Attachment 4 - Offerors Proposed Delivery Schedule.doc
DOC document 51 KB Posted
- Attached to
- 87' Port and STBD Rudder Overhaul
- Solicitation number
- 70Z08020Q16000B00
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Statement of Work.pdf | ||
| RFQ 70Z08020Q16000B00 87 Rudder Overhaul.docx | DOCX document | |
| Attachment 6 - DHS Form 11000-6.pdf | ||
| Attachment 5 - PPQ.docx | DOCX document | |
| Attachment 3 - Contracting Pricing and CLIN List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
70Z080-20-Q-16000B00
OFFEROR’S PROPOSED DELIVERY SCHEDULE
| CLIN |
| DESCRIPTION |
| QUANTITY |
| WITHIN DAYS AFTER DATE OF CONTRACT |
| 0001 - 4001 |
| Open, Clean, Paint Removal, Inspect, Test STBD or PORT RUDDER(S) & submit a Condition Found Report (CFR) |
| As required |
| Within ___ days after receipt of Government Furnished Property (GFP) |
| Review |
| Coast Guard review and approval. |
| As required |
| Within 7 calendar days after receipt of CLIN 0001-4001 |
| 0002 - 4002 |
| Overhauled STBD or PORT Rudder(s) |
| As required |
| Within ___ days after approval of CLIN 0001 -40001 |
| 0003 - 4003 |
| Repackage B.E.R. Rudder, or any item shipped in error |
| As required |
| Within __ days after receipt of delivery order |
| 0004 - 4004 |
| (Optional) - Additional sand blasting as required to remove unknown coatings that are beyond normal coating applications |
| As required |
| As part of CFR if required |
| 0005 - 4005 |
| (Optional) - Weld Repairs: General - Rudder Stock: Undercut 0.1875" x 6" Long and clad weld up to facilitate finish machining per Work Item 1 2040014611943_Ruddr_Stbd or Work Item 1 2040014611944_Ruddr_Port, section 3.5. |
| As required |
| As part of CFR if required |
| 0006 - 4006 |
| (Optional) – Weld Repairs: General - Rudder blade: 4 square inch of blade skin removed, replaced, welded and tested per Work Item 1 2040014611943_Ruddr_Stbd or Work Item 1 2040014611944_Ruddr_Port section 6.2.1. and 3.4 including subsections. |
| As required |
| As part of CFR if required |
| 0007 - 4007 |
| (Optional) – Weld Repairs: Blade welds, 3 inch – based on welding a 3 inch length to repair leakage and test per Work Item 1 2040014611943_Ruddr_Stbd or Work Item 1 2040014611944_Ruddr_Port section 6.2.2 and 3.4 including subsections. |
| As required |
| As part of CFR if required |
| 0008 - 4008 |
| (Optional) - Rudder Replacement: Replace B.E.R. rudder with new manufactured rudder. Rudder(s) shall meet all the requirements of Work Item 1 2040014611943_Ruddr_Stbd or Work Item 1 2040014611944_Ruddr_Port. |
| As required |
| As part of CFR if required. |
| 0009 - 4009 |
| Construct new shipping crate for a RUDDER per Work Item 1 2040014611943_Ruddr_Stbd or Work Item 1 2040014611944_Ruddr_Port section 5.2 and subsections |
| As required |
| As part of CFR if required |
| 0010 |
| Final Inspection Report per section 3.7 of Spec |
R-562-2013.
| As required |
| Within ___ days of final delivery date |
| Review |
| Coast Guard Review and Approval |
| As required |
| 7 calendar days |
| Packing, packaging, marking and delivery of the Rudders |
| As required |
| Within ___ days of Coast Guard quality assurance inspection |
File details come from the government source that posted it. Updated .