Attachment 4 - Performance Checklist - Landscape.pdf

PDF 101 KB Posted

Attached to
RMRS Moscow Laboratory Grounds Maintenance and Snow Removal Services
Solicitation number
1240BG25Q0030
Issued by

About this file

The document is a Landscaping Checklist for grounds maintenance services, detailing specific tasks and performance standards for landscape maintenance from April to October. The checklist outlines weekly, bi-annual, seasonal, annual, and as-needed landscaping tasks, including mowing (grass cut to 2-1/2 - 3-1/2 inches), trimming, weeding, litter removal, watering, edging, fertilizer application, irrigation system management, pruning, and soil aeration. Each task has designated "Acceptable" and "Unacceptable" columns to track performance compliance, with specific requirements such as removing noxious weeds, following ANSI Z133.1-1994 pruning standards, and completing soil aeration before May 1st. The checklist is designed to ensure consistent, high-quality landscape maintenance with clear performance expectations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date of Service:

Observed:

Tasks Acceptable Unacceptable

Weekly:

Mowing - Grass is cut to 2-1/2 - 3-1/2 inches.

Trimming - Grass is trimmed to 2-1/2 - 3-

1/2 inches

Weeding - All noxious and undesirable weeds are removed; includes tree sprouts.

Grounds monitoring/litter removal -

Removal and disposal of all natural and man-made debris.

Watering - Supplement irrigation system when needed.

Bi-annually

Edging - Sidewalks, driveways, curbs, and other concrete or asphalt shall be edged twice per year.

Seasonally:

Fertilizer Application - Appropriate seaonal commercial fertilizer application.

Irrigation system - Spring start-up and Fall shut down.

April - October

Landscaping Checklist

Notes :

Annually: Acceptable Unacceptable

Pruning - Accomplished in accordance with industry (ANSI Z133.1 - 1994) standards.

Aerate Soil - On improved grounds to be completed before May 1st.

As Needed:

Watering - Additional watering as needed to keep plants healthy.

Notes

File details come from the government source that posted it. Updated .