Attachment 4 Drawings Merged Set.pdf
PDF 47 MB Posted
- Solicitation number
- 36C2224B0010
About this file
This document is a set of drawings related to a federal contract opportunity for the Department of Veterans Affairs Veterans Health Administration to provide site preparation for the installation of a new skid base heat treatment reverse osmosis water system.
The key details include:
- The solicitation number is 36C2224B0010.
- The requirement is for site preparation work to install a new skid base heat treatment reverse osmosis water system.
- The agency involved is the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 22.
- The drawings provide technical specifications and details for the site preparation work.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 126
U.S. DEPARTMENT OF VETERANS AFFAIRS
SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID BASE
HEAT TREATMENT RO WATER SYSTEM, B126, 3RD AND 9TH
FLOOR
VA PROJECT NUMBER: 600-23-111
VA LONG BEACH HEALTHCARE SYSTEM
5901 E 7TH ST, LONG BEACH, CA 90822
100% CONSTRUCTION DOCUMENTS
01_GENERAL
GI-001 COVER
GI-101A PHASE ONE PLANS
GI-103 INFECTION CONTROL PLANS
GI-102 PHASING PLANS - ELECTRICAL PATHWAY
02_STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 TYPICAL INTERIOR PARTITION WALL LIGHT GAGE FRAMING DETAILS
S-004 EQUIPMENT BRACING AND ANCHORAGE DETAILS
S-005 TYPICAL SEISMIC EQUIPMENT BRACING AND ANCHORAGE DETAILS
SF109 9TH FLOOR FRAMING AND EQUIPMENT PLAN
03_ARCHITECTURAL
AI-103 3RD FLOOR PLANS
AI-108 8TH FLOOR PLANS
AI-109 9TH FLOOR - LOOP PLAN
AI-109.1 9TH FLOOR - LAYOUT PLANS
04_PLUMBING
FD-109
FIRE SPRINKLER THIRD FLOOR
FX-001
FIRE SPRINKLER DEMOLITION NINTH FLOOR
FX-103
FIRE SPRINKLER NINTH FLOORFX-109
FIRE SPRINKLER DETAILSFX-501
PLUMBING ABBREVIATIONS, SYMBOLS, LEGENDS AND GENERAL NOTESP001
PLUMBING DEMOLITION - THIRD FLOORPD103
PLUMBING DEMOLITION PLAN - NINTH FLOORPD109
OVERALL PLUMBING DEMOLITION PLAN - NINTH FLOOR
PLUMBING PLAN - NINTH FLOORP109
PLUMBING DETAILSP501
PLUMBING SCHEDULESP601
05_MECHANICAL
M001 MECHANICAL ABBREVIATIONS, SYMBOLS AND GENERAL NOTES
MD103 MECHANICAL DEMOLITION PLAN - THIRD FLOOR
MD109 MECHANICAL DEMOLITION PLAN - NINTH FLOOR
M103 MECHANICAL PLAN - THIRD FLOOR
M109 MECHANICAL PLAN - NINTH FLOOR
M501 MECHANICAL HVAC DETAILS
M601 MECHANICAL SCHEDULES
06_ELECTRICAL
E-001 ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS
E-901 ELECTRICAL PHOTOGRAPHS
E-902 ELECTRICAL PHOTOGRAPHS
ED103 ELECTRICAL DEMOLITION PLAN - THIRD FLOOR
ED109 ELECTRICAL DEMOLITION PLAN - NINTH FLOOR
EL103 ELECTRICAL LIGHTING PLAN - THIRD FLOOR
EL109 ELECTRICAL LIGHTING PLAN - NINTH FLOOR
EL501 LIGHT FIXTURE CUT SHEETS, SCHEDULE AND DETAILS
EP103 ELECTRICAL POWER PLAN - THIRD FLOOR
EP109 ELECTRICAL POWER PLAN - NINTH FLOOR
EP109A ENLARGED PLAN AND R.O. EQUIPMENT SCHEDULE - NINTH FLOOR
EP501 PARTIAL RISER DIAGRAM EMERGENCY POWER
EP502 RISER DIAGRAM DETAILS
EP601 ELECTRICAL PANEL SCHEDULES EMERGENCY POWER
EP602 ELECTRICAL PANEL SCHEDULES NORMAL POWER
AI-600 ROOM FINISH, DOOR AND FRAME TYPES, SCHEDULES, AND DETAILS
PHASE TWO PLANSGI-101B
PHASE THREE PLANSGI-101C
GI-102A PHASING PLANS - ELECTRICAL PATHWAY
GI-102B PHASING PLANS - ELECTRICAL PATHWAY
PD110
PHASE FOUR PLANSGI-101D1
AD-109 9TH FLOOR DEMOLITION PLANS
FIRE PROTECTION ABBREVIATIONS, SYMBOLS, LEGENDS AND GENERAL NOTES
OVERALL PLUMBING PLAN - NINTH FLOORP110
AREA MAP
VICINITY - AERIAL MAP
SHEET INDEX
APPROVALS
REMODEL OF EXISTING 9TH FLOOR HEMODIALYSIS LOOP SYSTEM.
REPLACEMENT OF WATER LINE FROM THE 3RD FLOOR UP TO THE 9TH
FLOOR. REMODEL OF EXISTING DIALYSIS EQUIPMENT AND SUPPLY ROOM.
NEW LOOP LINE ABOVE CEILING AND REMOVAL OF EXISTING LOOP LINE.
REMODEL OF 3RD FLOOR EXISTING EQUIPMENT ROOM AS WELL AS
UPGRADE ROOF PATH TO REMODELED ROOM. NEW WASTE WATER DRAIN
LINES, ABOVE CEILING, IN THE 8TH FLOOR TO EXISTING WATER DRAIN
LINES, ABOVE CEILING, ON THE SAME FLOOR.
ALL NEW EQUIPMENT IN DIALYSIS EQUIPMENT / STORAGE ROOM.
PHASING OF DEMOLITION AND CONSTRUCTION IS TO KEEP THE EXISTING
DIALYSIS UNIT UP AND RUNNING DURING OPERATIONAL HOURS THROUGH
THE ENTIRE CONSTRUCTION PHASE. MEANS AND METHODS SUB-PHASING
IS REQUIRED TO SUB PHASE THE EXISTING PHASES OF THE
CONSTRUCTION TO ALLOW OPTIMUM USE OF THE FACILITY DURING THE
SCHEDULING OF THE PROJECT.
APPLICABLE CODES
2021 IBC.
2021 IMC.
2021 IFC.
2021 NEC.
2021 NFPA 99
2021 NFPA 60
TRUE
N
TRUE
N
CIVIL: NO SCOPE
STRUCTURAL:
Moon Tree Consulting, LLC 1808 Deep Creek Rd, Oklahoma City, OK David R. Walton SEOR / Blast Engineer david@moontreellc.com
ARCHITECTURAL:
Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Nico Sanchez, Architect john.slattery@paradigmusa.com
FIRE PROTECTION:
Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Rick Inghram rick.inghram@paradigmusa.com
PLUMBING:
Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Tyler Montgomery tyler.montgomery@paradigmusa.com
MECHANICAL:
Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Tyler Montgomery tyler.montgomery@paradigmusa.com
ELECTRICAL:
Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Wayne Meyer wayne.meyer@paradigmusa.com
DESIGN TEAM
PHASE FOUR PLANSGI-101D2
GI-100 LIFE SAFETY PLAN 9TH FLOOR
GI-103A INFECTION CONTROL PLANS
AI-109.2 9TH FLOOR - CEILING LOOP PLAN
E-903 ELECTRICAL PHOTOGRAPHS
PROJECT SCOPE
GENERAL NOTES:
1. SEE PHASING PLANS FOR SCHEDULE OF PROJECT CONSTRUCTION. GC TO CREATE SUB-PHASING SCHEDULE WITH COR TO STATE WHICH ROOMS/AREAS WILL
BE WORKED UPON, IN WHICH ORDER THEY WILL BE WORKED UPON, TIME TO WORK THROUGH A SUB-PHASE AREA, AND GAIN COR APPROVAL FOR EACH SUB-PHASE.
