This is a project manual and specifications document for the Smith River Border Protection Station HVAC Split System, prepared by the California Department of General Services (DGS) under Project #13984. The project involves the design and installation of a heating, ventilating, and air conditioning split system at the Smith River Agricultural Inspection Station located at 17200 US 101 in Smith River, California. The project manual was approved by the Office of the State Fire Marshal on February 3, 2026, with final approval subject to field inspection. The document was prepared by Interactive Resources, Inc., serving as the architect, with mechanical and electrical engineering provided by GHD Inc. The project specifications include detailed requirements for HVAC components, thermal insulation, refrigerant piping, metal ducts, hangers and supports, and testing and balancing procedures, organized according to the Construction Specifications Institute (CSI) MasterFormat divisions.
The specifications establish comprehensive technical standards for all work, including performance requirements, product specifications, installation procedures, quality assurance protocols, and field testing methodologies. The project requires compliance with multiple industry standards including ASHRAE, AWS, ASME, SMACNA, and California building codes. The specifications detail specific materials such as copper tubing for refrigerant piping, galvanized sheet steel for ducts, and various HVAC accessories, along with installation requirements for hangers, supports, and seismic restraints. The document mandates field quality control testing, including refrigerant system pressure tests, leak detection, duct sealing verification, and testing and balancing procedures to ensure systems operate within specified tolerances of plus or minus 10 percent for airflow rates. The contractor is required to submit detailed plans, certifications, and reports throughout the construction and commissioning process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26-0094_IFB_Public_Works.pdf | ||
| Attachment_2_-_Smith_River_BPS_Working_Drawings.pdf | ||
| 26-0094_COST_PROPOSAL.xlsx | XLSX spreadsheet | |
| Non-Collusion.pdf | ||
| Labor_Code_Certifications.pdf | ||
| Attachment_3_-_SR_BPS_Working_Drawings_-_As-built_Excerpts.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100% PROJECT MANUAL
FOR:
SMITH RIVER BORDER PROTECTION
HVAC SPLIT SYSTEM
Department of General Services Project #: 13984 February 3, 2026
Architect: Interactive Resources, Inc.
OFFICE OF THE STATE FIRE MARSHAL
shall be available on the project site at all times.
5/12/2026
APPROVED FIRE AND PANIC ONLY
Approval of this plan does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved plans
26-0325
Mike.Tran Text Box v1
Smith River Border Protection Station HVAC Split System DGS Project #13984, IR Project 2023-006-05
January 29, 2026
TABLE OF CONTENTS
INTRODUCTORY INFORMATION
Pages
Document 00 01 01 Project Title Page .............................................................................. 1 only 00 01 05 Certifications Page............................................................................. 1 through 3 00 01 10 Table of Contents .............................................................................. 1 through 2
DIVISION 01 — GENERAL REQUIREMENTS
01 73 00 – Execution
DIVISION 07 — THERMAL AND MOISTURE PROTECTION
07 21 00 – Thermal Insulation
DIVISION 23 — HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 00 – Common Work Results for HVAC
23 05 29 – Hangers and Support for HVAC
23 05 93 – Testing, Adjusting and Balancing for HVAC
23 23 00 – Refrigerant Piping
23 31 13 – Metal Ducts
23 34 16 – Centrifugal HVAC Fans
23 81 26 – Split-System Air-Conditioners
DIVISION 26 — ELECTRICAL
26 05 00 – Common Work Results for Electrical
26 05 19 – Low-Voltage Electrical Power Conductors and Cables
26 05 26 – Grounding and Bonding for Electrical Systems
26 05 29 – Hangers and Supports for Electrical Systems
January 29, 2026 26 05 33 – Raceways and Boxes for Electrical Systems
26 05 53 – Identification for Electrical Systems
26 24 16 – Panelboards
26 18 16 – Enclosed Switches
CERTIFICATIONS PAGE
00 01 05-1 000000000013984
SECTION 000105
CERTIFICATIONS PAGE (OSFM)
PROJECT TITLE : 000000000013984 – Smith River Border HVAC Split System
CLIENT AGENCY : Department of General Services – Facilities Management
Division 707 3rd St. 3rd Floor West Sacramento, CA 95605
LOCATION : Smith River Agricultural Inspection Station
17200 US 101
Smith River, California 95567
PROJECT NUMBER : 000000000013984
OWNER : Department of General Services-Facilities Management Division 707 3rd St. 3rd Floor West Sacramento, CA 95605
PROJECT MANAGER : Anthony Brown Telephone Number: (916) 879-1021 Email: Anthony.brown@dgs.ca.gov
CONSULTANT : Interactive Resources, Inc.
