3.5 The Contractor must track and document calendar time, flight time, flight/life cycles, all work and services performed on R391 Propeller assemblies and components as required under USCG System ACMS. See Section 6 for specific information.

3.6 The contractor shall ensure that all Service Bulletins (SB), Amendment (AMD) and MODs that have previously been incorporated remain incorporated unless otherwise appropriately superseded and directed by the USCG Contracting Officer.

3.7 The contractor shall identify and recommend, new or additional SBs, AMDs, or MODs, as applicable, to be incorporated and specify how the SBs, AMDs, or MODs may affect components, part numbers, and pricing.

3.8 The contractor shall provide current lists and status of all Dowty or other OEM Manuals, Component Maintenance Manuals (CMM), Revisions (Rev), Temporary Revisions (TR), (SB’s),(MOD’s), (AMD’s), including Contractor specifications and procedures applicable to be used for the inspection, repairs or modification of the USCG model R391 Propeller assemblies and components.

3.8.1 The list/lists may be provided in the Contractors’ style and format but must contain the following information:

· Name/Nomenclature and type of document

· Part numbers as applicable

· Air Transport Association (ATA) Charter Code

· Basic / Issue dates

· Revision or TR numbers and dates

· OEM and applicable cage code

3.9 If the Contractor receives information more current than that previously provided to the USCG, the Contractor must identify the Dowty or other OEM Manuals, CMMs, Revisions, and specifications, including SBs, AMDs, and MODs, and provide a brief synopsis of the revisions and dates to the USCG’s Contracting Officer for review and disposition approval. Refer to paragraph 3.15 for the incorporation of SBs and MODs.

3.10 All parts must be thoroughly cleaned IAW applicable CMMs to ensure they are as free as practicable of all hazardous dust to include hexavalent chromium, cadmium, lead, etc., prior to being returned to ALC. OEM manuals take precedence should discrepancies be found. ALC may take random samples of parts to ensure they are free as practicable of all hazards. Information on these hazards can be found in Occupational Safety and Health Standards 1910.1025 (lead), 1910.1026 (Hexavalent Chromium) and 1910.1027 (Cadmium).

3.11 Notification of Variances

The Contractor shall provide a copy of the regulatory authority approved variance when the Contractor deviates from the authorized configuration and/or uses unauthorized parts or components.

3.12 Diminishing Manufacturing Sources and Material Shortages (DMSMS) The contractor shall give the Government notice of items that are becoming logistically non-supportable as well as how the DMSMS issue is being remedied. The Contractor shall identify and assist with resolution of R391 Propeller DMSMS determinations.

3.13 Configuration Changes

Configuration changes are categorized as Class I – Major or Class II.

The Contractor shall provide AMD and MOD information to the Government at the same time it is issued to the airframe.

3.14 The contractor shall provide written verification of receipt of delivery order within five (5) business days of award for all R391 Propeller assemblies and components.

3.14.1 Delivery order receipts shall include, but are not limited to, the following information: nomenclature, National Stock Numbers (NSN), Part Numbers (P/Ns),Serial Numbers (S/Ns), contract number, delivery order numbers, Contract Line-Item Numbers (CLIN), and dates of receipt.

3.14.2 Delivery order receipts via email are acceptable and may contain single or multiple notification entries.

3.14.3 Within ten (10) business days of receipt of propeller and components at the Contractor’s repair facility, the Contractor shall notify the Contracting Officer in writing providing the following information: (1) date the components were received at the Contractor’s facility, (2) Confirmation of P/Ns and S/Ns, and any discrepancy with the P/N and/or S/N shown on the task order and /or the SCHR and CRR.

3.15 The contractor shall maintain all SB’s (Mandatory and Optional) and other modifications previously incorporated unless otherwise directed by the USCG Contracting Officer.

3.15.1 SB configurations are subject to change during the contract period. SBs and MODs not previously incorporated shall be identified to the USCG Contracting Officer. The Contractor is responsible for obtaining and notifying the USCG Contracting Officer within seven (7) business days of SB changes and modifications, for disposition approval prior to incorporation of those changes and modifications.

3.15.2 SBs incorporated during performance of this requirement may create new part numbers to identify configuration changes, which supersede the previous configurations. In cases where the older configurations cannot be modified to the newer configurations, the new configuration part numbers may be added to the contract. The Contractor shall notify and request disposition instructions from the USCG Contracting Officer for superseded parts, which have been removed and replaced by newer configurations.