2. PROJECT IS BASED UPON THE 9TH FLOOR HEMODIALYSIS AREA BRINGING IN A NEW WATER SUPPLY AND REPLACING THE EXISTING LOOP ABOVE CEILING.
3. THE EXISTING HEMODIALYSIS AREA ON THE 9TH FLOOR WILL NOT SHUT DOWN OPERATIONS AT ANY TIME AND ONLY TWO (2) HEADWALL UNITS ATTACHED TO THE
EXISTING LOOP MAY BE SHUT DOWN AT A TIME. PLEASE SEE COR TO IDENTIFY EXACT UNITS AND GAIN APPROVAL FOR SHUT DOWN OF ANY SUCH UNITS.
4. 8TH FLOOR WORK IS FOR PUMBING LINES ONLY ABOVE THE CEILING AND ATTACHING NEW LINES TO THE EXISTING WASTE LINES ON THE AT FLOOR.
5. 3RD FLOOR WORK IS FOR THE REMOVAL OF EXISTING EQUIPMENT AND MACHINERY AS WELL AND UPGRADING THE PATH TO THE EXISTING EQUIPMENT ROOM.
6. NO EXISTING EQUIPMENT OR POWER/WATER LINES ARE TO BE TERMINATED UNTIL NEW UTILITY LINES ARE HOOKED UP SO THAT THE HEMODIALYIS DEPARTMENT
ON THE 9TH FLOOR IS KEPT OPERATIONAL AT ALL TIMES.
7. ELECTICAL POWER PATHWAYS THROUGHOUT ALL FLOORS IS TO BE COMPLETED DURING THE PHASE 1 WHEN THE NEW TRANSFORMER IS PLACED UPON THE 9TH
FLOOR AND THE POWER FOR THE NEW/EXISTING EQUIPMENT ON THE 9TH FLOOR IS KEPT POWERED AT ALL TIMES.
8. ALWAYS GAIN APPROVAL OF PHASING AND SUB-PHASING SCHEDULES FRO THE VA COR ON ANY CONSTRUCTION.
9. ALWAYS KEEP THE LIFE SAFETY OF ALL PORTIONS OF ANY FLOOR WORKED UPON UP TO CURRENT EXISTING STATUS IN CASE OF EMERGENCY.
10. ALL WORK IS TO FOLLOW VA ICRA RULES AND GUIDELINES, ALL WORK IN THE REMOVAL AND REPLACEMENT OF WATER OR LOOP LINES IN ANY AREA
IS TO FOLLOW ICRA GUIDELINES AND BE SUFFICIENT IN BARRIERS VS. PASSAGE OF DUST OR OTHER CONTAMINATES. THOSE BARRIERS ARE TO BE CREATED & MAINTAINED ACCORDING TO THE MEANS AND METHODS OF THE CONSTRUCTION PROCESS WHICH WILL BE DEFINED BY THE CONTRACTORS AND APPROVED
BY THE VA.
11. TRANSFPORT OF NEW MATERIALS AND THE REMOVAL OF DEMOLISHED MATERIALS FROM THE WORK AREA TO A SPECIFIED LOCATION IS TO BE COMPLETED WITH VA COR APPROVAL AND TO BE PLANNED OUT IN THE SUB-PHASING PRIOR TO IMPLEMENTATION.
12. STAGING AREAS FOR NEW MATERIALS AND WORK LOCATIONS ARE TO BE DEFINED BY THE GC AND APPROVED BY THE VA COR PRIOR TO THE WORK.
13. MEANS AND METHODS OF CONSTRUCTION PLAYS A LARGE ROLE IN THE REMODEL OF THE HEMODIALYSIS UNIT DUE TO THE FACT THAT THE UNIT MUST STAY
OPERATIONAL AT ALL TIMES IN A CLEAN AND SANITARY CONDITION. GC TO WORK CLOSELY WITH THE VA COR TO OBTAIN THIS GOAL AND ALWAYS GAIN APPROVAL OF ANY CONSTRUCTION DEFINED AS THE IMPLICATIONS OF ANY WORK IS FAR REACHING AND CAN GO BEYOND THE WORK DEFINED HEREIN.
PLUMBING PLAN - THIRD FLOORP103
9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
31 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
JS JS
SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID
BASE HEAT TREATMENT RO WATER SYSTEM, B126,
3RD AND 9TH FLOOR
600-23-111
LONG BEACH VA HEALTHCARE SYSTEM
5901 E 7TH ST, LONG BEACH, CA 90822
01-02-2024
100% CONSTRUCTION DOCUMENTS
FOR CONSTRUCTION
SLA T
Y
T ER
J
J
OH
N
BROKEN ARROW
OKLAHOMA
S
O
ATA
TE
OF
M
OHALK
A
L TICENSED
CETIHCR
AutoCAD SHX Text
MEDICAL CENTER DIRECTOR
AutoCAD SHX Text
DEPUTY DIRECTOR
AutoCAD SHX Text
ACTING ASSOCIATE DIRECTOR
AutoCAD SHX Text
ASSOCIATE DIRECTOR FOR
AutoCAD SHX Text
PATIENT CARE SERVICES CHIEF
AutoCAD SHX Text
CHIEF OF STAFF
AutoCAD SHX Text
CHIEF, ENGINEER
AutoCAD SHX Text
CHIEF QUALITY, SAFETY AND
AutoCAD SHX Text
VALUE SERVICES
AutoCAD SHX Text
COR, PROJECT ENGINEER
AutoCAD SHX Text
CHIEF INFORMATION
AutoCAD SHX Text
CHIEF QUALITY, SAFETY &
AutoCAD SHX Text
CHIEF OCCUPATIONAL SAFETY
AutoCAD SHX Text
& EMERGENCY MANAGEMENT
AutoCAD SHX Text
NURSE EXCECUTIVE
AutoCAD SHX Text
CHIEF MEDICAL HEALTHACRE
AutoCAD SHX Text
GROUP
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
VALUE SERVICES
AutoCAD SHX Text
TECHNOLOGY AREA MANAGER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SERVICES.
AutoCAD SHX Text
CHIEF, NEPHROLOGY SECTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHIEF, SUPPLY CHAIN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SERVICES
AutoCAD SHX Text
CHIEF, ENVIRONMENTAL
AutoCAD SHX Text
DATE
AutoCAD SHX Text
MANAGEMENT SERVICES
AutoCAD SHX Text 03-10-23
AutoCAD SHX Text 04-14-23
AutoCAD SHX Text 07-14-23
AutoCAD SHX Text 09-15-23
AutoCAD SHX Text 09-29-23
AutoCAD SHX Text 11-03-23
AutoCAD SHX Text
35%%% SCHEMATIC
AutoCAD SHX Text
65%%% DD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% CD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-05-23
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-20-23
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text 01-03-24
FA
C
FA
C
FAC
FAC
DF
UP
UP
EXIST
DOOR
XFMR
TEMP.
DOOR
4'-6"
TEMP.
DOOR
4'-6"
TEMP.
DOOR
4'-6"
NEVER BLOCK
SINGLE DOOR
EGRESS
PATH OF EGRESS
PATH OF EGRESSPATH OF EGRESS
PA
TH
O F
EG
R
ES
S
PA
TH
O F
EG
R
ES
S
PA
TH
O F
EG
R
ES
S
PA
TH
O F
EG
R
ES
S
PA
TH
O F
EG
R
ES
S
PA
TH
O F
EG
R
ES
S
PA
TH
O F
EG
R
ES
S
PA
TH
O F
EG
R
ES
S
EXISTING STAIRWELL
FIRE ENCLOSURE
EXISTING STAIRWELL
FIRE ENCLOSURE
EXSITING 90 MIN DOOR
N.I.C.
EXSITING 90 MIN DOOR
N.I.C.