00 01 05-2 000000000013984
ARCHITECT
ELECTRICAL ENGINEER
MECHANICALENGINEER
REGULATORY REVIEWS:
STATE FIRE MARSHAL
ACCESS COMPLIANCE
L
IC
E
NSED ARCHITE
C T
No. C 7,389
TH
OMAS K BUTT
REN. 3-31-27S
T
ATE
OF CALIFORN
IA
E25957RE
G I S T
ER
ED PRO F E S S I ON A L ENG I NEER
S T A T E O F C A L I F O R N I A
E L E C T R I C A L
R E B E
C C A O . K EA T I NG
E25957RE
G I
S T
ER
ED PRO F E S S I ON A L ENG I NEER
S T A T E O F C A L I F O R N I A
E L E C T R I C A L
R E B E
C C A O . K EA T I NGM29562
6/30/27
No.
Exp.
RE
G I
ST
ER
ED PRO FE S S I ON A L E NGI NEER
S TA T E O F C A L I F O R N I A
T E R R Y W O NG
M E C H A N I C A L
00 01 05-3 000000000013984
OSHPD
CERTIFICATION PAGE
00 01 07-1 000000000013984
SECTION 00 01 07
CERTIFICATION PAGE
PROJECT #000000000013984
DESIGN PROFESSIONALS OF RECORD
ARCHITECT:
Thomas K. Butt Interactive Resources, Inc., 117 Park Place Richmond, CA 94801 510-236-7435 Tom.Butt@intres.com
ELECTRICAL/MECHANICAL ENGINEER:
Rebeca O. Keating, PE.
GHD Inc.
2235 Mercury Way Suite 150 Santa Rosa, California 95407
(707) 523-1010 Ashley.Johnson@ghd.com
MECHANICAL ENGINEER:
Terry Wong, PE.
GHD Inc.
2235 Mercury Way Suite 150 Santa Rosa, California 95407
(707) 523-1010 Terry.wong@ghd.com
L
IC
E
NSED ARCHITE
C T
No. C 7,389
TH
OMAS K BUTT
REN. 3-31-27S
T
ATE
OF CALIFORN
IA
E25957RE
G I
S T
ER
ED PRO F E S S I ON A L ENG I NEER
S T A T E O F C A L I F O R N I A
E L E C T R I C A L
R E B E
C C A O . K EA T I NG
M29562 6/30/27
No.
Exp.
RE
G I
ST
ER
ED PRO FE S S I ON A L E NGI NEER
S TA T E O F C A L I F O R N I A
T E R R Y W O NG
M E C H A N I C A L
EXECUTION 01 73 00 - 1
SECTION 01 73 00 - EXECUTION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes general administrative and procedural requirements governing execution of the Work, including, but not limited to, the following:
1. Installation.
2. Cutting and patching.
3. Progress cleaning.
4. Starting and adjusting.
5. Protection of installed construction.
6. Correction of the Work.
B. Cutting: Removal of in-place construction necessary to permit installation or performance of subsequent work.
C. Patching: Fitting and repair work required to restore construction to original conditions after installation of subsequent work.
1.2 INFORMATIONAL SUBMITTALS
A. Cutting and Patching Plan: Submit plan describing procedures at least [10] <Insert number> days prior to the time cutting and patching will be performed. Include the following information:
1. Extent: Describe reason for and extent of each occurrence of cutting and patching.
2. Changes to In-Place Construction: Describe anticipated results. Include changes to structural elements and operating components as well as changes in building appearance and other significant visual elements.
3. Products: List products to be used for patching and firms or entities that will perform patching work.
4. Dates: Indicate when cutting and patching will be performed.
5. Utilities and Mechanical and Electrical Systems: List services and systems that cutting and patching procedures will disturb or affect. List services and systems that will be relocated and those that will be temporarily out of service. Indicate length of time permanent services and systems will be disrupted.
a. Include description of provisions for temporary services and systems during interruption of permanent services and systems.
EXECUTION 01 73 00 - 2
PART 2 - PRODUCTS
2.1 MATERIALS
A. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.
1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to Architect for the visual and functional performance of in-place materials. Use materials that are not considered hazardous.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.
1. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.
2. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.
3. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.
B. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following:
1. Description of the Work, including Specification Section number and paragraph, and Drawing sheet number and detail, where applicable.
2. List of detrimental conditions, including substrates.
3. List of unacceptable installation tolerances.
4. Recommended corrections.
C. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
EXECUTION 01 73 00 - 3
3.2 PREPARATION
A. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Architect in accordance with requirements in Section 013100 "Project Management and Coordination."
3.3 INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb, and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated.
B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
C. Install products at the time and under conditions that will ensure satisfactory results as judged by Architect. Maintain conditions required for product performance until Substantial Completion.
D. Conduct construction operations, so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy of type expected for Project.
E. Sequence the Work and allow adequate clearances to accommodate movement of construction items on-site and placement in permanent locations.
F. Tools and Equipment: Select tools or equipment that minimize production of excessive noise levels.
G. Templates: Obtain and distribute to the parties involved templates for Work specified to be factory prepared and field installed. Check Shop Drawings of other portions of the Work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.
H. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are
I. not indicated, verify size and type required for load conditions with manufacturer.
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.
2. Allow for building movement, including thermal expansion and contraction.
3. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.
EXECUTION 01 73 00 - 4
J. Joints: Make joints of uniform width. Where joint locations in exposed Work are not indicated, arrange joints for the best visual effect, as judged by Architect. Fit exposed connections together to for
K. m hairline joints.
3.4 CUTTING AND PATCHING
A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.
1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.
B. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties.
C. Temporary Support: Provide temporary support of Work to be cut.
D. Protection: Protect in-place construction during cutting and patching to prevent damage.
Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
E. Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of free passage to adjoining areas is unavoidable, coordinate cutting and patching in accordance with requirements in Section 01 10 00 "Summary."
F. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to [minimize] [prevent] interruption to occupied areas.
G. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.
1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum d
2. isturbance of adjacent surfaces. Temporarily cover openings when not in use.
3. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.
4. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.
5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.
6. Proceed with patching after construction operations requiring cutting are complete.
H. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as
EXECUTION 01 73 00 - 5
practicable, as judged by Architect. Provide materials and comply with installation requirements specified in other Sections, where applicable.
1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate physical integrity of installation.
2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.
a. Clean piping, conduit, and similar features before applying paint or other finishing materials.
b. Restore damaged pipe covering to its original condition.
3. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an even-plane surface of uniform appearance.
4. Exterior Building Enclosure: Patch and seal conduit and pipe penetrations in a manner that restores enclosure to a weathertight condition and ensures thermal and moisture integrity of building enclosure.
I. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.
3.5 PROGRESS CLEANING
A. Clean Project site and work areas daily, including common areas. Enforce requirements strictly.
Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold waste materials more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste.
Mark containers appropriately and dispose of legally, in accordance with regulations.
a. Use containers intended for holding waste materials of type to be stored.
4. Coordinate progress cleaning for joint-use areas where Contractor and other contractors are working concurrently.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
D. Installed Work: Keep installed work clean. Clean installed surfaces in accordance with written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning
EXECUTION 01 73 00 - 6
materials that are not hazardous to health or property and that will not damage exposed surfaces.
E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.
F. Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.
G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways. Comply with waste disposal requirements in Section 01 74 19 "Construction Waste Management and Disposal."
H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
J. Limiting Exposures: Supervise construction operations to ensure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
3.6 STARTING AND ADJUSTING
A. Coordinate startup and adjusting of equipment and operating components with requirements in Section 019113 "General Commissioning Requirements."
B. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.
C. Adjust equipment for proper operation. Adjust operating components for proper operation without binding.
D. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties.
Replace damaged and malfunctioning controls and equipment.
E. Manufacturer's Field Service: Comply with qualification requirements in Section 014000 "Quality Requirements."
3.7 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
B. Protection of Existing Items: Provide protection and ensure that existing items to remain undisturbed by construction are maintained in condition that existed at commencement of the Work.
C. Comply with manufacturer's written instructions for temperature and relative humidity.
EXECUTION 01 73 00 - 7
3.8 CORRECTION OF THE WORK
A. Repair or remove and replace damaged, defective, or nonconforming Work. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
B. Repair Work previously completed and subsequently damaged during construction period.
Repair to like-new condition.
C. Restore permanent facilities used during construction to their specified condition.
D. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.
E. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.
F. Remove and replace chipped, scratched, and broken glass or reflective surfaces.
END OF SECTION 01 73 00
THERMAL INSULATION 07 21 00 - 1
SECTION 07 21 00 - THERMAL INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Spray-applied cellulosic loose-fill insulation.
