Attachment 4 Heavy Highway Wage Determination.pdf
PDF 151 KB Posted
- Attached to
- Airfield Paving IDIQ Federal contract opportunity
- Solicitation number
- FA8601-21-R-0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8601-21-R-0010 Presolicitation Notice.docx | DOCX document | |
| FA860121R0010 Presolicitation Notice.docx | DOCX document | |
| Attachment 1 Call Sheet.xlsx | XLSX spreadsheet | |
| Attachment 2 Section L and M.docx | DOCX document | |
| Attachment 3 Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"General Decision Number: OH20210001 02/12/2021
Superseded General Decision Number: OH20200001
State: Ohio
Construction Types: Heavy and Highway
Counties: Ohio Statewide.
Heavy and Highway Construction Projects
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the DavisBacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the abovementioned types of contracts entered into by the federal government that are subject to the DavisBacon Act itself, but it does not apply to contracts subject only to the DavisBacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/01/2021 1 01/22/2021 2 02/12/2021
BROH0001001 06/01/2019
DEFIANCE, FULTON (Excluding Fulton, Amboy & Swan Creek Townships), HENRY (Excluding Monroe, Bartlow, Liberty, Washington, Richfield, Marion, Damascus & Townships & that part of Harrison Township outside corporate limits of city of Napoleon), PAULDING, PUTNAM and WILLIAMS COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0001004 06/01/2019
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.34 16.11
BROH0003002 06/01/2019
FULTON (Townships of Amboy, Swan Creek & Fulton), HENRY (Townships of Washington, Damascus, Richfield, Bartlow, Liberty, Harrison, Monroe, & Marion), LUCAS and WOOD (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson & Grand Rapids) COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0005003 05/01/2019
CUYAHOGA, LORAIN & MEDINA (Hinckley, Granger, Brunswick, Liverpool, Montville, York, Homer, Harrisville, Chatham, Litchfield & Spencer Townships and the city of Medina)
Rates Fringes
BRICKLAYER
BRICKLAYERS; CAULKERS;
CLEANERS; POINTERS; &
STONEMASONS.................$ 34.85 16.94
SANDBLASTERS................$ 35.10 16.94
SEWER BRICKLAYERS & STACK
BUILDERS....................$ 35.35 16.94
SWING SCAFFOLDS.............$ 35.35 16.94
BROH0006005 06/01/2019
CARROLL, COLUMBIANA (Knox, Butler, West & Hanover Townships), STARK & TUSCARAWAS
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0007002 06/01/2019
LAWRENCE
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0007005 06/01/2019
PORTAGE & SUMMIT
BRICKLAYER.......................$ 29.34 16.11
BROH0007010 06/01/2019
PORTAGE & SUMMIT
Rates Fringes
MASON STONE....................$ 29.34 16.11
BROH0008001 06/01/2019
COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton, & Unity Townships and the city of New Waterford), MAHONING & TRUMBULL
Rates Fringes
BRICKLAYER.......................$ 29.34 16.11
BROH0009002 06/01/2019
BELMONT & MONROE COUNTIES and the Townships of Warren & Mt.
Pleasant and the Village of Dillonvale in JEFFERSON COUNTY
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11 Refractory.......................$ 31.45 19.01
BROH0010002 06/01/2019
COLUMBIANA (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships) & JEFFERSON (Brush Creek & Saline Townships)
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0014002 06/01/2019
HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale)
Rates Fringes
BROH0016002 06/01/2019
ASHTABULA, GEAUGA, and LAKE COUNTIES
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0018002 06/01/2019
BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN COUNTIES:
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0022004 06/01/2019
CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN,
MIAMI, MONTGOMERY, PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships) and SHELBY COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0032001 06/01/2019
GALLIA & MEIGS
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0035002 06/01/2019
ALLEN, AUGLAIZE, MERCER and VAN WERT COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0039002 06/01/2019
ADAMS & SCIOTO
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0040003 06/01/2019
ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND,
WAYNE and WYANDOT (Except Crawford, Ridge, Richland & Tymochtee Townships) COUNTIES
FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate.
Free standing stack work ground level to top of stack;
Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.
""Hot"" work: $2.50 above journeyman rate.
BROH0044002 06/01/2019
Bricklayer, Stonemason
COSHOCTON, FAIRFIELD,
GUERNSEY, HOCKING, KNOX,
KICKING, MORGAN,
MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne Townships) & PERRY
COUNTIES:...................$ 29.34 16.11
BROH0045002 06/01/2017
FAYETTE, JACKSON, PIKE, ROSS and VINTON COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 28.65 14.55
BROH0046002 06/01/2019
ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry & Bloom Townships) and WYANDOT (Tymochtee, Crawford, Ridge & Richland Townships) COUNTIES & the Islands of Lake Erie north of Sandusky
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
FOOTNOTE: Layout Man and Sawman rate: $1.00 per hour above journeyman rate.
Free standing stack work ground level to top of stack;
Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.
""Hot"" work: $2.50 above journeyman rate.
