This is a Quality Assurance Surveillance Plan (QASP) for the Spotted Bear Ranger District Annual Spring Janitorial Service contract (Req #: 1661807) administered by the USDA Forest Service at Flathead National Forest.
The QASP establishes the procedures and methodologies for monitoring contractor performance against the performance work statement requirements. The plan defines two primary performance objectives with specific acceptable quality levels and consequences: (1) Overall Cleaning—accomplishing all cleaning tasks to an acceptable level of cleanliness allows a maximum of 5 defects per yearly cleaning, with 25% payment deduction if this threshold is exceeded; and (2) Perform Work within Schedule Requirements—cleaning must be completed within specified timeframes with zero tolerance, resulting in 100% payment withhold if work is not completed on schedule. The Government's surveillance method consists of visual walkthrough inspections by the Contracting Officer Representative (COR) upon completion of janitorial services, combined with customer feedback validation. Performance is rated as Outstanding (substantially exceeding standards with no significant deficiencies), Acceptable (completing all tasks within timeframes with up to 5 defects acceptable due to remote location), or Poor (failing to satisfactorily complete tasks or missing deadlines without justification). The contractor is responsible for implementing a Quality Control Plan, maintaining quality records, and appointing a single quality control point-of-contact. The COR conducts surveillance, documents deficiencies through discrepancy reports, and makes recommendations to the Contracting Officer for corrective actions or contract modifications. The QASP includes example forms for discrepancy reporting, customer feedback documentation, inspection checklists, quality assurance monitoring, complaint investigations, and surveillance activity tracking.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 6- map_HH_to_SBRS.PNG | PNG image | |
| Attachment 3- Wage Determination 2015-5401 Rev 27 dated Dec 3 2025.pdf | ||
| Attachment 2- Statement of Work.pdf | ||
| Attachment 5- Biobased Products.pdf | ||
| Part 12 Combined Synopsis_Solicitation Spotted Bear RD Spring Janitorial.pdf | ||
| Attachment 7-map_aerial_view_SB_compound.jpg | JPG image | |
| Attachment 1 - Solicitation Terms and Conditions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Quality Assurance Surveillance Plan
Contents Project Name Solicitation / Contract Number Section 1: Introduction
1.1 Purpose
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
1.2.2 Surveillance of Performance Progression
1.3 QASP Relation to the Quality Control Plan (QCP)
Section 2: Performance Description
2.1 Performance Standards and Acceptable Quality Levels (AQLs)
2.1.1 Allowable Deviation
2.1.2 Substantially Complete
2.2 Non-Performance
2.2.1 Documentation
2.2.2 Remedial Actions
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
3.2.2 Contracting Officer Representative (COR)
3.2.3 Customers.................................................................................................................................. Error! Bookmark not defined.
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
4.2 Analysis and Results
Appendix A: Example Performance Requirement Summaries ................................................................... Error! Bookmark not defined.
Appendix B: Example Discrepancy Report Appendix C: Customer Feedback Record Appendix D: Example Guide / Inspection List Appendix E: Example Quality Assurance Monitoring Appendix F: Example Customer Complaint Investigation Appendix G: Example Surveillance Activity Checklist
Project Name Spotted Bear Ranger District Annual Spring Janitorial Service
Solicitation / Contract Number Req #: 1661807
Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Spotted Bear Ranger District Annual Spring Janitorial Service. This plan sets forth the procedures and guidelines that the USDA, Forest Service (Flathead National Forest) will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).
1.2.2 Surveillance of Performance Progression
As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.
1.3 QASP Relation to the Quality Control Plan (QCP)
The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.
Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.
2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.
The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.
2.1.1 Allowable Deviation
The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).
2.1.2 Substantially Complete
In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.
2.2 Non-Performance
Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement.
Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.
When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.
2.2.1 Documentation
Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix Appendix B:
Discrepancy Report. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.
2.2.2 Remedial Actions
The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.
3.2.2 Contracting Officer Representative (COR)
The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP;
and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.
The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR clause 52.246-4 Inspection of Services- Fixed Price in Section [Insert Number] of the contract.
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.
Explain how the PRS method of surveillance will be measured.
Surveillance Methods:
• Maximum Allowable Defect Rate/AQL’s: Government COR shall conduct a visual, walkthrough inspection upon the completion of the janitorial service to determine potential number with the tasks outlined in the Contract Requirements/Dates/Time. Any logistical issues or challenges to completing the tasks as outlined in the Contract Requirements in the SOW shall be discussed during the walkthrough.
4.2 Analysis and Results
When the inspections and customer feedback validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:
Insert Performance Outcomes Here:
Performance Outcomes
• Outstanding Performance o Outstanding performance is the result of the Contractor substantially exceeding the performance standards as listed in the SOW (Contract Requirements) with significant achievements and no significant deficiencies and no deviations from the dates/timeframes as laid out in the SOW.
• Acceptable Performance o Acceptable performance is the result of the Contractor completing all the cleaning tasks as listed in the
SOW (Contract Requirements) and within the timeframes/dates as described in the Contract Dates/Times. Up to 5 defects is acceptable due to the nature of the remote service location.
• Poor Performance o Poor performance is the result of the Contractor not satisfactorily completing the cleaning tasks as listed in the SOW (Contract Requirements) or not completing the work within the timeframes/dates as specified in the SOW with no justification.
PERFORMANCE REQUIREMENT SUMMARY:
Performance Objective
Maximum Allowable Defect Rate
Surveillance Method AQL/Deductions
Overall Cleaning:
Accomplishing all cleaning tasks to an acceptable level of cleanliness as described in the
SOW.
5 Defects per yearly cleaning.
COR
Inspections/Customer
Feedback
25% Deduction from established contract total if 5 defects or more are found during inspections.
Perform Work within Schedule Requirements:
Cleaning is accomplished within the timeframes laid out in the SOW
NONE
If work isn’t completed within the timeframes laid out in the SOW; then the contract is not fulfilled.
COR
Inspections/Customer
Feedback
100% deduction of established contract rate. Failure to perform the cleaning during the timeframe established in contract results in non-payment.
Deduction Threshold. For example, failure to complete 5 or more of the listed tasks in the SOW results in a 25% total deduction of payout for the contract amount. For example, if maximum defects are exceeded (i.e. windows aren’t cleaned in the office, dishes aren’t sanitized in the Cookhouse, carpets aren’t washed in the office, etc) and contract amount is $6300, then a total amount of $1575 is withheld. If cleaning doesn’t occur within the timeframe laid down in the SOW; then 100% of payment is withheld and the contract is considered unfulfilled.
[THIS PAGE IS FOR INFORMATIONAL PURPOSES]
The Contacting Officer must include as attachments or exhibits the appropriate performance requirement summary, forms, checklists, etc. in the QASP that will be used during surveillance / monitoring for the applicable contract.
Appendix B: Example Discrepancy Report The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
DISCREPANCY REPORT 1. DISCREPENCY REPORT NO.
2. TO: (Contractor / Project Manager Name) 3. FROM: (Name of COR)
CONTRACT NUMBER: DATE:
PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR ACTION COMPLETE
4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)
5. SIGNATURE OF COR
6. TO: (Name of COR) 7. FROM: (Contractor / Project Manager)
8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)
9. SIGNATURE OF CONTRACTOR REPRESENTIVE 10. DATE
11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)
12. GOVERNMENT ACTIONS (Cure notice, show cause, other)
CLOSE OUT
KTR NOTIFIED
NAME AND TITLE SIGNATURE DATE
COR
Appendix C: Customer Feedback Record The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
CUSTOMER FEEDBACK RECORD
DATE AND TIME OF COMPLAINT CONTRACT NUMBER/ OR PROJECT:
SOURCE OF COMPLAINT
ORGANIZATION
INDIVIDUAL
NATURE OF COMPLAINT
PWS REFERENCE
VALIDATION
DATE AND TIME CONTRACTOR INFORMED OF COMPLAINT NAME OF CONTRACTOR REPRESENTATIVE INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR (Responsible officer):
RECEIVED AND VALIDATED BY
Determination: Complaint Valid Complaint Invalid
Appendix D: Example Guide / Inspection List The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
CONTRACT NUMBER: ___________________________________
SERVICE FUNCTION:
PWS SECTION:
1 Method of Surveillance:
2 Lot Size:
3 Sample Size:
4 Performance Requirement: Performance is Excellent (E) when ___________or fewer defects are discovered per month. Performance is Satisfactory (S) when ________ or fewer defects are discovered per month. Performance is Unsatisfactory (U) when _______ or more defects are discovered per month.
5 Sampling Procedure: Instructions on how to select the sample must be clear and complete
6 Inspection Procedure: The procedure must be detailed enough to allow a yes/no objective decision as to the acceptability of performance by anyone making the inspection. Explain when evaluation is to occur and what is acceptable/unacceptable
Performance: Excellent (E), Satisfactory (S), Unsatisfactory (U), Not Applicable (N/A)
PRS Requirements Timeliness Quality of Work Notes
Overall Rating Of Inspection (E, S, U or N/A)
COR/Inspector Comments:
Contractor Signature: ___ Date: __
COR Signature: ____________________Date: _________________
Appendix E: Example Quality Assurance Monitoring The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
CONTRACT NUMBER: ______________________________________
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check the applicable item):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check the applicable item):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check the applicable item):
Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
Prepared By: _______________________________ Date: ______________
Appendix F: Example Customer Complaint Investigation The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
CONTRACT NUMBER: _________________________
SERVICE or STANDARD:
SURVEY PERIOD: ___________________
DATE COMPLAINT RECEIVED: ____________
SOURCE OF COMPLAINT: _________________________________________ (Name) _______________________________________________________________ (Organization) ___________________ (Phone No.) _________________________________ (Email Address)
NATURE OF COMPLAINT:
RESULTS OF COMPLAINT INVESTIGATION:
DATE SERVICE PROVIDER INFORMED OF COMPLAINT: _____________
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER:
Received and Validated By: __________________________________________ Prepared By: _____________________________ Date: _________________
Appendix G: Example Surveillance Activity Checklist The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.
Performance Requirement
Performance Standard
Method of Measurement
Performance Metrics
Method of Surveillance
Date Accomplished
Compliance (Exceed, Met, Partial Met)
| Project Name |
| Solicitation / Contract Number |
| Section 1: Introduction |
| 1.1 Purpose |
| 1.2 QASP Relation to the Contract |
| 1.2.1 QASP Revisions |
| 1.2.2 Surveillance of Performance Progression |
| 1.3 QASP Relation to the Quality Control Plan (QCP) |
| Section 2: Performance Description |
| 2 |
| 2.1 Performance Standards and Acceptable Quality Levels (AQLs) |
| 2.1.1 Allowable Deviation |
| 2.1.2 Substantially Complete |
| 2.2 Non-Performance |
| 2.2.1 Documentation |
| 2.2.2 Remedial Actions |
| Section 3: Contractor and Government Responsibilities |
| 3 |
| 3.1 Contractor Responsibility |
| 3.2 Government Responsibility |
| 3.2.1 Contracting Officer (CO) |
| 3.2.2 Contracting Officer Representative (COR) |
| Section 4: Surveillance Methods to Perform Quality Assurance |
| 4 |
| 4.1 Surveillance Methods |
| 4.2 Analysis and Results |
| Appendix B: Example Discrepancy Report |
| Appendix C: Customer Feedback Record |
| Appendix D: Example Guide / Inspection List |
| Appendix E: Example Quality Assurance Monitoring |
| Appendix F: Example Customer Complaint Investigation |
| Appendix G: Example Surveillance Activity Checklist |
File details come from the government source that posted it. Updated .