Attachment 4 - Price Breakdown Worksheet- R. 11-14-24.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
3rd, 6th, & 8th Floor, East to West Elevator -Renovate Halls & Walls | Project: 521-25-101
Solicitation number
36C24725R0024
Issued by

About this file

This is a price breakdown worksheet template (Attachment 4) associated with solicitation number 36C24725R0023 for a Department of Veterans Affairs renovation project. The template provides a detailed cost breakdown structure organized by construction divisions (01-27) with columns for Material, Labor, Equipment, and Other costs. The divisions include General Requirements, Existing Conditions, Concrete, Metals, Wood and Plastic, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, and Communications.

The worksheet requires bidders to itemize costs within each division and calculate subtotals, followed by overhead, profit, and bonds/insurance to arrive at a total proposal price. The template is currently blank with "$0" placeholders throughout, intended to be completed by contractors submitting bids for the renovation work of halls and walls on the 3rd, 6th, and 8th floors, which includes ceiling tile replacement, painting, wall protection, cove base installation, and new commercial grade rubber tile flooring.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Solicitation No. 36C24725R0023_ Attachment – Price Breakdown Worksheet

DESCRIPTIONMATERIALLABOREQUIPMENTOTHERTOTAL
Division 01 - General Requirements
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 02 – Existing ConditionsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 03 – ConcreteMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 05 - MetalsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 06- Wood and PlasticMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 07- Thermal and Moisture ProtectionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 08- Openings (Doors and Windows)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 09- FinishesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 10- SpecialtiesMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 11- EquipmentMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 12- FurnishingsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 13- Special ConstructionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 21- Fire SuppressionMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 22- PlumbingMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 23- Heating, Ventilating, and Air conditioning (HVAC)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 26 ElectricalMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Division 27- CommunicationsMATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Division Total$ - 0$ - 0$ - 0$ - 0$ - 0
Other (If applicable)MATERIALLABOREQUIPMENTOTHERTOTAL
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
$$$$$ - 0
Other Total$ - 0$ - 0$ - 0$ - 0$ - 0
MATERIALLABOREQUIPMENTOTHERTOTAL
SUB TOTAL$ - 0$ - 0$ - 0$ - 0$ - 0
Overhead$$$$$
Profit$$$$$
Bonds and Insurance$$$$$
Total Proposal$ - 0$ - 0$ - 0$ - 0$ - 0

File details come from the government source that posted it. Updated .