BROH0052001 06/01/2019
ATHENS COUNTY
BROH0052003 06/01/2019
NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) and WASHINGTON COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 29.34 16.11
BROH0055003 06/01/2017
DELAWARE, FRANKLIN, MADISON, PICKAWAY and UNION COUNTIES
Rates Fringes
Bricklayer, Stonemason...........$ 28.65 14.55
CARP0003004 05/01/2017
MAHONING & TRUMBULL
Rates Fringes
CARPENTER........................$ 26.20 17.42
CARP0069003 05/01/2017
CARROLL, STARK, TUSCARAWAS & WAYNE
Rates Fringes
CARPENTER........................$ 25.98 15.98
CARP0069006 05/01/2017
COSHOCTON, HOLMES, KNOX & MORROW
Rates Fringes
CARPENTER........................$ 24.04 15.29
CARP0171002 05/01/2019
BELMONT, COLUMBIANA, HARRISON, JEFFERSON & MONROE
Rates Fringes
CARPENTER........................$ 27.37 20.02
CARP0200002 05/01/2017
ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA,
GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING,
MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY,
PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON and WASHINGTON
COUNTIES
Rates Fringes
CARPENTER........................$ 29.07 16.22
Diver............................$ 39.41 10.40
PILEDRIVERMAN....................$ 29.07 16.22
CARP0248005 07/01/2008
LUCAS & WOOD
Rates Fringes
CARPENTER........................$ 27.27 14.58
CARP0248008 07/01/2008
Rates Fringes
CARPENTER
DEFIANCE, FULTON, HANCOCK,
HENRY, PAULDING & WILLIAMS
COUNTIES....................$ 23.71 13.28
CARP0254002 05/01/2017
ASHTABULA, CUYAHOGA, GEAUGA & LAKE
Rates Fringes
CARPENTER........................$ 32.40 16.97
CARP0372002 05/01/2016
ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM & VAN WERT
Rates Fringes
CARPENTER........................$ 24.54 18.21
CARP0639003 05/01/2017
MEDINA, PORTAGE & SUMMIT
Rates Fringes
CARPENTER........................$ 30.42 16.99
CARP0735002 05/01/2019
ASHLAND, ERIE, HURON, LORAIN & RICHLAND
CARPENTER........................$ 26.30 17.91
CARP1311001 05/01/2017
BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE,
GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY &
WARREN
Rates Fringes
Carpenter & Piledrivermen........$ 29.34 15.95 Diver............................$ 40.58 9.69
CARP1393002 07/01/2008
CRAWFORD, DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA,
PAULDING, SANDUSKY, SENECA, WILLIAMS & WOOD
Rates Fringes
Piledrivermen & Diver's Tender...$ 27.30 16.05
DIVERS $250.00 per day
CARP1393003 07/01/2008
ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM, VAN WERT & WYANDOT
Rates Fringes
Piledrivermen & Diver's Tender...$ 25.15 15.92
DIVERS $250.00 per day
CARP1871006 05/01/2017
BELMONT, HARRISON, & MONROE
Rates Fringes
Diver, Wet.......................$ 48.11 17.33 Piledrivermen; Diver, Dry........$ 32.07 17.33
CARP1871008 05/01/2017
ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE,
LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT
Rates Fringes
Diver, Wet.......................$ 45.80 18.84 Piledrivermen; Diver, Dry........$ 30.53 18.84
CARP1871014 05/01/2017
CARROLL, STARK, TUSCARAWAS & WAYNE
Diver, Wet.......................$ 38.34 16.95 Piledrivermen; Diver, Dry........$ 25.56 16.95
CARP1871015 05/01/2017
COSHOCTON, HOLMES, KNOX & MORROW
Rates Fringes
Diver, Wet.......................$ 37.34 16.07 Piledrivermen; Diver, Dry........$ 24.89 16.07
CARP1871017 05/01/2017
MAHONING & TRUMBULL
Rates Fringes
Diver, Wet.......................$ 40.65 17.62 Piledrivermen; Diver, Dry........$ 27.10 17.62
CARP2235012 01/01/2014
COLUMBIANA & JEFFERSON
Rates Fringes
PILEDRIVERMAN....................$ 31.74 16.41
CARP2239001 07/01/2008
CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT
Rates Fringes
CARPENTER........................$ 23.71 13.28
ELEC0008002 05/25/2020
DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING,
PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD
Rates Fringes
CABLE SPLICER....................$ 38.98 18.96
ELECTRICIAN......................$ 41.81 4.5%+20.73
ELEC0032003 11/29/2020
ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT &
WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships)
ELECTRICIAN......................$ 32.12 20.29
ELEC0038002 04/27/2020
CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township)
Rates Fringes
ELECTRICIAN
Excluding Sound & Communications Work.........$ 39.88 21.22
FOOTNOTES;
a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;
Labor Day; Thanksgiving Day; & Christmas Day
b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service
ELEC0038008 04/29/2019
CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township)
Rates Fringes
Sound & Communication Technician Communications Technician...$ 27.55 11.98 Installer Technician........$ 26.30 11.94
FOOTNOTES;
a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;
Labor Day; Thanksgiving Day; & Christmas Day
b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service
ELEC0064003 11/30/2020
COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships), & TRUMBULL (Hubbard & Liberty Townships)