B. Related Requirements:
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.3 INFORMATIONAL SUBMITTALS
A. Installer's Certification: Listing type, manufacturer, and R-value of insulation installed in each element of the building thermal envelope.
1. For blown-in or sprayed cellulosic-fiber loose-fill insulation, indicate initial installed thickness, settled thickness, settled R-value, installed density, coverage area, and number of bags installed.
2. Sign, date, and post the certification in a conspicuous location on Project site.
B. Product Test Reports: For each product, for tests performed by a qualified testing agency.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Protect insulation materials from physical damage and from deterioration due to moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation.
PART 2 - PRODUCTS
2.1 LOOSE-FILL INSULATION
A. Cellulosic-Fiber Loose-Fill Insulation: ASTM C739, chemically treated for flame-resistance, processing, and handling characteristics. Type I for pneumatic application.
B. Products must conform to the CPSC standard 16 CFR Parts 1209 and 1404.
THERMAL INSULATION 07 21 00 - 2
C. Products must meet all of the test requirements of ASTM C739 and Underwriter’s Laboratories (R-8173) tested the following properties:
1. Density. The maximum density after long- term settling of dry applications: ASTM C739,
1.6 lb. B. Thermal Resistance
D. Thermal Resistance: Average thermal resistance per inch:
1. ASTM C-518 — (4 in. thick)
2. ASTM C-739 — 3.40 (R-Value/in)
E. Surface Burning Characteristics
1. Critical Radiant Flux: using test method ASTM E-970
2. Flame Spread: using ASTM E-84
3. ASTM E-970 greater than 0.12 watts/cm
4. ASTM E-84 less than 25/ft³
F. Moisture Vapor Absorption: Normal variations in relative humidity will not adversely affect thermal resistance with less than 15% for maximum weight gain under specified test conditions..
G. Corrosiveness: Non corrosive wen When in contact with steel,copper, aluminum, or galvanized materials.
H. Other properties;
1. Odor Emission Starch Content
2. Fungi Resistance Separation of Chemicals
3. Smolder Resistance Flame Spread
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products, applications and applicable codes.
B. Comply with Cellulose Insulation Manufacturers Association Technical Bulletin “Standard Practices for Installation of Cellulose Insulation in he United States.”
C. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.
D. Do not install in areas of excessive or continuous moisture. Spaces to be insulated must be prepared so as to keep insulation material from coming in direct contact with non-IC rated recessed light fixtures, stove pipes, or chimneys.
E. REPAIRING HOLES
THERMAL INSULATION 07 21 00 - 3
F. Repairing walls after cellulose installation by sealing, patching, and finishing 1.5-inch to 2-inch diameter holes. Suitable methods include plugging holes with wood or drywall discs secured with adhesive, filling with spray foam, covering with mesh tape, and applying joint compound, followed by sanding and painting for a seamless finish
1. Drywall Plug Method: Reuse the original hole-saw cutouts or create new drywall circles.
Insert a small piece of wood (1x2 or plywood) into the hole, screw it to the existing drywall to create a bridge, then attach the patch plug to this bridge with a screw.
2. Spray Foam/Caulk Method: Use low-expansion foam to fill the hole, allowing it to act as both a plug and air seal. Once hardened, cut excess foam with a serrated knife, leaving an indentation for joint compound.
3. Wood Plugs/Filler: For exterior walls or deeper holes, use tapered wood plugs and specialized polyurethane caulk to seal and weatherproof the hole.
4. Finishing: Apply mesh tape or drywall tape over the patch, apply joint compound, feather the edges, sand smooth, prime, and paint.
5. Patching Many Holes: For a large number of holes in a line, it may be faster to cut out a full strip of drywall and replace it rather than patching individual holes.
6. Paint to match adjacent surfaces.
3.2 PROTECTION
A. Protect installed insulation from damage due to harmful weather exposures, physical abuse, and other causes.
END OF SECTION 07 21 00
January 29, 2026
12666094 23 05 00-1 Common Work Results For
HVAC
SECTION 23 05 00
COMMON WORK RESULTS FOR HVAC
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Sleeves without waterstop.
2. Sleeves with waterstop.
3. Stack-sleeve fittings.
4. Sleeve-seal systems.
5. Grout.
6. Silicone sealants.
7. Escutcheons.
1.2 ACTION SUBMITTALS
A. Product data.
1.3 INFORMATIONAL SUBMITTALS
A. Welding certificates.
B. Field quality-control reports.
1.4 QUALITY ASSURANCE
A. Welding Qualifications: Qualify procedures and personnel in accordance with
AWS D1.1/D1.1M.