3.15.3 Upon receipt of notification and authorization from the USCG Contracting Officer that a SB or MOD is to be incorporated, the Contractor shall submit, within thirty (30) calendar days after receipt of that notification, a FFP quote for an incremental charge to be assessed each time the SB is incorporated in a component. The quote shall contain a breakdown of material and labor costs including hours, labor categories, labor rates, and applicable mark ups. The incremental charge agreed to for incorporation of a SB shall apply only to those components which the Contractor incorporates a required SB, and not those which the SB has been previously incorporated. Upon agreement of an incremental charge and issuance of a contract MOD to reflect this change, the SB shall be incorporated into each subsequent component received at the Contractor’s facility for which the SB has not already been incorporated. When SB incorporation changes the CLIN P/N, the new P/N shall be added to the contract. The same procedures apply if removal of SBs is required. Failure to supply a change notice shall forfeit the right to any increase because of the contractor’s failure to request additional funding. Unless the contractor has a signed contract MOD permitting a change and bearing the signature of a USCG Contracting Officer, funding has not been authorized. Performance without written authority will not be authorized for payment.

3.15.4 The Contractor shall provide supporting documentation to the Government within three (3) business days of notification to the regulatory authority for safety related service bulletins.

3.16 The contractor shall prepare and submit, component Teardown Inspection Reports (TIR)

3.16.1 A Teardown Inspection Report (TIR), are occasionally requested by the USCG Contracting Officer, and are usually requested in support of a USCG Engineering incident, Engineering Investigations (EI), safety investigation, warranty determination, or for other failure analysis.

3.16.2 Upon request the Contractor shall within ten (10) calendar days provide a copy of the TIR to the Contracting Officer.

3.16.3 TIRs, when requested, shall be forwarded to the USCG Contracting Officer prior to commencement of repair or overhaul work; pending USCG Engineering final review and release.

3.16.4 TIRs shall include Nomenclature, NSNs, P/Ns, S/Ns, Contract number, Delivery Order numbers, CLINs, including descriptions, photos, illustrations, and drawings, as necessary before and during teardown, for documentation of the failure, and list all parts and costs as would be required for repair/overhaul of the component or assembly.

3.17 Replacement Parts:

3.17.1 USCG serviceable parts will not be intermixed between HC-27J and HC-130J assemblies due to current service life differences set by the OEM. Component parts found to be in serviceable condition IAW OEM specifications and functional testing shall be reused. USCG components are tracked and shall not be included in rotatable exchanged parts.

3.17.2 USCG life and cycle limited components shall be deemed at life limit if the component has 10% or less hours or cycles remaining until the published airworthiness limit is reached. No subcomponent of the propeller assembly shall shorten the on-wing life of the assembly itself requiring early removal of the propeller assembly.

3.17.3 The Contractor shall notify the Contracting Officer in writing of any missing parts. This notification shall be within ten (10) business days of receipt of the propeller assemblies or components. The USCG will provide replacement parts or funding to the Contractor to replace missing parts at the discretion of the Contracting Officer. The cost of missing parts should not be incorporated in the contract repair price. High time, life, or cycle limited parts which have reached their respective limits IAW paragraph 3.17.2 above, shall not be repaired or overhauled, but shall be replaced with other USCG serviceable parts or replaced with new OEM parts. The cost to replace high time, life, or cycle limited parts should be priced separately and not included in the cost of overhauled components under this contract.

3.17.4 Replacement parts shall be new and have full traceability to the OEM.

3.17.5 Defective parts: The cost of repair or replacement of defective parts is inclusive to the component repair contract price. Defective parts which cannot otherwise be repaired IAW OEM specifications, shall be scrapped IAW ALCINST 4100.1A dated 08 September 2016, and replaced with new OEM parts. The only exception is the major Sub- Assemblies (listed in 3.17.7) associated with Contract line item 1 (propeller assembly).

3.17.6 Defective Major Sub-assemblies’ part of CLIN 1 (propeller assembly): The Contractor shall submit a firm fixed price to include an itemized breakdown of part number, nomenclature, cost, and quantity of replacement parts. Upon approval by the Contracting Officer, the USCG will provide replacement parts or funding to the Contractor to replace the defective Sub-assemblies. The cost of these replacement parts (listed in 3.17.7) should not be incorporated in the contract repair cost.

