This document is a submittal register for a federal contract to replace lint traps and stacks at an Air Force facility. Key details include a requirement for the contractor to submit documentation such as hazmat questionnaires and material safety data sheets prior to the start of work and at the end of the contract. Additional submittals include product data and shop drawings for lint interceptors, pipes, fittings, solid surface countertops, floor tiles, cleanout covers, and firestopping materials. The contractor must also provide as-built drawings, warranties, and recycling/landfill reports. The related federal contract opportunity is solicitation number FA301021R0003 from the Department of the Air Force Air Education and Training Command for a project to replace washer lint traps and stacks at MAHG20-1024 with various submittal deadlines within 10 days of notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Attachment 10 Addendum 1 Questions and Answers.pdf | ||
| Amendment 1.pdf | ||
| Attachment 11 Addendum 1 Drawings.pdf | ||
| Sign In Sheet.pdf | ||
| Attachment 5 - MAHG201024 Wage Det MS20200050.pdf | ||
| Attachment 6 - MAHG201024 Past Performance Questionnaire.pdf | ||
| Attachment 9 - MAHG201024 SF 1444.pdf | ||
| Solicitation - FA301021R0003.pdf | ||
| Attachment 1 - MAHG201024 SOW 20201215.pdf | ||
| Attachment 2 - MAHG201024 Specs 20201215.pdf | ||
| Attachment 3 - MAHG201024 Drawings.pdf | ||
| Attachment 7 - MAHG201024 Past Performance Reference List.pdf | ||
| Attachment 8 - MAHG201024 Notice of Compliance.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF 66 Sheet 1-16
| SUBMITTAL REGISTER | PROJECT NUMBER | PROJECT TITLE | ||||||||||||||||
| MAHG20-1024 | Replace Lint Traps and Stacks Phase 1 | |||||||||||||||||
| TO BE COMPLETED BY PROJECT MANAGER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||
| ITEM NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NO. OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | DATA | DOCUMENT \ REPORT |
APPROVED DIS-APPROVED
| 1 | HazMat Questionnaire | 3 | 3 | 5 Days Prior to Start Date | ||||||
| 2 | HazMat MSDS | 3 | 3 | 5 Days Prior to Start Date | Must be filled out if contractor answers YES to the Hazmat Questionnaire | |||||
| 3 | Hazmat Reporting Entry Form | 3 | 3 | 5 Days Prior to Start Date | Submit Final Quantities | |||||
| 4 | Hazmat Reporting Entry Form | 3 | 3 | End of Contract | ||||||
| 5 | Recycling and Landfill Report | 3 | 3 | End of Contract | ||||||
| 6 | Warranty (Manufacturer's) i.e. Lint Interceptor, Solid Surface, Laundry Outlet Boxes | 3 | End of Contract | |||||||
| 7 | 1-Year Warranty (Contractor) | 3 | End of Contract | |||||||
| 8 | Lint Interceptor Submittal, DWG M1 detail 1 | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 9 | Pipe Submittal, SOW section Provide and Install New, subsection B | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 10 | Heavy-Duty No-Hub Connector Submittal, SOW section Modify Existing, subsection B | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 11 | Pipe Fittings Submittal, SOW section Provide and Install New,subsections B-L | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 12 | PVC Pipe Cement Submittal including MSDS | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 13 | Solid Surface Countertop and Backsplash Material Samples Submittal (1 set of samples) section Provide and Install New, subsection F, Solid Surface Fabrications Specification | 1 | 1 | 1 | 3 | 3 | 3 | Within 10 Days of Notice to Proceed | ||
| 14 | Moisture Resistant Gypsum Wallboard and Joint Compound Submittal including J.C. MSDS, SOW section Provide and Install New, subsection D, Gypsum Board Assemblies Specification | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 15 | Floor Tile and Grout Submittals including MSDS for Grout, SOW section Provide and Install New, subsection K | 1 | 3 | 3 | Within 10 Days of Notice to Proceed | |||||
| 16 | Exterior Cleanout Covers Submittal, SOW section Provide and Install New, subsection L | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 17 | Interior Cleanout Cover Plates Submittal, SOW section Provide and Install New, subsection B | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 18 | Recessed Laundry Outlet Boxes Submittal, SOW section Provide and Install New, subsection G | 3 | 3 | Within 10 Days of Notice to Proceed | ||||||
| 19 | As-Builts (Construction) | 3 | End of Contract | |||||||
| 20 | Fire Stop Caulk Submittal including MSDS, DWG M1 detail 2 | 3 | 3 | 3 | 3 | Within 10 Days of Notice to Proceed | ||||
| 21 | Fire Stop Filler Material including MSDS, DWG M1 detail 2 | 3 | 3 | 3 | 3 | Within 10 Days of Notice to Proceed | ||||
| 22 | ||||||||||
| 23 | ||||||||||
| 24 | ||||||||||
| 25 | ||||||||||
| 26 | ||||||||||
| 27 | ||||||||||
| 28 | ||||||||||
| 29 |
File details come from the government source that posted it. Updated .