Attachment 4 - Repair Marina Pier-Cristobal MSS.xls
XLS spreadsheet 99 KB Posted
- Attached to
- Repair Marina Piers - TS Cristobal
- Solicitation number
- FA301022R0002
About this file
This document contains a Material Submittal Schedule and related federal contract opportunity for repair of marina piers at Tyndall Air Force Base. The schedule outlines over 150 required submittals for products and services across various construction disciplines, including concrete, structural steel, doors and windows, HVAC, electrical and plumbing systems. Submittals are due prior to the start of work and at various stages of completion, with engineering review and approval required.
The related federal contract opportunity is a 100% Service-Disabled Veteran-Owned Small Business set-aside between $1,000,000 to $5,000,000 for repair of marina piers at Tyndall Air Force Base. The solicitation allows for an organized site visit on November 8, 2021 and requires acknowledgement of all amendments. Proposals are due by the closing date specified in Section L, and evaluation will be based on the factors defined in Section M. The Department of the Air Force is the contracting agency.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| MAHG211006 | Project Title: | ||
| Repair Marina Pier-Cristobal | Solicitation / Contract Number: |
[ enter here ]
| 1 | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | ||||||||||||||||||||||||
| Specification Section | Item or Description of Item, Contract Reference, Type of Submittal | Paragragh Number | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | |||||
| Notified | Contractor Resubmittal | Final Approval | |||||||||||||||||||||||
| Approved | Disapproved | ||||||||||||||||||||||||
| 1 | HazMat Questionnaire | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | |||||||||||||||||||||
| 2 | HazMat MSDS | 1 | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | ||||||||||||||||||||
| 3 | Hazmat Reporting Entry Form | 1 | 1 | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | |||||||||||||||||||
| 4 | Recycling and Landfill Report | 1 | 1 | End of Contract | Provide the documents as required per the Environmental packet provided by Keesler AFB. | ||||||||||||||||||||
| 5 | Warranty (Manufacturer's) | 1 | End of Contract | ||||||||||||||||||||||
| 6 | 1-Year Warranty (Contractor) | 1 | End of Contract | ||||||||||||||||||||||
| 7 | 03 31 30 | SD-01 Preconstruction Submittals | |||||||||||||||||||||||
| 8 | Concrete Curing Plan | 1.8.2.2 | 1 | ||||||||||||||||||||||
| 9 | Concrete Qualification Program | 1.7.4 | 1 | ||||||||||||||||||||||
| 10 | |||||||||||||||||||||||||
| 11 | Concrete Placement and | 1.8.2.4 | 1 | ||||||||||||||||||||||
| 12 | Compaction | ||||||||||||||||||||||||
| 13 | |||||||||||||||||||||||||
| 14 | Curing Concrete Elements | 1.8.2.1 | 1 | ||||||||||||||||||||||
| 15 | Form Removal Schedule | 1.8.2.3 | 1 | ||||||||||||||||||||||
| 16 | Laboratory Qualifications | 1.6.2 | 1 | ||||||||||||||||||||||
| 17 | |||||||||||||||||||||||||