B. Pipe and Pressure-Vessel Welding Qualifications: Qualify procedures and operators in accordance with 2021 ASME Boiler and Pressure Vessel Code, Section IX.
PART 2 PRODUCTS
2.1 SLEEVES AND SLEEVE SEALS
A. Sleeves without Waterstop:
1. Cast-Iron Pipe Sleeves: Cast or fabricated of cast or ductile iron, with plain ends.
2. Steel Pipe Sleeves: ASTM A53/A53M, Type E, Grade B, Schedule 40, hot-dip galvanized, with plain ends.
3. Steel Sheet Sleeves: ASTM A653/A653M, 24 gauge minimum thickness; hot-dip galvanized, round tube closed with welded longitudinal joint.
B. Sleeves with Waterstop:
1. Description: Manufactured galvanized-steel, sleeve-type, waterstop assembly, made for imbedding in concrete slab or wall.
January 29, 2026
12666094 23 05 00-2 Common Work Results For
HVAC
C. Sleeve-Seal Systems:
1. Description: Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.
a. Hydrostatic Seal: 20 psig minimum.
b. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe.
Include type and number required for pipe material and size.
c. Pressure Plates: Carbon steel.
d. Connecting Bolts and Nuts: Carbon steel, with zinc coating. ASTM B633 of length required to secure pressure plates to sealing elements.
D. Grout:
1. Description: Non-shrink, for interior and exterior sealing openings in non-fire-rated walls or floors.
2. Standard: ASTM C1107/C1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.
3. Design Mix: 5000 psi, 28-day compressive strength.
4. Packaging: Premixed and factory packaged.
E. Silicone Sealants:
1. Silicone Sealant, S, NS, 25, NT: Single-component, non-sag, plus 25 percent and minus 25 percent movement capability, nontraffic-use, neutral-curing silicone joint sealant.
a. Standard: ASTM C920, Type S, Grade NS, Class 25, Use NT.
2. Silicone Sealant, S, P, T, NT: Single-component, 100/50, pourable, plus 100 percent and minus 50 percent movement capability, traffic- and nontraffic-use, neutral-curing silicone joint sealant.
a. Standard: ASTM C920, Type S, Grade P, Class 100/50, Uses T and NT.
3. Sealant shall have a VOC content of 250 g/L or less.
a. Sealant shall comply with the testing and product requirements of the EPA’s "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."
2.2 ESCUTCHEONS
A. Escutcheon Types:
1. One-Piece, Steel Type: With polished, chrome-plated finish and setscrew fastener.
2. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped steel with polished, chrome-plated finish and spring-clip fasteners.
3. One-Piece, Stamped-Steel Type: With polished, chrome-plated finish and spring-clip fasteners.
4. Split-Plate, Stamped-Steel Type: With polished, chrome-plated finish; concealed hinge; and spring-clip fasteners.
B. Floor Plates:
January 29, 2026
12666094 23 05 00-3 Common Work Results For
HVAC
1. Split Floor Plates: Steel with concealed hinge.
PART 3 EXECUTION
3.1 INSTALLATION OF SLEEVES - GENERAL
A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.
B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1-inch annular clear space between piping and concrete slabs and walls.
1. Sleeves are not required for core-drilled holes.
C. Install sleeves in concrete floors, concrete roof slabs, and concrete walls as new slabs and walls are constructed.
1. Cut sleeves to length for mounting flush with both surfaces.
a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level.
2. Using grout or silicone sealant, seal space outside of sleeves in floors/slabs/walls without sleeve-seal system. Select to maintain fire resistance of floor/slab/wall.
D. Install sleeves for pipes passing through interior partitions.
1. Cut sleeves to length for mounting flush with both surfaces.
2. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation.
3. Seal annular space between sleeve and piping or piping insulation; use joint sealants that joint sealant manufacturer's literature indicates is appropriate for size, depth, and location of joint.
E. Fire-Resistance-Rated Penetrations, Horizontal Assembly Penetrations, and Smoke- Barrier Penetrations: Maintain indicated fire or smoke rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with fire- and smoke-stop materials.
Comply with requirements for firestopping and fill materials specified in Section 07 84 13 "Penetration Firestopping."
3.2 INSTALLATION OF SLEEVES WITH WATERSTOP
A. Install sleeve with waterstop as new walls and slabs are constructed.
B. Assemble fitting components of length to be flush with both surfaces of concrete slabs and walls. Position waterstop flange centered across width of concrete slab or wall.
C. Secure nailing flanges to wooden concrete forms.
D. Using grout or silicone sealant, seal space around outside of sleeves.
3.3 INSTALLATION OF SLEEVE-SEAL SYSTEMS
A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building and passing through exterior walls.
January 29, 2026
12666094 23 05 00-4 Common Work Results For
HVAC
B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Assemble sleeve-seal system components and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.
3.4 INSTALLATION OF ESCUTCHEONS
A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors.
B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of insulated piping and with OD that completely covers opening.
3.5 FIELD QUALITY CONTROL
A. Sleeves and Sleeve Seals:
1. Perform the following tests and inspections:
a. Leak Test: After allowing for a full cure, test sleeves and sleeve seals for leaks.
Repair leaks and retest until no leaks exist.
b. Sleeves and sleeve seals will be considered defective if they do not pass tests and inspections.
2. Prepare test and inspection reports.
B. Escutcheons:
1. Using new materials, replace broken and damaged escutcheons and floor plates.
3.6 SLEEVES APPLICATION
A. Use sleeves and sleeve seals for the following piping-penetration applications:
1. Exterior Concrete Walls above and below Grade:
a. Sleeves with waterstops.
1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.
2. Concrete Slabs-on-Grade:
a. Sleeves with waterstops.
1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.
3. Concrete Slabs above Grade:
a. Sleeves with waterstops or stack-sleeve fittings.
4. Interior Walls and Partitions:
a. Sleeves without waterstops.
January 29, 2026
12666094 23 05 00-5 Common Work Results For
HVAC
3.7 ESCUTCHEONS APPLICATION
A. Escutcheons for New Piping and Relocated Existing Piping:
1. Piping with Fitting or Sleeve Protruding from Wall: One piece, deep pattern.
2. Chrome-Plated Piping: One piece, steel with polished, chrome-plated finish.
3. Insulated Piping:
a. One piece, steel with polished, chrome-plated finish.
b. Bare Piping at Wall and Floor Penetrations in Finished Spaces:
c. One piece, steel with polished, chrome-plated finish.
d. Bare Piping at Ceiling Penetrations in Finished Spaces:
e. One piece, steel with polished, chrome-plated finish.
f. Install floor plates for piping penetrations of equipment-room floors.
B. Install floor plates with ID to closely fit around pipe, tube, and insulation of piping and with OD that completely covers opening.
1. New Piping and Relocated Existing Piping: Split floor plate.
END OF SECTION
12666094 23 05 29-1 Hangers And Supports For HVAC
Piping And Equipment
SECTION 23 05 29
HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Metal pipe hangers and supports.
2. Trapeze pipe hangers.
3. Thermal-hanger shield inserts.
4. Fastener systems.
5. Equipment supports.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product indicated.
1.3 INFORMATIONAL SUBMITTALS
A. Welding certificates.
1.4 QUALITY ASSURANCE
A. Structural Steel Welding Qualifications: Qualify procedures and personnel according to AWS D1.1/D1.1M, "Structural Welding Code - Steel."
B. Pipe Welding Qualifications.
C. Qualify procedures and operators according to ASME Boiler and Pressure Vessel Code.
PART 2 - PRODUCTS
2.1 METAL PIPE HANGERS AND SUPPORTS
A. Carbon-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Galvanized Metallic Coatings: Pre-galvanized or hot dipped.
3. Nonmetallic Coatings: Plastic coating, jacket, or liner.
4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.
B. Stainless-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
3. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
C. Copper Pipe Hangers:
1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.
2. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel
12666094 23 05 29-2
2.2 TRAPEZE PIPE HANGERS
A. Description: MSS SP-69, Type 59, shop- or field-fabricated pipe-support assembly made from structural carbon-steel shapes with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts.
2.3 THERMAL-HANGER SHIELD INSERTS
A. Insulation-Insert Material for Cold Piping: ASTM C 552, Type II cellular glass with 100-psig minimum compressive strength and vapor barrier.
B. Insulation-Insert Material for Hot Piping: Water-repellent treated, ASTM C 533, Type I calcium silicate with 100-psig minimum compressive strength.
C. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.
D. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.
E. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.
2.4 FASTENER SYSTEMS
A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
B. Mechanical-Expansion Anchors: Insert-wedge-type, steel anchors, for use in hardened portland cement concrete; with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
2.5 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon-steel shapes.
2.6 MISCELLANEOUS MATERIALS
A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized.
B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, non-shrink and nonmetallic grout; suitable for interior and exterior applications.
1. Properties: Non-staining, noncorrosive, and nongaseous.
2. Design Mix: 5000-psi, 28-day compressive strength.
PART 3 - EXECUTION
3.1 HANGER AND SUPPORT INSTALLATION
A. Metal Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.
B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89.
Arrange for grouping of parallel runs of horizontal piping and support together on field-fabricated trapeze pipe hangers.
1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for individual pipe hangers.
12666094 23 05 29-3
2. Field fabricate from ASTM A 36/A 36M, carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.
C. Thermal-Hanger Shield Installation: Install in pipe hanger or shield for insulated piping.
D. Fastener System Installation:
1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches thick in concrete after concrete is placed and completely cured.
Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual.
2. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.
E. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.
F. Equipment Support Installation: Fabricate from welded-structural-steel shapes.
G. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
H. Install lateral bracing with pipe hangers and supports to prevent swaying.
I. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.
J. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
K. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.
L. Insulated Piping:
1. Attach clamps and spacers to piping.
a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
b. Piping Operating below Ambient Air Temperature: Use thermal-hanger shield insert with clamp sized to match OD of insert.
c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.
2. Install MSS SP-58, Type 39, protection saddles if insulation without vapor barrier is indicated. Fill interior voids with insulation that matches adjoining insulation.
a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
3. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier.
Shields shall span an arc of 180 degrees.
a. Option: Thermal-hanger shield inserts may be used. Include steel weight-distribution plate for pipe NPS 4 and larger if pipe is installed on rollers.
4. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick.
b. NPS 4: 12 inches long and 0.06 inch thick.
12666094 23 05 29-4
c. NPS 5 and NPS 6: 18 inches long and 0.06 inch thick.
d. NPS 8 to NPS 14: 24 inches long and 0.075 inch thick.
e. NPS 16 to NPS 24: 24 inches long and 0.105 inch thick.
5. Pipes NPS 8 and Larger: Include wood or reinforced calcium-silicate-insulation inserts of length at least as long as protective shield.
6. Thermal-Hanger Shields: Install with insulation same thickness as piping insulation.
3.2 EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.
B. Grouting: Place grout under supports for equipment and make bearing surface smooth.
C. Provide lateral bracing, to prevent swaying, for equipment supports.
3.3 METAL FABRICATIONS
A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports.
B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.
C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding;
appearance and quality of welds; and methods used in correcting welding work; and with the following:
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.
3.4 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.
B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.
3.5 PAINTING
A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC-PA 1 requirements for touching up field-painted surfaces.
1. Apply paint by brush or spray to provide a minimum dry film thickness of 2.0 mils.
B. Touchup: Cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal are specified in Division 09 painting Sections.
C. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780.
3.6 HANGER AND SUPPORT SCHEDULE
A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.
B. Comply with MSS SP-69 for pipe-hanger selections and applications that are not specified in piping system Sections.
12666094 23 05 29-5
C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.
D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.
E. Use carbon-steel pipe hangers and supports and metal trapeze pipe hangers and attachments for general service applications.
F. Use stainless-steel pipe hangers and stainless-steel or corrosion-resistant attachments for hostile environment applications.
G. Use copper-plated pipe hangers and copper or stainless-steel attachments for copper piping and tubing.
H. Use padded hangers for piping that is subject to scratching.
I. Use thermal-hanger shield inserts for insulated piping and tubing.
J. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of non-insulated or insulated, stationary pipes NPS 1/2 to NPS 30.
2. Yoke-Type Pipe Clamps (MSS Type 2): For suspension of up to 1050 deg F, pipes NPS 4 to NPS 24, requiring up to 4 inches of insulation.
3. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36, requiring clamp flexibility and up to 4 inches of insulation.
4. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of non-insulated, stationary pipes NPS 1/2 to NPS 8.
5. U-Bolts (MSS Type 24): For support of heavy pipes NPS 1/2 to NPS 30.
6. Pipe Saddle Supports (MSS Type 36): For support of pipes NPS 4 to NPS 36, with steel-pipe base stanchion support and cast-iron floor flange or carbon-steel plate.
7. Pipe Stanchion Saddles (MSS Type 37): For support of pipes NPS 4 to NPS 36, with steel-pipe base stanchion support and cast-iron floor flange or carbon-steel plate, and with U-bolt to retain pipe.
