Attachment - 4_Exhibit A_CDRLS_Draft.pdf

PDF 3 MB Posted

Attached to
Steam Generator AFRL West
Solicitation number
FA930025R6001
Issued by

About this file

This file is a Contract Data Requirements List (CDRL) for the Area 1-42 Steam Generator project, detailing multiple documentation requirements for a contract with the Air Force Research Laboratory (AFRL). The CDRL includes seven distinct data items that contractors must prepare and submit throughout the project lifecycle, including:

  1. Technical and Management Work Plan (A001): A comprehensive plan describing the contractor's approach to implementing the Statement of Work, including organizational structure, interfaces, methodology, personnel, security requirements, schedules, and resources. 2. Technical Data Package (A002): An authoritative technical description supporting acquisition, production, and engineering of the steam generator, requiring detailed engineering design data, specifications, and quality assurance provisions. 3. Engineering Documentation Product Drawings (A003): Sanitized drawings to support prototype and limited production, with specific requirements for labeling, content, and documentation. 4. Hydrostatic Test Plan (A004): A detailed plan outlining testing objectives, methods, equipment, and validation procedures. Additional deliverables include Presentation Materials (A005), an Operations and Maintenance Manual (A006), Meeting Minutes (A007), Digital Imaging (A008), and a Digital System Model (A009). Each data item has specific submission requirements, distribution statements, and is subject to export control regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024 Page 1 of 3

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Technical and Management Work Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81117A/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

1TIME

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at: https://quicksearch.dla.mil/qsDocDetails.aspx?

ident_number=205295 Scope: The Technical and Management Work Plan describes the contractor’s plan to implement the Statement of Work (SOW) tasking provided via delivery order or task order.

Requirements:

1. Reference Documents. None

2. Format. The plan shall be submitted in a contractor devised and Government approved electronic format.

3. Content. The plan shall include information necessary to substantiate the contractor’s approach to completing the delivery or task order and information necessary for the Government to assess the soundness of the contractor’s approach. The plan shall contain the following:

3.1 Identification. The plan shall identify the contractor’s name, contract number, title and number of the delivery or task order, security classification of the plan, name of contract monitor, and the Government office issuing the tasking.

3.2 Descriptive material. The plan shall include descriptive material, system diagrams, sketches, photographs, tables, forms, graphs, worksheets, charts, drawings, etc., as required.

3.3 Organizational structure. The plan shall include a description of the contractor’s organizational structure and assignment of functions, duties, and responsibilities, which will be assigned in support of the tasking.

Additionally, the plan shall identify the contractor’s procedures, policies, and reporting requirements established to initiate, monitor, control, complete, and report on activities required of the delivery or task order.

3.4 Organizational interfaces. The plan shall describe all interfaces between the contractor and the Government and between the contractor and other contractors or subcontractors, which are necessary to complete the assigned tasking. This shall include a description of the applicable responsibilities and functional relationships between those organizations.

3.5 Methodology. The plan shall include a narrative description clearly defining the technical approach (or method) including tools, standards, and procedures to be used by the contractor to accomplish the delivery or task order. All documentation, activity, or decisions required from the Government or other Government contractor shall be identified.

3.6 Personnel. The plan shall identify the names and types of personnel assigned to accomplish the delivery or task order. The plan shall show how the combination of people assigned to each task provides a sufficient knowledge or experience base for that task. This includes identifying any special education, training, experience, or skills of these individuals. Also, any special administrative support requirements shall be identified.

3.7 Security. The plan shall identify any special or unique security requirements resulting from the delivery or task order.

3.8 Schedule. The plan shall include a milestone chart(s) graphically depicting the schedule of events associated with the delivery or task order. The level of detail shall be sufficient to clearly show how each subtask shall be performed. This includes:

a. Contractor activities.

b. Contractor deliverances (interim and final), including briefings (if required).

c. Other program milestones as appropriate (including Government input in 3.5 above).

d. Periodic milestones to allow adequate Government review of contractor progress.

3.9 Resources chart. The plan shall include a resources chart that graphically and numerically identifies the contractor’s total planned man-hour level of effort (LOE) and LOE by month for each subtask identified in the delivery or task order. Proposed monthly subtask man-hours shall be broken out by labor category in support of the delivery or task order.

AFRL/RQRO 1

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Technical and Management Work Plan

3. SUBTITLE

DD FORM 1423, FEB 2024 Page 2 of 3

UNCLASSIFIED

UNCLASSIFIED

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81117A/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

1TIME

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

3.10 Travel. The plan shall include a list of the travel requirements that shall include the following for each trip:

a. Company or Government agency visited.

b. Location.

c. Number of travelers by labor category.

d. Trip duration.

3.11 The TMWP is the contractor’s plan for executing the project. At a minimum, the plan shall include a description of the proposed demonstration system, the technical approach, an overview of technical milestones and tasks, analysis showing the proposed prototypes will meet objectives and requirements of the Area 1-42 Steam Generator effort, and a milestone-based schedule (including any dependencies).

3.12 Deliverables. The plan shall include a brief description of the contents of each deliverable to be provided as a result of the delivery or task order.

Block 9: "DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; CTI; Critical Technology; Export Controlled; (Fill in Contract End Month and Year).

Other requests for this document must be referred to AFRL/RQRO, 8 Draco Drive, Edwards AFB, CA 93524-7135."

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

In accordance with DoD Instruction 5200.48, Section 3.4, paragraph a, mark the header and footer with

CUI.

Block 12: Submit 3 weeks after contract award.

Block 14: Electronic submittals shall be password protected/encrypted when transmitted by e-mail.

Attachments larger than 10MB are too large for DoD e-mail. If file is too large, contact AFRL program manager to provide you with a Dropoff Request through DoD SAFE (https://safe.apps.mil/).

AFRL/RQRO 1

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Dillon Roberts

H. SIGNED ON 20250319 I. APPROVED BY

Melissa Moore

J. SIGNED ON 20250319

ROBERTS.DILL

ON.T.1464589127

Digitally signed by

ROBERTS.DILLON.T.1464589127

Date: 2025.03.19 15:13:04 -07'00'

MOORE.MELISS

A.A.1046094200

Digitally signed by

MOORE.MELISSA.A.1046094200

Date: 2025.03.19 15:49:19 -07'00'

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

TECHNICAL DATA PACKAGE (TDP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80776B/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at: https://quicksearch.dla.mil/qsDocDetails.aspx?

ident_number=205021 Use/relationship: A TDP is the authoritative technical description of an item which is clear, complete, and accurate, and in a form adequate for its intended use. This technical description supports the acquisition, production, inspection, engineering, and logistics of the item. The description defines the design, configuration, performance requirements, and procedures necessary to ensure essential interface and effective item performance. It consists of applicable technical data, such as: models, drawings, associated lists, engineering design data, specifications, standards, performance requirements, quality assurance provisions, software documentation, and packaging detail.

1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. Deliverable TDP elements shall be in the Government’s format as specified on the TDP Option Selection Worksheet incorporated into the contractor or purchase order, or contractor format.

3. Content. The TDP shall include one or more of the following elements:

a. Conceptual engineering design data in accordance with MIL-STD-31000B paragraph 5.4.1.1, and American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code as called out in sections 3 and 5 of the Statement of Work

b. Developmental engineering design data and associated lists in accordance with MIL-STD-31000B paragraph 5.4.1.2 and ASME Boiler & Pressure Vessel Code as called out in sections 3 and 5 of the Statement of Work

c. Product engineering design data and associated lists in accordance with MIL-STD-31000B paragraph

5.4.1.3 and ASME Boiler & Pressure Vessel Code as called out in sections 3 and 5 of the Statement of Work. The product design data shall document directly or by reference the following, as applicable:

(1) Details of unique processes, i.e., not published or generally available to industry, when essential to design and manufacture.

(2) Performance ratings.

(3) Dimensional and tolerance data.

(4) Critical manufacturing processes and assembly sequences

(5) Toleranced input and output characteristics.

(6) Diagrams.

(7) Mechanical and electrical connections.

(8) Physical characteristics, including: form, finishes, and protective coatings.

(9) Details of material identification, including material condition, and mandatory treatments and coatings.

(10) Inspection, test, and evaluation criteria.

(11) Equipment calibration requirements.

(12) Quality assurance requirements.

(13) Hardware marking requirements.

(14) All required certifications, special inspections, and other environmental, operational and functional testing necessary to ensure intended performance.

(15) Vendor substantiation data.

(16) Requirements for programming software into devices or assemblies including: a description of the input media and procedures for validating that the software has been installed correctly.