| 18 | SD-02 Shop Drawings | ||||||||||||||||||||||||
| 19 | Expansion Joints | 1 | 1 | ||||||||||||||||||||||
| 20 | Formwork | 1.8.1.1 | 1 | ||||||||||||||||||||||
| 21 | Reinforcing Steel | 1.6.1.2 | 1 | 1 | |||||||||||||||||||||
| 22 | SD-03 Product Data | ||||||||||||||||||||||||
| 23 | Admixtures | 1.8.5.4 | 1 | ||||||||||||||||||||||
| 24 | Air Entraining | 2.4.1 | 1 | ||||||||||||||||||||||
| 25 | Aggregates | 1.8.3 | 1 | ||||||||||||||||||||||
| 26 | Corrosion Inhibitors | 1.2 | 1 | ||||||||||||||||||||||
| 27 | Materials for Curing Concrete | 2.8.1 | 1 | ||||||||||||||||||||||
| 28 | Mechanical Reinforcing Bar Connectors | 1 | |||||||||||||||||||||||
| 29 | Non-Shrink Grout | 2.5 | 1 | ||||||||||||||||||||||
| 30 | Reinforcing Bars | 2.7.1 | 1 | 1 | |||||||||||||||||||||
| 31 | Reinforcement and Protective Coating | 2.7.1.1 | 1 | ||||||||||||||||||||||
| 32 | Reinforcement Supports | 3.2.1 | 1 | ||||||||||||||||||||||
| 33 | Sealer-Hardener | 2.8.2 | 1 | ||||||||||||||||||||||
| 34 | SD-05 Design Data | ||||||||||||||||||||||||
| 35 | Mixture Designs | 1.8.2.8 | 1 | ||||||||||||||||||||||
| 36 | SD-06 Test Reports | ||||||||||||||||||||||||
| 37 | Air Entraining | 2.4.1 | 1 | ||||||||||||||||||||||
| 38 | Aggregates | 1.8.5.3 | 1 | ||||||||||||||||||||||
| 39 | Admixtures | 1.8.5.4 | 1 | ||||||||||||||||||||||
| 40 | Cement | 1.8.5.5 | 1 | ||||||||||||||||||||||
| 41 | Concrete Mixture Proportions | 1.7.1 | 1 | ||||||||||||||||||||||
| 42 | Concrete Test Reports | 1.8.5 | 1 | 1 | |||||||||||||||||||||
| 43 | Fresh Concrete Properties | 1.7.4.1 | 1 | ||||||||||||||||||||||
| 44 | Hardened Concrete Properties | 1.7.4.2 | 1 | ||||||||||||||||||||||
| 45 | Reinforcing Bars | 2.7.1 | 1 | ||||||||||||||||||||||
| 46 | Reinforcement and Protective Coating | 2.7.1.1 | 1 | ||||||||||||||||||||||
| 47 | |||||||||||||||||||||||||
| 48 | SD-07 Certificates | ||||||||||||||||||||||||
| 49 | Admixtures | 1.8.5.4 | 1 | 1 | |||||||||||||||||||||
| 50 | Cementitious Materials | 2.1 | 1 | 1 | |||||||||||||||||||||
| 51 | Cementitious Material Mill Certificates | 1.8.3.1 | 1 | ||||||||||||||||||||||
| 52 | Field Testing Technician and Testing Agency | 1.6.1.2 | 1 | 1 | |||||||||||||||||||||
| 53 | SD-11 Closeout Submittals | ||||||||||||||||||||||||
| 54 | Aggregate Moisture Content | 1.8.3.1 | 1 | 1 | |||||||||||||||||||||
| 55 | Aggregate Sampling | 1.8.3.1 | 1 | 1 | |||||||||||||||||||||
| 56 | Concrete Test Reports | 1.8.5 | 1 | 1 | |||||||||||||||||||||
| 57 | 03 92 50 | SD-03 Product Data | |||||||||||||||||||||||
| 58 | Mortor Repair | 2.2.A | 1 | ||||||||||||||||||||||
| 59 | Concrete Overlay | 2.2.B | 1 | ||||||||||||||||||||||
| 60 | Concrete Sealer | 2.2.C | 1 | ||||||||||||||||||||||
| 61 | SD-05 Design Data | ||||||||||||||||||||||||
| 62 | MSDS | 1.3.B | 1 | ||||||||||||||||||||||
| 63 | SD-07 Certificates | ||||||||||||||||||||||||
| 64 | Installer Qualifications | 1.3.C | 1 | ||||||||||||||||||||||
| 65 | 05 50 00 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 66 | Steel Fabrications | 1.2.B | 1 | ||||||||||||||||||||||
