Attachment_4_QASP.pdf
PDF 374 KB Posted
- Solicitation number
- N0018926QL001_Solicitation
About this file
This is a Quality Assurance Surveillance Plan (QASP) template for administering Performance Based Service Contracts (PBSC). The document establishes the government's systematic approach to ensuring contractor compliance with contract performance standards and deliverables.
The QASP designates three levels of government oversight: the Contracting Officer holds ultimate responsibility for contractor performance adequacy; the Contracting Officer's Representative (COR) administers the contract and ensures compliance; and the Technical Point of Contact (TPOC) provides technical oversight and reports monthly findings to the COR. Surveillance methods include COR assessments of deliverable timeliness and quality, customer feedback collection through formal surveys or written complaints, and random inspections to verify Standard Operating Procedures compliance. The COR maintains a comprehensive surveillance file containing appointment letters, contract documents, all QASP revisions, complaint records, meeting minutes, and performance documentation. Monthly performance analysis determines whether to adjust surveillance levels or initiate corrective action. The QASP Matrix specifies measurable performance standards for contract line items, with acceptable quality levels (AQL) predominantly set at 95 percent for tasks including system readiness, availability metrics, failure notifications, training provisions, vulnerability alert installations, compliance reporting, and deliverable submissions. Disincentives for non-performance include Contract Discrepancy Reports, potential contract termination, exclusion from future government contracts, and non-exercise of available options. Contractors must respond to discrepancy reports within five days with corrective action plans.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN AND MATRIX
1.0 PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.
2.0 AUTHORITY
Authority for issuance of this QASP is provided under FAR 52-212-4(a), Inspection/Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in the contract to be accomplished by the Contracting Officer or their duly authorized representative.
3.0 SCOPE
The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet quality standards set forth by the contract. The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to ensure that they are timely, effective and deliver the results specified in the contract.
The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan. The Government may provide the Contractor with an information copy of the QASP as an Attachment to the solicitation to support the Contractor’s efforts in developing its plan for maintaining the levels of quality anticipated to be delivered under the terms of the contract.
4.0 RESPONSIBILITIES
The Government resources shall have responsibilities for the implementation of this QASP as follows:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) – An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for the COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
Technical Point of Contact (TPOC) – An individual designated in writing by the COR to act as their authorized representative to assist in administering a contract. TPOC limitations are contained in the written letter of appointment. The TPOC provides oversight of the Contractors’ performance from a technical perspective and reports monthly his or her findings to the COR in a timely, complete and impartial fashion. While the TPOC may provide technical clarification of the Performance Work Statement to the Contractor he/she is not empowered to alter the terms and/or conditions of the contract.
5.0 METHODS OF QA SURVEILLANCE
The methods of surveillance listed below shall be used in the administration of this QASP. The QASP Matrix (Attachment 1) describes the methods of surveillance that may be used to monitor the services and deliverables to be provided under the contract.
COR Assessment – The Contracting Officer’s Representative will evaluate the timeliness, quality and accuracy of reports and presentations, contract deliverables and invoices. The COR will also assess success or failure related to the replacement of an instructor within the allotted timeframe.
Customer Feedback – Customer feedback may be obtained either from the results of formal customer satisfaction surveys, informal discussions or from random customer complaints. Customer complaints, to be considered valid, must be submitted to the COR in writing detailing the nature and circumstances of the complaint. Complaints must be signed by the complainant and the COR and will be forwarded to the Contractor. The Contractor shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file.
Random Checks/Inspections – Random checks will be conducted to ensure compliance with the Standard Operating Procedures (SOP) and the PWS. The Contracting Officer, COR or TPOC may conduct random monitoring.
6.0 IDENTIFIED QA SURVEILLANCE ITEMS
The PBSC items that have been identified for surveillance are identified in the Performance Work Statement (PWS).
7.0 DOCUMENTATION
The COR will maintain a complete Quality Assurance Surveillance file. The file shall contain such documents as copies of all receiving reports, evaluations, recommendations, and any other actions related to the Government’s performance of the quality assurance function. All such records will be retained for the life of this contract. At a minimum, the Quality Assurance Surveillance file shall contain:
Copies of letters of appointment for the COR and TPOC A copy of the contract and all modifications A copy of the QASP and all subsequent revisions The names and titles of individuals on the contract administration team A record of all accepted receiving reports required documentation with the submission of each receiving report and reviews.
Copies of complaints received.
Memoranda for the record or minutes of any pre-performance meetings or conferences.
Memoranda for the record or minutes of any meetings or discussions with the contractor, or others, pertaining to the contract or contract performance or changes to the PWS.
8.0 ANALYSIS OF CONTRACTOR PERFORMANCE
The COR will analyze contractor performance monthly to determine whether to increase, decrease or maintain the current level of surveillance and/or whether to initiate corrective action to bring the Contractor’s work up to the standards stated in the QASP and PWS.
QASP MATRIX
Deliverable or Service
Requirement
Measurement/ Metric
Performance Standard
Acceptable Quality
Level (AQL)
Method of Surveillance
Incentives
PWS
Paragraph 5.2
Task end results and timeliness.
The contractor shall maintain the CMRS in a high state of readiness as defined in
Section 5.2.1.
95%
Monthly written progress reports.
Ad Hoc meetings between COR & contractor.
Customer feedback.
FAR Clause 52.212- 4(a) –
Inspection/Acceptance Positive: Favorable
Performance Reviews.
Negative: FAR
52.246-4(e).
Paragraph 5.2.1 timeliness.
Each CRMS site (BCS and
Receiver) shall meet or exceed availability (Ao) of 95%.
95% or Greater
Monthly written progress reports.
Ad Hoc meetings between COR & contractor.
Customer feedback.
FAR Clause 52.212- 4(a) –
Inspection/Acceptance Positive: Favorable
Performance Reviews.
5.2.2 timeliness.
The contractor shall notify the Navy within 24 hours of the detection of a failure progress reports.
Ad Hoc meetings between COR & contractor.
Customer feedback.
FAR Clause 52.212- 4(a) –
Inspection/Acceptance Positive: Favorable
Performance Reviews.
5.2.3 timeliness.
The contractor shall provide periodic (quarterly or in conjunction with a maintenance visit) BCA operator training.
progress reports.
Ad Hoc meetings between COR & contractor.
Customer feedback.
FAR Clause 52.212- 4(a) –
Inspection/Acceptance Positive: Favorable
Performance Reviews.
Negative: FAR
52.246-5 (c), (d), and (e).
5.2.4 timeliness.
The contractor shall install and test corrections for Information
Assurance Vulnerability
Alerts (IAVA) in accordance with reference 5.0.
progress reports.
Ad Hoc meetings between COR & contractor.
Customer feedback.
FAR Clause 52.212- 4(a) –
Inspection/Acceptance Positive: Favorable
Performance Reviews.
Negative: FAR
52.246-5 (c), (d), and (e).
PWS
Paragraph
5.2.5
Task end results and timeliness.
The contractor shall acknowledge and report progress reports.
Ad Hoc meetings between COR &
FAR Clause 52.212- 4(a) Inspection/Acceptance
IAVA
compliance in the
Online Compliance
Reporting System (OCRS) in accordance with Department of the Navy Chief
Information Office (DON
CIO) direction for Information Assurance (IA) management.
contractor.
Customer feedback.
Positive: Favorable Performance Reviews.
Negative: FAR
5.2.6 timeliness.
The contractor shall provide subject matter expertise (SME) assistance to
Space and Naval Warfare
Command
(SPAWAR)
Fleet Readiness Directorate (FRD)
IA
specialists as required.
progress reports.
Ad Hoc meetings between COR & contractor.
Customer feedback.
FAR Clause 52.212-
4(a) – Inspection/Acceptance
Positive: Favorable Performance Reviews.
Negative: FAR
5.2.7 timeliness.
The contractor shall scan each location with the approved ACAS scanning software and provide a report of the results and a POA&M to mitigate the discrepancies to the COR within 30 days of each event.
Ad Hoc meetings between COR &
Inspection/Acceptance
Positive: Favorable Performance Reviews.
Negative: FAR
5.2.8 timeliness.
The contractor shall notify the
Government, in a timely manner, of any anticipated system changes (i.e., hardware, software, progress reports.
Ad Hoc meetings between COR & contractor.
Customer feedback.
FAR Clause 52.212- 4(a) –
Inspection/Acceptance Positive: Favorable
Performance Reviews.
Negative: FAR connection, etc.).
Paragraph 5.5 timeliness.
All deliverables shall meet required submission dates in Technical
Exhibit 1.
Provide deliverables in specified format;
contain no errors, omissions or erroneous information:
requiring no rewrites.
Ad Hoc meetings between COR &
Inspection/Acceptance
Positive: Favorable Performance Reviews.
Negative: FAR
Combating Trafficking in Persons Training
(FAR
52.222-50) timeliness.
The contractor shall ensure compliance with
FAR 52.222-50.
100%
The Contracting
Officer will review as needed.
Contract Discrepancy Report may be completed.
Failure to comply may be documented in Contractor Performance Assessment Reporting System (CPARS) and in future requests for Past Performance information
INCENTIVES/DISINCENTIVES:
The COR makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract, reflected in the COR’s annual report, may result in termination of the contract and may also result in the loss of future Government contracts. Additionally, the contractor’s failure to achieve satisfactory performance under the contract may also result in the non-exercise of available options.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor.
The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
File details come from the government source that posted it. Updated .