Attachment 4 Price Proposal Breakout Spreadsheet TEMPLATE.xlsx

XLSX spreadsheet 86 KB Posted

Attached to
Niagara Falls Storage Site Remediation and Site Services
Solicitation number
W912P423R0002
Issued by

About this file

This document contains a solicitation for a remediation and site services contract at the Niagara Falls Storage Site in New York. The U.S. Army Corps of Engineers seeks to award a five-year IDIQ single award task order contract, including Task Order 1 which is a mix of FFP and CPFF line items, to remediate the Balance of Plant and Groundwater Operable Units and provide other site services. The solicitation includes a five-year ordering period and the January 19, 2023 site visit requires registration with the Contracting Officer. Questions are due by January 24, 2023 and proposals are due February 15, 2023. The template attachment provides pricing details for the remediation tasks.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

CLIN Type
TaskDescriptionCLINTotal Price
1Mobilization0001FFP$ ‐
4Demobilization0002FFP$ ‐
2aImpacted Media Remediation (Soil and road bedding, Building 401 foundation and
utilities, Building 431/432 trench, and EU4 CVOC plume)0003CPFF$ ‐
3aTransportation and Disposal (Wastes contaminated with ROCs)0004FFUP$ ‐
3bTransportation and Disposal (Wastes contaminated with COCs)0005FFUP$ ‐
3cTransportation and Disposal (Wastes contaminated with both ROCs and COCs)0006FFUP$ ‐
2bImpacted Media Remediation (Building 430 foundation)0007(Option)CPFF$ ‐
3dTransportation and Disposal (Building 430 foundation)0008(Option)FFUP$ ‐
2cImpacted Media Remediation (Building 431/432 foundation)0009(Option)CPFF$ ‐
3eTransportation and Disposal (Building 431/432 foundation)0010(Option)FFUP$ ‐
2dImpacted Media Remediation (Building 433 foundation, sidewalls, and roof)0011(Option)CPFF$ ‐
3fTransportation and Disposal (Building 433 foundation, sidewalls, and roof)0012(Option)FFUP$ ‐
Total (CLIN 0001 ‐ 0012)$ ‐

CLIN 0003

CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

Labor
Subcontractor
Travel
ODCs
Materials
Equipment
SUBTOTAL
G&A
SUBTOTAL
Fee
TOTAL TASK 2a (CLIN 0003)

3-331XX 02

331XX 02 Monitoring, Sampling, Testing, and Analysis CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

331XX0201 - Meteorological Monitoring331XX0202 - Radiation Monitoring331XX0203 - Air Monitoring and Sampling331XX0204 - Monitoring Wells331XX0205 - Sampling Surface Water/Groundwater/Liquid Waste331XX0206 - Sampling Soil and Sediment331XX0208 - Sampling Radioactive Contaminated Media331XX0209 - Laboratory Chemical Analysis331XX0210 - Radioactive Waste Analysis331XX0211 - Geotechnical Testing
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor Rate
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit Rate
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

3-331XX 03

331XX 03 Site Work CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

331XX0302 - Clearing and Grubbing331XX0303 - Earthwork331XX0304 - Roads/Parking/Curbs/Walks331XX0305 - FencingTotals for 331XX 03
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

3-331XX 05

331XX 05 Surface Water Collection and Control CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

331XX0507 - Sediment Barriers331XX0509 - Pumping/Draining CollectionTotals for 331XX 05
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

3-331XX 08

331XX 08 Solids Collection and Containment CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

331XX0801 - Contaminated Soil CollectionTotals for 331XX 08
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

3-331XX 09

331XX 09 Liquids/Sediments/Sludges Collection and Containment CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

331XX0907 - Lagoons/Basins/Tanks/Dikes/Pump SystemTotals for 331XX 09
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

3-331XX 19

331XX 19 Disposal (Commercial) CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

331XX1920 - Container HandlingTotals for 331XX 19
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

3-331XX 20

331XX 20 Site Restoration CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

331XX2001 - Earthwork331XX2004 - Revegetation and PlantingTotals for 331XX 20
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

3-331XX 22

331XX 22 General Requirements CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

331XX2201 - Supervision and Management 331XX2204 - Engineering, Surveying, and Quality Control 331XX2206 - First Aid, Fire Protection, Traffic Control and Security 331XX2207 - Health and Safety 331XX2208 - Temporary Construction Facilities (Ownership) 331XX2209 - Temporary Construction Facilities (Operation) 331XX2210 - Project Utilities Totals for 331XX 02

Labor Categories (by rate year) Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost

Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

CLIN 0003 Rollup CLIN 0003: Impacted Media Remediation (Soil and road bedding, Building 401 foundation and utilities, Building 431/432 trench, and EU4 CVOC plume)

Labor Categories (by rate year)Category UnitsHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyTotal UnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

CLIN 0007

CLIN 0007: Impacted Media Remediation (Building 430 Foundation)

Total Cost

Labor
Subcontractor
Travel
ODCs
Materials
Equipment
SUBTOTAL
G&A
SUBTOTAL
Fee
TOTAL TASK 2b (CLIN 0003)

7-331XX 02

331XX 02 Monitoring, Sampling, Testing, and Analysis CLIN 0007: Impacted Media Remediation (Building 430 Foundation)

331XX0201 - Meteorological Monitoring331XX0202 - Radiation Monitoring331XX0203 - Air Monitoring and Sampling331XX0204 - Monitoring Wells331XX0205 - Sampling Surface Water/Groundwater/Liquid Waste331XX0206 - Sampling Soil and Sediment331XX0208 - Sampling Radioactive Contaminated Media331XX0209 - Laboratory Chemical Analysis331XX0210 - Radioactive Waste Analysis331XX0211 - Geotechnical Testing
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor Rate
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit Rate
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

7-331XX 03

331XX 03 Site Work CLIN 0007: Impacted Media Remediation (Building 430 foundation)

331XX0302 - Clearing and Grubbing331XX0303 - Earthwork331XX0304 - Roads/Parking/Curbs/Walks331XX0305 - FencingTotals for 331XX 03
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

7-331XX 05

331XX 05 Surface Water Collection and Control CLIN 0007: Impacted Media Remediation (Building 430 foundation)

331XX0507 - Sediment Barriers331XX0509 - Pumping/Draining CollectionTotals for 331XX 05
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

7-331XX 08

331XX 08 Solids Collection and Containment CLIN 0007: Impacted Media Remediation (Building 430 foundation)

331XX0801 - Contaminated Soil CollectionTotals for 331XX 08
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

7-331XX 09

331XX 09 Liquids/Sediments/Sludges Collection and Containment CLIN 0007: Impacted Media Remediation (Building 430 foundation)

331XX0907 - Lagoons/Basins/Tanks/Dikes/Pump SystemTotals for 331XX 09
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

7-331XX 19

331XX 19 Disposal (Commercial) CLIN 0007: Impacted Media Remediation (Building 430 foundation)

331XX1920 - Container HandlingTotals for 331XX 19
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

7-331XX 20

331XX 20 Site Restoration CLIN 0007: Impacted Media Remediation (Building 430 foundation)

331XX2001 - Earthwork331XX2004 - Revegetation and PlantingTotals for 331XX 20
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

7-331XX 22

331XX 22 General Requirements CLIN 0007: Impacted Media Remediation (Building 430 foundation)

331XX2201 - Supervision and Management 331XX2204 - Engineering, Surveying, and Quality Control 331XX2206 - First Aid, Fire Protection, Traffic Control and Security 331XX2207 - Health and Safety 331XX2208 - Temporary Construction Facilities (Ownership) 331XX2209 - Temporary Construction Facilities (Operation) 331XX2210 - Project Utilities Totals for 331XX 02

Labor Categories (by rate year) Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost

Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

CLIN 0007 Rollup

CLIN 0007: Impacted Media Remediation (Building 430 foundation)
Labor Categories (by rate year)Category UnitsHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyTotal UnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

CLIN 09 Summary CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

Total Cost

Labor
Subcontractor
Travel
ODCs
Materials
Equipment
SUBTOTAL
G&A
SUBTOTAL
Fee
TOTAL TASK 2c (CLIN 0009)

9-331XX 02

331XX 02 Monitoring, Sampling, Testing, and Analysis CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

331XX0201 - Meteorological Monitoring331XX0202 - Radiation Monitoring331XX0203 - Air Monitoring and Sampling331XX0204 - Monitoring Wells331XX0205 - Sampling Surface Water/Groundwater/Liquid Waste331XX0206 - Sampling Soil and Sediment331XX0208 - Sampling Radioactive Contaminated Media331XX0209 - Laboratory Chemical Analysis331XX0210 - Radioactive Waste Analysis331XX0211 - Geotechnical Testing
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor Rate
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit Rate
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

9-331XX 03

331XX 03 Site Work CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

331XX0302 - Clearing and Grubbing331XX0303 - Earthwork331XX0304 - Roads/Parking/Curbs/Walks331XX0305 - FencingTotals for 331XX 03
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

9-331XX 05

331XX 05 Surface Water Collection and Control CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