| 67 | SD-07 Certificates | ||||||||||||||||||||||||
| 68 | Mill Certificates | 1.2.A | 1 | ||||||||||||||||||||||
| 69 | 06 10 00 | SD-07 Certificates | |||||||||||||||||||||||
| 70 | Preservatives | 1.2.B.1 | 1 | 1 | |||||||||||||||||||||
| 71 | 06 10 05 | SD-03 Product Data | |||||||||||||||||||||||
| 72 | Connectors | 2.1.D | 1 | 1 | |||||||||||||||||||||
| 73 | Piling Caps | 2.1.D.6 | 1 | 1 | |||||||||||||||||||||
| 74 | Epoxy Binder Compound | 2.1.D.7 | 1 | 1 | |||||||||||||||||||||
| 75 | 06 73 13 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 76 | Layout Drawings | 1.02.C | 1 | ||||||||||||||||||||||
| 77 | 06 73 13 | SD-03 Product Data | |||||||||||||||||||||||
| 78 | FRP Planks | 2.01.A | 1 | 1 | 1 | ||||||||||||||||||||
| 79 | Hardware | 2.01.B | 1 | 1 | |||||||||||||||||||||
| 80 | SD-04 Samples | ||||||||||||||||||||||||
| 81 | FRP Plank | 1.02.D | 1 | 1 | |||||||||||||||||||||
| 82 | 07 21 16 | SD-03 Product Data | |||||||||||||||||||||||
| 83 | Rigid Insulation | 2.2.A.1 | 1 | 1 | |||||||||||||||||||||
| 84 | Low Expansion Foam | 2.2.B.1 | 1 | 1 | |||||||||||||||||||||
| 85 | 07 92 00 | SD-01 Preconstruction Submittals | |||||||||||||||||||||||
| 86 | Test Reports | 1.2.E | 1 | 1 | |||||||||||||||||||||
| 87 | Field Adhesion Test Reports | 1.2.F | 1 | ||||||||||||||||||||||
| 88 | SD-02 Shop Drawings | ||||||||||||||||||||||||
| 89 | Schedule | 1.2.D | 1 | ||||||||||||||||||||||
| 90 | SD-03 Product Data | ||||||||||||||||||||||||
| 91 | Primer & Install Instructions | 1.2.B.1 | 1 | ||||||||||||||||||||||
| 92 | SD-04 Samples | ||||||||||||||||||||||||
| 93 | Color | 1.2.C | 1 | ||||||||||||||||||||||
| 94 | 08 11 13 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 95 | Doors | 1.2.A | 1 | ||||||||||||||||||||||
| 96 | Frames | 1.2.A | 1 | ||||||||||||||||||||||
| 97 | SD-03 Product Data | ||||||||||||||||||||||||
| 98 | Doors | 2.3.A | 1 | ||||||||||||||||||||||
| 99 | Frames | 2.3.B | 1 | ||||||||||||||||||||||
| 100 | 08 71 00 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 101 | Hardware schedule | 1.2.C | 1 | ||||||||||||||||||||||
| 102 | Keying system | 1.2.D | 1 | ||||||||||||||||||||||
| 103 | SD-03 Product Data | ||||||||||||||||||||||||
| 104 | Hardware items | 1.2.B | 1 | ||||||||||||||||||||||
| 105 | SD-10 Operation and Maintenance Data | ||||||||||||||||||||||||
| 106 | Hardware Schedule | 1.2.F | 1 | ||||||||||||||||||||||
| 107 | 08 95 43 | SD-03 Product Data | |||||||||||||||||||||||
| 108 | Flood Vents | 2.2 | 1 | 1 | 1 | ||||||||||||||||||||
| 109 | SD-07 Certificates | ||||||||||||||||||||||||
| 110 | Flood Vents | 1.4 | 1 | ||||||||||||||||||||||
| 111 | 09 25 20 | SD-03 Product Data | |||||||||||||||||||||||
| 112 | EIFS System | 2.1 | 1 | 1 | |||||||||||||||||||||
| 113 | SD-04 Samples | ||||||||||||||||||||||||
| 114 | Color | 2.3 | 1 | ||||||||||||||||||||||
| 115 | 09 29 00 | SD-03 Product Data | |||||||||||||||||||||||
| 116 | Tile Backer Board | 2.2 | 1 | ||||||||||||||||||||||
