Attachment 4 - Price Matrix.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C24821R0139
About this file
This document contains a price matrix template and details of a federal contract opportunity for construction services. The price matrix templates provide a breakdown of estimated labor, material, and total costs by construction division for base bids and alternatives.
The federal contract opportunity is to expand and renovate the Cardiothoracic Intensive Care Unit at the Malcolm Randall VA Medical Center in Gainesville, Florida. Services include construction work to increase capacity, eliminate privacy deficiencies, and improve functionality and patient access. The project value is estimated between $1 million to $5 million. The North American Industry Classification System code is 236220. Interested parties should register on SAM.gov as the solicitation and drawings will be available for download on or around July 28, 2021, with responses due on a date specified in the solicitation. The contract type will be firm-fixed-price with an estimated 365 day performance period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - LOS Certification Solicitation Version.doc | DOC document | |
| Attachment 9 - Q_A RFIs.xlsx | XLSX spreadsheet | |
| Attachment 5- DB Wage Rates FL20210194 05.07.2021.pdf | ||
| 36C24821R0139.docx | DOCX document | |
| Attachment 8 (Exhibit B) Past and Present Performance Questionnaire.docx | DOCX document | |
| Attachment 1- Specifications.zip | ZIP file | |
| Attachment 6 -(Exhibit C) EMR.docx | DOCX document | |
| Attachment 7- (Exhibit A) Performance Relevancy Survey v2.docx | DOCX document | |
| 36C24821R0139_3.docx | DOCX document | |
| Attachment 2- Drawings.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Item 1 BASE
Bid Item 1 Base Offer Cost Breakdown
| Project Number: | Date: | ||
| Project Title | |||
| Project Location | |||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
| Item | Description | Labor Cost | Material Cost | Total Cost |
| Division 1 | General Requirements | $- | $- | $- |
| Division 2 | Existing Conditions | - | - | - |
| Division 3 | Concrete | - | - | - |
| Division 4 | Masonry | - | - | - |
| Division 5 | Metals | - | - | - |
| Division 6 | Wood and Plastic | - | - | - |
| Division 7 | Thermal & Moisture Protect | - | - | - |
| Division 8 | Doors and Windows | - | - | - |
| Division 9 | Finishes | - | - | - |
| Division 10 | Specialties | - | - | - |
| Division 11 | Equipment | - | - | - |
| Division 12 | Furnishings | - | - | - |
| Division 13 | Special Construction | - | - | - |
| Division 14 | Conveying Equipment | - | - | - |
| Division 21 | Fire Suppression | - | - | - |
| Division 22 | Plumbing | - | - | - |
| Division 23 | HVAC | - | - | - |
| Division 26 | Electrical | - | - | - |
| Division 27 | Communications | - | - | - |
| Division 28 | Electronic Safety & Security | - | - | - |
| Division 31 | Earthwork | - | - | - |
| Division 32 | Exterior Improvements | - | - | - |
| Division 33 | Utilities | - | - | - |
| Division 34 | Transportation Subtotal | - | - | - |
| Division Subtotals : | $- | $- | $- |
| Overhead % | 0.00% | - |
| Profit % | 0.00% | - |
| Bond % | 0.00% | - |
| Overhead/Profit Subtotals : | $- |
Total Price $- $- $-
Bid Item 2
Bid Item 1 Offer Cost Breakdown
| Project Number: | Date: | ||
| Project Title | |||
| Project Location | |||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
| Item | Description | Labor Cost | Material Cost | Total Cost |
| Division 1 | General Requirements | $- | $- | $- |
| Division 2 | Existing Conditions | - | - | - |
| Division 3 | Concrete | - | - | - |
| Division 4 | Masonry | - | - | - |
| Division 5 | Metals | - | - | - |
| Division 6 | Wood and Plastic | - | - | - |
| Division 7 | Thermal & Moisture Protect | - | - | - |
| Division 8 | Doors and Windows | - | - | - |
| Division 9 | Finishes | - | - | - |
| Division 10 | Specialties | - | - | - |
| Division 11 | Equipment | - | - | - |
| Division 12 | Furnishings | - | - | - |
| Division 13 | Special Construction | - | - | - |
| Division 14 | Conveying Equipment | - | - | - |
| Division 21 | Fire Suppression | - | - | - |
| Division 22 | Plumbing | - | - | - |
| Division 23 | HVAC | - | - | - |
| Division 26 | Electrical | - | - | - |
| Division 27 | Communications | - | - | - |
| Division 28 | Electronic Safety & Security | - | - | - |
| Division 31 | Earthwork | - | - | - |
| Division 32 | Exterior Improvements | - | - | - |
| Division 33 | Utilities | - | - | - |
| Division 34 | Transportation Subtotal | - | - | - |
| Division Subtotals : | $- | $- | $- |
| Overhead % | 0.00% | - |
| Profit % | 0.00% | - |
| Bond % | 0.00% | - |
| Overhead/Profit Subtotals : | $- |
Total Price $- $- $-
File details come from the government source that posted it. Updated .