3.17.7 List of Major Sub-assemblies under CLIN 1 (propeller assembly):

3.17.7.1 Propeller BladeP/N 697040215-14
3.17.7.2 Propeller HubP/N 697040221
3.17.7.3 Crosshead AssemblyP/N 697039262
3.17.7.4 Yoke Assy, CrossheadP/N 697039261
3.17.7.5 CounterweightsP/N 697040212
3.17.7.6 BackplateP/N 697039289
3.17.7.7 Piston AssemblyP/N 697039260
3.17.7.8 Cylinder AssemblyP/N 697039221
3.17.7.9 Propeller Race, InnerP/N 666000401-2
3.17.7.10 Propeller Race, OuterP/N 666000401-3
3.17.7.11 Propeller Race, InnerP/N 666000488-2
3.17.7.12 Propeller Race, OuterP/N 666000488-3
3.17.7.13 De-Ice SpinnerP/N 697095001

3.18 Beyond Economical Repair (BER):

3.18.1 When the cost of returning the component to serviceable condition, exceeds the current replacement cost of that component; or when the component cannot be repaired or overhauled due to damage or wear beyond the material properties, characteristic, or specifications of the item. The Contractor shall contact the USCG Contracting Officer, in writing, via e-mail, with specific rationale for the BER condition. The rationale shall include and provide nomenclature, NSN, P/N, S/N, contract number, delivery order number, and CLIN along with a cost breakdown of additional parts and labor as would be necessary to repair the component to serviceable status.

3.18.2 Once the contract line item is determined to be BER, no further repair/overhaul work on that item will be performed and the item in question will be placed in a bonded storage room for safekeeping until written authorization to proceed or other disposition instructions are received from the USCG Contracting Officer.

3.19 Missing Or Cannibalized Components

3.19.1 Missing or Cannibalized Components: Within ten (10) business days after the receipt and inspection of the components the Contractor shall notify the USCG Contracting Officer in writing of any missing or cannibalized parts or sub-assemblies required for final inspection and acceptance. The USCG Contracting Officer shall then have forty-five (45) calendar days to provide formal disposition instructions to the Contractor. The USCG reserves the right to provide RFI or repairable parts to replace the missing or cannibalized parts, or funding to the Contractor to replace these parts at the discretion of the Contracting Officer.

3.19.2 Turn Around Time (TAT) stops as of the date on the correspondence giving notification that work must cease due to missing/cannibalized parts. Unless the USCG Contracting Officer elects to have the component returned to the USCG as is, the TAT will re-start effective as of the mutually agreeable date stated in the bilateral modification.

3.20 Corrosion

3.20.1 Low altitude flight over salt water contributes to greater corrosion damage in USCG components than that experienced in commercial aircraft components. The Contractor shall consider the presence and effects of corrosion to be "normal" in this case and provide for correction and removal of corrosion in the firm fixed repair/overhaul price. During inspection and functional testing, the presence of corrosion in an item or part thereof shall constitute reason for a more thorough disassembly and inspection.

3.20.2 Corroded parts shall be replaced, except in those cases where removal of corrosion from a part will not impair the efficiency or safe operation of the part. Corrosion removal and treatment of any affected areas shall be accomplished IAW the manufacturer's specifications.

3.21 Exclusions

3.21.1 Components received in the following conditions are to be considered exclusions and may indicate an exclusion from the price in the contract schedule:

3.21.1.1 Catastrophic crash damage, foreign object damage, domestic object damage traceable to a USCG documented repair on the propeller assembly, Acts of God, war, and accidents attributable to the USCG responsibility.

3.21.1.2 Alteration, modification or repairs that were not completed by the USCG IAW technical data approved by the FAA, OEM, or the USCG.

3.21.2 If a component is considered (by the Contractor) to fit the exclusion description, the Contractor shall notify the USCG Contracting Officer within ten (10) business days and discontinue all actions until the Contracting Officer makes a determination. The USCG reserves the right to appoint a USCG Representative to witness the remaining teardown and inspection of the component. A letter of notification and the TIR report shall be submitted to the USCG Contracting Officer for disposition of the component. The Contractor shall make the affected equipment available to a USCG Representative to view the exclusionary damage. If the Government elects not to physically view the equipment, the Contractor’s findings report shall stand.

3.21.3 Upon request by the USCG’s Contracting Officer, the Contractor shall submit a FFP quote to include an itemized breakdown of material including nomenclature, P/N, cost, and quantity of replacement parts, replacement percentages used to develop the original firm fixed contract price and the number of labor hours at the labor rates quote for additional funding required to restore exclusionary damage. This quote shall include all necessary supporting rationale and shall be submitted within forty-five (45) calendar days after notification is given to the USCG Contracting Officer. Upon agreement of the parties, the USCG Contracting Officer will authorize repair/overhaul, via contract MOD, for restoration of the exclusionary damage above and beyond the original FFP.

3.22 The Leading-Edge Guard Repair and Replacement

3.22.1 The Contractor (FSR) shall repair and/or replace legacy propeller blade Leading Edge Guards (LEGs) as required by the USCG.

3.23 Field Service Representative (FSR)

The contractor shall provide a Dowty FSR to support the USCG in maintaining the operational readiness of the HC-130J/HC-27J R391 propellers to include engineering and technical support. The FSR will act in an advisory capacity and is not authorized to deviate from or modify OEM or USCG published maintenance procedures. Recommendations for changes to existing USCG procedures are encouraged and shall be made through USCG publication change procedures utilizing the CG-22 process. The FSR shall provide technical and logistical assistance to HC-130J/HC-27J support personnel at ALC and all other USCG operating locations. Additional FSR work, travel, and qualification requirements are detailed in Attachment (A).

3.24 Technical Manuals Support

3.24.1 The Contractor shall provide license access, via Windchill, to current technical manuals and all updates and/or revisions as applicable to the R391 propeller assemblies and components to all USCG units where the HC-130J and HC-27J aircraft are located. This license access is nontransferable and for USCG use only. REVs, MODs, SBs, AMDs and Specifications shall be provided within thirty (30) days of release as applicable to the R391propeller assemblies and components at no additional cost to the Government. Technical data support shall include minor technical inquires and clarification regarding manuals, repair procedures and/or parts and materials. On occasion the FSR may require off-hours technical inquires and parts expediting service.

3.24.2 The Contractor shall analyze potential repair schemes, develop repair procedures, and provide supporting engineering documentation, such as Technical Variances (TVs), SBs, or publication to support changes. The Contractor shall publish changes and provide notification of pending changes prior to implementation.

3.24.3 Propeller Organization Level Maintenance/Technical Manual as listed below:

Operations Manual Illustrated Parts Catalog Maintenance Manual Repair Manual SBs Service Letters (SL) Airworthiness Directive (AD) Part Release Bulletins (PRB) Notice to Operators required to operate and maintain R391 propellers of the HC-130J and HC-27J

3.24.4 Propeller Super O-Level Technical Manuals

Repair Manuals CMMs Illustrated Tool and Equipment Manual

4. Contracting Officer’s Authority No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract; and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.

4.1 Contracting Officer’s Representative (COR). The COR will be the primary conduit between the USCG and the Contractor.

4.2 The COR will act as the Contracting Officer’s representative for technical matters, providing technical direction and discussion as necessary with respect to the FSR, monitoring the progress and quality of the FSR performance.

4.3 The COR is not a Contracting Officer and does not have authority to take any action, either directly or indirectly, that would change pricing, quantity, quality, place of performance, delivery schedule, personal services, or any other terms and conditions of the contract, or to direct the accomplishment of effort which goes beyond the scope of the statement of work in the contract. This also applies to the alternate COR and Technical Monitors.

4.4 It is emphasized that only a Contracting Officer has the authority to modify the terms of the contract; therefore, in no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the Contractor and any other person be effective or binding on the Government. When/if, in the opinion of the Contractor, an effort outside the existing scope of the contract is requested, the Contractor shall promptly notify the Contracting Officer in writing. No action shall be taken by the Contractor (under such direction) unless the Contracting Officer has issued a contractual change or otherwise resolved the issue.

5. Definitions

5.1 ACMS tracking provides an effective means of configuration control to maintain the integrity of OEM overhaul/high time hourly intervals including flight and life cycle limits as applicable to R391 propeller assemblies and components. See section 6 for specific information on the incorporation of USCG ACMS requirements.