ELECTRICIAN......................$ 35.67 16.37
ELEC0071001 01/01/2019
ASHLAND, CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE,
FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HIGHLAND, HOCKING,
JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston Townships), KNOX, LICKING, MADISON, MARION, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York Townships), UNION, VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships), and WASHINGTON COUNTIES
Rates Fringes
Line Construction Equipment Operators.........$ 33.62 13.40 Groundmen...................$ 24.17 11.32 Linemen & Cable Splicers....$ 38.27 14.42
ELEC0071004 01/01/2019
AUGLAIZE, CLINTON, DARKE, GREENE, LOGAN, MERCER, MIAMI,
MONTGOMERY, PREBLE, and SHELBY COUNTIES
Rates Fringes
Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42
ELEC0071005 12/31/2018
ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN
Rates Fringes
LINE CONSTRUCTION: Equipment Operator DOT/Traffic Signal & Highway Lighting Projects...$ 32.44 14.10 Municipal Power/Transit Projects....................$ 40.10 16.42 LINE CONSTRUCTION: Groundman DOT/Traffic Signal & Highway Lighting Projects...$ 25.06 12.26 Municipal Power/Transit Projects....................$ 31.19 14.11
LINE CONSTRUCTION:
Linemen/Cable Splicer DOT/Traffic Signal & Highway Lighting Projects...$ 36.13 15.03 Municipal Power/Transit Projects....................$ 44.56 17.58
ELEC0071008 01/01/2019
COLUMBIANA, MAHONING, and TRUMBULL COUNTIES
Rates Fringes
Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42
ELEC0071010 01/01/2019
BELMONT, CARROLL, HARRISON, HOLMES, JEFFERSON, MEDINA, PORTAGE,
STARK, SUMMIT, and WAYNE COUNTIES
Rates Fringes
Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42
ELEC0071013 01/01/2019
BROWN, BUTLER, CLERMONT, HAMILTON, and WARREN COUNTIES
Rates Fringes
Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42
ELEC0071014 01/01/2019
ADAMS, ATHENS, GALLIA, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), LAWRENCE, MEIGS, PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union Townships), SCIOTO & VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships)
Rates Fringes
Line Construction Equipment Operator..........$ 33.62 13.40 Groundman...................$ 24.17 11.32 Lineman & Cable Splicers....$ 38.27 14.42
ELEC0082002 11/30/2020
CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN
(Wayne, Clear Creek & Franklin Townships)
ELECTRICIAN......................$ 32.15 20.51
ELEC0082006 11/26/2018
CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN
(Wayne, Clear Creek & Franklin Townships)
Rates Fringes
Sound & Communication Technician Cable Puller................$ 12.18 3.85 Installer/Technician........$ 24.35 11.29
ELEC0129003 02/24/2020
LORAIN (Except Columbia Township) & MEDINA (Litchfield & Liverpool Townships)
Rates Fringes
ELECTRICIAN......................$ 35.35 17.68
ELEC0129004 02/24/2020
ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships)
Rates Fringes
ELECTRICIAN......................$ 35.35 17.68
ELEC0141003 09/01/2019
BELMONT COUNTY
Rates Fringes
CABLE SPLICER....................$ 30.63 25.87
ELECTRICIAN......................$ 30.38 25.87
ELEC0212003 11/26/2018
BROWN, CLERMONT & HAMILTON
Rates Fringes
Sound & Communication Technician.......................$ 24.35 10.99
ELEC0212005 06/03/2020
BROWN, CLERMONT, and HAMILTON COUNTIES
ELECTRICIAN......................$ 31.30 19.07
ELEC0245001 01/01/2020
ALLEN, HARDIN, VAN WERT & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Richland, Ridge & Salem Townships)
Rates Fringes
Line Construction Equipment Operator..........$ 32.37 25.9%+6.75 Groundman Truck Driver......$ 17.70 25.9%+6.75 Lineman.....................$ 40.46 25.9%+6.75
FOOTNOTE: a. Half day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day
ELEC0245003 01/01/2020
DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA,
PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, and WOOD COUNTIES
Rates Fringes
Line Construction Cable Splicer...............$ 46.53 25.9%+6.75 Groundman/Truck Driver......$ 17.70 25.9%+6.75 Heliarc Welding............$ 40.76 25.9%+6.75 Lineman.....................$ 40.46 25.9%+6.75 Operator Class 1..........$ 32.37 25.9%+6.75 Operator Class 2..........$ 28.32 25.9%+6.75 Traffic Signal & Lighting Technician..................$ 36.41 25.9%+6.75
FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straighttime rates for the work performed on such holiday.
ELEC0245004 01/01/2020
ERIE COUNTY
Rates Fringes
Line Construction Cable Splicer...............$ 46.53 25.9%+6.75 Groundman/Truck Driver......$ 17.70 25.9%+6.75 Lineman.....................$ 40.46 25.9%+6.75 Operator Class 1..........$ 32.37 25.9%+6.75
Operator Class 2..........$ 28.32 25.9%+6.75
FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straighttime rates for the work performed on such holiday.
ELEC0246001 10/29/2018
ELECTRICIAN......................$ 38.00 84%+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.
