Attachment_4_Quote_Schedule.pdf

PDF 101 KB Posted

Attached to
BUFFALO MONITOR WELL PLUGGING 2026
Solicitation number
140L0626Q0017
Issued by

About this file

This is a cost estimation worksheet for well plugging and abandonment activities across multiple sites. The document contains two primary tables detailing deep monitoring wells and skewed reservoir wells, along with associated costs for materials and services.

Table 1 lists 17 deep monitoring wells at various sites including Kingsbury, Napier, Durham Ranch, Remington, Sasquatch, Carr Draw, Timar Stockwell, Coal Gulch, Petrified Tree, and Ford Ranch. For each well, the worksheet tracks production casing specifications (setting depth, outer diameter, weight, inner diameter), cement requirements (total length and number of sacks with 10% excess), bentonite usage, casing volume calculations, and cost components including cement ($-/sack), bentonite ($-/bag), CIBP (Cement In-Between Plugs), mobilization/demobilization, rig time, and reclamation costs. Production casing depths range from 100 feet to 1,970 feet. Table 2 documents 20 skewed reservoir wells (SK1 through SK18) with total depths ranging from 22.4 to 124.34 feet, calculating bentonite requirements and associated costs at $17 per bag. Both tables include line items for mobilization/demobilization, steel casing removal, and reclamation activities. All cost columns currently display "$-" placeholders, indicating the worksheet is configured for cost data entry. Summary rows at the bottom aggregate costs for each well category and provide a total project cost line.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1: Deep Monitoring Wel ls Site Name API Number If Applicable SEO Number If Applicable Production Casing Setting Depth (ft) Production Casing OD (in) Production Casing weight (pounds per foot) Production Casing ID (in) CIBPs used Total Cement length (ft) Total Bentonite length (ft) Casing area ft^2 per lin ft Casing volume ft^3 Number of Cement Sacks (1.6679 ft^3/sk) with 10% excess Cost of cement ($ per sk) Bags of Bentonite Bentonite Cost ($ per bag) CIBP COST Mobilization/Demobilization (including cement truck, water truck, vac truck) Rig time Reclamation Cost (below grade plugging marker included) Addtional Reclamation Cost Total Cost

Kingsbury Big George and UBS 4901906445(Coal Comp) 4901906437 (water comp) 179493 1641 7 20 6.456 3 155 0 0.227336839 35.23720999 25.35 -$ Napier Big George Coal 4900507914 133775 1587 7 20 6.456 1 1587 0 0.227336839 360.783563 237.94 -$ Durham Ranch 14 Wyodak Coal NA 106973 720 N/A (Assuming 7) N/A (Assuming 20) N/A (Assuming 6.456) 1 695 0 0.227336839 157.9991029 104.20 -$ Durham Ranch 14 Wasatch Sand NA 106972 720 N/A (Assuming 7) N/A (Assuming 20) N/A (Assuming 6.456) 1 695 0 0.227336839 157.9991029 104.20 -$ Durham Ranch 6 Wyodak Coal NA 106975 363 N/A (Assuming 7) N/A (Assuming 20) N/A (Assuming 6.456) 1 338 0 0.227336839 76.83985147 50.68 -$ Durham Ranch 6 Wasatch Sand NA 106974 285 N/A (Assuming 7) N/A (Assuming 20) N/A (Assuming 6.456) 1 260 0 0.227336839 59.10757805 38.98 -$ Remington 30-07A 4903323127 139658 314 7 17 6.413 1 264 0 0.224318583 59.2201059 39.06 -$ Remington 30-07CK 4903323107 139652 625 7 17 6.413 1 490 0 0.224318583 109.9161057 72.49 -$ Remington 30-07C 4903323126 139649 787 7 17 6.413 1 550 0 0.224318583 123.3752206 81.37 -$ Napier Wasatch Sand 4900507915 133776 1530 7 20 6.456 1 455 0 0.227336839 103.4382616 68.22 -$ Sasquatch 1 4901920920 NA 1425 7.625 26.4 6.969 1 577 0 0.264901064 152.8479137 100.81 -$ Carr Draw BG Coal & Wasatch Sand 4900507635 177448 1412 7 20 6.456 2 580 0 0.227336839 131.8553664 86.96 -$ Carr Draw Gates Wal l & Werner Coals 4900507636 177450 1934 7 20 6.456 2 882 0 0.227336839 200.5110917 132.24 -$ Timar Stockwel l Wasatch Sand NA NA 150 6.625 NA 6.625 0 0 150 0.239394704 35.90920557 NA Coal Gulch Smith & BG Coal Dual 4901924209 (coa l comp) 159720 1970 7 20 6.456 3 500 0 0.227336839 113.6684193 74.97 -$ Petri fied Tree Wasatch Sand NA NA 100 3 NA 3 0 0 100 0.049089124 4.908912403 NA Ford Ranch 13CW-32 4900559912 185847 400 5.5 15.5 4.95 3 150 0 0.13364514 20.04677103 13.22 -$

Key: Sum of Deep Monitoring Wells -$ Dual completed wel lbore Bentonite plugging

Table 2: Skewed Reservoir Wel ls Site Name Total Depth (ft) Production Casing ID Hole area ft^2 per lin ft Hole volume ft^3 Bags of Bentonite Bentonite Cost ($17 per bag) Mobilization/Demobilization Steel Casing Removal Reclamation Cost Total Cost

SK1 25.34 2 0.021818579 0.55288278 0.789832542 -$ Sum of Skewed Reservoir -$ SK2S 38.88 2 0.021818579 0.848306333 1.21186619 -$ Sum of Deep Monitoring Wel ls -$ SK2D 55.56 2 0.021818579 1.212240223 1.731771746 -$ Total Project Cost -$

SK3 124.34 2 0.021818579 2.712922053 3.875602933 -$

SK4D 63.16 2 0.021818579 1.378061419 1.96865917 -$

SK4S 22.4 2 0.021818579 0.488736159 0.698194513 -$

SK5 29.8 2 0.021818579 0.65019364 0.928848057 -$

SK6 26.18 2 0.021818579 0.571210386 0.816014837 -$

SK7 38.39 2 0.021818579 0.837615229 1.196593185 -$

SK8 27.12 2 0.021818579 0.591719849 0.845314071 -$

SK9 30.86 2 0.021818579 0.673321333 0.961887619 -$

SK10 39.21 2 0.021818579 0.855506464 1.222152091 -$

SK11 34.87 2 0.021818579 0.760813833 1.086876904 -$

SK12 42.47 2 0.021818579 0.92663503 1.323764328 -$

SK13 37.41 2 0.021818579 0.816233022 1.166047175 -$

SK14 41.5 2 0.021818579 0.905471009 1.293530012 -$

SK15 45.98 2 0.021818579 1.00321824 1.433168915 -$

SK16 41.28 2 0.021818579 0.900670921 1.286672745 -$

SK17 28.21 2 0.021818579 0.6155021 0.879288714 -$

SKS18 77.4 2 0.021818579 1.688757977 2.412511396 -$

Sum of Skewed Reservoir -$

IGE

File details come from the government source that posted it. Updated .