5.2 An overhaul zeroes the TSO and may effectively restart some sub-assembly time intervals; while the total time, and OEM component life cycle limits may continue as applicable.

5.3 Modification to the R391 propeller or propeller components is defined as the incorporation of FAA approved SBs, Spare Parts Bulletins, and Airworthiness Directives. This also includes USCG Time Compliance Technical Order (TCTO), and Special Compliance Technical Orders (SCTO), that are based on the FAA approved documents listed above. See paragraph 3.15 for incorporation of SBs and MODs.

5.4 BER: When the cost of returning the component to serviceable condition, exceeds the current replacement cost of that component; or when the component cannot be repaired or overhauled due to damage or wear beyond the material properties, characteristic, or specifications of the item. See paragraph 3.18 for specific information on USCG BER requirements.

5.5 SB (Mandatory and Optional): An Official statement from the OEM to correct issues or improve efficiency of systems within the aircraft. The Contractor is responsible for obtaining and notifying the USCG Contracting Officer of all SB changes and MODs, for disposition approval prior to incorporation of those changes and modifications. See paragraph 3.15 for incorporation of SBs and MODs.

6. USCG ACMS

6.1 The contractor shall comply with all USCG ACMS documentation requirements.

6.2 R391 propeller assemblies and components are serial number tracked under USCG ACMS. This tracking provides historical records of repairs, MODs, overhauls, flight times, cycles, item location, status, and an effective method of configuration control. Components that are serial number tracked under USCG ACMS should, at the time of receipt, have a blank Component Repair Record (CRR), and a current Significant Component History Report (SCHR) attached to the component.

6.3 For configuration control, prior written approval of the USCG Contracting Officer shall be obtained for any configuration changes to propeller assemblies and components. See paragraph 3.15 for specific information on the incorporation of SBs and MODs.

6.4 The contractor shall verify the SCHR and CRR correspond with the NSN, P/N, and S/N of the component received. Promptly report discrepancies to the USCG Contracting Officer prior to performing any work.

6.5 The contractor shall complete the CRR or a Contractor proposed form pre-approved by the USCG, describing the work performed, the technical data used to perform the work, and any significant parts replaced.

6.6 The CRR shall provide a complete description of the work performed, the component status (repaired, modified, overhauled, BER, scrap, etc.) and include, but not be limited to the Contract number, Delivery Order number, CLIN, the Contractor’s Work Order number, the date work was completed, any changes to the TSO, and total time, landings, or cycles as applicable.

6.7 The information provided in the CRR will be used by the USCG to update the component SCHRs.

6.8 The contractor shall provide two copies of the completed CRR as follows:

6.8.1 One copy of the CRR shall remain with the material and is to be returned with the component upon completion of the repair MOD or overhaul.

6.8.2 A second copy of the CRR shall be mailed to:

USCG AVIATION LOGISTICS CENTER (ATTN ACMS)

1664 WEEKSVILLE ROAD

RECEIVING DEPT. BUILDING 63

ELIZABETH CITY, NC 27909-5001

The CRR is considered a deliverable under the contract, and noncompliance with instructions will result in the delay or nonpayment of the invoice.

7. Air Worthy Certification

7.1 The contractor shall provide two (2) copies of an approved FAA Airworthiness Form 8130-3 or other FAA authorized form (e.g., EASA Form 1).

7.2 Attach one (1) copy to the component along with the CRR. The Contractor must track and document calendar time, flight time, flight/life cycles, all work and services performed on R391 Propeller assemblies and components as required under USCG ACMS. See Section 6 for specific information.

7.3 The contractor shall provide copies of all FAA, and OEM certifications, and International Organization for Standardization (ISO) or SIX SIGMA registration (if registered) at the time of contract award. If the Contractor for any reason loses its FAA certification during the period of performance, this constitutes a material breach of contract which may, at the discretion of the USCG Contracting Officer, result in contract termination. The Contractor shall notify the Contracting Officer verbally and in writing, not later than five (5) calendar days after certification forfeiture and disclose all facts relevant to the forfeiture.

7.4 Propeller system changes published by Dowty Propellers will be approved and released according to their type certificate holder obligations under the UK Civil Aviation Authority (UK CAA), which has a bilateral agreement of approval with the FAA. The Contractor shall notify the Government when a propeller system product change is published by the OEM to the relevant technical publications for the propeller system.