331XX0507 - Sediment Barriers331XX0509 - Pumping/Draining CollectionTotals for 331XX 05
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

9-331XX 08

331XX 08 Solids Collection and Containment CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

331XX0801 - Contaminated Soil CollectionTotals for 331XX 08
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

9-331XX 09

331XX 09 Liquids/Sediments/Sludges Collection and Containment CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

331XX0907 - Lagoons/Basins/Tanks/Dikes/Pump SystemTotals for 331XX 09
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

9-331XX 19

331XX 19 Disposal (Commercial) CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

331XX1920 - Container HandlingTotals for 331XX 19
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

9-331XX 20

331XX 20 Site Restoration CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

331XX2001 - Earthwork331XX2004 - Revegetation and PlantingTotals for 331XX 20
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

9-331XX 22

331XX 22 General Requirements CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

331XX2201 - Supervision and Management 331XX2204 - Engineering, Surveying, and Quality Control 331XX2206 - First Aid, Fire Protection, Traffic Control and Security 331XX2207 - Health and Safety 331XX2208 - Temporary Construction Facilities (Ownership) 331XX2209 - Temporary Construction Facilities (Operation) 331XX2210 - Project Utilities Totals for 331XX 02

Labor Categories (by rate year) Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost

Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

CLIN 0009 Rollup CLIN 0009: Impacted Media Remediation (Building 431/432 Foundation)

Labor Categories (by rate year)Category UnitsHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyTotal UnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

CLIN 0011 Summary CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

Total Cost

Labor
Subcontractor
Travel
ODCs
Materials
Equipment
SUBTOTAL
G&A
SUBTOTAL
Fee
TOTAL TASK 2d (CLIN 0011)

11-331XX 02

331XX 02 Monitoring, Sampling, Testing, and Analysis CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

331XX0201 - Meteorological Monitoring331XX0202 - Radiation Monitoring331XX0203 - Air Monitoring and Sampling331XX0204 - Monitoring Wells331XX0205 - Sampling Surface Water/Groundwater/Liquid Waste331XX0206 - Sampling Soil and Sediment331XX0208 - Sampling Radioactive Contaminated Media331XX0209 - Laboratory Chemical Analysis331XX0210 - Radioactive Waste Analysis331XX0211 - Geotechnical Testing
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor Rate
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit Rate
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

11-331XX 03

331XX 03 Site Work CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

331XX0302 - Clearing and Grubbing331XX0303 - Earthwork331XX0304 - Roads/Parking/Curbs/Walks331XX0305 - FencingTotals for 331XX 03
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

11-331XX 05

331XX 05 Surface Water Collection and Control CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

331XX0507 - Sediment Barriers331XX0509 - Pumping/Draining CollectionTotals for 331XX 05
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

11-331XX 08

331XX 08 Solids Collection and Containment CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

331XX0801 - Contaminated Soil CollectionTotals for 331XX 08
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

11-331XX 09

331XX 09 Liquids/Sediments/Sludges Collection and Containment CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

331XX0907 - Lagoons/Basins/Tanks/Dikes/Pump SystemTotals for 331XX 09
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

11-331XX 19

331XX 19 Disposal (Commercial) CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

331XX1920 - Container HandlingTotals for 331XX 19
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

11-331XX 20

331XX 20 Site Restoration CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

331XX2001 - Earthwork331XX2004 - Revegetation and PlantingTotals for 331XX 20
Labor Categories (by rate year)Category QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCostCategory QtyHoursTotal HoursHourly Labor RateCost
Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)
Subtotal
G&A
Fee
Total
Equipment
Sub Equipment (if applicable)
Subtotal
G&A
Fee
Total

11-331XX 22

331XX 22 General Requirements CLIN 0011: Impacted Media Remediation (Building 433 Foundation, Sidewalls, and Roof)

331XX2201 - Supervision and Management 331XX2204 - Engineering, Surveying, and Quality Control 331XX2206 - First Aid, Fire Protection, Traffic Control and Security 331XX2207 - Health and Safety 331XX2208 - Temporary Construction Facilities (Ownership) 331XX2209 - Temporary Construction Facilities (Operation) 331XX2210 - Project Utilities Totals for 331XX 02

Labor Categories (by rate year) Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost Category Qty Hours Total Hours Hourly Labor Rate Cost

Subcontractor Labor Categories (by rate year)
Total
Fee
Total Labor
ODCsQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCostQtyUnitsUnit RateCost
Sub ODC (if applicable)
Subtotal
G&A
Fee
Total ODC
Travel
Sub Travel (if applicable)
Subtotal
G&A
Total
Materials
Sub Materials (if applicable)

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .