Attachment 4 - Material Submittals.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Repair Bldg 107 Heaters
Solicitation number
W50S8Q-23-B-0003
Issued by

About this file

This document is a schedule of material submittals for the project to install gas fired bay heaters in Building 107 under solicitation number W50S8Q-23-B-0003 from the Department of the Army National Guard. The schedule lists 17 required submittal items for the project such as a site safety plan, shop drawings of finished utilities, gas fired heaters, piping, ducting, and exhaust plan. For each item, the schedule specifies the number of copies required and due dates for certification of compliance, shop drawings, samples, color selection, manufacturer's recommendations, warranty, and other submittal data. It also includes fields to track dates the submittals are received by the contracting office, sent to the civil engineering office, suspended, and finally approved or disapproved.

View the file

Other files

File Type Posted
Attachment 6 - Base Entry Request.pdf PDF
Attachment 3 - Base Facility Standards.pdf PDF
W50S8Q-23-B-0003 107 Heaters.pdf PDF
Attachment 2 - Bldg 107 Drawing 1.pdf PDF
Attachment 1 - SOW.pdf PDF
Attachment 5 - RFI Template.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 3000

SCHEDULE OF MATERIAL SUBMITTALS
( Form 66 Modified)SCHEDULE OF MATERIAL SUBMITTALS
(Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
WAAR232013Install Gas Fired Bay Heaters Bldg 107
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAMSD SHEETOPERATING INSTRUCTIONSOther

SUBMITTAL

REQUIRED DATES DUE

BY__10__

DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Progress Schedule
(AF Form 3064)1
2Progress Reports
(OANG Form 3065)1
3Existing Condition Photos
(Prior to Beginning Work)1
5Site Safety Plan1
6Gas Fired Heaters11
7Piping1
9Fittings and adheasives1
11Electrical Materials1
12Ducting1
13Allthread/Strut Channel1
14Pipe Hangers1
15Exhaust plan1
16Red Line/Shop Drawings of Finished Utilities1
17
18