7.5 The Contractor shall provide and use a commercial quality system that demonstrates a systems approach for managing quality, safety, and its compliance with all contractual requirements IAW Title 14 CFR Part 145. The Contractor shall, upon Government request, make Contractor and sub-contractor facilities available to the Government to perform any necessary inspection, verification, and evaluations to ascertain the adequacy of the quality system.

7.6 The FAA airworthiness Form 8130-3, the OEM Certificate of Conformance or a Certificate of Conformance IAW FAR 52.246-15 is considered a deliverable under the contract, and noncompliance with instructions herein, will result in the delay or nonpayment of the invoice.

7.7 The Contractor shall deliver all applicable Airworthiness and Configuration Change substantiation technical data as applicable, to include certification reports, modification sheets, Technical Analysis Report (TAR), life analysis with supporting documentation or other substantiating technical documentation for airworthiness and configuration changes developed by the OEM and published to the propeller system technical publications.

8. Marking, Packaging, and Preservation

8.1 Propeller assemblies and components shall be preserved and packaged IAW the applicable component maintenance manual or ASTM D 3951-10. All containers must be labeled on the outside with the NSN, P/N, S/N, nomenclature, contract number, delivery order number, CLIN, and vendor Commercial and Government Entity (CAGE) Code.

8.2 Propeller assembly or individual blades shall be returned in the original OEM or USCG constructed wooden crate.

8.3 The internal packaging material shall be sufficient to prevent damage during shipment, handling, and storage. Preservation protection must be sufficient to prevent corrosion, deterioration, or decay during warehouse storage for a period of not less than one year.

8.4 Packaging matter shall not consist of the following materials: popcorn, shredded paper, Styrofoam, or any type of peanut packaging.

8.5 Bar coding is authorized but not required.

9. Inspection and Acceptance

9.1 Notwithstanding any requirement for specific inspections to be performed solely by the Government, the Contractor shall perform all inspections, tests, and checks as required to substantiate that the supplies and services provided under the contract conform to the latest drawings, specifications, CMMs, and contract requirements listed herein.

9.2 Final inspection and acceptance will be performed by ALC quality assurance personnel for quantity, condition, and compliance with the contract statement of work.

10. Deliver/Reporting Timeframes

Task
Responsible Party
Timeframe
Return of overhauled or repaired components to the USCG
Contractor
Within ninety (90) calendar days after receipt of materiel.
Obtaining and notifying the Contracting Officer for disposition approval prior to incorporation of service bulletin changes and modifications
Contractor
Within seven (7) business days of service bulletin changes and modifications; Section 3.15.1
The Contractor shall notify the Contracting Officer verbally and in writing, not later than five (5) calendar days after certification forfeiture and disclose all facts relevant to the forfeiture
Contractor
Not later than five (5) calendar days after certification forfeiture; Section 7.2
Provide written task order receipts for all assemblies, blades and components
Contractor
Within five (5) business days; Section 3.14
Contractor shall provide supporting documentation to the Government within three (3) business days of notification to the regulatory authority for safety related service bulletins
Contractor
Within three (3) business days after receipt of that notification; Section 3.15.4
Upon request the Contractor shall provide a copy of the TIR to the Contracting Officer
Contractor
Within ten (10) calendar days; Section 3.16.2
The Contractor shall notify the Contracting Officer in writing of any missing parts.
Contractor
Within ten (10) business days of receipt of the propeller assemblies, blades or after induction to repair for other listed contract line items; Section 3.19.1
The Contractor shall notify the USCG Contracting Officer in writing of any missing parts or sub-assemblies required for final inspection and acceptance.
Contractor
Within ten (10) business days of receipt of the propeller assemblies, blades or after induction to repair for other listed contract line items; Section 3.16.1
The Contracting Officer shall provide formal disposition instructions to the Contractor.
Contracting Officer
Forty-five (45) calendar days; Section 3.19.1
Upon receiving components exhibiting cannibalization, the Contractor shall notify the Contracting Officer, in writing and in detail, and discontinue all actions until receipt of written authorization to proceed from the Contracting Officer.
Contractor
Within ten (10) business days; Section 3.16.2
If a component is considered (by the Contractor) to fit the exclusion description, the Contractor shall notify the Contracting Officer and discontinue all actions until the Contracting Officer makes a determination.
Contractor
Within ten (10) business days; Section 3.21.2
Exclusions: Upon request by the Contracting Officer, the Contractor shall submit a firm fixed price to include an itemized breakdown of material including nomenclature, part number, cost, and quantity of replacement parts, replacement percentages used to develop the original firm fixed contract price and the number of labor hours at the labor rates proposal for additional funding required to restore exclusionary damage. This proposal shall include all necessary supporting rationale and shall be submitted to the Contracting Officer.
Contractor
Within forty-five (45) calendar days after notification given to the Contracting Officer; Section 3.21.3
The Contractor shall notify the Contracting Officer in writing providing the following information: (1) date the components were received at the Contractor’s facility, (2) Confirmation of P/Ns and S/Ns, and any discrepancy with the P/N and/or S/N shown on the task order and /or the SCHR and CRR.
Contractor
Within ten (10) business days of receipt of propeller assemblies, blades or after induction to repair for other listed contract items; Section 3.14.3
Revisions, MODs, SBs, AMDs and Specifications shall be provided as applicable to the R391 propeller assemblies, blades, and listed components at no additional cost to the Government.
Contractor
Provided within thirty (30) days of release; Section 3.24.1
The Contractor shall supply a quarterly report of the FSR activity.
Contractor
Provided following the end of each quarter.

11. Acronyms

ACMSAsset Computerized Maintenance System
ALCAviation Logistics Center
AMDAmendment
AOGAircraft-On-Ground
ASSYAssembly
BERBeyond Economical Repair
USCGUnited States Coast Guard
CLINContract Line Item
CMMComponent Maintenance Manual
CRRComponent Repair Record
DCMADefense Contract Management Agency
FAAFederal Aviation Administration
FODForeign Object Damage
GFPGovernment Furnished Property
IAWIn Accordance With
IPCIllustrated Parts Catalog
NSNNational Stock Number
OEMOriginal Equipment Manufacturer
P/NPart Number
SOWStatement Of Work
REVRevision
RFIReady For Installation
S/NSerial Number
SBService Bulletin
SCHRSignificant Component History Report
TATTurn Around Time
TIRTeardown Inspection Report
TRTemporary Revision
TSNTime Since New
TSOTime Since Overhaul
USCGUnited States Coast Guard

I certify this requirement meets the Government’s minimum need and that the supporting data, which forms a basis for this justification, is complete and accurate.

________________________________________________
LCDR Chanel LeeDate

USCG, MRS HC-27J Engineering

_________________________________________________
LCDR Greg BukataDate

USCG, LRS HC-130J Engineering

ATTACHMENT 1

Dowty R391 propeller overhaul and major inspection work scope inclusions.

Propeller Induction Activities

Strip

Wash

Strip Report

Clean

Inspect

NDT

As Required Repairs

Hub Bronze Bore Repair

Hub Back Plate Repair

Repair of Cylinder Assy.

Repair of Crosshead shaft Assy.

Slip Ring Repair

Repair/Replacement of Leading-Edge Guards (up to 6)

Repair/Replacement of De-Ice Overshoe (up to 6)

Repair of blade surface damage (up to 6)

Parts Replacement if a Repair Cannot be Achieved Within the CMM Tolerances, or Approved by Engineering Concession

Hub Back Plate Replacement

Replacement of Cylinder Assy.

Replacement of Crosshead shaft Assy.

Slip Ring Replacement

Replacement of Inner bearing assembly components (up to 6)

Replacement of Outer bearing assembly components (up to 6)

Replacement of miscellaneous fasteners, bolts, screws and harnesses

Blade de-ice boot replacement.

OEM Remanufacturing and Repair Services

Blade re-cuff and re-poly, if required, to limit scrap replacement.

OEM Engineering Support for repairs activities

Engineering Repair Concessions - Covers non-standard repairs for part damage features that are outside those addressed in the CMM, the Dowty engineering teamwork with the maintenance team to develop repair concessions or additional repairs.

Propeller Shipping Instructions

Do Not Test

Ship in two (2) crates and (1) one backplate box strapped to crates

PAGE \* MERGEFORMAT 1

File details come from the government source that posted it. Updated .