ELEC0306005 05/28/2018
MEDINA (Brunswick, Chatham, Granger, Guilford, Harrisville, Hinckley, Homer, Lafayette, Medina, Montville, Sharon, Spencer, Wadsworth, Westfield & York Townships), PORTAGE (Atwater, Aurora, Brimfield, Deerfield, Franklin, Mantua, Randolph, Ravenna, Rootstown, Shalersville, Streetsboro & Suffield Townships), SUMMIT & WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton, & Wayne Townships)
Rates Fringes
CABLE SPLICER....................$ 36.87 16.56
ELECTRICIAN......................$ 34.54 5%+18.06
ELEC0317002 06/01/2020
GALLIA & LAWRENCE
Rates Fringes
CABLE SPLICER....................$ 32.68 18.13
ELECTRICIAN......................$ 35.10 26.22
* ELEC0540005 12/28/2020
CARROLL (Northern half, including Fox, Harrison, Rose & Washington Townhships), COLUMBIANA (Knox Township), HOLMES, MAHONING (Smith Township), STARK, TUSCARAWAS (North of Auburn, Clay, Rush & York Townships), and WAYNE (South of Baughman, Chester, Green & Wayne Townships) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 34.00 25.50
ELEC0573003 06/01/2020
ASHTABULA (Colebrook, Wayne, Williamsfield, Orwell & Windsor Townships), GEAUGA (Auburn, Middlefield, Parkman & Troy Townships), MAHONING (Milton Township), PORTAGE (Charlestown, Edinburg, Freedom, Hiram, Nelson, Palmyra, Paris & Windham Townships), and TRUMBULL (Except Liberty & Hubbard Townships)
Rates Fringes
ELECTRICIAN......................$ 34.11 19.46
ELEC0575001 11/30/2020
ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY (Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)
Rates Fringes
ELECTRICIAN......................$ 33.75 19.22
ELEC0648001 09/02/2019
BUTLER and WARREN COUNTIES (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships)
Rates Fringes
CABLE SPLICER....................$ 30.50 18.23
ELECTRICIAN......................$ 30.00 19.85
ELEC0673004 02/01/2020
ASHTABULA (Excluding Orwell, Colebrook, Williamsfield, Wayne & Windsor Townships), GEAUGA (Burton, Chardon, Claridon, Hambden, Huntsburg, Montville, Munson, Newbury & Thompson Townships) and
LAKE COUNTIES
Rates Fringes
CABLE SPLICER....................$ 33.81 21.47
ELECTRICIAN......................$ 33.56 21.47
ELEC0683002 06/01/2020
CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON,
PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships), and
UNION COUNTIES
CABLE SPLICER....................$ 35.50 21.06
ELECTRICIAN......................$ 34.50 21.06
ELEC0688003 06/01/2020
ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley & Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown & Jefferson Townships), MARION, MORROW, RICHLAND and WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)
COUNTIES
Rates Fringes
ELECTRICIAN......................$ 30.00 19.66
ELEC0972002 06/01/2020
ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships), and WASHINGTON
COUNITES
Rates Fringes
CABLE SPLICER....................$ 37.35 27.81
ELECTRICIAN......................$ 33.95 27.71
ELEC1105001 05/28/2018
COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College Townships), LICKING, MUSKINGUM, PERRY, and TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry & Bucks Townships) COUNTIES
Rates Fringes
ELECTRICIAN......................$ 30.95 17.96
ENGI0018003 05/01/2019
ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA,
PORTAGE, and SUMMIT COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 38.63 15.20
GROUP 2.....................$ 38.53 15.20
GROUP 3.....................$ 37.49 15.20
GROUP 4.....................$ 36.27 15.20
GROUP 5.....................$ 30.98 15.20
GROUP 6.....................$ 38.88 15.20
GROUP 7.....................$ 39.13 15.20
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;
Crane (All Types, Including Boom Truck, Cherry Picker);
CraneCompact, Track or Rubber over 4,000 lbs. capacity;
CranesSelf Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (OperatorHoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Hydraulic Gantry (Lifting System);
IndustrialType Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge); Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper; Piledriving Machine (All Types);
Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work;
Rough Terrain Fork Lift with Winch/Hoist; SideBoom;
SlipForm Paver; Tower Derrick; Tree Shredder; Trench Machine (Over 24"" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; Wheel Excavator; and Asphalt Plant Engineer (Cleveland District Only).
GROUP 2 Asphalt Paver; Automatic Subgrader Machine, SelfPropelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48""; Bulldozer; Endloader; Horizontal Directional Drill (Over 50,000 ft lbs thrust); Hydro Milling Machine; Kolmantype Loader (production typeDirt);
Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications);
Material Transfer Equipment (Shuttle Buggy) Asphalt;
PettiboneRail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types;
Trench Machine (24"" wide & under); Vermeer type Concrete Saw; and Maintenance Operators (Portage and Summit Counties Only).
GROUP 3 AFrame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer (Portage and Summit Counties Only); Bobcattype and/or Skid Steer Loader with or without Attachments; Highway Drills (all types);
Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs.
Pressure) Pump Operator installing & operating Well Points;
Pump (4"" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); Welding Machines; and Railroad Tie Inserter/Remover; Articulating/straight bed end dumps if assigned (minus $4.00 per hour.
GROUP 4 Backfiller; Ballast Relocator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48"" or less); Bull Floats; Burlap & Curing Machine;
Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand;
Farmtype Tractor with attachments (highway); Finishing Machine; Fireperson, Floating Equipment (all types);
Forklift; Form Trencher; Hydro Hammer expect masonary;
Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver;
Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); SelfPropelled Power Spreader;
SelfPropelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); and Vibratory Compactor with Integral Power.
GROUP 5 Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt Plant); Generator; Masonry Fork Lift;
InboardOutboard Motor Boat Launch; Oil Heater (asphalt plant); Oiler/Helper; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4"" discharge); Signalperson; Tire Repairperson; VAC/ALLS; Cranes Compact, track or rubber under 4,000 pound capacity; fueling and greasing; and Chainmen.
GROUP 6 Master Mechanic & Boom from 150 to 180.
GROUP 7 Boom from 180 and over.
ENGI0018004 05/01/2019
ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN,
BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON,
COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD,
FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON,
HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES,
HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN,
LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE,
MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING,
PERRY, PICKAWAY, PIKE, PREBLE, PUTNAM, RICHLAND, ROSS,
SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN
WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, and
YANDOT COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 37.14 15.20
GROUP 2.....................$ 37.02 15.20
GROUP 3.....................$ 35.98 15.20
GROUP 4.....................$ 34.80 15.20
GROUP 5.....................$ 29.34 15.20
GROUP 6.....................$ 37.39 15.20
GROUP 7.....................$ 37.64 15.20
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;
Crane (All Types, Including Boom Truck, Cherry Picker);
CraneCompact, Track or Rubber over 4,000 lbs. capacity;
CranesSelf Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (OperatorHoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Hydraulic Gantry (Lifting System); IndustrialType Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge);
Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper;
Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; SideBoom; SlipForm Paver;
Tower Derrick; Tree Shredder; Trench Machine (Over 24"" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; and Wheel Excavator.
GROUP 2 Asphalt Paver; Automatic Subgrader Machine, SelfPropelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48""; Bulldozer; Endloader; Hydro Milling Machine; Horizontal Directional Drill (over 50,000 ft. lbs.
thrust);Kolmantype Loader (production typeDirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; PettiboneRail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24"" wide & under); and Vermeer type Concrete Saw.
GROUP 3 AFrame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcattype and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4"" & over discharge); Railroad Tie Inserter/Remover; Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); and Welding Machines; Artiaculating/straight bed end dumps if assigned (minus $4.00 per hour.
GROUP 4 Backfiller; Ballast Relocator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48"" or less); Bull Floats; Burlap & Curing Machine;
Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand;
Farmtype Tractor with attachments (highway); Finishing Machine; Fireperson, Floating Equipment (all types); Fork Lift; Form Trencher; Hydro Hammer expect masonary; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner; Power Form Handling Equipment; Road Widening Trencher; Roller (Brick, Grade & Macadam); SelfPropelled Power Spreader;
SelfPropelled Power Subgrader; Steam Fireperson; Tractor (Pulling Sheepfoot, Roller or Grader); and Vibratory Compactor with Integral Power.
GROUP 5 Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt Plant); Generator; Masonary Forklift;
InboardOutboard Motor Boat Launch; Oil Heater (asphalt plant); Oiler/Helper; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4"" discharge); Signalperson; Tire Repairperson; VAC/ALLS; Cranes Compact, track or rubber under 4,000 pound capacity; fueling and greasing; and Chainmen.
GROUP 6 Master Mechanic & Boom from 150 to 180.
GROUP 7 Boom from 180 and over.
ENGI0066023 06/01/2017
COLUMBIANA, MAHONING & TRUMBULL COUNTIES
Rates Fringes
POWER EQUIPMENT OPERATOR
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 1 A & B.............$ 39.23 19.66
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 2 A & B.............$ 38.90 19.66
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 3 A & B.............$ 34.64 19.66
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 4 A & B.............$ 30.70 19.66
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 5 A & B.............$ 27.30 19.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 1 C & D.............$ 35.96 19.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 2 C & D.............$ 35.66 19.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 3 C & D.............$ 31.76 19.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 4 C & D.............$ 28.14 19.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 5 C & D.............$ 25.03 19.66
ALL OTHER WORK
GROUP 1.....................$ 32.69 19.66
ALL OTHER WORK
GROUP 2.....................$ 32.42 19.66
ALL OTHER WORK
GROUP 3.....................$ 28.87 19.66
ALL OTHER WORK
GROUP 4.....................$ 25.58 19.66
ALL OTHER WORK
GROUP 5.....................$ 22.75 19.66
GROUP 1 Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached
GROUP 2 Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; BackhoeRear Pivotal Swing; Batch PlantCentral Mix Concrete; Batch Plant, Portable concrete; Berm BuilderAutomatic; Boat Derrick; BoatTug;
Boring Machine Attached to Tractor; Bullclam; Bulldozer;
C.M.I. Road Builder & Similar Type; Cable Placer & Layer;
CarrierStraddle; CarryallScraper or Scoop; Chicago Boom;
Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; CraneElectric Overhead;
CraneRough Terrain; CraneSide Boom; CraneTruck;
CraneTower; DerrickBoom; DerrickCar; DiggerWheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;
DrillKenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile;
Gradall; Grader; Gurry; SelfPropelled; Heavy Equipment Robotics Operator/Mechanic; HoistMonorail;
HoistStationary & Mobile Tractor; Hoist, 2 or 3 drum;
Horizontal Directional Drill Operator; Jackall; Jumbo
Machine; Kocal & Kuhlman; LandSeagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;
Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; PaverAsphalt Finishing Machine;
PaverRoad Concrete; PaverSlip Form (C.M.I. or similar);
Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine;
RegulatorBallast; Hydraulic Power Unit not attached to Rig for Pile Drillings; RigsDrilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing;
Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;
TractorDouble Boom; Tractor with Attachments; TruckBoom;
TruckTire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)
GROUP 3 Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer;
Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork lift & Lulls; Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine; Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Selfpropelled or Ridden);
Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, SelfPropelled; Straw Blower Machine; SubGrader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist
GROUP 4 Air Curtain Destructor & Similar Type; Batch PlantJob Related; Boiler Operator; Compressor; Conveyor;
Curb Builder, selfpropelled; Drill Wagon; Generator Set;
GeneratorSteam; HeaterPortable Power; Hydraulic Manipulator Crane; JackHydraulic Power driven;
JackHydraulic (Railroad); Ladavator; Minor Machine Operator; MixerConcrete; Mulching Machine; Pin Puller;
Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); SawConcreteSelfPropelled (Highway Work); Signal Person; Spray Cure MachineMotor Powered; Stump Cutter;
Tractor; Trencher Form; Water Blaster; Steam Jenny;
Syphon; VibratorGasoline; & Welding Machine
GROUP 5 Brakeperson; Fireperson; & Oiler
IRON0017002 05/01/2020
ASHTABULA (North of Route 6, starting at the Geauga County Line, proceeding east to State Route 45), CUYAHOGA, ERIE (Eastern 2/3), GEAUGA, HURON (East of a line drawn from the north border through Monroeville & Willard), LAKE, LORAIN, MEDINA (North of Old Rte. #224), PORTAGE (West of a line from
Middlefield to Shalersville to Deerfield), and SUMMIT (North of Old Rte. #224, including city limits of Barberton) COUNTIES
Rates Fringes
IRONWORKER
Ornamental, Reinforcing, & Structural..................$ 35.93 23.11
IRON0017010 05/01/2020
ASHTABULA (Eastern part from Lake Erie on the north to route #322 on the south to include Conneaut, Kingsville, Sheffield, Denmark, Dorset, Cherry Valley, Wayne, Monroe, Pierpont, Richmond, Andover & Williamsfield Townships)
Rates Fringes
IRONWORKER
Structural, including metal building erection & Reinforcing.................$ 35.93 23.11
IRON0044001 06/01/2018
ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern onefifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) and WARREN (South of a line drawn from Blanchester through Morrow to the west county line) COUNTIES
Rates Fringes
IRONWORKER, REINFORCING
Beyond 30mile radius of Hamilton County Courthouse..$ 28.67 21.20 Up to & including 30mile radius of Hamilton County Courthouse..................$ 27.60 20.70
IRON0044002 06/01/2020
CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern onefifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line)
IRONWORKER
Fence Erector...............$ 28.76 21.40 Ornamental; Structural......$ 30.27 21.40
IRON0055003 07/01/2019
CRAWFORD (Area Between lines drawn from where Hwy #598 & #30 meet through N. Liberty to the northern border & from said Hwy junction point due west to the border), DEFIANCE (S. of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), ERIE (Western 1/3), FULTON, HANCOCK, HARDIN (North of a line drawn from Maysville to a point 4 miles south of the northern line on the eastern line), HENRY, HURON (West of a line drawn from the northern border through Monroeville & Willard), LUCAS, OTTAWA, PUTNAM (East of a line drawn from the northern border down through Miller City to where #696 meets the southern border), SANDUSKY, SENECA, WILLIAMS (East of a line drawn from Pioneer through Stryker to the southern border), WOOD & WYANDOT (North of Rte.
#30)
Rates Fringes
IRONWORKER
Fence Erector...............$ 21.30 20.92 Flat Road Mesh..............$ 29.77 21.30 Tunnels & Caissons Under Pressure....................$ 29.77 21.30 All Other Work..............$ 30.38 24.40
IRON0147002 06/01/2020
ALLEN (Northern half), DEFIANCE (Northern part, excluding south of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), MERCER (Northern half), PAULDING, PUTNAM (Western part, excluding east of a line drawn from the northern border down through Miller City to where #696 meets the southern border), VAN WERT, and WILLIAMS (Western part, excluding east of a line drawn from Pioneer through Stryker to the southern border) COUNTIES
Rates Fringes
IRONWORKER.......................$ 29.58 23.27
IRON0172002 06/01/2020
CHAMPAIGN (Eastern onethird), CLARK (Eastern onefourth), COSHOCTON (West of a line beginning at the northwestern county line going through Walhonding & Tunnel Hill to the southern county line), CRAWFORD (South of Rte. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HARDIN (Excluding a line drawn from Roundhead to Maysville), HIGHLAND (Eastern onefifth), HOCKING, JACKSON (Northern half), KNOX, LICKING, LOGAN (Eastern onethird), MADISON, MARION, MORROW, MUSKINGUM (West of a line starting at Adams Mill going to Adamsville & going from Adamsville through Blue Rock to the southern border), PERRY, PICKAWAY, PIKE (Northern half), ROSS, UNION, VINTON and WYANDOT (South of Rte. #30) COUNTIES
Rates Fringes
IRONWORKER.......................$ 30.75 20.80
IRON0207004 06/01/2020
ASHTABULA (Southern part starting at the Geauga County line), COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224), PORTAGE (E. of a line from Middlefield to Shalersville to Deerfield) & TRUMBULL
Rates Fringes
IRONWORKER
Layout; Sheeter.............$ 31.25 25.75 Ornamental; Reinforcing;
Structural..................$ 28.06 24.70 Ornamental; Reinforcing.....$ 30.25 25.75
IRON0290002 06/01/2020
ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawn from east to the west county line going through Oxford, Darrtown & Woodsdale), CHAMPAIGN (Excluding east of a line drawn from Catawla to the point where #68 intersects the northern county line), CLARK (Western twothirds), CLINTON (Excluding south of a line drawn from Blanchester to Lynchburg), DARKE, GREENE, HIGHLAND (Inside lines drawn from Marshall to Lynchburg & from the northern county line through East Monroe to Marshall), LOGAN (West of a line drawn from West Liberty to where the northern county line meets the western county line of Hardin), MERCER (Southern half), MIAMI, MONTGOMERY, PREBLE, SHELBY & WARREN (Excluding south of a line drawn from Blanchester through Morrow to the western county line) COUNTIES
Rates Fringes
IRONWORKER.......................$ 29.68 22.90
IRON0549003 12/01/2020
BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM
(Excluding portion west of a line starting at Adams Mill going to Adamsville and going from Adamsville through Blue Rock to the south border)
IRONWORKER.......................$ 34.03 23.22
IRON0550004 05/01/2020
ASHLAND, CARROLL, COLUMBIANA (W. of a line from Damascus to Highlandtown), COSHOCTON (E. of a line beginning at NW Co. line going through Walhonding & Tunnel Hill to the South Co. line), HOLMES, HURON (S. of Old Rte. #224), MAHONING (S. of Old Rte.
#224), MEDINA (S. of Old Rte. #224), PORTAGE (S. of Old Rte.
#224), RICHLAND, STARK, SUMMIT (S. of Old Rte. #224, Excluding city limits of Barberton), TUSCARAWAS, & WAYNE
Rates Fringes
Ironworkers:Structural, Ornamental and Reinforcing.......$ 29.27 20.87
IRON0769004 06/01/2020
ADAMS (Eastern Half), GALLIA, JACKSON (Southern Half), LAWRENCE
& SCIOTO
Rates Fringes
IRONWORKER.......................$ 32.75 26.34
IRON0787003 12/01/2020
ATHENS, MEIGS, MORGAN, NOBLE, and WASHINGTON COUNTIES
Rates Fringes
IRONWORKER.......................$ 30.98 22.75
* LABO0265008 05/01/2020
Rates Fringes
LABORER
ASHTABULA, ERIE, HURON,
LORAIN, LUCAS, MAHONING,
MEDINA, OTTAWA, PORTAGE,
SANDUSKY, STARK, SUMMIT,
TRUMBULL & WOOD COUNTIES
GROUP 1....................$ 33.05 11.25
GROUP 2....................$ 33.22 11.25
GROUP 3....................$ 33.55 11.25
GROUP 4....................$ 34.00 11.25
CUYAHOGA AND GEAUGA
COUNTIES ONLY: SEWAGE
PLANTS, WASTE PLANTS,
WATER TREATMENT
FACILITIES, PUMPING
STATIONS, & ETHANOL PLANTS
CONSTRUCTION................$ 35.66 11.25
CUYAHOGA, GEAUGA & LAKE
COUNTIES
GROUP 1....................$ 34.28 11.25
GROUP 2....................$ 34.45 11.25
GROUP 3....................$ 34.78 11.25
GROUP 4....................$ 35.23 11.25
REMAINING COUNTIES OF OHIO
GROUP 1....................$ 32.62 11.25
GROUP 2....................$ 32.79 11.25
GROUP 3....................$ 33.12 11.25
GROUP 4....................$ 33.57 11.25
LABORER CLASSIFICATIONS
GROUP 1 Asphalt Laborer; Carpenter Tender; Concrete Curing Applicator; Dump Man (Batch Truck); Guardrail and Fence Installer; Joint Setter; Laborer (Construction); Landscape Laborer; Mesh Handlers & Placer; Rightofway Laborer;
Riprap Laborer & Grouter; Scaffold Erector; Seal Coating;
Surface Treatment or Road Mix Laborer; Sign Installer;
Slurry Seal; Utility Man; Bridge Man; Handyman;
Waterproofing Laborer; Flagperson; Hazardous Waste (level D); Diver Tender; Zone Person & Traffic Control
GROUP 2 Asphalt Raker; Concrete Puddler; Kettle Man Pipeline); Machine Driven Tools (Gas, Electric, Air); Mason Tender; Brick Paver; Mortar Mixer; Power Buggy or Power Wheelbarrow; Paint Striper; Sheeting & Shoring Man; Surface Grinder Man; Plastic Fusing Machine Operator; Pug Mill Operator; & Vacuum Devices (wet or dry); Rodding Machine Operator; Diver; Screwman or Paver; Screed Person; Water Blast, Hand Held Wand; Pumps 4"" & Under (Gas, Air or Electric) & Hazardous Waste (level C); Air Track and Wagon Drill; Bottom Person; Cofferdam (below 25 ft. deep);
Concrete Saw Person; Cutting with Burning Torch; Form Setter; Hand Spiker (Railroad); Pipelayer; Tunnel Laborer (without air) & Caisson; Underground Person (working in Sewer and Waterline, Cleaning, Repairing & Reconditioning);
Sandblaster Nozzle Person; & Hazardous Waste (level B)
GROUP 3 Blaster; Mucker; Powder Person; Top Lander;
Wrencher (Mechanical Joints & Utility Pipeline); Yarner;
Hazardous Waste (level A); Concrete Specialist; Concrete Crew in Tunnels (With Airpressurized $1.00 premium);
Curb Setter & Cutter; Grade Checker; Utility Pipeline Tapper; Waterline; and Caulker
GROUP 4 Miner (With Airpressurized $1.00 premium); & Gunite Nozzle Person
TUNNEL LABORER WITH AIRPRESSURIZED ADD $1.00 TO BASE RATE
SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID
THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING.