| 117 | Accessories | 2.3 | 1 | ||||||||||||||||||||||
| 118 | 09 30 00 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 119 | Layout Drawings | 1.3.C | 1 | ||||||||||||||||||||||
| 120 | SD-03 Product Data | ||||||||||||||||||||||||
| 121 | Tile | 2.1 | 1 | ||||||||||||||||||||||
| 122 | Setting Materials | 2.2 | 1 | ||||||||||||||||||||||
| 123 | Accessories | 2.3 | 1 | ||||||||||||||||||||||
| 124 | SD-04 Samples | ||||||||||||||||||||||||
| 125 | Tile Color | 2.1 | 1 | 1 | |||||||||||||||||||||
| 126 | Grout Color | 2.2 | 1 | 1 | |||||||||||||||||||||
| 127 | SD-07 Certificates | ||||||||||||||||||||||||
| 128 | Tile | 2.1 | 1 | ||||||||||||||||||||||
| 129 | Setting Materials | 2.2 | 1 | ||||||||||||||||||||||
| 130 | 09 96 00 | SD-03 Product Data | |||||||||||||||||||||||
| 131 | Coatings | 2.1 | 1 | 1 | |||||||||||||||||||||
| 132 | Manufacturer's Technical Data | 2.2 | 1 | ||||||||||||||||||||||
| 133 | SD-04 Samples | ||||||||||||||||||||||||
| 134 | Color | 2.1 | 1 | 1 | |||||||||||||||||||||
| 135 | 10 00 00 | SD-03 Product Data | |||||||||||||||||||||||
| 136 | Pile Jacket | 2.1 | 1 | 1 | 1 | ||||||||||||||||||||
| 137 | SD-07 Certificates | ||||||||||||||||||||||||
| 138 | Manufacturer's Information | 1.5.C | |||||||||||||||||||||||
| 139 | 10 28 00 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 140 | Layout Drawings | 2.1 | 1 | ||||||||||||||||||||||
| 141 | SD-03 Product Data | ||||||||||||||||||||||||
| 142 | Grab Bars, Dispensers, Etc. | 2.1 | 1 | ||||||||||||||||||||||
| 143 | 10 28 13 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 144 | Layout Drawings | 2.1 | 1 | ||||||||||||||||||||||
| 145 | SD-03 Product Data | ||||||||||||||||||||||||
| 146 | Dryer | 1.4.C | 1 | ||||||||||||||||||||||
| 147 | SD-07 Certificates | ||||||||||||||||||||||||
| 148 | Warranty | 1.4.D | 1 | ||||||||||||||||||||||
| 149 | 11 22 00 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 150 | Layout Drawings | 1.2.A | 1 | ||||||||||||||||||||||
| 151 | SD-03 Product Data | ||||||||||||||||||||||||
| 152 | System | 2.1 | 1 | ||||||||||||||||||||||
| 153 | SD-07 Certificates | ||||||||||||||||||||||||
| 154 | Warranty | 1.4 | 1 | ||||||||||||||||||||||
| 155 | 12 87 50 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 156 | Layout Drawings | 1.2.B | 1 | ||||||||||||||||||||||
| 157 | SD-03 Product Data | ||||||||||||||||||||||||
| 158 | Materials | 2.1 | 1 | ||||||||||||||||||||||
| 159 | 21 12 00 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 160 | Standpipe system modification | 1 | 1 | 1 | |||||||||||||||||||||
| 161 | SD-03 Product Data | ||||||||||||||||||||||||
| 162 | Pipe and fittings | 2.1.1 | 1 | 1 | |||||||||||||||||||||
| 163 | Mechanical couplings | 2.1.1 | 1 | 1 | |||||||||||||||||||||
| 164 | Pipe hangers and supports | 2.1.2 | 1 | 1 | |||||||||||||||||||||
| 165 | SD-06 Test Reports | ||||||||||||||||||||||||
| 166 | Preliminary tests | 3.2.1 | 1 | 1 | 1 | ||||||||||||||||||||
| 167 | Acceptance tests | 3.2.2 | 1 | 1 | 1 | ||||||||||||||||||||
