Attachment 4 - MS Canandaigua 6B ELECTRICAL_POWER_PLAN.pdf

PDF 409 KB Posted

Attached to
N059--Combined Synopsis - Solicitation - Canandaigua Wiring Project Federal contract opportunity
Solicitation number
36C25922Q0480
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

View the file

Other files for this federal contract opportunity

Other files attached to N059--Combined Synopsis - Solicitation - Canandaigua Wiring Project, newest first.
File Type Posted
36C25922Q0480 A0001.docx DOCX document
36C25922Q0480.docx DOCX document
Attachment 2 - 852.219-77 VA Notice of Limitations on Subcontracting _ Certificate of Compliance for Services.docx DOCX document
Attachment 3 - Canandaigua Bldg 6 Floorplan.pdf PDF
Attachment 1 - SOW - Canandaigua Electrical Project.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN DNR

E

F

R E

F

J

J

J

J J

J

J

J

J

J

J

J

JJ

J

J

J J

JJ

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J J

J J

J J

J

J

J

J J

J

J

J

J

J

J J

J

J

J

J

J

J

J

J

J

J

J

J J

J

J J

J J

J J

J

J

J J

J

JJ

J

J

J

J

J

J J J J J

JJ

J J

CALL CENTER

CALL CENTER

CALL CENTER

MENS

LOBBY

OFFICE

OFFICE

TRAINING ROOM

ENTRY

TELECOM

BREAK ROOM

CALL CENTER

LOCKERS

CALL CENTER

CALL CENTER

OFFICE

WOMENS

NURSING

OFFICE

CORRIDOR

CONF RM

CORRIDOR

HAC

P2A LS2A P2B

OP2B

LS2B

GFI

GFI

TV

TV

GFI

GFI

GFI

GFI

GFI

GFI

TV

UPS-2A-11

UPS-2A-1

UPS-2A-6

UPS-2A-8

UPS-2A-9

UPS-2A-10

UPS-2A-12

UPS-2A-14

UPS-2A-2

UPS-2A-15

UPS-2A-13

UPS-2A-5

UPS-2A-7

OP2B-3

OP2B-2

OP2B-1

UPS-2B-14

UPS-2B-15 UPS-2B-15

UPS-2B-12

UPS-2B-9

UPS-2A-16

UPS-2B-7

UPS-2B-1

UPS-2B-3

UPS-2B-1

UPS-2B-2

UPS-2B-5

UPS-2B-6

UPS-2B-4

UPS-2B-11

UPS-2B-10

UPS-2B-8

UPS-2BUPS-2A

2.8 4.2 53 4

2.5

6 7

5.8 7.26.5 7.5 98.8

16.214.814 1615

16.5

131211 13.211.8 12.511.510 10.2

A

B

C

D

E

F

G

H

I

J

K

H.5

L

M

N

UPS-2A-3

UPS-2A-1

UPS-2A-17

UPS-2A-4

UPS-2A-2

6 6

7 7

UPS-2B-13

4 4

1 1

8 8 8

LS2B-1

OP2B-4

8 8

9 7

GFI

ADA

ADA

ADA

ADA

ADA

GFI

9 TYP ALL ADA

CONNECTIONS

OP2B-5

OP2B-5

OP2B-6

GFI

OP2B-6

OP2B-6

16,18

FC-1

16,18

FC-1

16,18

FC-1

16,18

FC-1

BC-1

16,18

16,18

FC-1

16,18

FC-1

16,18

FC-1

16,18

FC-1

16,18

FC-2

16,18

BC-1

19,21

BC-1

19,21

FC-1

19,21

FC-2

19,21

FC-2

19,21

FC-2

19,21

FC-2

19,21

BC-1

FC-2

19,21

19,21

BC-1

FC-2

20,22

FC-2

20,22

FC-2

20,22

FC-4

20,22

20,22

FC-3

BC-1

15,17

FC-5

15,17

SPLIT

FC-5

15,17

BC-1

15,17

BC-1

15,17

FC-1

16,18

FC-1

16,18

FC-1

16,18

FC-1

