Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).
Approved Disapproved
HazMat Questionnaire 3
5 Days Prior to
Start Date
Provide the documents as required per the Environmental packet provided by Keesler AFB.
HazMat MSDS 3 3
5 Days Prior to
Start Date
Provide the documents as required per the Environmental packet provided by Keesler AFB.
Hazmat Reporting Entry Form 3 3 3
5 Days Prior to
Start Date
Provide the documents as required per the Environmental packet provided by Keesler AFB.
4 Recycling and Landfill Report 3 3 End of
Contract Provide the documents as required per the Environmental packet provided by Keesler AFB.
5 Warranty (Manufacturer's)
End of Contract
6 1-Year Warranty (Contractor)
End of Contract
7 Section 032000 - Concrete Reinforcement 3 3
14 Days Prior to
Start Date 8 Section 033000 - Cast-in-place
Concrete 3 3 10 Days Prior to
Start Date Provide Test Results 5 days following tests as required per specifications.
9 Section 030516 - Underslab Vapor Barrier 3 3 3 3
10 Days Prior to
Start Date 10 Section 093000 - Tiling
3 3 3 3 3 10 Days Prior to
Start Date 11 Section 220517 - Sleeves and
Sleeve Seals for Plumbing Piping 3 3 10 Days Prior to
Start Date 12 Section 220529 - Hangers and
Supports for Plumbing Piping and Equipment
3 3 10 Days Prior to
Start Date 13 Section 221005 - Plumbing Piping 3 3 10 Days
Prior to Start Date
14 Section 221006 - Plumbing Piping Specialties
3 3 10 Days Prior to
Start Date 15 Construction Phasing Proposal Plan 3 3 14 Days
Prior to Start Date
Re tu rn S us pe ns e
D at e
Te ch ni ca l D at a
Te st
R ep or ts
D at e to
C iv il En gi ne er in g
Sa m pl es
Co lo r S el ec tio n
M an uf ac tu re r's R ec om m en da tio n
W ar ra nt y- M an uf ac tu re r a nd /o r W or km an sh ip
Ca ta lo g
D at a
Project Number:
MAHG211108
Project Title:
Replace Sanitary Lines Live Oak Dining Facility
Solicitation / Contract Number:
[ enter here ]
Remarks
(To be completed by Project Engineer)
Li ne
N um be r
Re qu ire d
Su bm is si on D at e
Item or Description of Item, Contract Reference, Type of Submittal
Ce rt ifi ca te o f C om pl ia nc e
Sh op
D ra w in gs
Date Contractor Notified
(To be completed by Contract Administrator)
Su bm itt al
N um be rs
Co nt ra ct or R es ub m itt al
Fi na l A pp ro va l
Number of Copies Required (if not electronically submitted)
D at e Re ce iv ed in
C on tr ac tin g
Fi el d Re po rt s
O pe ra tin g In st ru ct io ns
Sc he du le s, Li st in gs , R ep or ts , P la ns