Attachment 4 - SOW.pdf

PDF 130 KB Posted

Attached to
Eaton/Wright Line Furniture - ITEC Federal contract opportunity
Solicitation number
FA875122Q0371
Issued by
Department of the Air Force Materiel Command Research Laboratory

View the file

Other files for this federal contract opportunity

Other files attached to Eaton/Wright Line Furniture - ITEC, newest first.
File Type Posted
Attachment 1 -Brand Name_Wrightline.pdf PDF
Attachment 5 - Wage Determination.pdf PDF
Attachment 2- Wright Line Parts List.xlsx XLSX spreadsheet
Attachment 3- Furniture Drawing.pdf PDF
Attachment 6 - Reps and Certs.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

PROVIDE EATON/WRIGHT LINE LAB FURNITURE

RELOCATE ITEC TO BUILDING 106

AT

AIR FORCE RESEARCH LABORATORY

ROME, NY

17 May 2022

1.01 SCOPE

A. The scope of this effort consists of furnishing all design services, delivery and labor, equipment, devices, and materials, for new and existing components and parts and to perform all work required to PROVIDE EATON/WRIGHT LINE LAB FURNITURE, located at Air Force Research Laboratory ITEC, ROME, NY. This procurement will consist of installing existing furniture from our current inventory as well as supplemental new parts and pieces.

1.02 PRINCIPAL FEATURES

A. The work to be performed involves the following principal features:

1. Develop estimates with part numbers and descriptions for all pieces listed on attached parts list. All parts must be new. Eaton/Wright Line brand parts will be the only accepted product line, as our existing parts are from Eaton/Wright Line.

Parts are proprietary, Eaton/Wright Line will be the only brand accepted.

2. All product to be quoted in the following finishes:

Metal Frame: Black

Metal: NuGrey

Fabric: FR701 Grey Mix

Laminate: Greystone (ESD)

Trim: NuGrey

3. After AFRL/RIOC approval, order and deliver all furniture and materials to work area site. Transport existing inventory from Bldg. 2, Warehouse to installation site in Bldg. 106 (Warehouse is located across from installation site).

4. Install all furniture, including all accessories. Remove all packing material and boxes from the work site.

5. Bldg. 2 Warehouse has a useable loading dock. Bldg. 106 (Installation bldg.) has a vehicle bay with overhead door, no loading dock. Installation will be on the 1st floor installation directly across from the vehicle bay.

‐‐ End of SOW‐‐