| 168 | SD-07 Certificates | ||||||||||||||||||||||||
| 169 | Qualifications of installer | 1.6.1 | 1 | ||||||||||||||||||||||
| 170 | SD-11 Closeout Submittals | ||||||||||||||||||||||||
| 171 | System as-built drawings | 1.6.2 | 1 | ||||||||||||||||||||||
| 172 | 22 00 00 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 173 | Plumbing System | 3.8.1 | 1 | 1 | |||||||||||||||||||||
| 174 | SD-03 Product Data | ||||||||||||||||||||||||
| 175 | Fixtures | 2.5 | 1 | ||||||||||||||||||||||
| 176 | Flush Valve Water Closet | 2.5.1 | 1 | 1 | |||||||||||||||||||||
| 177 | Wall Hung Lavatories | 2.5.2 | 1 | 1 | |||||||||||||||||||||
| 178 | Water Heaters | 2.8 | 1 | 1 | |||||||||||||||||||||
| 179 | Backflow Prevention Assemblies | 3.8.1.1 | 1 | 1 | |||||||||||||||||||||
| 180 | Welding | 1.5.1 | 1 | ||||||||||||||||||||||
| 181 | Plumbing System 3.8.1 | 1 | |||||||||||||||||||||||
| 182 | SD-06 Test Reports | ||||||||||||||||||||||||
| 183 | Tests, Flushing and Disinfection | 3.8 | 1 | 1 | 1 | ||||||||||||||||||||
| 184 | Test of Backflow Prevention Assemblies | 3.8.1.1 | 1 | 1 | 1 | ||||||||||||||||||||
| 185 | SD-10 Operation and Maintenance Data | ||||||||||||||||||||||||
| 186 | Plumbing System | 3.8.1 | 1 | 1 | |||||||||||||||||||||
| 187 | SD-11 Closeout Submittals | ||||||||||||||||||||||||
| 188 | Water-Efficient Products | 2.1.1 | 1 | 1 | |||||||||||||||||||||
| 189 | Energy-Efficient Water Heaters | 2.1.2 | 1 | 1 | |||||||||||||||||||||
| 190 | 23 00 00 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 191 | Detail Drawings | 1.4.5 | 1 | ||||||||||||||||||||||
| 192 | SD-03 Product Data | ||||||||||||||||||||||||
| 193 | Metallic Flexible Duct | 2.9.1.1 | 1 | 1 | |||||||||||||||||||||
| 194 | Air Vents, Penthouses, and Goosenecks | 2.9.2 | |||||||||||||||||||||||
| 195 | Ceiling Exhaust Fans | 2.10.1.1 | 1 | 1 | 1 | ||||||||||||||||||||
| 196 | SD-06 Test Reports | ||||||||||||||||||||||||
| 197 | Performance Tests | 3.9 | 1 | 1 | 1 | ||||||||||||||||||||
| 198 | SD-08 Manufacturer’s Instructions | ||||||||||||||||||||||||
| 199 | Manufacturer's Installatio | 3.2 | 1 | ||||||||||||||||||||||
| 200 | Instructions | ||||||||||||||||||||||||
| 201 | Operation and Maintenance Training | 3.11.2 | 1 | ||||||||||||||||||||||
| 202 | SD-10 Operation and Maintenance | ||||||||||||||||||||||||
| 203 | Operation and Maintenance Manuals | 3.11.1 | 2 | Provide 2 hard copy binders and 2 dvd's | |||||||||||||||||||||
| 204 | Ceiling Exhaust Fans | 2.10.1.1 | 2 | ||||||||||||||||||||||
| 205 | 23 03 00.00 20 | SD-11 Closeout Submittals | |||||||||||||||||||||||
| 206 | Energy Efficient Equipment for Motors | 2.1.1 | 1 | ||||||||||||||||||||||
| 207 | Reduce Volatile Organic Compounds | 2.1.2 | 1 | ||||||||||||||||||||||
| 208 | 23 05 93 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 209 | TAB Schematic Drawings and Report Forms | 1.3.2 | 1 | 1 | 1 | ||||||||||||||||||||
| 210 | SD-03 Product Data | ||||||||||||||||||||||||
| 211 | Equipment and Performance Data | 1.3 | 1 | ||||||||||||||||||||||
| 212 | Data | 1 | |||||||||||||||||||||||
| 213 | SD-07 Certificates | ||||||||||||||||||||||||
| 214 | Independent TAB Agency and Personnel Qualifications | 1.5.1 | 1 | ||||||||||||||||||||||
| 215 | TAB Submittal and Work Schedule | 1 | 1 | ||||||||||||||||||||||
| 216 | TAB Pre-Field Engineering Report | 1 | 1 | 1 | |||||||||||||||||||||
| 217 | 23 82 46.00 40 | SD-02 Shop Drawings | |||||||||||||||||||||||
| 218 | Fabrication Drawings | 1.2.1 | 1 | ||||||||||||||||||||||
| 219 | SD-03 Product Data | ||||||||||||||||||||||||
| 220 | Performance Data | 2.1 | 1 | ||||||||||||||||||||||
| 221 | Electric Unit Heaters | 2.1 | 1 | 1 | 1 | ||||||||||||||||||||
| 222 | SD-08 Manufacturer’s Instructions | ||||||||||||||||||||||||
| 223 | Manufacturer's Instructions | 1.2.1 | |||||||||||||||||||||||
| 224 | 26 27 29 | SD-02 Shop Drawings | 1 | ||||||||||||||||||||||
| 225 | Panelboards | 2.1 | 1 | ||||||||||||||||||||||
| 226 | Wireways | 2.14 | 1 | ||||||||||||||||||||||
| 227 | SD-03 Product Data | ||||||||||||||||||||||||
| 228 | Receptacles | 2.9 | 1 | ||||||||||||||||||||||
| 229 | Disconnect switches | 2.8 | 1 | ||||||||||||||||||||||
| 230 | Conduit and fittings | 2.2 | 1 | ||||||||||||||||||||||
| 231 | Power center | 2.3 | 1 | ||||||||||||||||||||||
| 232 | Grounding and bonding equipment | 2.12 | 1 | ||||||||||||||||||||||
| 233 | Device plates | 2.7 | 1 | ||||||||||||||||||||||
| 234 | Wires and cables | 2.6 | 1 | ||||||||||||||||||||||
| 235 | Outlet boxes and covers | 2.4 | 1 | ||||||||||||||||||||||
| 236 | Splice and termination components | 2.6.5 | 1 | ||||||||||||||||||||||
| 237 | |||||||||||||||||||||||||
| 238 | Wireways | 2.14 | 1 | ||||||||||||||||||||||
| 239 | Cabinets, junction boxes, and pull boxes | 2.5 | 1 | ||||||||||||||||||||||
| 240 | Mounting straps 2.11 | 2.11 | 1 | ||||||||||||||||||||||
| 241 | Conduit support 3.1.5.1 | 5.1 | 1 | ||||||||||||||||||||||
| 242 | SD-06 Test Reports | ||||||||||||||||||||||||
| 243 | Transformer tests | 3.3.2 | 1 | 1 | 1 | ||||||||||||||||||||
| 244 | 600-volt wiring test | 3.3.3 | 1 | 1 | 1 | ||||||||||||||||||||
| 245 | Grounding system test | 3.3.4 | 1 | 1 | 1 | ||||||||||||||||||||
| 246 | 31 00 00 | SD-01 Preconstruction Submittals | |||||||||||||||||||||||
| 247 | Shoring | 3.3 | 1 | ||||||||||||||||||||||
| 248 | 32 12 17 | SD-05 Design Data | |||||||||||||||||||||||
| 249 | Job-mix formula 1.3.2 | 1.3.2 | 1 | ||||||||||||||||||||||
| 250 | Asphalt Cement Binder 2.2 | 2.2 | 1 | ||||||||||||||||||||||
| 251 | Mix Design 2.3 | 2.3 | 1 | ||||||||||||||||||||||
| 252 | SD-06 Test Reports | ||||||||||||||||||||||||
| 253 | Specific gravity test of asphalt 2.4.1 | 2.4.1 | 1 | 1 | |||||||||||||||||||||
| 254 | Bituminous mixture tests 2.4.1 | 2.4.1 | 1 | 1 | |||||||||||||||||||||
| 255 | Bituminous mix tests 3.5.2.2 | 3.5.2.2 | 1 | ||||||||||||||||||||||
| 256 | 32 17 24.00 10 | SD-03 Product Data | |||||||||||||||||||||||
| 257 | Composition Requirements | 2.2.1 | 1 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .