Attachment 4 - Furniture_SOW.pdf
PDF 252 KB Posted
- Attached to
- 3 TES Furniture
- Solicitation number
- FA255026Q0032
About this file
This is a Statement of Work (SOW) for the modernization and optimization of the 3 TES front office area at Schriever Space Force Base (SSFB), Colorado, located in Building 400, Rooms 9, 10, 11, and 11a within a Restricted Area.
The contractor must remove existing cubicle furniture from the four designated rooms and dispose of it through the contractor's disposal process. Installation of new furniture is required across all rooms, including: ten benching stations with 48-inch panels, task chairs, and standalone cubicle walls in Room 9; one L-shaped executive desk and one rectangular desk with task chairs in Room 10; four benching stations, four L-shaped cubicles with 76-inch panels, and task chairs in Room 11; and one L-shaped executive desk with executive and desk chairs in Room 11a. All furniture must feature brown laminate desktops, blue fabric panels, gray metal trim, under-desk storage, cable penetrations, and integrated electrical outlets. The contractor is responsible for all personnel, equipment, tools, materials, supervision, storage, assembly, transportation, and installation. Design services must include space planning, site verification, and material selection by qualified professional designers, with deliverables provided in CAD format (.dwg and .pdf). The contractor must provide a site representative during installation and coordinate scheduling with the government at least two weeks in advance for multi-day projects. Installation must be performed by manufacturer-certified professionals under oversight, with comprehensive post-installation documentation and inspection/acceptance checklists required before final payment. The contractor must comply with all federal, state, and local laws; OSHA Voluntary Protection Program requirements; and Schriever SFB security protocols, including vehicle access requests submitted three days prior, background checks, and restricted area entry procedures. A maximum of 30 days storage is included, and customer service must be available during standard duty hours (0730-1630 Monday-Friday, excluding federal holidays). Any electrical work must be performed by a licensed electrician paid in accordance with Davis-Bacon wage determination CO20260022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA255026Q00320001.pdf | ||
| Solicitation Amendment FA255026Q00320001 SF 30.pdf | ||
| Attachment 8 - RFIs_Answers.xlsx | XLSX spreadsheet | |
| Attachment 7 - Benching Stations.png | PNG image | |
| Attachment 3 - Standard Power Layout.png | PNG image | |
| Attachment 1 - Proposed Layout.png | PNG image | |
| Solicitation - FA255026Q0032.pdf | ||
| Attachment 6 - L-Shaped Cubicles.png | PNG image | |
| Attachment 5 - Executive Desk Example.png | PNG image | |
| Attachment 2 - Tech Power Layout.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3 TES Front Office Furniture
(Schriever Space Force Base, CO)
Contents
1.0 Project
2.0 Scope
3.0 Description of Services
4.0 Government Furnished Support
5.0 Site Conditions
6.0 Voluntary Protection Program (VPP) & Safety
7.0 Base & Installation Specifics
8.0 Deliverables (CDRLs)
9.0 Attachment
9.1 Standard Power Layout
9.2 Tech Power Layout
9.3 Proposed Layout
Title: 3 TES Front Office Furniture Author: Capt Calvin Raymond/ Chief of OW Test Management Kaitlyn Guldan/50CONS/Contracting Officer
Author Name Date Reason For Changes Version
Capt Raymond 8 July 2026 Initial SOW 1 Seth King 17 July 2026 Updating the SOW 2 Capt Raymond 22 July 2026 Updating the SOW 3 Kaitlyn Guldan 27 July 2026 Finalizing SOW details 4
1.0 Project
The modernization and optimization of 3 TES front office area. This project will take place within the Restricted Area (RA), Bldg. 400 Rooms 9, 10, 11, and 11a, on Schriever Space Force Base (SSFB).
2.0 Scope
Project will generally consist of removal of existing furniture pieces from designated open floorplan office spaces. Installing new furniture in the designated rooms listed out in the SOW.
2.1 Requirements & Scope
2.1.1 This requirement is to refurbish the front office section area currently occupied by
3 TES.
2.1.2 The contractor shall dispose of the existing system (cubicle) furniture through the contractor’s disposal process. All personal items from the mission partner will be removed prior to disposal.
a. Cubicle Furniture in Room 9 in Building 400 shall be removed and disposed of:
a. 1x U-shape executive desk
b. 2x L-shape executive desk
c. 1x Rectangle executive desk
b. Furniture located in – Room 10 in building 400 shall be removed and disposed of:
a. 1x U-shape executive desk
b. 1x Standalone circle table
c. Furniture located in – Room 11 in building 400 shall be removed and disposed of:
a. Small circle table
b. 4x Lower and upper bookcases
c. 1x U-shape executive desk
d. Furniture located in – Room 11a in building 400 shall be removed and disposed of:
a. 1x U-shape executive desk
b. 1x Couch
2.1.3 Building 400, Room 9
a. Install New Furniture:
i. Ten (10) benching stations approximately sized 4’6” W x 2’ D with 48” tall panels (H)
(i) Must have under-desk storage (wheels, double drawer)
(ii) Must have three (3) duplex built-in outlets
(iii) Brown laminate (adjustable) desks
(iv) Metal and fabric
(v) Fabric color to be shade of blue
(vi) Gray metal trim
(vii) Minimum of 2 cable penetrations/port holes per work surface
ii. Ten (10) task chairs
(i) Black
(ii) Mid-back
(iii) Roll around
(iv) Mesh material
(v) Adjustable arms
iii. One (1) cubicle standalone wall approximately sized 4’10” L x 84” H
(i) Metal and fabric
(ii) Fabric color to be the shade of blue
(iii) Gray metal trim
2.1.4 Building 400, Room 10
i. Install New Furniture:
(i) One (1) L-Shaped executive office desks approximately sized 6’ W x 6’ D
(ii) Brown laminate desktop approximately 2’ wide
(iii) Adjustable height
(iv) Under-desk storage
(v) Minimum of 2 cable penetrations/port holes per work surface
ii. One (1) executive (rectangular) desk approximately sized 6’ W x 2’ D
(i) Brown laminate
(ii) Adjustable height
(iii) Under-desk storage
(iv) Minimum of 2 cable penetrations/port work hole per work surface
iii. Two (2) task chairs
(i) Black
(ii) Mid-back
(iii) Rolling
(iv) Mesh material
(v) Adjustable arms
2.1.5 Building 400, Room 11
a. Install New Furniture:
i. Four (4) benching stations approximately sized 4’2” W x 2’ D with 48” tall panels (H)
(i) Must have under-desk storage (wheels, double-drawer)
(ii) Must have three duplex built-in outlets.
(iii) Brown laminate (adjustable) desks
(iv) Minimum of 2 cable penetrations/ port holes per work surface
ii. Four (4) L-Shaped cubicle approximately sized 6’ W x 6’ D with 76” tall panels (H). Each cubicle:
(i) Must have under-desk storage (wheels, double drawer)
(ii) Must have three (3) duplex built-in outlets
(iii) Brown laminate (adjustable) 2’ wide desktops
(iv) Metal and fabric
(v) Fabric to be the shade of blue
(vi) Gray metal trim
(vii) Minimum of 2 cable penetrations per work surface
iii. Eight (8) task chairs
(i) Black
(ii) Mid-back
(iii) Rolling
(iv) Mesh material
(v) Adjustable arms
2.1.6 Building 400, Room 11a
a. Install New Furniture:
i. One (1) executive L-Shaped office desk approximately sized 6’ W x 6’ D
(i) Brown laminate desktop approximately 2’ wide
(ii) Adjustable Height
(iii) Under-desk storage
(iv) Minimum of 2 cable penetrations/port holes per work surface
ii. One (1) executive chair
(i) Black
iii. Two (2) desk chairs
(i) Black
(ii) Mid-back
(iii) Rolling
(iv) Mesh material
(v) Adjustable arms
2.2 This work is to be completed within the Restricted Area (RA) at Schriever SFB, CO. The location inside the RA is Building 400, MOD 16. Contractor will either require T-Badges or Visitor badges, in which case, the Contractor needs to be escorted. Contractor will need to secure a Restricted Area Vehicle Entry pass for their truck when they dispose of old cubicle material and when they bring in the new cubicle furniture. Escorts will be provided by 3 TES for within the RA
a. Note: Foreign national employees of the contractor have an upward intake process of 6 months.
2.3 Additional Information:
a. Storage will not be available to store the furniture until installation. Contractor shall coordinate storage, delivery, and install of the furniture.
b. Building 400 has a loading dock with accessible freight elevator.
c. Under no circumstances shall any electronic devices, smart watches, or devices capable of connecting to internet or data storage be allowed within Building 400.
Devices must be left inside vehicles or outside.
d. There are underfloor power: where the Junction-boxes exist.
a. Contractor will provide documentation if modular furniture can support additional load of appliances (mini refrigerators, coffee makers, space heaters etc.) to ensure DAFMAN 91-203, paragraph 2.5.2.3. is complied with and unit maintains determination by contractor to ensure system is not overloaded/tripped by personal appliances or space heaters.
2.3.1 Flooring will not be required for this requirement
2.3.2 There is no IT/Data work required for this effort.
2.3.3 Schedule of furniture removal and new furniture installation will need to be scheduled as below to accommodate work schedules.
a. Phases:
i. Phase 1: Dispose of existing furniture through contractor’s disposal process. Carpet and baseboards will not be replaced.
ii. Phase 2: Electrical work, if required to sustain new furniture installation.
Vendor will ensure work is performed by qualified electrician and in compliance to 50 Civil Engineer Squadron (50 CES).
iii. Phase 3: Furniture installation and electrical hook up for new and existing furniture. The vendor will be responsible for cleaning up all packing materials and supplies.
2.4 Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer. It is understood that the actual site parameters or certain customer requirements may deviate from the standard typical layouts; therefore, any deviation that causes an increase in the price submitted during the bid process must be documented in writing and submitted to the Contracting Officer (CO) for review, along with a floor plan reference to show just cause.
2.5 Schedule of furniture removal and installation of new furniture will need to be scheduled and coordinated with the customer to accommodate work schedules. If installation is expected to take more than 1 business day, the Government will be notified at least two weeks in advance.
3.0 Description of Services
3.1 General Services
3.1.1 Coordination and management of all new products, equipment and people required to create, deliver, and install new systems and modular furniture within a Space Force location. This includes ongoing servicing of any items defective due to manufacturing error as well as for replacement or repair of any damaged item after purchase.
3.1.2 The contractor shall perform tasks on Office Workplace Furniture in accordance with the requirements stated in this contract.
3.1.3 The contractor shall be responsible for all personnel, equipment, tools, materials, supervision, storage, assembly, transportation, incidentals and all other items and services necessary to provide and install systems and modular furniture.
3.1.4 The contractor shall be knowledgeable of and shall comply with all applicable federal, state, and local laws, codes, permits, DoW, DAF, USSF, and base requirements and instructions required for the performance of the duties in this Statement of Work (SOW).
3.1.5 The contractor shall ensure policies and procedures are established that protect the safety and welfare of customers, employees, and the community to minimize or eliminate safety or environmental risks. These policies shall be in compliance with Federal and Installation policies and procedures.
3.1.6 The contractor shall provide a representative responsible for project site management on day of installation, scheduling & coordination with the government ahead of time, and technical assistance to the government representative as required throughout the project.
3.1.7 Any electrician provided by the contractor shall be a licensed electrical contractor.
The electrician will be paid in accordance with Davis-Bacon wage determination
CO20260022.
3.1.8 It is the responsibility of the contractor to verify the site conditions for accuracy and compatibility prior to starting the work.
3.1.9 The contractor shall submit a complete list of personnel in accordance with installation policy, including deliverymen, who will be expected to work on the installation. This list will contain Privacy Act information as required as well as the expectation that each individual will be able to present a current and valid state/federal identification complying with the REAL ID Act, to meet local Air Force security requirements. Please note that many installations require this information to be coordinated days in advance.
3.1.10 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.
3.1.11 The contractor shall be the authorized dealer of the specific office workplace furniture manufacturer proposed for the project.