(17) Special consideration items and processes.

d. Commercial engineering design data and associated lists in accordance with MIL-STD-31000B paragraph 5.4.1.4 and ASME Boiler & Pressure Vessel Code as called out in sections 3 and 5 of the Statement of Work

e. Special Inspection Equipment (SIE) engineering design data and associated lists in accordance with MILSTD-31000B paragraph 5.4.2 and ASME Boiler & Pressure Vessel Code as called out in sections 3 and 5 of the Statement of Work

AFRL/RQRO 1

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

TECHNICAL DATA PACKAGE (TDP)

UNCLASSIFIED

UNCLASSIFIED

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80776B/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

f. Special Tooling (ST) engineering design data and associated lists in accordance with MIL-STD-31000B paragraph 5.4.3,

g. Specifications in accordance with MIL-STD-31000B paragraph 5.4.4, and ASME Boiler & Pressure Vessel Code as called out in sections 3 and 5 of the Statement of Work

h. Software documentation in accordance with MIL-STD-31000B paragraph 5.4.5

i. Special Packaging Instructions (SPI) engineering design data and associated lists in accordance with MIL-STD-31000B paragraph 5.4.6

j. Quality Assurance Provisions (QAPs) in accordance with MIL-STD-31000B paragraph 5.4.7.

Block 9: "DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; CTI; Critical Technology; Export Controlled; (Fill in Contract End Month and Year).

Other requests for this document must be referred to AFRL/RQRO, 8 Draco Drive, Edwards AFB, CA 93524-7135."

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

In accordance with DoD Instruction 5200.48, Section 3.4, paragraph a, mark the header and footer with

CUI.

Block 12: Technical Data Package shall be submitted at the end of the effort.

Block 14: Electronic submittals shall be password protected/encrypted when transmitted by e-mail.

Attachments larger than 10MB are too large for DoD e-mail. If file is too large, contact AFRL program manager to provide you with a Dropoff Request through DoD SAFE (https://safe.apps.mil/).

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Dillon Roberts

H. SIGNED ON 20250319 I. APPROVED BY

Melissa Moore

J. SIGNED ON 20250319

ROBERTS.DILL

ON.T.1464589127

Digitally signed by

ROBERTS.DILLON.T.1464589127

Date: 2025.03.19 15:13:20 -07'00'

MOORE.MELISS

A.A.1046094200

Digitally signed by

Date: 2025.03.19 15:50:45 -07'00'

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER DRPR

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Engineering Documentation Product Drawings (Re-Procurement)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-DRPR-81680A/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at: https://quicksearch.dla.mil/qsDocDetails.aspx?

ident_number=275434 Use/Relationship:

a. To provide Engineering Documentation Product Drawings, Sanitized to support prototype and limited production of equipment and systems. The drawings shall be used to support the maintenance, repair, spare procurement, training, testing, and configuration baseline of the equipment and system acquired.

b. This Data Item Description (DID) contains suggested guidance for the format and content preparation instructions of the Engineering Documentation Product Drawings resulting from the work task described in the contract SOW.

d. This DID supersedes DI-DRPR-81680.

Requirements:

1. Reference Documents. The applicable issue of the documents and procedure cited herein, including their approval dates and dates of any applicable amendments, notices, and revision shall be as stated herein. The ASME Standard, Y14.100-2013, Engineering Drawing Practices, is available through the American Society of Mechanical Engineers (http://www.asme.org). Further guidance can be obtained through the National Security Agency, Aquisition Logistics and Deployment Review, 9800 Savage Road, Suite 6129, Fort Meade, MD 20755-6129, Attn: B-023.

2. General. Drawings shall meet either the ASME Y14.100-2013 Standard or best business practices, as defined by the customer’s engineering drawing and documentation resources.

3. Format and Content. The following shall be noted on the drawing:

3.1 Each separate type of drawing in the system shall contain a drawing reference number.

3.2 Unclassified System Name and/or Steam Generator Name shall be shown.

3.3 Date, drafter point of contact and government point of contact information.

3.4 Each drawing shall be labeled with a general description (e.g., Steam Generator Elevation, Interconnect Diagram, Cabling List, Power, Parts List, etc).

3.5 Number of sheets shall be shown (Sheet X of X on first sheet and individual sheet number on continuing sheets).

3.6 Page Size B.

3.7 Front and back of Steam Generator shown.

3.8 Each part in the Steam Generator shall be identified (Manufacturer, Part Number, etc.).

3.9 Location of equipment in the Steam Generator (unit numbering method or location numbering method).

3.10 Open or blank spaces in the Steam Generator shall be identified.

Block 9: "DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; CTI; Critical Technology; Export Controlled; (Fill in Contract End Month and Year).

Other requests for this document must be referred to AFRL/RQRO, 8 Draco Drive, Edwards AFB, CA 93524-7135."

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

In accordance with DoD Instruction 5200.48, Section 3.4, paragraph a, mark the header and footer with

CUI.

CONTINUED ON NEXT PAGE

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Engineering Documentation Product Drawings (Re-Procurement)

UNCLASSIFIED

UNCLASSIFIED

4. AUTHORITY (Data Acquisition Document No.)

DI-DRPR-81680A/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASERQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 12: Drawings shall be delivered no later than 3 weeks after the 95% Design Review.

Block 14: Electronic submittals shall be password protected/encrypted when transmitted by e-mail.

Attachments larger than 10MB are too large for DoD e-mail. If file is too large, contact AFRL program manager to provide you with a Dropoff Request through DoD SAFE (https://safe.apps.mil/).

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Dillon Roberts

H. SIGNED ON 20250319 I. APPROVED BY

Melissa Moore

J. SIGNED ON 20250319

ROBERTS.DILL

ON.T.1464589127

Digitally signed by

ROBERTS.DILLON.T.1464589127

Date: 2025.03.19 15:15:06 -07'00'

MOORE.MELISS

A.A.1046094200

Digitally signed by

Date: 2025.03.19 15:52:05 -07'00'

DD FORM 1423, FEB 2024 Page 1 of 4

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER NDTI

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Test Plan

3. SUBTITLE

Hydrostatic Test Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80566A/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at: https://quicksearch.dla.mil/qsDocDetails.aspx?

ident_number=205041 Use/relationship: The Test Plan outlines the plans and performance objectives at every level of testing on systems or equipment. It provides the procuring activity with the test concept, objectives and requirements to be satisfied, test methods, elements, responsible activities associated with the testing, measures required and recording procedures to be used.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract. This DID is applicable to system and equipment tests that include design evaluation tests, engineering tests, preliminary qualification tests, formal qualification tests, human factors tests, operational tests and acceptance tests.

This DID supersede DI-NDTI-80566.

Requirements:

1. Reference documents. None.

2. General. The test plan shall document in detail the contractor’s plan for conducting tests and analyzing the test results to show how the system, when fielded, will satisfy the requirements of the applicable design specification.

3. Format: The plan shall be in contractor’s format.

4. Contents. The plan shall contain the following:

4.1 Title page. The title page shall include the following:

a. Title of the test to be conducted.

b. Identification of system being tested.

c. Contractor’s name.

d. Contractor number.

e. Security classification.

f. Distribution statement.

4.2 Introduction. Consists of an overview of the objectives of the test plan, including flow diagrams, milestones, personnel participation, locations, schedules, and security measures to be observed. The plan shall include the following:

4.3 Flow diagrams. The flow diagrams will reflect a functional description of the test program using a block diagram portrayal of the functions that must be met to satisfy the total test program. Functions shall be numbered 1.0, 2.0, 3.0, etc.

4.4 Milestones. Identifies the start and expected completion dates of each test to be performed.

4.5 Participation. Identifies the government and contractor participation roles and responsibilities.

4.6 Location. Identifies the facilities where the testing will be performed.

4.7 Schedule. States when testing will be performed, whether testing is on schedule, and if not, what procedures will be taken to meet the schedule.

4.8 Security. Identify and state briefly any security measures of guidelines to be observed.

4.10 Master test list. Lists all tests to be accomplished in the order they are to be performed. A separate listing for each location shall be provided. Each listing shall include the following:

4.9.1 Test description. Name and brief description of test to be performed.

4.9.2 Applicable specification (s). The specifications shall be identified as follows:

a. Title and identification number.

b. Paragraph number associated with the tests.

c. Title of test.

d. Functional category of test.

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Test Plan

Hydrostatic Test Plan

DD FORM 1423, FEB 2024 Page 2 of 4

UNCLASSIFIED

UNCLASSIFIED

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80566A/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

4.9.3 Parameters. The number of cycles the test will be performed and selected parameters to be observed.

4.9.4 Special tests. Provides a list of special or unusual tests and examination necessary to verify satisfactory equipment performance to specifications.

4.9.5 Test classification category. State the functional area of each test performed.

4.9.6 Test objectives. Describes the objectives of each test performed, including the criteria, baseline, duration, and number of times each test should be performed.

a. Success/failure criteria.

b. Baseline.

c. Duration.

d. Quantity of test.

4.9.7 Test equipment. List all equipment to be used in the test and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

4.9.8 Support equipment. List all support equipment that will be used to perform the tests and identify as follows:

a. Description.

b. Nomenclature.

c. Serial number.

d. Calibration constants.

e. Calibration procedures.

f. Operating instructions.

4.9.9 Special test equipment. List all special test equipment required to be designed or fabricated for use on the program as follows:

a. Description.

b. Nomenclature.

c. Data required.

4.9.10 Approach. Describe the steps used to perform each test.

4.9.11 Instrumentation. Indicates the type and recording devices that will be used and the number and types of parameters to be recorded.

4.9.12 Data reduction and analysis. Describes data to be recorded and the data reduction and analysis techniques that will be used to interpret the data.

4.9.13 Government test facilities. Identifies applicable facility and includes a reference to the appropriate facility requirements documents.

Validation procedure. An overview of the procedures that the contractor will use to validate the test results.

4.10 Signature/Approval page.

Block 9: "DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; CTI; Critical Technology; Export Controlled; [Month and Year]. Other requests for this document must be referred to AFRL/RQRE, 8 Draco Drive, Edwards AFB CA 93524-7135."

EXPORT CONTROL WARNING: All technical data shall be marked as follows: "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties.

Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02."

CONTINUED ON NEXT PAGE

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Test Plan

3. SUBTITLE

Hydrostatic Test Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80566A/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

DD FORM 1423, FEB 2024 Page 3 of 4

UNCLASSIFIED

UNCLASSIFIED

16. REMARKS

Enclosed in a text box with border the following items:

Controlled by: United States Air Force Controlled by: Air Force Research Laboratory; Rocket Propulsion Division CUI Category: (Insert category (reason) - Ex. CTI, Critical Technology, as appropriate) Distribution Statement: (Insert C as appropriate) POC: (Insert government contracting officers representative e-mail address) In accordance with DoD Instruction 5200.48, Section 3.4, paragraph a, mark the header and footer with

CUI.

Block 12: The Test Plan shall be delivered 17 months after contract award.

Block 14: Electronic submittals shall be password protected/encrypted when transmitted by e-mail.

Attachments larger than 10MB are too large for DoD e-mail. If file is too large, contact AFRL program manager to provide you with a Dropoff Request through DoD SAFE (https://safe.apps.mil/).

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Dillon Roberts

H. SIGNED ON 20250319 I. APPROVED BY

Melissa Moore

J. SIGNED ON 20250319

ROBERTS.DILL

ON.T.1464589127

Digitally signed by

ROBERTS.DILLON.T.1464589127

Date: 2025.03.19 15:15:41 -07'00'

MOORE.MELISS

A.A.1046094200

Digitally signed by

Date: 2025.03.19 15:54:03 -07'00'

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Presentation Material

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81373/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at:

https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=205854 Description/Purpose:

3.1 Presentation materials are audiovisual aids, such as viewgraphs, photographs, slides, or electronic equivalent. They are used to present information during reviews, briefings, and similar activities involving more than one person.

7. Application / Interrelationship

7.1 This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

7.2 This DID may be applied on any acquisition.

7.3 This DID supersedes DI-A-3024A.

10. Preparation Instructions Replace 10.1 Format with: Contractor may include logos and trademarks on presentations. All presentation material, engineering, and related analysis task shall be provided in consistent units. Presentations shall be prepared using Microsoft Office product.

Replace 10.2 Content with:

Include the following items, as a minimum, for each review:

a) List of previous action items and responses, if applicable

b) Status of risks and mitigation plans

c) Entry and exit criteria, agendas, minutes (See DI-ADMN-81250B) and results of this review, with any new action items

d) Documentation to provide evidence of meeting entry and exit criteria

Presentation materials that shall be submitted are but not exclusively:

(1) Kickoff and Closeout meetings, (2) 30% Design Review, (3) 60% Design Review, (4) 95% Design Review, and (5) Monthly Technical Updates

A distribution statement and export control statement are required and will be provided by the Government program manager in coordination of the Contractor program manager before delivery of the data. The distribution statement must appear in full on the first page of the presentation. An abbreviated distribution statement and notice shall appear on each page after page 1.

(Example: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors. WARNING-Export Controlled.).

Block 9: "DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; CTI; Critical Technology; Export Controlled; (Fill in Contract End Month and Year).

Other requests for this document must be referred to AFRL/RQRO, 8 Draco Drive, Edwards AFB, CA 93524-7135."

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

In accordance with DoD Instruction 5200.48, Section 3.4, paragraph a, mark the header and footer with

CUI.

AFRL/RQRO 1

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Presentation Material

UNCLASSIFIED

UNCLASSIFIED

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81373/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 12: Presentation materials for the (1) Kickoff and Closeout meetings, (2) 30% Design Review, (3) 60% Design Review, (4) 95% Design Review, and (5) Monthly Technical Updates shall be delivered electronically at least 7 calendar days prior to scheduled meeting to the Government program manager. The contractor shall deliver viewgraphs before meeting, hard copies at meetings only if requested, and electronic updates following the meeting if requested. On occasion, the Government project manager will need specific viewgraphs and electronic copies delivered on request.

Block 13: Date of subsequent submissions shall follow the same as the first as needed or requested.

Block 14: Electronic submittals shall be password protected/encrypted when transmitted by e-mail.

Attachments larger than 10MB are too large for DoD e-mail. If file is too large, contact AFRL program manager to provide you with a Dropoff Request through DoD SAFE (https://safe.apps.mil/).

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Dillon Roberts

H. SIGNED ON 20250319 I. APPROVED BY

Melissa Moore

J. SIGNED ON 20250319

ROBERTS.DILL

ON.T.1464589127

Digitally signed by

ROBERTS.DILLON.T.1464589127

Date: 2025.03.19 15:15:56 -07'00'

MOORE.MELISS

A.A.1046094200

Digitally signed by

Date: 2025.03.19 15:55:07 -07'00'

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Technical Report–Study/Services

3. SUBTITLE

O&M Manual

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ONE/R

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at: https://quicksearch.dla.mil/qsDocDetails.aspx?

ident_number=204915 Use/relationship: A technical report provides fully documented results of studies or analysis performed.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

The Contractor shall prepare an Operations and Maintenance (O&M) Manual for the steam generator. The document shall be clearly arranged for instruction, training, and reference for operations and maintenance personnel.

Requirements:

1. Reference documents. None.

2. Format.

(a) The report shall be provided in both Microsoft Word, and in a loose leaf 3 ring binder.

(b) Printed text shall be prepared on standard letter size paper (8 ½ x 11”) single sided. Major sections shall be clearly tabbed and identified.

(c) When attachments are included, they shall be fully identified, referenced in the text, and conform to the size paper used in the report.

(d) Security classification and distribution markings shall conform to the requirements of the contract, purchase description and security requirements checklist, as applicable.

3. Contents.

(a) Title Page – Identifies the report by providing contract number, project name or purchase description title, task number, and reporting period.

(b) Table of Contents.

(c) Section I – Includes, but is not limited to the following:

(1) Start up, normal operation, emergency conditions and safe shut down.

(d) Section II – Includes, but is not limited to the following:

(1) Address recommended maintenance of all parts, systems and components.

(2) Recommended maintenance shall include time intervals for inspection of items, replacement of items based on time and hours of operational usage of the steam generators, listing recommended spare parts and other key important data.

(e) Cut sheets and relevant information for all key components such as the burner, burner blower, instruments and like parts and systems.

(f) All P&IDs, schematics, and similar drawings and documents shall be included and referenced as required in the O&M Manual.

Block 9: "DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; CTI; Critical Technology; Export Controlled; (Fill in Contract End Month and Year).

Other requests for this document must be referred to AFRL/RQRO, 8 Draco Drive, Edwards AFB, CA 93524-7135."

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

In accordance with DoD Instruction 5200.48, Section 3.4, paragraph a, mark the header and footer with

CUI.

Block 12: The O&M Manual shall be submitted upon completion of the Steam Generator hardware fabrication and no later than delivery of the hardware to the Air Force Research Laboratory.

Block 13: Date of subsequent submissions shall follow the completion of Final Acceptance Training.

AFRL/RQRO 1

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Technical Report–Study/Services

UNCLASSIFIED

UNCLASSIFIED

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ONE/R

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 14: Electronic submittals shall be password protected/encrypted when transmitted by e-mail.

Attachments larger than 10MB are too large for DoD e-mail. If file is too large, contact AFRL program manager to provide you with a Dropoff Request through DoD SAFE (https://safe.apps.mil/).

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Dillon Roberts

H. SIGNED ON 20250319 I. APPROVED BY

Melissa Moore

J. SIGNED ON 20250319

ROBERTS.DILL

ON.T.1464589127

Digitally signed by

ROBERTS.DILLON.T.1464589127

Date: 2025.03.19 15:17:09 -07'00'

MOORE.MELISS

A.A.1046094200

Digitally signed by

Date: 2025.03.19 15:56:12 -07'00'

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

MEETING MINUTES

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250C

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at: https://quicksearch.dla.mil/qsDocDetails.aspx?

ident_number=206486 Use/Relationship: Meeting minutes provide documentation of technical information provided, and decisions and agreements reached, at meetings and conferences. For the purposes of this DID, a conference is considered to be a type of meeting.

Meeting Minutes that shall be submitted are but not exclusively: Preliminary Design Review (PDR), Critical Design Review (CDR), and Monthly Follow Up Meetings.

Requirements:

1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. Contractor format, compatible with government applications, is acceptable.

3. Content. The meeting minutes shall include the following:

a. A title page containing the following:

(1) Meeting title, type of meeting, and meeting date(s).

(2) Identification of the system, equipment, or contract number for which the meeting was held.

(3) Space for signatures of the designated representatives of the contractor and government activity.

(4) The name of the contractor and address to which the government activity will acknowledge receipt of comments.

b. The purpose and objective of the meeting.

c. The meeting location (or virtual conferencing application, if applicable).

d. A summary of the discussions, decisions, and agreements reached during the meeting or during individual subcommittee meetings.

e. A list of attendees by name, rank, grade or position, activity represented, activity symbol or code, phone number, and email address, as appropriate.

f. Action items resulting from the meeting, including, for each action item: a description, responsible party, suspense date, closure criteria, and status.

g. Briefing charts, if any were presented, shall be provided for information only.

h. A list of documents reviewed during the meeting, where applicable.

3.1 Distribution Statement. The applicable Distribution Statement, as necessary, in accordance with Department of Defense Instruction (DoDI) 5230.24, Distribution Statements on Technical Documents, Enclosure 4. (Copies of this document are available online at www.esd.whs.mil/DD.)

3.2 Classification Marking. The applicable classification marking, as necessary, in accordance with Department of Defense Manual (DoDM) 5200.01, Volume 2, DoD Information Security Program: Marking of Information, or Controlled Unclassified Information (CUI) markings (when applicable) in accordance with DoDI 5200.48, Controlled Unclassified Information (CUI). (Copies of these documents are available online at www.esd.whs.mil/DD.)

Block 9: "DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; CTI; Critical Technology; Export Controlled; (Fill in Contract End Month and Year).

Other requests for this document must be referred to AFRL/RQRO, 8 Draco Drive, Edwards AFB, CA 93524-7135."

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

In accordance with DoD Instruction 5200.48, Section 3.4, paragraph a, mark the header and footer with

CUI.

CONTINUED ON NEXT PAGE

AFRL/RQRO 1

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

MEETING MINUTES

UNCLASSIFIED

UNCLASSIFIED

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250C

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 12: Contractor shall submit the Meeting Minutes at Kickoff and Closeout meetings, the 30% Design Review, 60%/Preliminary Design Review (PDR), 95%/Critical Design Review (CDR), and Monthly Technical Update Meetings.

Block 13: Date of subsequent submissions shall follow the same as the first as needed or requested.

Block 14: Electronic submittals shall be password protected/encrypted when transmitted by e-mail.

Attachments larger than 10MB are too large for DoD e-mail. If file is too large, contact AFRL program manager to provide you with a Dropoff Request through DoD SAFE (https://safe.apps.mil/).

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Dillon Roberts

H. SIGNED ON 20250319 I. APPROVED BY

Melissa Moore

J. SIGNED ON 20250319

ROBERTS.DILL

ON.T.1464589127

Digitally signed by

ROBERTS.DILLON.T.1464589127

Date: 2025.03.19 15:19:03 -07'00'

MOORE.MELISS

A.A.1046094200

Digitally signed by

Date: 2025.03.19 15:57:16 -07'00'

DD FORM 1423, FEB 2024 Page 1 of 2

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MISC

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Digital Imaging

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-81579/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

MTHLY

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at: https://quicksearch.dla.mil/qsDocDetails.aspx?

ident_number=206873 Use, Relationship: This data item description (DID) contains format and content preparation instructions for digital images and the electronic data compression technology for efficient transmission.

Delete paragraph 1.2.2.1

a) Digital imaging provides the Government with visual records of objects and events which are stored in an electronic format that is efficiently transmittable.

b) This data item description is designed for contracts requiring photographic documentation of material conditions and /or events.

c) Images shall be transmitted electronically to Government and commercial activities.

Requirements:

1.1 Format Digital Imaging data shall be in contractor's format as stated in the Statement of Work.

1.1.1 Data compression Technology. Image data files shall utilize a universal data compression format.

1.1.2 Image Quality. The items prepared shall be of high quality resolution equal to Millions (1536 x 1024 or greater of pixels per image 32 bit (or greater) color.

1.2 Content

1.2.1 Image composition. Each image shall adequately depict the subject clearly; without obstruction or cropping.

1.2.2 Data Storage and Identification. Each image shall be stored as an electronic file. The file name shall include the object name and view number. Each file shall be date/time stamped automatically by the acquisition and/or processing software.

The file name shall include the object name and view number. Each file shall be date/time stamped automatically by the acquisition and/or processing software. This shall include the contractors name, image description, date, security classification, and automatic time-phased downgrading notation.

1.3 Image Transmission. Each image or group of images used to depict the subject shall be transmitted electronically.

Block 9: "DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors; CTI; Critical Technology; Export Controlled; (Fill in Contract End Month and Year).

Other requests for this document must be referred to AFRL/RQRO, 8 Draco Drive, Edwards AFB, CA 93524-7135."

WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 of Title 22, United States Code) or the Export Control Reform Act of 2018 (Chapter 58 Sections 4801-4852 of Title 50, United States Code). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25 and DoD Instruction 2040.02.

In accordance with DoD Instruction 5200.48, Section 3.4, paragraph a, mark the header and footer with

CUI.

Block 12: Contractor shall submit the digital imaging at the 15th of each month.

Block 13: Subsequent submissions shall be delivered the 15th of the following month.

Block 14: Electronic submittals shall be password protected/encrypted when transmitted by e-mail.

Attachments larger than 10MB are too large for DoD e-mail. If file is too large, contact AFRL program manager to provide you with a Dropoff Request through DoD SAFE (https://safe.apps.mil/). Program Manager - austin.johns.1@us.af.mil

AFRL/RQRO 1

AFRL.RQF@us.af.mil 1

15.TOTAL

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY

Dillon Roberts

H. SIGNED ON 20250319 I. APPROVED BY

Melissa Moore

J. SIGNED ON 20250319

ROBERTS.DILL

ON.T.1464589127

Digitally signed by

ROBERTS.DILLON.T.1464589127

Date: 2025.03.19 15:19:43 -07'00'

MOORE.MELISS

A.A.1046094200

Digitally signed by

Date: 2025.03.19 15:58:27 -07'00'

DD FORM 1423, FEB 2024 Page 1 of 7

UNCLASSIFIED

UNCLASSIFIED

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER SESS

D. SYSTEM/ITEM

Area 1-42 Steam Generator

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Digital System Model

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-82364/T

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

AFRL/RQRO

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

16. REMARKS

Block 4: Data Item Description (DID) located at: https://quicksearch.dla.mil/qsDocDetails.aspx?

ident_number=284695 Tailored to delete DID Sections 3.3.3.3, 3.9.3, 3.9.4, 3.9.5, 3.9.6, 3.9.7, and 3.9.8 Requirements:

1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The Digital System Model shall be delivered in the native file format(s) of the modeling tool(s) or developed directly in the Integrated Digital Data Environment (IDDE) as identified in the Contractor’s Systems Engineering Management Plan. The Digital System Model shall include documentation regarding necessary software tool(s) configurations, access types (e.g., read-only or write access), dashboards, views, data integrations, data flows, reporting mechanisms outside of dashboards (e.g., report building tools), security, size, and configuration management details.

3. Contents. The Digital System Model shall be organized into the following sections:

3.1. Scope. This section shall be divided into the following sub-sections:

3.1.1. Identification. This sub-section shall fully define the system and elements to which this document applies, including, as applicable, identification number(s), title(s),…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .