Attachment 4 - JA Exception to Fair Opportunity Paxton.pdf

PDF 4 MB Posted

Attached to
Paxton Access Control/Secure Comm Rooms
Solicitation number
FA460824QS018
Issued by

About this file

This document is a Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction for the acquisition of Paxton Access Control Panels, Keypad Readers, and Electric Strikes to support Air Force Global Strike Command Headquarters, 8th Air Force Headquarters, 2nd and 307th Bomb wings at Barksdale AFB. It justifies the use of a brand-name product on the basis that the existing Paxton system is proprietary and requires compatible equipment for configuration management, architecture, and interoperability. The total estimated cost is $76,940. The contracting activity is 2 CONS/PKA at Barksdale AFB, and the requirement is under the Secure Comm Rooms program. The document also includes instructions for completing a justification for exceptions to fair opportunity.

The related federal contract opportunity is a Request for Quotation (Solicitation #FA460824QS018) for a turn-key Paxton Access Control System installation around Barksdale AFB. It is a total small business set-aside with a NAICS code of 561622 and a $25M size standard. Key dates include a site visit on 11 June 2024, questions due 12 June 2024, and quotes due 28 June 2024. The contract will be awarded to a small business.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction

CONTROLLED UNCLASSIFIED INFORMATION

16 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4

Is this a brand-name justification? Yes No Please provide the product title and description. [ FAR16.505(a)(4)(i) ]

Brand-Name Product Title: Paxton

Brand-Name Product Description: Door access control

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No

Contracting Activity: 2 CONS/PKA 801 Kenney Ave, Suite 2301 Barksdale AFB, LA 71112

Purchase Request / Local ID Number: F1G3B24094AW01

Program Name (and Program Element, if applicable): Secure Comm Rooms

Estimated Cost/Price of the Order (including options): $76,940.00

Type Program (see AFFARS 5302.101 for definitions): PEO Program Other Contracting

Type of D etermination: Individual Class Expires: [ click and select ]

Click here for instructions to complete the boxes below.

(1) Contracting Activity:

2 CONS

801 Kenney Ave, Suite 2301 Barksdale AFB, LA 71112

(2) Nature and/or description of the action being approved:

This is an Individual Justification for an Exception to the Fair Opportunity for the acquisition of Paxton Access Control Panels, Keypad Readers, and Electric Strikes in support of Air Force Global Strike Command Headquarters, 8th Air Force Headquarters, 2nd and 307th Bomb wings and associated buildings for controlling access to the network infrastructure hardware.

(3) Description of the supplies/services required to meet the agency's needs:

This requirement is for the installation of a brand name or equal to Paxton Access Control System for a complete security upgrade IAW the SOW. The contractor will install 77 access control panels, keypad readers, and electric strikes as well as remove existing mechanical hardware and install door wraps with new lever locks and cores. This is a brand name or equal requirement therefore equipment must be compatible with the current Paxton systems in place. All electrical units must meet current standards, meaning, installation of communications wiring must be CAT6.

(4) Justification for restricting consideration to a brand-name item:

One of the 2 CS missions is to establish policy and guidelines for configuration management, architecture, and interoperability of like systems. Paxton is a propitiatory system and is currently what 2 CS has installed across the installation. The use of any other Access Control System would not be compatible with installed Paxton systems.

Continuing to procure one manufacturer's equipment and using the same products base-wide has proven to:

a. Eliminate product training costs.

b. Maintain complete compatibility with existing equipment for tracking access to critical communications infrstructure.

c. Equipment is approved for connection to the Air Force AFNET.

16 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4

(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:

AFFARS 5313.501 - 10 U.S.C. 2302b, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901). The Contracting Officer has determined that the anticipated cost to the Government will be fair and reasonable, since adequate price competition is anticipated and a technical evaluation of the offers received will be conducted. Competitive proposals from resellers and the prices will be compared to the Government estimate based upon results from various market research tools such as historical information, market research and a review of other Federal Government contracts for similar work. Because the items to be procured are commercial, certified cost and pricing data will not be obtained, and audit services should not be required.

(6) Other facts supporting the justification:

Other systems similar are not able to integrate with current system already in use on the base.

(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:

2 CS will conduct periodic market surveys consisting of internet searches and trade journal reviews, such as Government Computer News and Defense Journal. 2 CS will also continue attending industry conferences, trade shows in local area, to determine if future requirements can be acquired through full and open competition.

(8) Program Manager's certification that supporting data is accurate and complete:

As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.

(9) Contracting Officer's certification that the justification is accurate and complete:

As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.

(10) Approving Official's determination that FAR16.505(a)(4)(i) applies to the order:

As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.

REMOVING ROWS: CAUTION (click here first) NOTE: The text in the signature blocks below is editable, including the title.

Date

30 May 2024

Contracting Officer

Nicole Rondeau, DAF

2CONS/PKA, 318-456-3729

Signature

X

16 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4

Instructions for Completing the Template IAW FAR 16.505(b)(2)(ii)(B)

(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).

(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts.

(Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).

(4) Include the appropriate exception from FAR 16.505 (b)(2) and the supporting rationale. FAR16.505(b)(1)(i) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding $3,000 unless a statutory exception applies. The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i)(__) [Insert A,B, C, D, or E]. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.

FAR 16.505(b)(2)(i)(A): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.

FAR 16.505(b)(2)(i)(B): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information.

Supporting documentation may be attached to the back of the document. General statements are not acceptable.

FAR 16.505(b)(2)(i)(C): “The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order”. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information.

General statements are not acceptable.

FAR 16.505(b)(2)(i)(D): “It is necessary to place an order to satisfy a minimum guarantee.”

FAR 16.505(b)(2)(i)(E): “For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.”

Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of FAR 16.505(b)(1) and DFARS 216.505-70 could not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.

16 Jun 2022 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 4

If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.

(5) This paragraph needs to be tailored based on the types of CLINs in the order and the pricing arrangements on the basic multiple award contract. If the contract did not establish the price for the supply or service, the Contracting Officer must establish prices for each order IAW FAR 15.4. The paragraph needs to describe the steps that will ensure that the prices/estimated cost of the order will be fair and reasonable. For example, even if firm-fixed prices were obtained under adequate price competition in the award of the multiple award contract, the Contracting Officer still needs to consider market conditions and other factors that may have changed since contract award and explain the basis in the determination that prices/costs are fair and reasonable prior to award of the order.

(6) Provide any other facts supporting the use of exceptions to the fair opportunity process.

(7) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.

https://usaf.dps.mil/sites/AFCC/KnowledgeCenter/templates_admin/aqc-front.jpg https://usaf.dps.mil/sites/AFCC/KnowledgeCenter/templates_admin/aqc-back.jpg Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction 16 Jun 2022 Page of Is this a brand-name justification?

Please provide the product title and description. [ FAR16.505(a)(4)(i) ] Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?

Type Program (see AFFARS 5302.101 for definitions):

Type of D etermination:

Fair Opportunity Exception: FAR 16.505(B)(2)(i) (Check the applicable subparagraph below.)

(1) Contracting Activity:

(2) Nature and/or description of the action being approved:

(3) Description of the supplies/services required to meet the agency's needs:

(4) Justification for restricting consideration to a brand-name item:

(4) Identification of the exception to fair opportunity and the supporting rationale:

(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:

(6) Other facts supporting the justification:

(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:

(7) Actions the agency may take to remove or overcome any barriers to increasing fair opportunity before any subsequent acquisition for the supplies or services:

(8) Program Manager's certification that supporting data is accurate and complete:

As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.

(9) Contracting Officer's certification that the justification is accurate and complete:

As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.

(10) Approving Official's determination that FAR16.505(a)(4)(i) applies to the order:

As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.

(10) Approving Official's determination that one of the circumstances in FAR 16.505(b)(2)(i) applies to the order.

As evidenced by my signature below, I hereby determine that the fair opportunity exception checked on page 1 applies.

NOTE: The text in the signature blocks below is editable, including the title.

Instructions for Completing the Template IAW FAR 16.505(b)(2)(ii)(B)

(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).

(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts. (Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).

(4) Include the appropriate exception from FAR 16.505 (b)(2) and the supporting rationale. FAR16.505(b)(1)(i) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding $3,000 unless a statutory exception applies. The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i)(__) [Insert A,B, C, D, or E]. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.

FAR 16.505(b)(2)(i)(A): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.

FAR 16.505(b)(2)(i)(B): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information. Supporting documentation may be attached to the back of the document. General statements are not acceptable.

FAR 16.505(b)(2)(i)(C): “The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order”. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information. General statements are not acceptable.

FAR 16.505(b)(2)(i)(D): “It is necessary to place an order to satisfy a minimum guarantee.”

FAR 16.505(b)(2)(i)(E): “For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.”

Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of FAR 16.505(b)(1) and DFARS 216.505-70 could not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.

If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.

(5) This paragraph needs to be tailored based on the types of CLINs in the order and the pricing arrangements on the basic multiple award contract. If the contract did not establish the price for the supply or service, the Contracting Officer must establish prices for each order IAW FAR 15.4. The paragraph needs to describe the steps that will ensure that the prices/estimated cost of the order will be fair and reasonable. For example, even if firm-fixed prices were obtained under adequate price competition in the award of the multiple award contract, the Contracting Officer still needs to consider market conditions and other factors that may have changed since contract award and explain the basis in the determination that prices/costs are fair and reasonable prior to award of the order.

(6) Provide any other facts supporting the use of exceptions to the fair opportunity process.

(7) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.

9.0.0.2.20120627.2.874785

security_markings: CONTROLLED UNCLASSIFIED INFORMATION
CurrentPage:
PageCount:
Yes:
No:
Brand-Name-Title_hidden: Paxton
Brand-Name-Description_hidden: Door access control
Contacting-Activity: 2 CONS/PKA

801 Kenney Ave, Suite 2301 Barksdale AFB, LA 71112

Purchase-Request: F1G3B24094AW01
Program-Name: Secure Comm Rooms
Cost-Price: $76,940.00
PEO-Program: 0
Other-Contracting: 1
Individual:
Class:
Expiration_Date: [ click and select ]
subparagraph-A: 0
subparagraph-B: 0
subparagraph-C: 0
subparagraph-D: 0
subparagraph-E: 0
subparagraph-F: 0
subparagraph-G: 0
Drop-Down_for_Exceptions: Select the applicable FAR 6.302 exception from the drop-down list below.
Instructions_Button:
A:
CAUTION:
Date: 30 May 2024
Name:
Signature:
Hide-PM-Coord:
Hide-CO-Coord:
Hide-Legal-Coord:
Hide-COCO-Coord:
Hide-CA-Coord:
Hide-SCO-Coord:
Hide-Approval-Coord:
Hide-Blank-1-Coord:
Hide-Blank-2-Coord:
anchor:

File details come from the government source that posted it. Updated .