3.1.12 The vendor shall manage ordering, shipment, delivery, and installation of all new furniture from manufacturer to final acceptance by the designated Government Acceptor.
3.1.13 The contractor shall provide customer service during normal duty hours, 0730- 1630 hours, Monday through Friday; except for federal holidays.
3.1.14 Recognized US Federal Holidays are as follows: New Year’s Day, Birthday of Martin Luther King Jr., Washington’s Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday. Family days, in conjunction with holidays, will need to be identified and ensured no work is done on those days.
3.1.15 When the contractor desires to work other than standard times, a written request shall be submitted to the Government Acceptor for approval. Written approval from the Contracting Officer must be received before proceeding with the work.
The request shall be submitted at least five (5) work days prior to the proposed performance of work, and it shall indicate the day/days, time/amount of work, and reason why performance is necessary during nonstandard hours.
3.1.16 All Air Force inquiries shall be responded to by a contractor representative within two business days.
3.1.17 Meetings may periodically be held between base personnel and contractor management to discuss contract status. The CO will notify the contractor in writing in advance of the place and time of required meetings.
3.1.18 Vehicle registration, proof of insurance and a valid driver’s license shall be presented to gain base access.
3.1.19 Lost vehicle and entry passes shall be reported immediately to the Security Police, as well as the Government Acceptor, in accordance with the local security forces policy.
3.1.20 The contractor shall be responsible for any storage of all new systems/modular/demountable wall furniture, components, parts, and assemblies prior to and during installation in accordance with the agreed upon delivery schedule.
3.1.21 The only travel required will be from Schriever parking to RA Bldg. 400. If furniture delivery truck is required to enter into the restricted area, it must be first cleared by security forces through the west portal entry control point.
3.1.22 The contractor shall maintain the capability to surge in the event of unforeseen circumstances such as extended duty hours, travel, classes and education, and mission-related surges.
3.2 Design Work
3.2.1 Providing professionals versed in programming, space planning and product specification, able to communicate product capabilities to the customer, to ensure products purchased meets the requirements.
3.2.2 As a part of the request for proposal and quote process, the contractor will propose products and a design that takes into account site layout considerations, as well as other information gathered during initial customer review at the discounted price upon which the award will be based.
3.2.3 RESERVED
3.2.4 The contractor shall provide design services, including space planning, site verification, material selection and programming as necessary for the project.
3.2.5 The contractor shall define and furnish the necessary hardware, software, and all other equipment necessary to accomplish design tasks. Standard equipment in addition to the hardware and software shall include but not necessarily be limited to: reproduction machines, plotters, paper, pencils, fax machines, and office furniture.
3.2.6 The contractor shall be responsible for collection of information relevant to the design/redesign of a space. Examples could include personnel interviews, questionnaires and walk-through inspections of the facility, as well as the existing furniture database (if available).
3.2.7 Services shall include site evaluation to ensure proper fit of the furniture within the given space and that all structural and other anomalies are taken into account.
3.2.8 The contractor is responsible for notifying the Government POC of all power requirements regarding location of communication, Local Area Network (LAN) and power junction boxes, with the expectation that the government will be responsible for providing and locating those junction boxes within 4'-0" of the ceiling penetration of the power pole location provided by the contractor.
3.2.9 Design shall ensure that power poles do not protrude into main walkways.
3.2.10 Design shall ensure that all outlets included in the design are accessible to the user, free and clear of obstacles.
3.2.11 Design shall not allow more than four cubicles to be served by a single circuit.
3.2.12 Design shall ensure that no more than two duplex outlets (four plug in points) are put onto the same circuit.
3.2.13 Design shall ensure that no existing wall outlets or thermostats are covered or concealed by panels or other systems furniture components.
3.2.14 Design shall consider utilize wall mounted applications where possible.
3.2.15 All designs of furniture layouts, including original designs and any subsequent redesigns, must be accomplished by qualified professional designers.
3.2.16 The contractor shall coordinate with the Government POC to review the installation drawings prior to submission of any revised price quote.
3.2.17 The contractor shall provide additional drawings of furniture layouts, if requested by the Government POC on a non-rewritable CD or DVD in both .dwg and .pdf formats unless otherwise specified in the contract.
3.2.18 RESERVED
3.2.19 RESERVED
3.2.20 Designs of each location shall include a Basic component floor plan sheet in which all systems furniture and workstation are tagged: to include graphic symbols for all major hanging components (flipper cabinets, shelves, task lights, tack boards, work surfaces, drawers, etc) as determined by the government. This design sheet shall include station numbers and movable wall and associated product locations, in 1/4" = 1'-0" scale.
3.2.21 Designs of each location shall include a Panel and Hardware Layout sheet: to include all finish colors and fabrics, panel widths (30", 36", 42", etc), in 1/4" = 1'0" scale, in addition to display hardware, keys and locksets shall be included.
3.2.22 Design sheet layouts of each location shall include a Furniture Power Distribution sheet in 1/4" = 1'0" scale to include: the location of all powered panels, powered components, receptacles, communication ports, power poles, powered raceways, base electrical feeds and building connection points.
3.2.23 RESERVED
3.2.24 The contractor shall maintain an updated, automated master copy of all furniture layouts, (designs/redesigns) accomplished under this contract for the duration of the warranty, after government acceptance of the project.
3.2.25 Drawing changes required to a layout due to contractor errors or omissions shall be the responsibility of the contractor and the corrected drawing and bill of materials shall be delivered to the government within three calendar days of the request.
3.2.26 RESERVED
3.2.27 Contractor shall make the government aware of any discrepancies to existing conditions not previously identified.
3.2.28 Design shall conform to the parameters established in the Architectural Barriers Act regarding accessibility of persons with disabilities.
3.3 Product Markings/Documentation/Tools
3.3.1 All documentation (Owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, etc.) shall be provided to and reviewed with the Government Acceptor and/or Government Project Manager upon completion of the installation.
3.3.2 Special assembly tools (security hardware wrench, spare parts provided with the furnishings, etc.) shall be provided to the Government Acceptor and/or Government Project Manager prior to final Government acceptance of products and services.
3.4 Delivery Services
3.4.1 The contractor is responsible for transportation of all new products, loading, unloading, storage and all necessary movement from factory to final onsite set up.
3.4.2 The contractor Project Manager shall be responsible for on-site coordination of all staging and deliveries, to include access to and operation of any equipment needed for unloading and movement of materials or product.
3.4.3 Contractor shall be responsible for determination of the appropriate delivery method and handling, based on site conditions to include the non-existence of loading docks and equipment at any given location. Special circumstances may be identified by and negotiated with the Contracting Officer.
3.4.4 Delivery shall be in accordance with the terms of the contractor's agreement. If the ordering activity designates an accelerated delivery schedule it will be identified in the contract.
3.4.5 A maximum of 30 days storage for new products shall be included in the contractor's agreement.
3.4.6 Work shall comply with applicable building standards and codes, specifically:
National Electrical Code (National Fire Protection Association (NFPA 70) and National Life Safety Code (NFPA 101).
3.4.7 The contractor shall be responsible for following all safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.
3.4.8 The contractor shall maintain accountability and control of any keys provided and shall return them to the Government Acceptor upon completion of work.
Duplication of keys or other means of access is not authorized.
3.4.9 The contractor shall prevent its personnel from entering any area other than the designated work area.
3.4.10 The contractor will be able to evacuate within all designated work areas to comply with fire codes.
3.4.11 The contractor shall ensure its personnel eat, drink, or smoke only in designated areas.
3.5 Installation and Removal Services
3.5.1 Manufacturer certified professionals to install systems and modular furniture per the approved design drawings.
3.5.2 Contractor shall provide, or have capability of obtaining support services to include removal and warehousing of the proposed furniture and demountable walls.
3.5.3 The contractor shall appoint an authorized representative who will be the company's senior representation on site for all customer communication and enforce compliance of all requirements for the project. This representative shall have a physical presence during any delivery and throughout installation unless agreed to by the Government POC.
3.5.4 The contractor representative shall meet with Government Acceptor and/or Government Project Manager to review the installation drawings prior to installation.
3.5.5 The contractor shall install office workplace furniture in accordance with each requirement statement and basic component floorplan, panel plan and electrical plan, designed and provided by the contractor with each purchase.
3.5.6 Contractor shall be liable for any damage to government property caused by the contractor or their representatives.
3.5.7 During installation the contractor shall protect all furniture and building materials, to include carpet, existing within the space with industry approved protective coverings inclusive of craft paper, moving blankets and such type material. The contractor shall not use protective materials that will leave any type of residual print, outline or imaging on any furniture or building materials. Contractor shall not repair damage to finishes unless directed by CO, but will be responsible to pay for damages. The government will make repairs and back charge the installation contractor.
3.5.8 Services shall include product transportation of existing inventory as required.
3.5.9 Services shall include inspection of product for shipping damage. If damage is found it shall be the responsibility of the contractor to notify the authorized government representative and make all arrangements for replacement or repair of item(s) damaged. Damaged items are not to be installed unless otherwise directed by the Government Acceptor.
3.5.10 Services shall include assembly of new product to conform to final Air Force approved design drawings.
3.5.11 Services shall include assembly of product to conform to final CO approved design drawings.
3.5.12 Installation of new systems and modular furniture must be under the oversight of an onsite manufacturer certified installer.
3.5.13 Installation of office workplace furniture must be under the oversight of an onsite manufacturer certified installer.
3.5.14 The contractor shall ensure that all communication outlet faceplates are provided with the furniture, based on the unique specifications of the IT requirements at that location.
3.5.15 Services shall include removal of packing materials from the installation and cleaning of product so that they are presented in new state (i.e. must clean off desktops if it is required to stand on them to install overhead storage).
3.5.16 Services shall include removal of all excess product and transport to the Government POC approved warehouse or other location as specified.
3.5.17 Prior to acceptance, the contractor shall clean all new furniture only with the manufacturer's recommended cleaning agents/products.
3.5.18 The contractor shall provide all new components, completely assembled, installed, and operational, including keys in each lock set.
3.5.19 New furniture, equipment, and accessories shall be level, square, and in proper alignment with adjoining furniture. All drawers should operate smoothly and stay closed when not in use.
3.5.20 The contractor shall inspect to ensure the new furniture is free of surface dirt and defects, the installation is complete, and the new furniture is ready for use.
3.6 Inspection/Acceptance Checklist
3.6.1 Validation between the contractor and the Government Acceptor that all product has been installed according to manufacturer guidelines and customer specifications.
3.6.2 A post-installation walkthrough shall be coordinated with the contractor’s authorized representative and Government Acceptor and/or Government Project Manager.
3.6.3 All areas requiring correction shall be documented in a punch list by the contractor and provided to the Government POC upon completion of a joint walk through by the contractor and the Government POC. No payment will be authorized while punch list items remain open.
3.6.4 A final walk through will be performed with the contractor and the Government POC and the CO to ensure all punch list items have been addressed to the satisfaction of the government.
3.6.5 Upon completion of all contract requirements, the contractor will submit to the Government Acceptor the Inspection acceptance documentation of completed Items under Scope of work 2.0. The Government Acceptor will complete the Inspection/Acceptance Checklist and return it to the contractor. The Contractor may then submit a final invoice in the Wide Area Workflow system (WAWF) (https://wawf.eb.mil/) and will attach an electronic copy of the signed Inspection/Acceptance Checklist to the invoice submission.
4.0 Government Furnished Support
Base support includes Government-controlled working space and utilities.
5.0 Site Conditions
5.1 Standard site conditions shall be considered those that include
5.1.1 Free and clear hard surface access to the receiving and installation location during regular working hours (0730-1630 Local).
http://www.wawf.eb.mil/
5.1.2 Parking and off-loading area suitable for access by a semi-trailer combination or truck within 100 feet of the building entrance closest to product installation area.
5.1.3 Threat condition level of the base is Bravo. This requires dealer personnel to get base access in order to complete the product installation.
5.1.4 A staging area adequate to sort, stage and uncrate products along with a waste receptacle suitable for disposal of materials.
5.1.5 Includes electric power, working lights, heating and air conditioning, and access to a working freight elevator if location is on a floor other than the first floor.
5.1.6 Current and correct CAD drawings of the building shell.
5.1.7 A building ready for the installation of furniture (i.e. other tasks such as painting and flooring are complete so as not to cause any delays in performance)
5.2 Contractor shall notify the CO of any deviations from the above standards, as well as any requests for equitable adjustment to the contract price based on a condition not available at site visit.
6.0 Voluntary Protection Program (VPP) & Safety
6.1 Voluntary Protection Program: The Air Force is part of the OSHA VPP. All contractors are required to familiarize themselves with the requirements of the VPP. Information on VPP can be accessed at http://www.osha.gov/desp/vpp/index.html.
6.2 An Applicable Quality Control Plan must identify the processes and procedures the contractor will use to track compliance with the Safety and Health Plan, and the process and procedures that will be used to correct violations. Upon award of the contract, the contractor working will have a safety and security brief by the Delta 8 Safety officer and Delta 8 Security Assistant
7.0 Base & Installation Specifics
7.1 The contractor shall adhere to local installation security and force protection postures. Ensure compliance with installation real-world antiterrorism/force protection (AT/FP) measures, traffic laws, and prohibitions against carrying firearms on the installation. Favorable completion of National Crime Information Center and local files checks is required prior to allowing individuals access to the installation. The contractor shall ensure all personnel employed in the performance of the contract, or any representative of the contractor entering the installation, shall abide by all applicable security regulations and base policies concerning entry/access to the installation.
7.2 All commercial trucks must submit a Schriever SFB Vehicle Access Request Form no later than 3 days prior to coming onto base. When coming to base, come to the Visitor Center located off Enoch Road to get a visitor pass and then enter the base through the West Gate near the intersection of Curtis and Irwin Road, for inspection. In accordance with the Installation/Space Base Delta 41 (SBD-41) base entry procedures, delivery personnel must adhere to delivery vehicle process requirements mandated by the SBD-41 Base Defense Plan (BDP) 31-1. Once at the http://www.osha.gov/desp/vpp/index.html
West Gate, the driver must have a current pass from the Visitor Center and will show the following documents:
7.2.1 A current vehicle registration.
7.2.2 A current proof of insurance.
7.2.3 A valid and current Driver’s License for the driver.
7.2.4 A valid/current Driver’s License or other State identification for any passenger(s) in the vehicle.
7.3 Gate Procedures
7.3.1 Once at the West Gate commercial vehicle inspection port, be prepared to exit the vehicle and allow for vehicle inspection. At this time, you may ask for directions to your final destination.
7.3.2 If the final destination requires the driver to leave the West Gate, and re-enter the base through an alternate gate, the pass received will be sufficient documentation for entry into both gates, within a pre-established time directed by the Security Forces representative.
7.3.3 Arrival at the appropriate gate after the designated allotted time will result in non-admittance to the installation.
7.4 This procedure will occur each time a commercial truck requests access to the base.
7.5 Current Bill of Lading (BOL) to get delivery driver and the vehicle on base. BOL must include the DAF installation name, date of anticipated delivery, and specific destination (including building number, street address, and point of contact information).
7.6 Personnel should have the following items when entering an installation:
7.6.1 Current registration for all vehicles
7.6.2 Current Proof of Insurance for all vehicles
7.6.3 Valid Driver’s license for each driver
7.6.4 Valid Driver’s license or other state identification for each passenger.
7.6.5 Depending on the current Force Protection Condition, a government representative may be required to sponsor those people in person at Pass & ID, 1560 Enoch Road, Colorado Springs, CO 80930.
7.6.6 The sponsor must state the guest's purpose and destination. It is the responsibility of the contractor to validate this need with their government POC prior to their arrival so as to coordinate the arrival time accordingly. Sponsors may request that a pass be applicable for multiple days if needed.
7.7 To sponsor 10 or more people, a typed list of those people must be submitted by the Government Acceptor in Word or Excel format, stating LAST NAME then FIRST NAME of each person. The sponsor must submit that list to Pass & ID, 1560 Enoch Road, no fewer than three days prior to the anticipated arrival. Names listed must be complete names, (no nicknames), and correspond to the names on the state ID for each person.
7.8 Mission Essential Services: Contractors are not considered mission essential.
7.9 Prohibitions: Firearms will not be brought on base under any circumstances.
Individuals with criminal records are not allowed on base. Contractor personnel may not sponsor guests onto the installation.
7.10 3 TES for RA access. Security Forces for base access. (Vehicle information written down must exactly match what shows up at the RA gate).
8.0 Deliverables (CDRLs)
8.1 (CDRL A00X) Design
8.2 (CDRL A00X) Installation
8.3 (CDRL A00X) Product CDRLs
8.4 (CDRL A00X) TBD
8.5 (CDRL A00X)TBD
8.6 The Government has full ownership of all formal deliverables and required supporting documentation with regard to use, distribution, and reproduction.
9.0 Attachment
9.1 Standard Power Layout
9.2 Tech Power Layout
9.3 Proposed Layout
| 1.0 Project |
| 2.0 Scope |
| Project will generally consist of removal of existing furniture pieces from designated open floorplan office spaces. Installing new furniture in the designated rooms listed out in the SOW. |
| 2.1 Requirements & Scope |
| 2.1.1 This requirement is to refurbish the front office section area currently occupied by 3 TES. |
| 2.1.2 The contractor shall dispose of the existing system (cubicle) furniture through the contractor’s disposal process. All personal items from the mission partner will be removed prior to disposal. |
| a. Cubicle Furniture in Room 9 in Building 400 shall be removed and disposed of: |
| a. 1x U-shape executive desk |
| b. 2x L-shape executive desk |
| b. Furniture located in – Room 10 in building 400 shall be removed and disposed of: |
| a. 1x U-shape executive desk |
| c. Furniture located in – Room 11 in building 400 shall be removed and disposed of: |
| a. Small circle table |
| d. Furniture located in – Room 11a in building 400 shall be removed and disposed of: |
| a. 1x U-shape executive desk |
| 2.1.3 Building 400, Room 9 |
| 2.1.5 Building 400, Room 11 |
| 2.1.6 Building 400, Room 11a |
| 2.2 This work is to be completed within the Restricted Area (RA) at Schriever SFB, CO. The location inside the RA is Building 400, MOD 16. Contractor will either require T-Badges or Visitor badges, in which case, the Contractor needs to be escorted. C... |
| a. Note: Foreign national employees of the contractor have an upward intake process of 6 months. |
| 2.3 Additional Information: |
| 2.3.1 Flooring will not be required for this requirement |
| 2.3.2 There is no IT/Data work required for this effort. |
| 2.3.3 Schedule of furniture removal and new furniture installation will need to be scheduled as below to accommodate work schedules. |
| a. Phases: |
| i. Phase 1: Dispose of existing furniture through contractor’s disposal process. Carpet and baseboards will not be replaced. |
| ii. Phase 2: Electrical work, if required to sustain new furniture installation. Vendor will ensure work is performed by qualified electrician and in compliance to 50 Civil Engineer Squadron (50 CES). |
| iii. Phase 3: Furniture installation and electrical hook up for new and existing furniture. The vendor will be responsible for cleaning up all packing materials and supplies. |
| 2.4 Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer. It is understood that the actual site parameters or certain custo... |
| 2.5 Schedule of furniture removal and installation of new furniture will need to be scheduled and coordinated with the customer to accommodate work schedules. If installation is expected to take more than 1 business day, the Government will be notifie... |
| 3.0 Description of Services |
| 4.0 Government Furnished Support |
| 5.0 Site Conditions |
| 6.0 Voluntary Protection Program (VPP) & Safety |
| 7.0 Base & Installation Specifics |
| 8.0 Deliverables (CDRLs) |
| 9.0 Attachment |
| 9.1 Standard Power Layout |
| 9.2 Tech Power Layout |
| 9.3 Proposed Layout |