PAIN0006002 05/01/2018
ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. of the EastWest Turnpike) & SUMMIT (N. of the EastWest Turnpike)
PAINTER
COMMERCIAL NEW WORK;
REMODELING; & RENOVATIONS
GROUP 1....................$ 27.90 16.16
GROUP 2....................$ 28.30 16.16
GROUP 3....................$ 28.60 16.16
GROUP 4....................$ 34.16 16.16
COMMERCIAL REPAINT
GROUP 1....................$ 26.40 16.16
GROUP 2....................$ 26.80 16.16
GROUP 3....................$ 27.10 16.16
PAINTER CLASSIFICATIONS COMMERCIAL NEW WORK; REMODELING; &
RENOVATIONS
GROUP 1 Brush; & Roller
GROUP 2 Sandblasting & Buffing
GROUP 3 Spray Painting; Closed Steel Above 55 feet; Bridges & Open Structural Steel; Tanks Water Towers; Bridge Painters; Bridge Riggers; Containment Builders
GROUP 4 Bridge Blaster
PAINTER CLASSIFICATIONS COMMERCIAL REPAINT
GROUP 1 Brush; & Roller
GROUP 2 Sandblasting & Buffing
GROUP 3 Spray Painting
PAIN0007002 07/01/2019
FULTON, HENRY, LUCAS, OTTAWA (Excluding Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genova) & WOOD
Rates Fringes
PAINTER
NEW COMMERCIAL WORK
GROUP 1....................$ 27.64 17.79
GROUP 2....................$ 27.39 17.79
GROUP 3....................$ 27.39 17.79
GROUP 4....................$ 27.39 17.79
GROUP 5....................$ 27.39 17.79
GROUP 6....................$ 27.39 17.79
GROUP 7....................$ 27.39 17.79
GROUP 8....................$ 27.39 17.79
GROUP 9....................$ 27.39 17.79
REPAINT IS 90% OF JR
PAINTER CLASSIFICATIONS
GROUP 1 Brush; Spray & Sandblasting Pot Tender
GROUP 2 Refineries & Refinery Tanks; Surfaces 30 ft. or over where material is applied to or labor performed on above ground level (exterior), floor level (interior)
GROUP 3 Swing Stage & Chair
GROUP 4 Lead Abatement
GROUP 5 All Methods of Spray
GROUP 6 SolventBased Catalized Epoxy Materials of 2 or More Component Materials, to include SolventBased Conversion Varnish (excluding water based)
GROUP 7 Spray Solvent Based Material; Sand & Abrasive Blasting
GROUP 8 Towers; Tanks; Bridges; Stacks Over 30 Feet
GROUP 9 Epoxy Spray (excluding water based)
PAIN0012008 05/01/2019
BUTLER COUNTY
Rates Fringes
PAINTER
GROUP 1.....................$ 21.95 10.20
GROUP 2.....................$ 25.30 10.20
GROUP 3.....................$ 25.80 10.20
GROUP 4.....................$ 26.05 10.20
GROUP 5.....................$ 26.30 10.20
PAINTER CLASSIFICATIONS
GROUP 1: Bridge Equipment Tender; Bridge/Containment Builder
GROUP 2: Brush & Roller
GROUP 3: Spray
GROUP 4: Sandblasting; & Waterblasting
GROUP 5: Elevated Tanks; Steeplejack Work; Bridge; & Lead Abatement
PAIN0012010 05/01/2019
BROWN, CLERMONT, CLINTON, HAMILTON & WARREN
PAINTER
HEAVY & HIGHWAY BRIDGES
GUARDRAILSLIGHTPOLES
STRIPING
Bridge Equipment Tender and Containment Builder....$ 21.95 10.20 Bridges when highest point of clearance is 60 feet or more; & Lead Abatement Projects.........$ 26.30 10.20 Brush & Roller.............$ 25.30 10.20 Sandblasting & Hopper Tender; Water Blasting.....$ 26.05 10.20 Spray......................$ 25.80 10.20
PAIN0093001 12/01/2018
ATHENS, GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE and
WASHINGTON COUNTIES
Rates Fringes
PAINTER
Bridges; Locks; Dams;
Tension Towers; & Energized Substations.......$ 34.04 18.50 Power Generating Facilities.$ 30.89 18.50
PAIN0249002 06/01/2020
CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE
Rates Fringes
PAINTER
GROUP 1 Brush & Roller....$ 24.17 11.22 GROUP 2 Swing, Scaffold Bridges; Structural Steel;
Open Acid Tank; High Tension Electrical Equipment; & Hot Pipes......$ 24.17 11.22 GROUP 3 Spray;
Sandblast; Steamclean;
Lead Abatement..............$ 24.92 11.22 GROUP 4 Steeplejack Work..$ 25.12 11.22 GROUP 5 Coal Tar..........$ 25.67 11.22 GROUP 6 Bridge Equipment Tender & or Containment Builder.....................$ 32.88 11.22 GROUP 7 Tanks, Stacks & Towers......................$ 27.81 11.22
GROUP 8 Bridge Blaster, Rigger......................$ 35.88 11.22
PAIN0356002 09/01/2009
KNOX, LICKING, MUSKINGUM, and PERRY
Rates Fringes
PAINTER
Bridge Equipment Tenders and Containment Builders....$ 27.93 7.25 Bridges; Blasters;
andRiggers..................$ 34.60 7.25 Brush and Roller............$ 20.93 7.25 Sandblasting; Steam Cleaning; Waterblasting;
and Hazardous Work..........$ 25.82 7.25 Spray.......................$ 21.40 7.25 Structural Steel and Swing Stage.......................$ 25.42 7.25 Tanks; Stacks; and Towers...$ 28.63 7.25
PAIN0438002 12/01/2018
BELMONT, HARRISON and JEFFERSON COUNTIES
Rates Fringes
PAINTER
Bridges, Locks, Dams, Tension Towers & Energized Substations.................$ 32.80 17.68 Power Generating Facilities.$ 29.65 17.68