8. Single-Pipe Rolls (MSS Type 41): For suspension of pipes NPS 1 to NPS 30, from two rods if longitudinal movement caused by expansion and contraction might occur.
9. Complete Pipe Rolls (MSS Type 44): For support of pipes NPS 2 to NPS 42 if longitudinal movement caused by expansion and contraction might occur but vertical adjustment is not necessary.
K. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to
NPS 24.
2. Carbon- or Alloy-Steel Riser Clamps (MSS Type 42): For support of pipe risers NPS 3/4 to NPS 24 if longer ends are required for riser clamps.
L. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.
2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.
M. Building Attachments: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.
12666094 23 05 29-6
2. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction, to attach to top flange of structural shape.
3. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.
4. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams.
5. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are considerable and rod sizes are large.
6. C-Clamps (MSS Type 23): For structural shapes.
7. Welded-Steel Brackets: For support of pipes from below, or for suspending from above by using clip and rod. Use one of the following for indicated loads:
a. Light (MSS Type 31): 750 lb.
b. Medium (MSS Type 32): 1500 lb.
c. Heavy (MSS Type 33): 3000 lb.
8. Side-Beam Brackets (MSS Type 34): For sides of steel or wooden beams.
9. Plate Lugs (MSS Type 57): For attaching to steel beams if flexibility at beam is required.
N. Saddles and Shields: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Steel-Pipe-Covering Protection Saddles (MSS Type 39): To fill interior voids with insulation that matches adjoining insulation.
2. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.
3. Thermal-Hanger Shield Inserts: For supporting insulated pipe.
O. Spring Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Spring Cushions (MSS Type 48): For light loads if vertical movement does not exceed 1-1/4 inches.
2. Spring-Cushion Roll Hangers (MSS Type 49): For equipping Type 41, roll hanger with springs.
3. Variable-Spring Base Supports (MSS Type 52): Preset to indicated load and limit variability factor to 25 percent to allow expansion and contraction of piping system from base support.
P. Comply with MSS SP-69 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.
Q. Use powder-actuated fasteners or mechanical-expansion anchors instead of building attachments where required in concrete construction.
12666094 23 05 93-1 Testing, Adjusting, And Balancing
For HVAC
SECTION 23 05 93
TESTING, ADJUSTING, AND BALANCING FOR HVAC
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Balancing Air Systems:
a. Constant-volume air systems.
1.2 DEFINITIONS
A. AABC: Associated Air Balance Council.
B. NEBB: National Environmental Balancing Bureau.
C. TAB: Testing, adjusting, and balancing.
D. TABB: Testing, Adjusting, and Balancing Bureau.
E. TAB Specialist: An entity engaged to perform TAB Work.
1.3 INFORMATIONAL SUBMITTALS
A. Strategies and Procedures Plan: Within 30 days of Contractor's Notice to Proceed, submit TAB strategies and step-by-step procedures as specified in "Preparation" Article.
B. Certified TAB reports.
1.4 QUALITY ASSURANCE
A. TAB Contractor Qualifications: Engage a TAB entity certified by AABC, NEBB or TABB.
1. TAB Field Supervisor: Employee of the TAB contractor and certified by AABC, NEBB, or TABB.
2. TAB Technician: Employee of the TAB contractor and who is certified by AABC, NEBB or TABB as a TAB technician.
B. Certify TAB field data reports and perform the following:
1. Review field data reports to validate accuracy of data and to prepare certified TAB reports.
2. Certify that the TAB team complied with the approved TAB plan and the procedures specified and referenced in this Specification.
C. TAB Report Forms: Use standard TAB contractor's forms approved by Architect.
D. Instrumentation Type, Quantity, Accuracy, and Calibration: As described in ASHRAE 111, Section 5, "Instrumentation."
E. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1, Section 7.2.2 - "Air Balancing."
F. ASHRAE/IESNA Compliance: Applicable requirements in ASHRAE/IESNA 90.1, Section 6.7.2.3 - "System Balancing."
12666094 23 05 93-2
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine the Contract Documents to become familiar with Project requirements and to discover conditions in systems' designs that may preclude proper TAB of systems and equipment.
B. Examine systems for installed balancing devices, such as test ports, gage cocks, thermometer wells, flow-control devices, balancing valves and fittings, and manual volume dampers. Verify that locations of these balancing devices are accessible.
C. Examine the approved submittals for HVAC systems and equipment.
D.…