16,18

BC-1

16,18

FC-1

16,18

FC-1 FC-1

19,21 19,21

BC-1

19,21

FC-1

19,21

FC-1

19,21

FC-1

19,21

FC-2

19,21

FC-2

19,21

BC-1

19,21

FC-1

16,18

BC-1

19,21

TYP ALL "FC-#" THIS

PLAN

TYP ALL "BC-#" THIS

PLAN

TYP ALL UPS CONNECTED

JUNCTION BOXES SHOWN BY

DESKS ON THIS PLAN

FC3

15,17

26 27 28 29 30

FC-7

15,17

13 TYP 10 IN THIS ROOM

HAND

DRYER

HAND

DRYER

GFI

FC-1

16,18

FC-1

16,18

ELECTRICAL GENERAL NOTES

1. WHERE STRUCTUAL OPENINGS ARE NOT AVAILABLE, THE

CONTRACTOR SHALL CORE DRILL WALLS AND FLOORS AS REQUIRED TO PERMIT

PASSAGE OF CONDUITS. THE E.C. SHALL PROVIDE A MARKED-UP PLAN WITH LOCATIONS

PENETRATIONS FOR REVIEW AND APPROVAL OF THE STRUCTUAL ENGINEER BEFORE

ROUGH-IN BEGINS.

2. RECEPTACLES FOR ALL EQUIPMENT SHALL BE COMPLETE WITH PLUGS FOR THIS

EQUIPMENT. THE E.C. SHALL VERIFY NEMA CONFIGURATIONS OF PLUGS AND

RECEPTACLES FOR EQUIPMENT IN THE SPACE.

3. DURING THE BIDDING PROCESS, THE ELCTRICAL CONTRACTOR SHALL REVIEW

DRAWINGS AND SPECIFICATIONS OF ALL OTHER TRADES (ARCHITECTURAL, SITE/

LANDSCAPING, HVAC,PLUMBING, AND SPECIALTY TRADES). ALL ITEMS REQUIRING

POWER INDICATED ON THESE DRAWINGS BUT NOT INDICATED ON THE ELECTRICAL

DRAWINGS SHALL BE CONSIDERED A PART OF THE ELECTRICAL CONTRACTOR'S

WORK. THIS WORK SHALL BE INSTALLED AS PER NEC REQUIREMENTS AT NO

ADDITIONAL COST TO THE OWNER.

4. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAKE ALL FEEDER RUNS

CONTINUOUS (NO CABLE BREAKS). IF SPLICING OF CABLES IN BOXES BECOMES

NECESSARY, USE O.Z.G. TYPE "XW" CABLE TAPS, OR APPROVED EQUAL, AND TAPE

EACH TAP IN APPROVED MANNER.

5. THE MECHANICAL CONTRACTOR SHALL PROVIDE DISCONNECT SWITCHES AND

STARTERS FOR ALL OF HIS/HER UNITS. THE E.C. SHALL RECEIVE THESE ITEMS FROM

THE M.C. FOR INSTALLATION BY THE E.C.

6. ALL DISCONNECT SWITCHES SHALL BE RATED EQUAL TO OR HIGHER THAN THE

UPSTREAM CIRCUIT BREAKER. ALL INDOOR SWITCHES TO BE NEMA 1, OUTDOOR TO BE

NEMA 4X

ELECTRICAL CIRCUITING NOTES

UNLESS OTHERWISE NOTED, ALL CIRCUIT NUMBERS ON THIS PLAN REFER TO THE

PANELBOARD DESIGNATIONS IDENTIFIED IN THE A/B CIRCUITING SPLIT LINE ON

THIS SHEET.

UNLESS OTHERWISE NOTED, ALL WIRING SHALL BE #12 IN 3/4" EMT UP TO 75', #10

IN 3/4" EMT UP TO 150', AND #8 IN 1" EMT ABOVE. THE CONTRACTOR SHALL SIZE

THE WIRING BASED ON FIELD INSTALLED LENGTHS.

ALL CIRCUITS SHALL HAVE A DEDICATED NEUTRAL.

SINGLE PHASE BRANCH CIRCUITS OVER 20A AND ALL 3 PHASE CIRCUITS SHALL BE

IN DEDICATED CONDUIT. 20A BRANCH CIRCUITS MAY SHARE A CONDUIT PROVIDED

THE WIRE SIZES ARE RATED AS PER NEC 310.15(B)(3)(a).

1.

2.

3.

4.

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Dwg. of

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

FULLY SPRINKLERED

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

6587 Hamilton Avenue Pittsburgh, Pennsylvania 15206 Ph: 412.287.7333 Fax: 412.287.7334 www.ae-works.com

AE Works Project Number:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

REVISIONS TO THESE CONTRACT DOCUMENTS BY AE WORKS, REFLECTEING

CHANGES IN THE WORK MADE DURING BIDDING AND CONSTRUCTION, ARE BASED

ON THE INFORMATION FURNISHED TO AE WORKS BY THE COR VIA THE

CONTRACTOR. AE WORKS SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR

COMPLETENESS OF THE INFORMATION PROVIDED BY THE COR, NOR THE

DISCREPANCIES BETWEEN THE COR OR CONTRACTOR-PROVIDED INFORMATION

AND THE BUILT CONDITIONS.

RECORD DRAWINGS

6/ 3/

:3

8:

P M

BUILDING 6, SECOND FLOOR HRC

528A5-16-501

GG ICT

400 Fort Hill Avenue, Canandaigua, NY 14424

E202

SECOND FLOOR ELECTRICAL POWER PLAN

12 / 12 / 18

16009

1/8" = 1'-0"

02-EP SECOND FLOOR NEW

KEYNOTES

KEY VALUE KEYNOTE TEXT

1 COORDINATE OUTLET LOCATION WITH TV MOUNTING FRAME PRIOR TO ROUGH IN. OUTLET

MOUNTED IN 3 GANG RECESSED TV BACKBOX. AS PER LEGRAND TV3W OR EQUAL.

2 RUN 2" CONDUIT FROM POKE THRU TO JUNCTION BOX BESIDE TV OUTLET AS SHOWN.

3 HDMI FEMALE OUTLET MOUNTED IN SINGLE GANG JUNCTION BOX LOCATED IN RECESSED

TV BACKBOX SYSTEM.

4 NEMA 5-30 OUTLET. RUN CIRCUIT IN 3/4"C,2#10,#10G.

5 JBOX FOR NEW ACCESS CONTROL SYSTEM PANEL.

6 JBOX FOR NEW FIRE ALARM POWER SUPPLIES.

7 DEDICATED PRINTER OUTLET.

8 DEDICATED OUTLET FOR ELECTRIC WATER COOLER/BOTTLE FILLER. FILLER INSTALLED BY

OTHERS.

9 POWER FOR ADA POWER DOOR OPERATOR. WIRE DOOR OPERATOR POWER. REFER TO

TELECOMS DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE ALL POWER

REQUIREMENTS WITH DOOR HARDWARE SUBMITTAL PRIOR TO ROUGH IN.

10 CEILING MOUNTED JUNCTION BOX FOR CONNECTION TO FAN COIL UNIT (VRF SYSTEM

INDOOR UNIT). BOD UNIT COMES WITH INTEGRAL DISCONNECT, IF ANOTHER

MANUFACTURERS UNIT DOES NOT COME WITH A DISCONNECT, INSTALL DISCONNECT

SWITCH FURNISHED BY MC. FINAL CONNECTION TO EQUIPMENT BY EC.

11 CEILING MOUNTED JUNCTION BOX FOR CONNECTION TO VRF SYSTEM

MANIFOLD/CONTROLLER. BOD UNIT COMES WITH INTEGRAL DISCONNECT, IF ANOTHER

MANUFACTURERS UNIT DOES NOT COME WITH A DISCONNECT, INSTALL DISCONNECT

SWITCH FURNISHED BY MC. FINAL CONNECTION TO EQUIPMENT BY EC.

12 JUNCTION BOX FOR CONNECTION TO PREWIRED FURNITURE WHIP. WHIP PROVIDED BY

OTHERS, WIRED BY EC. SINGLE CIRCUIT PER CLUSTER OF DESKS AS SHOWN. LABEL

CIRCUIT REFERENCE ON EACH JUNCTION BOX. REFER TO DETAIL 10 ON E500.

13 ON FLOOR SERVICE BOX TIED INTO IN CARPET RACEWAY SYSTEM (BASIS OF DESIGN BY

CONNECTRAC). BOX TO CONTAIN DUPLEX RECEPTACLE AND DOUBLE DATA PORT.

COORDINATE INSTALLATION WITH CARPET INSTALLER.

14 IN CARPET RACEWAY SYSTEM (BASIS OF DESIGN BY CONNECTRAC). TWO CHANNEL (POWER

AND DATA). PROVIDE WALL FEED KIT AND ALL PARTS AND PIECES REQUIRED FOR A

COMPLETE INSTALLATION. REFER TO E500 DETAIL 11 FOR MORE INFORMATION.

15 INSTALL HDMI CONNECTION IN THIS BOX AND RUN CABLE TO TV BACKBOX.

16 NEW COPPER TELECOMS GROUND BAR. PROVIDE STAND OFFS AND WALL MOUNT KIT.

GROUND RACKS, LADDER AND ALL OTHER EXPOSED METAL TELECOMS CONTAINMENT

SYSTEMS. CONNECT GROUND BAR INTO MAIN GROUND BUS IN MAIN ELECTRICAL ROOM VA

#6 COPPER GROUND WIRE RUN IN EMT MIN.

17 INDOOR UNIT FROM SPLIT SYSTEM POWERED FROM OUTDOOR UNITS. SEE E200 DETAIL 1

FOR ADDITIONAL INFORMATION.

18 3 COMPARTMENT MULTI SERVICE POKE THRU. DUPLEX RECEPTACLE, DATA AND AV

COMPARTMENTS. HDMI CONNECTION BETWEEN TV AND POKE THRU. AS PER LEGRAND

EVOLUTION 6 SERIES OR EQUAL. COORDINATE ALL WORK REQUIRED ON THE FLOOR

BELLOW WITH THE VA 10 DAYS PRIOR TO CARRYING OUT ANY WORK. LEVEL 1 IS AN

OCCUPIED SPACE AND MAY REQUIRE OFF HOURS OR WEEKEND WORK TO COMPLETE THE

INSTALLATION.

U.O.N. ALL CIRCUITS TO P2B

U.O.N. ALL CIRCUITS TO P2A

N

NOTE: RECEPTACLES AND A CONNECTION POINT FOR THE FAN COILS ARE

SHOWN. ONE CIRCUIT IS ASSIGNED TO EACH FAN COIL UNIT. IT IS NOT CLEAR

IN THE AS-BUILT PROVIDED BY THE CONTRACTOR WHICH CIRCUITS AND

OUTLETS ARE CONNECTED, AND SO THE CORRECT CONNECTIONS CANNOT

BE VERIFIED AND DEPICTED IN THESE RECORD DRAWINGS. VA TO VERIFY

CONDITIONS IN THE FIELD WHEN USING THESE RECORD DRAWINGS.

Sheets
E001 - ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES
E102 - SECOND FLOOR LIGHTING PLAN
E200 - BASEMENT AND FIRST FLOOR ELECTRICAL POWER PLAN
E202 - SECOND FLOOR ELECTRICAL POWER PLAN
E203 - ATTIC ELECTRICAL POWER PLAN
E500 - ELECTRICAL DETAILS
E501 - LIGHTING DETAILS
E600 - ELECTRICAL SINGLE LINE DIAGRAM
E700 - ELECTRICAL SCHEDULES
E701 - ELECTRICAL SCHEDULES
ED100 - BASEMENT AND FIRST FLOOR ELECTRICAL DEMOLITION PLAN
ED102 - SECOND FLOOR ELECTRICAL DEMOLITION PLAN
ED103 - ATTIC ELECTRICAL DEMOLITION PLAN
EF001 - FIRE ALARM SYMBOLS, ABBREVIATIONS AND NOTES
EF102 - SECOND FLOOR FIRE ALARM PLAN
EF500 - TYPICAL FIRE ALARM RISER
ET001 - TELECOMMUNICATION SYMBOLS, ABBREVIATIONS AND NOTES
ET101 - FIRST FLOOR TELECOM PLAN
ET102 - SECOND FLOOR TELECOM PLAN
ET500 - TELECOM DETAILS
ET501 - TELECOM DETAILS
ET502 - TELECOM DETAILS