This is a Questions and Answers document for solicitation FA480026Q0024 concerning the Building 602 Access Control System (ACS) project. The document does not contain pricing information, response dates, award dates, or set-asides, as it addresses clarifications on facility characteristics and project requirements rather than procurement terms.
The facility is a 111,672 square-foot building constructed in 1969 with stable power supplied by new wiring throughout. The structure features dropped ceilings in all areas, brick perimeter walls, metal and concrete-filled door frames, and existing cable trays above ceilings. New cabling infrastructure is required, as no existing cabling or IDS sensors are present. Conduit will be needed, though the exact footage remains uncertain. The project requires surface-mounted or above-ceiling conduit runs to connect doors to the ACS panel location, which is at an unknown distance from the proposed doors. A 110-volt, 20-amp dedicated circuit will be provided for both the ACS panel and workstation. The system will operate on a standalone, air-gapped network utilizing government-issued CAC cards with no spare cards required. Electromagnetic locks are mandatory for enhanced security fail-safe design, with connection to the fire panel for life safety purposes provided by the contractor. A Master Electrician certified by Virginia DPOR is required. The project is a new installation with no incumbent contractor, no existing Lenel system to integrate with, and no badge printing or connection to other systems required. The 30-calendar-day completion timeline may be extended due to typical material lead times of 2-4 weeks and increased computer hardware lead times.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers – Building 602 Access Control System Solicitation No. FA480026Q0024
1. How old is the facility?
The building was built in 1969.
2. How much square footage is in the facility?
The building is 111,672 sq ft.
3. How stable is the power?
Stable, there is new wiring throughout the building.
4. Is there a dropped ceiling in all areas of installation?
Yes.
5. What type of walls are in the perimeter areas?
The perimeter walls are brick.
6. Do we need to drill between the walls, to run our cable infrastructure?
Yes
7. Do we need to use conduit? If yes, what do you estimate the total conduit footage will be?
Yes—unsure of sq ft to be used
8. Are the door frames metal and concrete filled?
Yes
9. Please provide a comprehensive list of quantities of all IDS items needed (e.g.
total number of motion sensors, glass breaks, etc.) per location.
N/A
10. Do you currently have existing IDS Sensors in your doors? Please specify which doors.
No, there are no existing sensors.
11. What is the manufacturer of the existing IDS system?
N/A; there is no existing system. This requirement includes installation services
12. Will we be able to reuse the existing cable? If so, what type of cable is there currently?
There is no existing cabling.
13. Are Ceilings Suspended? Or Hard Lid?
Both suspended and hard ceilings exist in the building.
14. Are there existing Cable Trays for wiring above ceilings?
Yes
15. Can Existing Wiring be utilized?
No
16. Is a “UPS” required? If so, What Time/Power Duration is required?
No, Uninterruptible Power Supply (UPS) is not required.
17. re “Or Equal” Equipment substitutions allowed?
Yes, “or equal” will be accepted
18. Is “Plenum Wire” acceptable?
Yes, plenum wire is acceptable
19. Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t?
No, additional access will not be available
20. What is the height of Exterior Cameras? (If any)
N/A
21. Please provide/post other “Q & A” requests.
Full list of questions and answers will be posted.
22. Please provide a list of equipment and parts # that are to be installed.
Please refer to the Performance Work Statement for list of equipment.
23. Are there pipe chases between floors?
No, there are no pipe chases between floors.
24. What is the range of the budget for this project, and is it already appropriated?
The government’s estimate will not be disclosed.
25. Because of the high cost of the parts can we bill when parts arrive on site, or are progress payments allowed in the alternative?
Progress payment are not allowed
26. How many feet of new wire will have to be run?
Please see total sq ft of building to determine how many ft of wire
27. What kind of cipher lock and quantities are required e.g. X-10.
N/A
28. Please post the sign in sheet and Q&A's from the site visit.
N/A
29. Please post the drawings and the key for the drawings.
Please separate Attachment 5 for drawing.
30. Deliveries or Performance Line 001(From date of lead time event to completion of performance of 30 Calendar Days Complete Within 30 Days of the Contract
Award Date)
Does this include Survey/Design Approval, Ordering period and Installation to be completed in the 30 Days of the Contract Award? Depending on award date and Manufactures Lead time on materials Typically run 2-4 weeks and certain computer hardware is expected to have increased lead times do to current market.
Ordering and installation is included, but timeline may be extended with
31. Are there Drawings available indicating Doors, Panel and Workstation
Locations?
Yes, please see Attachment 5.
32. Will the site visit be rescheduled? If so, when?
No, the site visit will not be rescheduled.
33. Are Pictures of the ACS doors to include inside/outside/Frames available?
No.
34. Is there a Purpose for utilizing Electromagnetic Locks? In many cases they do not meet Life safety requirements, especially on exterior doors. Will other options be considered?
No other options will be considered; the locks provide enhanced security fail-safe design.
35. Please indicate distances from the proposed doors to the proposed ACS Panel
Location.
The distance is unknown.
36. What is the type of wall structure at the proposed ACS doors?
Brick and metal
37. What Type of Ceilings are in this space? If drop ceilings will conduit be required above ceiling from the ACS panel Location to the proposed doors?
Yes
38. Is surface-mounted conduit allowed?
Please see para 2.1.1.1 of the Performance Work Statement
39. Will a110 volt 20Amp dedicated circuit be provided for both the ACS Panel
Location and Workstation?
Yes
40. Will this be on a standalone Air Gapped Network?
Yes
41. What Cyber Security Protocols need to be in place?
Refer to para 2.1.2.3 of the Performance Work Statement
42. Is there a required running time for the system in a power outage? Or will the
Dedicated circuits be on Generator back up?
No generator currently exist
43. What type of cards are going to be enrolled and used at this facility? Will spare cards be required?
Gov’t issued CAC; no spares required
44. Is it the intent for only one (1) annual Preventative Maintenance and
Inspection?
Please refer to the Performance Work Statement for preventative maintenance details
45. Being Electromagnetic Locks are specified, Will there be a connection to the fire panel provided to drop the locks for life safety concerns? If so, will the government provide the fire panel programming and connections?
Connection the fire panel is provided; the government will not provide the fire panel connections.
46. Is there a requirement to print badges?
No
47. Is there a requirement to connect to any other existing systems?
No
48. Is there a specific DOD or AF directive/Instruction that this work falls under?
Yes; DoDI 8520.04, Access Management for DOD Information Systems
49. Is this just a controlled access area, or are you protecting a specific classification of assets or information?
The area is Controlled Access
50. Please Clarify DPOR Certified Class A Electrician (Electricians (individuals) are licensed through DPOR as Journeymen or Master electricians) Companies are licensed by Class (A, B or C Contractor) and further designated by trades
(Electrical, Plumbing, HVAC, General, etc....)
Master Electrician is required due to scope of work being performed.
51. The PWS references a Lenel Head End system — is the Government requiring integration with the existing Lenel OnGuard platform, or is a full Lenel system replacement within scope?
This is new install; there is currently no Lenel system in place
52. Will the Virginia DPOR Class A Electrician requirement be verified at proposal submission or prior to performance?
The contractors certification must be provided with the quote per the Instructions to
Offerors and will be verified after award per the Performance Work Statements
Schedule of Deliverables.
53. Is there an incumbent contractor currently maintaining the Bldg. 602 system?
No, there is no incumbent contractor.