PA
TH
O F
EG
R
ES
S
D E F G H J K L
W932A
NURSE STATION
W932A
NURSE STATION
W942
FELLOW
WORKROOM
DIALSATE
PREPARATION
RM
W932D
E958D
W920
W941A
W942A
W938A
W939A
944B
W940A
E947A
E954
CC
-9
-1
CC-9-3
W931
W927A
W927
W922
W925
E905
E904A
P-2P-1
E912
E912B
E912A
E913
E913A
W
2B
W931A W932C
W918
W919
W921
CC-9-6 CC-9-8
W924 W923C
W923B
E911
E910
P-3 P-4
S-5
S-6
E909A
E909
W932F W932G W932H
E962
E961
E958B E958C
E958
E956
E955
E954A
E951
E952A
E953
E950
E950B
E9 49E948E947
W944A W944
W
W941B
W941
W941C
W940B
W940
W939
W938
NO 1
NO 3
TOILET
STOR
BREAK
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
FILE
STORAGE
RM
CO
RR
ID
OR
CORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
CLEAN
UTILITY
COPY RM
CHECK IN
G I PATIENT
WAITING
AREA
TOILET
EQUIP
MAINTENANCE
AREA
SVC
ELEVATORS
BIOHAZARD TRASH
TECH
OFFICE
PASSENGER ELEVATOR
ELEVATORELEVATOR
PATIENT
LOCKER RM
TOILET
WAITING AREA
SOCIAL
WORKERS
OFFICE
TELECOM
CO
RR
ID
OR
SO
ILE
D
UT
ILI
TY
MED RMHEAD
NURSE
SCOPE
WASHING
AREA
SCOPE ROOM
ME
CH
S
HA
FT
HAC EL
EC
TR
IC
AL
CORRIDOR CORRIDOR
SUPPLY RM TELECOM
TELECOM
CO
RR
ID
OR
CO
RR
ID
OR
ME
CH
SH
AF
T
HAC
STORAGE
ELEVATOR ELEVATOR
ELEVATOR
ELEVATOR
EQUIP
STORAGE
TOILET
MED 1
BED RM
MED 1
BED RM SCI 1 BED
RM
STAIR
ISO
OFFICE
PH
YS
IC
IA
N
RM
CO
NF
ER
EN
CE
R
M
FEMALE
LOCKER RM
MALE
LOCKER
RM
AL
CO
VE
STAFF
LOUNGE
CAPD
TRAINING
CAPD PGM
MECH RM
INFUSION
CLINIC
NURSE
STATION
PHYSICIAN OFFICE
GI RECOVERY
RM
NU
RS
ES
ST
AT
IO
N
WAITING RM
PH
AR
MA
CI
ST
O
FF
IC
E
ULTRA
SOUND
G I
RESEARCH
OFFICE
STAIR
SUPPLY RMPREP
EXAM RM
UL
TR
AS
OU
ND
O
MN
IC
EL
L-
ENDOS
PROCEDURE
RM-1
PROCEDURE RM-2
OMNICELL-2
OMNICELL-3
OMNICELL-4
FLEXIBLE
SIGMOIDOSCOPY
ENDOS
PROCEDURE
RM
ALCOVE INFUSION
CHAIR STA.
CUBICLE
FLOOR 9
ENTRY POINT
EN
DO
SC
OP
IC
RECOVERY RESTROOM
E950A
E951A
INFUSION CLINIC
RESTROOM
W932E
HEMO
DIALYSIS
NO 1
STAIR
E957
CAPD
CO-ORDR
E957
CAPD
CO-ORDR
E913A
TELECOM
E913B
ELECTRICAL
FA
C
FA
C
FAC
FAC
DF
UP
UP
LEGEND
PATH OF EGRESS
HAZARDOUS AREAS.
EXISTING FIRE RATED
1-HOUR ASSEMBLIES.
NOTES:
1. EGRESS THROUGH EGRESS CORRIDORS TO REMAIN UN-INTERUTPED FOR PUBLIC / STAFF USE.
2. PATH OF EGRESS ADJACENT TO TEMPORARY CONSTRUCTION IN EGRESS CORRDIORS TO ALWAYS ALLOW FOR 1 DOOR OPENING AND USE IN ADDITIONA TO 4'-6" CLEAR SPACE IN THE CORRIDOR MINIMUM.
3. NO CORRIDOR BE REDUCED BELOW ITS EXISTING WIDTH, WITH THE EXEPTION BEING ANY TEMPORARY BARRIERS REQUIRED. COR TO BE MADE FULLY AWARE OF SCHEDULE OF INDIVIDUAL BARRIERS IN EGRESS CORRIDORS AND NO EGRESS CORRDIOR IS TO BE LESSENED LOWER THAN 4'-6" CLEAR BY CLINICAL STAFF AND PUBLIC USE.
4. IF ANY EGRESS CORRIDOR LEADING TO AN OFFICIAL EXIT FROM A FLOOR TO A ENCLOSED FIRE RATED STAIRWELL IS BE CLOSED OFF, DUE TO THE MEANS AND METHODS OF CONSTRUCTION, A NEW EGRESS PATH MUST BE CREATED ALONG WITH ALL EXIT SIGNS, EMERGENCY LIT CORRIDORS AND FULLY EMERGENCY PANIC BAR OPENING OF DOORS AT ALL TIMES.
5. ELEVATORS ARE NEVER TO BE A PART OF ANY EMERGENCY EGRESS PLAN.
EXISTING FIRE RATED
2 HOUR ASSEMBLIES.
N.I.C.
N.I.C.
NEW LOOP ROUTE.
OLD LOOP ROUTE
SHOWN FOR CLARITY.
SHOWN FOR CLARITY.
GI-100
1/8" = 1'-0"2 9TH FLOOR LIFE SAFETY PLAN
N.T.S.1 9TH FLOOR KEY MAP
9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
31 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
JS JS
SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID
BASE HEAT TREATMENT RO WATER SYSTEM, B126,
3RD AND 9TH FLOOR
600-23-111
LONG BEACH VA HEALTHCARE SYSTEM
5901 E 7TH ST, LONG BEACH, CA 90822
01-02-2024
100% CONSTRUCTION DOCUMENTS
FOR CONSTRUCTION
SLA T
Y
T ER
J
J
OH
N
BROKEN ARROW
OKLAHOMA
S
O
ATA
TE
OF
M
OHALK
A
L TICENSED
CETIHCR
LIFE SAFETY PLAN, 9TH FLOOR
AutoCAD SHX Text 03-10-23
AutoCAD SHX Text 04-14-23
AutoCAD SHX Text 07-14-23
AutoCAD SHX Text 09-15-23
AutoCAD SHX Text 09-29-23
AutoCAD SHX Text 11-03-23
AutoCAD SHX Text
35%%% SCHEMATIC
AutoCAD SHX Text
65%%% DD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% CD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-05-23
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-20-23
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
FA
C
FAC
FAC
DF
UP
UP
LEGEND
AREA OF WORK, PHASE 1
NEW LOOP (SHOWN FOR CLARITY ) PHASE 2
OLD LOOP (SHOWN FOR CLARITY) PHASE 4
REMOVAL.
TEMPORARY
WALL, TO REMAIN
EXIST
DOOR
PROPOSED
NEW LOOP
PHASE 3
PROPOSED
NEW LOOP
PHASE 3
SHOWN FOR
CLARITY
SHOWN FOR
CLARITY
PHASE 1A
DEMOLITION, REMOVE
ALL EQUIPMENT
NEW DOOR
NEW DOOR
XFMR
'-0
TEMP WALL
NEW WALL
TEMP
WALL
3'-6"
NEW ELEC.
PANEL
TEMP.
DOORNEW
TRANSFORMER
4'-6"
TEMP.
DOOR
4'-6"
TEMP
WALL
3'-6"
6' -6
NEVER BLOCK
SINGLE DOOR
EGRESS
NEVER BLOCK
SINGLE DOOR
EGRESS
RMV. BOOK CASE
PREP FOR NEW FLOOR,
WALLS, CEILING.
DIALSATE
PREPARATION
RM
W932D
CC-9-11
CC-9-3
W931
W927
E912A
W931A W932C
CORRIDOR
CORRIDOR
CLEAN
UTILITY
CHECK IN
WAITING AREA
MED RMHEAD
NURSE
TEMPORARY
WALL.
EXIST
DOOR
TEMP.
DOOR
4'-6"
TEMPORARY LOCATION OF DRUMS.
3'-6"
6' -6
REMODELED ROOM WITH NEW
FLOORING, GYP.BD. & CEILING
REMAIN
XFMR
NEW
DOOR
NEW
DOOR
NEW WALL
NEW ELEC.
PANEL
NEW
DOOR
COMPLETE & USABLE.
DIALYSIS CHECK IN TO BE
DIALSATE
PREPARATION
RM
W932D
CC-9-11
CC-9-3
W931
W927
E912A
CORRIDOR
CORRIDOR
CLEAN
UTILITY
CHECK IN
WAITING AREA
MED RM
HEAD
NURSE
BASEMENT
88'-5"
BASEMENT88'-5"
3RD FLOOR
124'-5"
3RD FLOOR124'-5"
8TH FLOOR
184'-5"
8TH FLOOR184'-5"
9TH FLOOR
196'-5"
9TH FLOOR196'-5"
9TH FLOOR WORK AREA
8TH FLOOR WORK AREA
3RD FLOOR WORK AREA
ROOF WORK AREA
PHASE 3
PHASE 1, 2, 3, 4.
PHASE 4
PHASE 4
SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION
WORK FOR ALL PHASES:
ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE
DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR
NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE
BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO
PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE
PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO
GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.
IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER
HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT
THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND
PLANNING.
PHASE 1 - DEMOLITION AND REMODEL 9TH FLOOR.
1. ERECT TEMPORARY WALL INSIDE EXSTING DIALYSATE ROOM BISECTING ROOM PER
LOCATION ON DRAWINGS.
2. ERECT TEMPORARY WALL ON WEST SIDE OR EXISTING DIALYSATE ROOM TO STOP
DUST CONTAMINATION INFILTRATING INTO PATIENT / STAFF OCCUPIED AREAS. ADD
TEMPORARY DOOR.
3. DEMOLITION OF EXISTING STORAGE ROOM W932d (LEFT PORTION) WALLS, DOORS, CEILINGS, ETC.
4. PREP AND RENOVATE WEST SIDE OF THE EXISTING DIALYSATE ROOM. EAST SIDE OF
EXISTING DIALYSATE ROOM WILL REMAIN OPERATIONAL WITH THE DIALSATE 55 GALLON
DRUMS IN PLACE FOR STAFF ACCESS USING THE EAST ENTRANCE.
5. MOVEMENT OF EXISTING ACIDIC DRUMS TO THE WEST SIDE SPACE SHALL OCCUR ONCE
THE WEST SIDE AREA HAS BEEN COMPLETED.
6. NEW ELECTRICAL ROOM TEMPORARY WALLS/BARRIERS IN CORRIDOR AND INSIDE GI CHECK
IN AREA TO BE CONSTRUCTED PRIOR TO START OF ANY WORK.
7. NEW ELECTICAL ROOM PERMENANT WALL TO BE CONSTRUCTED.
8. DEMOLITON OF EXISTING BUILT-IN BOOKCASES LOCATED ON THE SOUTH WALL OF THE
GI CHECK IN AREA.
9. NEW ELECTRICAL ROOM POWER PANELS AND TRANSFORMER TO BE INSTALLED.
10. INSTALL NEW DOOR & FINISHES FOR THE ELECTRICAL ROOM.
11. REPLACE EXISTING DOOR TO HEMODIALYSIS UNIT WITH NEW ONE AFTER HOURS. PATCH
AND PAINT TO MATCH EXISTING.
12. TEMPORARY WALLS AROUND NEW ELECTICAL ROOM AND NEW PANELS TO BE REMOVED
AFTER ALL WORK IS COMPLETED TO INCLUDE FINISHES. PAINT AND TOUCH UP SURROUNDING
SURFACES DAMAGED BY BARRIER.
13. VALB FOLLOWS STRICK PROCEDURES FOR ALL ELECTRICAL. ALL ELECTRICAL WORK
SURFACES DAMAGED BY BARRIER.
HEMODIALYSIS STATION NOTE:
1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.
GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE
AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A
SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.
CEILING TILE REMOVAL NOTE:
1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING
MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.
MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE
REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.
CEILING TILE REMOVAL NOTE:
1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING
MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.
MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE
REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.
N.T.S.1 9TH FLOOR R0 TREATMENT AREA
N.T.S.4 3D KEY PLAN
1/4" = 1'-0"2 ENLARGED 9TH FLOOR WORK AREA PHASE PLAN
1/4" = 1'-0"3 ENLARGED 9TH FLOOR FINISH PHASE PLAN
WORK AREA
LEGEND:
LEGEND:
GI-101A9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
31 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
JS JS
SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID
BASE HEAT TREATMENT RO WATER SYSTEM, B126,
3RD AND 9TH FLOOR
600-23-111
LONG BEACH VA HEALTHCARE SYSTEM
5901 E 7TH ST, LONG BEACH, CA 90822
01-02-2024
100% CONSTRUCTION DOCUMENTS
FOR CONSTRUCTION
SLA T
Y
T ER
J
J
OH
N
BROKEN ARROW
OKLAHOMA
S
O
ATA
TE
OF
M
OHALK
A
L TICENSED
CETIHCR
PHASE ONE PLANS
E F G H
E F G H
AutoCAD SHX Text 03-10-23
AutoCAD SHX Text 04-14-23
AutoCAD SHX Text 07-14-23
AutoCAD SHX Text 09-15-23
AutoCAD SHX Text 09-29-23
AutoCAD SHX Text 11-03-23
AutoCAD SHX Text
35%%% SCHEMATIC
AutoCAD SHX Text
65%%% DD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% CD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-05-23
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-20-23
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
FA
C
FAC
FAC
DF
UP
UP
FA
C
FA
C
FAC
DF
UP
UP
LEGEND
AREA OF WORK.
NEW LOOP TO BE INSTALLED.
OLD LOOP (SHOWN FOR CLARITY) PHASE 4.
D.C.W. DROP
TO 3RD FLOOR.
NEW WATER LINE
REMOVE CEILING TO INSTALL NEW WATER LINE EXISTING LOOP LINE
REMOVE CEILING TO
INSTALL NEW LOOP
REMOVE CEILING TO
INSTALL NEW LOOP
REMOVE CEILING TO
INSTALL NEW LOOP
SHOWN FOR CLARITY.
EXISTING LOOP LINE
SHOWN FOR CLARITY.
EXISTING LOOP LINE
SHOWN FOR CLARITY.
EXISTING LOOP LINE
SHOWN FOR CLARITY.
EXISTING LOOP LINE
SHOWN FOR CLARITY.
D E F G H J K L
W932A
NURSE STATION
W932A
NURSE STATION
W942
FELLOW
WORKROOM
DIALSATE
PREPARATION
RM
W932D
E958D
W920
W941A
W942A
W938A
W939A
944B
W940A
E947A
E954
CC-9-11
CC-9-3
W931
W927A
W927
W922
W925 E905
903 E904A
P-2P-1
E912
E912B
E912A
E913
E913A
W
2B
W931A W932C
W918
W919
W921
CC-9-6
CC-9-8
W924 W923C
W923B
E904
E911
E910
P-3 P-4
S-5
S-6
E909A
E909
W932F W932G W932H
E962
E961
E958B E958C
E958
E956
E955
E954A
E951
E952A
E953
E950
E950B
E9 49E948E947
W944A
W944W
W941B
W941
W941C
W940B
W940
W939
W938
NO 1
NO 3
TOILET
STOR
BREAK
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
FILE
STORAGE
RM
CORRIDOR
CORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
CLEAN
UTILITY
COPY RM
CHECK IN
G I PATIENT
WAITING
AREA
TOILET
EQUIP
MAINTENANCE
AREA
SVC
ELEVATORS
BIOHAZARD TRASH
TECH
OFFICE
PASSENGER ELEVATOR
ELEVATORELEVATOR
PATIENT
LOCKER RM
TOILET
WAITING AREA
SOCIAL
WORKERS
OFFICE
TELECOM
CO
RR
ID
OR
SO
ILE
D
UT
ILI
TY
MED RMHEAD
NURSE
SCOPE
WASHING
AREA
SCOPE ROOM
ME
CH
S
HA
FT
HAC EL
EC
TR
IC
AL
CORRIDOR
CORRIDOR
SUPPLY RM TELECOM
TELECOM
SOLUTION AREA
CO
RR
ID
OR
CO
RR
ID
OR
ME
CH
SH
AF
T
HAC
STORAGE
ELEVATOR ELEVATOR
ELEVATOR
ELEVATOR
EQUIP
STORAGE
TOILET
MED 1
BED RM
MED 1
BED RM SCI 1 BED
RM
STAIR
ISO
OFFICE
PH
YS
IC
IA
N
RM
CO
NF
ER
EN
CE
R
M
FEMALE
LOCKER RM
MALE
LOCKER
RM
AL
CO
VE
STAFF
LOUNGE
CAPD
TRAINING
CAPD PGM
MECH RM
INFUSION
CLINIC
NURSE
STATION
PHYSICIAN OFFICE
GI RECOVERY
RM
NU
RS
ES
ST
AT
IO
N
WAITING RM
PH
AR
MA
CI
ST
O
FF
IC
E
ULTRA
SOUND
G I
RESEARCH
OFFICE
STAIR
SUPPLY RM
PREP
EXAM RM
UL
TR
AS
OU
ND
O
MN
IC
EL
L-
ENDOS
PROCEDURE
RM-1
PROCEDURE RM-2
OMNICELL-2
OMNICELL-3
OMNICELL-4
FLEXIBLE
SIGMOIDOSCOPY
ENDOS
PROCEDURE
RM
ALCOVE INFUSION
CHAIR STA.
CUBICLE
EN
DO
SC
OP
IC
RECOVERY RESTROOM
E950A
E951A
INFUSION CLINIC
RESTROOM
W932E
HEMO
DIALYSIS
NO 1
STAIR
E957
CAPD
CO-ORDR
E957
CAPD
CO-ORDR
E913A
TELECOM
E913B
ELECTRICAL
PHASE 2 - DEMOLITION AND RENOVATION 9TH FLOOR.
1. CORE DRILL AND INSTALL OF NEW WATER LINE FROM THE 3RD FLOOR, UN-ATTACHED TO THE
EXISTING ALLOWING THE EXISTING LINE TO CONTIUE TO SUPPLY WATER.
2. REMOVAL OF CEILING TILE FROM ENTRY POINT OF THE NEW WATER LINE (DRY) ON 9TH FLOOR
TO THE LOCATION OF ITS USE (HEMODIALYSIS EQUIPMENT / SUPPLY ROOM). INSTALL OF THE
REMAINDER OF THE NEW WATER LINE HORIZONTALLY ABOVE THE CEILING AND CLOSE UP
(REPLACE) SUSPENDED CEILING. SUB-PHASE OF WATER PIPE INSTALL TO BE USED IN THE MORNING
EACH DAY BY THE FACILITY AND STAFF WITHIN ROOM/CORRIDORS AND READY FOR USE TO BE
COORDINATED WITH THE COR FOR DAILY USE.
3. REMOVAL OF CEILING TILES FROM THE "LOOP" PIPE. CEILING TILES TO BE REMOVED ALONG WITH T-BAR ALLWOING ACCESS TOABOVE CEILING SPACE AND SINTALL NEW "RO LOOP" PIPE. LOOPE PIPE TO BEGIN AND END AT HEMODIALYSIS EQUIPMENT / SUPPLY ROOM. ALL PORTIONS OF DEMOLITION AND NEW INSTALL OF "LOOP" PIPE TO B E AFTER HOURS AND AT THE BEINIGN OF EACH DAY THE CEILING IS TO BE PLACED BACK AND AREA(S) CLEANED ACCORDINGLY TO ALLOW FOR CLINICAL STAFF WORK. TWO STATIONS CAN BE CLOSED AT A TIME FOR A PERIOD LONGER THAN A SHIFT.
CONTRACTOR TO PROPOSE PHASING OF "LOOP" INSTALL IN THE HEMODIALYSIS UNIT WITH THIER
PHASING PLAN PRIPOR TO ANY WORK STARTED, PENDING VA APPROVAL.
4. SUB-PHASING, BY CONTRACTOR, TO BE CREATED FOR WORK PER DAY FOR VA APPROVAL.
5. ALL SPACES WORKED UPON AFTER HOURS TO BE CLEANED AND CEILINGS , WALLS, FLOORS TO BE
REPLACED PRIOR TO MORNING SHIFT BY VA CLINICAL STAFF. 3RD PARTY CONTRACTOR REQUIRED TO
PERFORM TERMINAL CLEANING OF ALL PUBLIC SPACES AT END OF SHIFT.
SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION
WORK FOR ALL PHASES:
ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE
DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR
NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE
BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO
PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE
PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO
GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.
IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER
HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT
THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND
PLANNING.
HEMODIALYSIS STATION NOTE:
1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.
GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE
AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A
SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.
CEILING TILE REMOVAL NOTE:
1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING
MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.
MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE
REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.
PHASE TWO PLANS
GI-101B
N.T.S.1 9TH FLOOR KEY MAP
1/8" = 1'-0"2 9TH FLOOR WORK AREA PHASIN PLAN
9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
31 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
JS JS
SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID
BASE HEAT TREATMENT RO WATER SYSTEM, B126,
3RD AND 9TH FLOOR
600-23-111
LONG BEACH VA HEALTHCARE SYSTEM
5901 E 7TH ST, LONG BEACH, CA 90822
01-02-2024
100% CONSTRUCTION DOCUMENTS
FOR CONSTRUCTION
SLA T
Y
T ER
J
J
OH
N
BROKEN ARROW
OKLAHOMA
S
O
ATA
TE
OF
M
OHALK
A
L TICENSED
CETIHCR
AutoCAD SHX Text 03-10-23
AutoCAD SHX Text 04-14-23
AutoCAD SHX Text 07-14-23
AutoCAD SHX Text 09-15-23
AutoCAD SHX Text 09-29-23
AutoCAD SHX Text 11-03-23
AutoCAD SHX Text
35%%% SCHEMATIC
AutoCAD SHX Text
65%%% DD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% CD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-05-23
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-20-23
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
PHASE 3 - DEMOLITION AND RENOVATION 8TH & 9TH FLOOR
8TH FLOOR:
1. CEILING TO BE REMOVED TO ALLOW FOR NEW CONSTRUCTION OF DRAINAGE PIPES.
2. NEW DRAINAGE PIPESFROM DRAINS IN NEW HEMODIALYSIS EQUIPMENT / STORAGE ROOM
TO BE INSTALLED ABOVE CEILING ON THE 8TH FLOOR AND CONNECTED TO THE MAIN
WASTE WATER LINES.
3. ALL CEILINGS TO BE PLACED BACK NEW AND FINAL CLEANING OF 8TH FLOOR WHEN
WORK IS COMPLETE FOR NEW WASTE LINES
4. ROOMS WORKED WITHIN TOBE WORKED ONLY AFTER HOURS AND ALL CEILINGS AND
ROOMS TO BE CLEANED PRIOR TO MORNING ARRIVAL OF CLINICAL STAFF FOR USE OF ROOMS
UNLESS THE VA COR ALLOWS OTHERWISE.
9TH FLOOR:
1. ERECT TEMPORARY WALL ON EAST SIDE TO STOP DUST FROM DEMOLITION FROM INFILTRATING
INTO PATIENT / STAFF OCCUPAIDE SPACES. ADD TEMPORARY DOOR.
2. MOVE ALL DIALYSATE ACID DRUMS TO THE WEST SIDE OF RENOVATED PORTION OF DIALYSTATE
EXISTING ROOM.
3. COMPLETE FINISH OUT OF EAST SIDE DEMOLITION OF DIALASYS EQUIPMENT / SUPPLY ROOM
PER PLAN.
4. ONCE WORK IS COMPETE ON EAST SIDE, THE TEMPORARY WALL BISECTING THE PROPOSED
HEMODIALYSIS EQUIPMENT / STORAGE ROOM TO BE REMOVED.
5. ALL DIALYSATE 55 GALLON DRUMS TO BE PLACED IN FINAL OCATION PER PLANS TO ALLOW
FOR THE INSTALLATION OF NEW RO EQUIPMENT IN THE NORTH SIDE PORTION OF THE ROOM.
6. NEW EQUIPMENT TO BE PLACED IN HEMODIALYSIS EQUIPMENT /STORAGE ROOM.
AFTER HOURS TO AVOID DISRUPTIONS TO AOPERATIONS SINCE THE STAFF NEEDS TO ACCESS
ACID DRUMS DURING WORK HOURS.
7. HEMODIALYSIS EQUPMENT / STORAGE ROOM TO BE FINISHED OUT AND CLEANED.
8. NEW ELECTRICAL POWER TO BE CONNECTED AND TURNED ON PRIOR TO EXISTING POWER
SUPPLY TO OLD EQUIPMENT TURNED OFF. ALL CONNECTIONS TO NEW EQUIPMENT ON 9TH FLOOR TO BE MADE FROM NEW ELECTRICAL PANELS. SEE GI-102, GI-102A, AND GI-102B FOR ELECT. PATHS.
9. ALL NEW WATER AND LOOP LINE TESTS ARE TO BTAKE PLACE TO CONFIRM FULL FUNCTION OF
LINES AND SUPPLY.
10. AL LNEW EQUIPMENT TO BER TESTED AND FOUND TOBE IN GOOD WORKING ORDER PRIOR TO
MORNING SHIFT OF CLINICAL STAFF SO ENTIRE WATER / POWER / EQUIPMENT SYSTEM IS
WORKING FOR ENTIRE FLOOR.
11. ALL EXISTING LOOP LINES ARE TO BE DISCONENCETE AND NEW LOOP AND WATER LINES TO BE
CONNECTED AND TURNED ON. SWITCH FROM ALL SYSTEMS TO NEW SYSTEM TO OCCUR AFTER
HOURS TO AVOID IMPACT TO PATIENT CARE.
12. TEMPORARY WALLS IN CORRIDORS FOR HEMODIALYSIS EQUPMENT / STORAGE ROOM TO BE
REMOVED INCLUDING DOORS. REPAIR OF FLOOR, WALLS AND CEILING TO BE ACCOMPLISHED
WHERE TEMPORARY WALL WERE. ENTIRE AREA TO BE CLENED AND PATCHED / REPAIRED.
VA COR TO APPROVE.
PREP ROOM FOR FINAL PREP ROOM FOR NEW EQUIPMENT
REMODEL OF ENTIRE PATCH, REPAIR, PAINT.
REMOVE
TEMPORARY WALL
NEW
DOORTEMP.
DOOR
TEMP.
DOOR
4'-6" 4'-6"
DIALYSIS EQUIPMENT / STORAGE
TEMPORARY LOCATION OF DRUMS.
ROOM COMPLETION.
MOVE DRUMS WITH COR APPROVAL.
TEMP WALL.
ELECT. ROOM
DIALISYS CHECK IN
DIALSATE
PREPARATION
RM
W932D
CC-9-11
CC-9-3
W931
W927
W931A W932C
CORRIDOR
CORRIDOR
CLEAN
UTILITY
CHECK IN
MED RMHEAD
NURSE
AREA OF PHASE 3 SHOWN AREA OF PHASE 3 SHOWN
WHEN COMPLETE WHEN COMPLETE
NEW
DOORNEW
DOOR
PH-1
PH-3
ELECT. ROOM
DIALISYS CHECK IN
CC-9-11
CC-9-3
W931
W927
W931A W932C
CORRIDOR
CORRIDOR
CLEAN
UTILITY
CHECK IN
MED RMHEAD
NURSE
LINE OF WORK AREA ABOVE ON
9TH FLOOR, EQUIPMENT ROOM.
AREA OF WORK ON 8TH FLOOR
CEILING & SANITARY LINES.
CORRIDOR
C126-8-13
CO
RR
ID
OR
C1
-8 -4
C1
-8 -2
RECEPTION
NURSE MANAGER
(TEMP)/ FUTURE
EQUIPMENT
EQUIPMENT
CO
RR
ID
OR
FE
C
FEC
FEC
LOCKER
DN
UP
UP
LEGEND
AREA OF WORK, SEE 6 / GI-101C.
LINE OF WORK AREA ABOVE ON 9TH FLOOR.
SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION
WORK FOR ALL PHASES:
ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE
DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR
NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE
BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO
PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE
PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO
GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.
IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER
HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT
THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND
PLANNING.
FA
C
FA
C
FAC
FAC
DF
UP
UP
LEGEND
AREA OF WORK, SEE 3 & 5 / GI-101C
NEW LOOP (SHOWN FOR CLARITY ) PHASE 2
OLD LOOP TO BE REMOVED (SHOWN FOR CLARITY) PHASE 4.
HEMODIALYSIS STATION NOTE:
1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.
GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE
AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A
SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.
CEILING TILE REMOVAL NOTE:
1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING
MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.
MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE
REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.
PHASE THREE PLANS
GI-101C
1/4" = 1'-0"2 9TH FLOOR WORK AREA PHASE PLAN
1/4" = 1'-0"3 9TH FLOOR FINISH PHASEPLAN
N.T.S.4 8TH FLOOR WORK AREA
N.T.S.5 8TH FLOOR KEY MAP.
N.T.S.1 9TH FLOOR KEY MAP OF WORK
9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
31 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
JS JS
SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID
BASE HEAT TREATMENT RO WATER SYSTEM, B126,
3RD AND 9TH FLOOR
600-23-111
LONG BEACH VA HEALTHCARE SYSTEM
5901 E 7TH ST, LONG BEACH, CA 90822
01-02-2024
100% CONSTRUCTION DOCUMENTS
FOR CONSTRUCTION
SLA T
Y
T ER
J
J
OH
N
BROKEN ARROW
OKLAHOMA
S
O
ATA
TE
OF
M
OHALK
A
L TICENSED
CETIHCR
E F G
F G
H
AutoCAD SHX Text 03-10-23
AutoCAD SHX Text 04-14-23
AutoCAD SHX Text 07-14-23
AutoCAD SHX Text 09-15-23
AutoCAD SHX Text 09-29-23
AutoCAD SHX Text 11-03-23
AutoCAD SHX Text
35%%% SCHEMATIC
AutoCAD SHX Text
65%%% DD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% CD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-05-23
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-20-23
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
FA
C
FAC
FAC
DF
UP
UP
PHASE 4 - DEMOLITION AND REMODEL 3RD & 9TH FLOOR
1. PHASE 4 BEGINS AFTER ALL EQUIPMENT, POWER AND WATER FROM PHASE 3 IS IN GOOD
WORKING ORDER. NO DEMOLITON TO BEGIN UNTIL THE NEW RO SYSTEM IS COMPLETELY
3RD FLOOR:
OPERATIONAL.
2. DEMOLITON OF ALL 3RD FLOOR ITEMS INCLUDINGREMOVAL OF ALL EQUIPMENT FROM
THE 3RD FLOOR ROOM ACCESSIBLE FROM THE ROOF. ALL ELECTRICAL PANELS WITHIN
3RD FLOOR ROOM TO BE REMOVED BUT NEVER SHUT DOWN PRIOR TO NEW POWER BEING
PROVIDED ON THE 9TH FLOOR.
3. ALL ROOF PADS TO BE PLACED AND ANY RAMPS CREATED AS WELL AS NEW DOORS
INSTALLED.
4. FINAL ACT IS TO DISCONNECT THE MACHINERYAND POWER, AND REMOVED THOSE ITEMS,
AFTER POWER AND EQUIPMENT PLACED WITHIN 9TH FLOOR HEMODIALYSIS EQUIPMENT /
STORAGE ROOOM AS WELL AS NEW ELCTRICAL ROOM.
5. 3RD FLOOR ROOM TO BE REMODELD PER PLANS.
9TH FLOOR:
1. CEILINGS AND T-BAR TO BE REMOVED IN AND AROUND EXISTING LINE OF OLD LOOP
PIPE, SUB-PHASED INTO SMALLER AREAS THAT CAN BE REMOVED, PIPE REMOVED, AND
NEW CEILING TILE PLACED BACK PRIOR TO MORNING SHIFT OF CLINICAL STAFF USERS
EACH DAY.
2. OLD LOOP PIPE TO BE REMOVED AND PROPERLY DISPOSED OF.
3. ALL AREAS ARE TO HAVE TERMINAL CLEANING BY A 3RD PARTY CONTRACTOR THE END
OF EACH WORK NIGHT SHIFT IN PREPARATION FOR CLINCIAL STAFF USE OF THE FLOOR
DURING THE DAY.
4. INFECTION CONTROLS PROCEDURES SHALL BE PUT IN PLACE TO CONTAIN AND DUST
FROM DEMOLITION OPERATIONS IN CORRDIROS, OFFICES AND ROOMS PER
THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PERMIT. no WORK SHALL START
PRIOR TO BARRIERS BEING PUT IN PLACE ALONG WITH PROPER NEGATIVE PRESSURE.
5. ALL ROOMS HAVING DEMOLITION AND REMOVAL OF OLD LOOP TO BE WORKED UPON
EITHER ONE AT A TIME OR IN GROUPS AS COORDINATED WITH THE VA COR AND CO.
ROOMS AND OFFICES WILL BE NEEDE TO BE CLEANED AT THE END OF SHIFT SINCE IT
WILL BE USED THE NEXT DAY FOR PATIENT CARE.IF SHUTDOWN OF A ROOM/OFFICE
IS NEEDED FOR MORE T HAN ONE SHIFT, CONTRACTOR SHALL COORDINATE WITH THE
COR AND PROPOSE AN ALTERNATIVE THAT MINIMUMIZES IMPACT TO PATIENT CARE FOR
VA APPROVAL.
FA
C
FA
C
FAC
FAC
DF
UP
UP
LEGEND
AREA OF WORK.
OLD LOOP TO BE REMOVED.
D.C.W. DROP
TO 3RD FLOOR.
REMOVE CEILING TO REMOVE EXISTING LOOP LINE.
D E F G H J K L
W932A
NURSE STATION
W932A
NURSE STATION
W942
FELLOW
WORKROOM
DIALSATE
PREPARATION
RM
W932D
E958D
W920
W941A
W942A
W938A
W939A
944B
W940A
E947A
E954
CC-9-11
CC-9-3
W931
W927A
W927
W922
W925
E905
E904A
P-2P-1
E912
E912B
E912A
E913
E913A
W
2B
W931A W932C
W918
W919
W921
CC-9-6
CC-9-8
W924 W923C
W923B
E904
E911
E910
P-3 P-4
S-5
S-6
E909A
E909
W932F W932G W932H
E962
E961
E958B E958C
E958
E956
E955
E954A
E951
E952A
E953
E950
E950B
E9 49E948E947
W944A W944
W
W941B
W941
W941C
W940B
W940
W939
W938
NO 1
NO 3
TOILET
STOR
BREAK
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
FILE
STORAGE
RM
CORRIDOR
CORRIDOR
CO
RR
ID
OR
CLEAN
UTILITY
COPY RM
CHECK IN
G I PATIENT
WAITING
AREA
TOILET
EQUIP
MAINTENANCE
AREA
SVC
ELEVATORS
BIOHAZARD TRASH
TECH
OFFICE
PASSENGER ELEVATOR
ELEVATORELEVATOR
PATIENT
LOCKER RM
TOILET
WAITING AREA
SOCIAL
WORKERS
OFFICE
TELECOM
CO
RR
ID
OR
SO
ILE
D
UT
ILI
TY
MED RMHEAD
NURSE
SCOPE
WASHING
AREA
SCOPE ROOM
ME
CH
S
HA
FT
HAC EL
EC
TR
IC
AL
CORRIDOR
CORRIDOR
SUPPLY RM TELECOM
TELECOM
SOLUTION AREA
CO
RR
ID
OR
CO
RR
ID
OR
ME
CH
SH
AF
T
HAC
STORAGE
ELEVATOR ELEVATOR
ELEVATOR
ELEVATOR
EQUIP
STORAGE
TOILET
MED 1
BED RM
MED 1
BED RM SCI 1 BED
RM
STAIR
ISO
OFFICE
PH
YS
IC
IA
N
RM
CO
NF
ER
EN
CE
R
M
FEMALE
LOCKER RM
MALE
LOCKER
RM
AL
CO
VE
STAFF
LOUNGE
CAPD
TRAINING
CAPD PGM
MECH RM
INFUSION
CLINIC
NURSE
STATION
PHYSICIAN OFFICE
GI RECOVERY
RM
NU
RS
ES
ST
AT
IO
N
WAITING RM
PH
AR
MA
CI
ST
O
FF
IC
E
ULTRA
SOUND
G I
RESEARCH
OFFICE
STAIR
SUPPLY RMPREP
EXAM RM
UL
TR
AS
OU
ND
O
MN
IC
EL
L-
ENDOS
PROCEDURE
RM-1
PROCEDURE RM-2
OMNICELL-2
OMNICELL-3
OMNICELL-4
FLEXIBLE
SIGMOIDOSCOPY
ENDOS
PROCEDURE
RM
ALCOVE INFUSION
CHAIR STA.
CUBICLE
FLOOR 9
ENTRY POINT
EN
DO
SC
OP
IC
RECOVERY RESTROOM
E950A
E951A
INFUSION CLINIC
RESTROOM
W932E
HEMO
DIALYSIS
NO 1
STAIR
E957
CAPD
CO-ORDR
E957
CAPD
CO-ORDR
E913A
TELECOM
E913B
ELECTRICAL
SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION
WORK FOR ALL PHASES:
ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE
DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR
NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE
BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO
PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE
PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO
GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.
IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER
HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT
THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND
PLANNING.
HEMODIALYSIS STATION NOTE:
1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.
GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE
AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A
SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.
CEILING TILE REMOVAL NOTE:
1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING
MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.
MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE
REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.
PHASE FOUR 9TH FLOOR PLANS
GI-101D1
N.T.S.1 9TH FLOOR KEY MAP
1/8" = 1'-0"2 9TH FLOOR WORK AREA PHASE PLAN
9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
31 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
JS JS
SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID
BASE HEAT TREATMENT RO WATER SYSTEM, B126,
3RD AND 9TH FLOOR
600-23-111
LONG BEACH VA HEALTHCARE SYSTEM
5901 E 7TH ST, LONG BEACH, CA 90822
01-02-2024
100% CONSTRUCTION DOCUMENTS
FOR CONSTRUCTION
SLA T
Y
T ER
J
J
OH
N
BROKEN ARROW
OKLAHOMA
S
O
ATA
TE
OF
M
OHALK
A
L TICENSED
CETIHCR
AutoCAD SHX Text 03-10-23
AutoCAD SHX Text 04-14-23
AutoCAD SHX Text 07-14-23
AutoCAD SHX Text 09-15-23
AutoCAD SHX Text 09-29-23
AutoCAD SHX Text 11-03-23
AutoCAD SHX Text
35%%% SCHEMATIC
AutoCAD SHX Text
65%%% DD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% CD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-05-23
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-20-23
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
RAMP DN
DNUP
UP
MICU-MECH-1
PHASE 4 - DEMOLITION AND REMODEL 3RD & 9TH FLOOR
1. PHASE 4 BEGINS AFTER ALL EQUIPMENT, POWER AND WATER FROM PHASE 3 IS IN GOOD
WORKING ORDER. NO DEMOLITON TO BEGIN UNTIL THE NEW RO SYSTEM IS COMPLETELY
3RD FLOOR:
OPERATIONAL.
2. DEMOLITON OF ALL 3RD FLOOR ITEMS INCLUDINGREMOVAL OF ALL EQUIPMENT FROM
THE 3RD FLOOR ROOM ACCESSIBLE FROM THE ROOF. ALL ELECTRICAL PANELS WITHIN
3RD FLOOR ROOM TO BE REMOVED BUT NEVER SHUT DOWN PRIOR TO NEW POWER BEING
PROVIDED ON THE 9TH FLOOR.
3. ALL ROOF PADS TO BE PLACED AND ANY RAMPS CREATED AS WELL AS NEW DOORS
INSTALLED.
4. FINAL ACT IS TO DISCONNECT THE MACHINERYAND POWER, AND REMOVED THOSE ITEMS,
AFTER POWER AND EQUIPMENT PLACED WITHIN 9TH FLOOR HEMODIALYSIS EQUIPMENT /
STORAGE ROOOM AS WELL AS NEW ELCTRICAL ROOM.
5. 3RD FLOOR ROOM TO BE REMODELD PER PLANS.
9TH FLOOR:
1. CEILINGS AND T-BAR TO BE REMOVED IN AND AROUND EXISTING LINE OF OLD LOOP
PIPE, SUB-PHASED INTO SMALLER AREAS THAT CAN BE REMOVED, PIPE REMOVED, AND
NEW CEILING TILE PLACED BACK PRIOR TO MORNING SHIFT OF CLINICAL STAFF USERS
EACH DAY.
2. OLD LOOP PIPE TO BE REMOVED AND PROPERLY DISPOSED OF.
3. ALL AREAS ARE TO HAVE TERMINAL CLEANING BY A 3RD PARTY CONTRACTOR THE END
OF EACH WORK NIGHT SHIFT IN PREPARATION FOR CLINCIAL STAFF USE OF THE FLOOR
DURING THE DAY.
4. INFECTION CONTROLS PROCEDURES SHALL BE PUT IN PLACE TO CONTAIN AND DUST
FROM DEMOLITION OPERATIONS IN CORRDIROS, OFFICES AND ROOMS PER
THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PERMIT. no WORK SHALL START
PRIOR TO BARRIERS BEING PUT IN PLACE ALONG WITH PROPER NEGATIVE PRESSURE.
5. ALL ROOMS HAVING DEMOLITION AND REMOVAL OF OLD LOOP TO BE WORKED UPON
EITHER ONE AT A TIME OR IN GROUPS AS COORDINATED WITH THE VA COR AND CO.
ROOMS AND OFFICES WILL BE NEEDE TO BE CLEANED AT THE END OF SHIFT SINCE IT
WILL BE USED THE NEXT DAY FOR PATIENT CARE.IF SHUTDOWN OF A ROOM/OFFICE
IS NEEDED FOR MORE T HAN ONE SHIFT, CONTRACTOR SHALL COORDINATE WITH THE
COR AND PROPOSE AN ALTERNATIVE THAT MINIMUMIZES IMPACT TO PATIENT CARE FOR
VA APPROVAL.
EXISTING
NEW ROOF TILES
REMOVE ALL EQUIP. FROM ROOM
EXISTIN CONCRETE RAISED FLOOR LINE
UPGRADE RAMP
NEW MICU-MECH-1
7'-0"24'-5"
5' -0
EXISTING RAMP,
N.I.C. NO WORK.
NEW DOOR
AREA OF WORK
EXISTING DOOR
TO REMAIN
DISCONNECT EQUIPMENT.
AREA OF WORK
LEGEND
NEW
RAMP DN
PATCH AND REPAIR WALLS & DOOR
NEW RAMP
RE: 6F/AI-103
RE: 5F/AI-103
3/ G
I-
1D
POTENTIALINFILL CONCRETE FLOOR TO LEVEL
OF EXISTING CONC. RAISED FLOOR
FOR A COMPLETE LEVEL FLOOR
3" GC. TO CONFIRM.
PATCH & REPAIR AS REQUIRED.
EXISTING CONC. RAISED FLOOR TO REMAIN.
SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION
WORK FOR ALL PHASES:
ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE
DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR
NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE
BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO
PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE
PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO
GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.
IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER
HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT
THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND
PLANNING.
EXISTING SLAB
EXISTING SLAB
EXISTING
EXTERIOR WALL
EXISTING
PARAPET
EXISTING
ROOF
EXISTING 2ND
FLOOR SPACE
NEW VOID
INFILL AS REQ.
EXISTING DOOR
BEYOND
NEW RAMP
BEYOND
ALL VOIDS TO BE
FILLED.
ROOF ROOF
INTERIOR
3RD FLOOR
EXISTINGEXISTING
EXISTING
RAISED FLOOR
HEMODIALYSIS STATION NOTE:
1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.
GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE
AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A
SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.
PHASE FOUR, 3RD FLOOR PLAN
GI-101D2
N.T.S.1 3RD FLOOR KEY MAP
1/4" = 1'-0"2 ENLARGED 3RD FLOOR WORK PHASE PLAN 3 SECTION
1/4" = 1'-0"
9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com
FULLY SPRINKLERED
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
31 4 5 6 7 8 9 10
Project Director
Revisions: Date:
Architecture Engineering Design-Build paradigm
JS JS
SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID
BASE HEAT TREATMENT RO WATER SYSTEM, B126,
3RD AND 9TH FLOOR
600-23-111
LONG BEACH VA HEALTHCARE SYSTEM
5901 E 7TH ST, LONG BEACH, CA 90822
01-02-2024
100% CONSTRUCTION DOCUMENTS
FOR CONSTRUCTION
SLA T
Y
T ER
J
J
OH
N
BROKEN ARROW
OKLAHOMA
S
O
ATA
TE
OF
M
OHALK
A
L TICENSED
CETIHCR
D
E
AutoCAD SHX Text 03-10-23
AutoCAD SHX Text 04-14-23
AutoCAD SHX Text 07-14-23
AutoCAD SHX Text 09-15-23
AutoCAD SHX Text 09-29-23
AutoCAD SHX Text 11-03-23
AutoCAD SHX Text
35%%% SCHEMATIC
AutoCAD SHX Text
65%%% DD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% CD
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-05-23
AutoCAD SHX Text
95%%% RESUBMISSION NFC
AutoCAD SHX Text 12-20-23
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
100%%% CONSTRUCTION DOCUMENTS
TO BLDG
126-OP
M E D
IC
IN
E S
MEDICINES
FAC
FAC
FAC
WAITING AREA
TO BUILDING
CONNECTING
CORRIDOR
TO BUILDING
126-OP
TO BUILDING
126-OP
N U C
LE
A R
NUCLEAR
8'-0 3_ 4"
7"
3'- 1_
59.51°
COUNTER
MW
MG
ME
MK
MA
MB
MS
PBK
WD
ATL
CS
WS
AC
UPS
EBS
UPS
WS
WT
JB1
CS2
CS1
JB2
FEC
FEC
FE
C
FEC
DF
DFDF
E-12D
E-
3A
W-146B
E-146A E-157
E-143A
E-104
E-
0B
W-147
W-163B
E-154A
WC-C2
W C-
C3
E-
3A
E-155A
W-169
E-156A
PC-C2
PC
-C
PC-C3
DC
-C
DC-C5
E-C-R4
E-
2D
MC
-C
MC
-C
E- C-
R7
E-C-R6
W-C1-9
E-C-R2
E-C-R1
E-C-C2
E-116
E-C-C1
E-C1-1
DC
-C
MC-C-7
DC
-C
2 E-170E
E-143
E-146
E-147
E-
7A
W-148C
W-128G
W-128E W-131C
E-160
E-170
E-141
E-128
DC-C3
MC-C6
MC-C4
E- C-
R5
E- C-
C3
E-C-R3
MC
-C
W C-
C1
W -1
W-164
W-161
NO 3
W-160
W-162
W-163A
W-168
W-128 V
W-169A
W-169B
W-169C
W-128X
W-128M
W-128UW-128L
W-128K W-128J
W-149
W-151
W-161A
W-128
W-150
W-128I
W-128H
W-128F
W-128D
W-128BW-128C
W-128AW-131
W-131A
W-132E
W-132D
W-131-G
#4
W-131D
W-148B
W-131E
W -1
F
W136
E-149
W-131J
NO 2
W-138
W-147
W-148
W-152
W-153W-170
E-172A
E-172B
E-172C
E-
8B
E-168
E-171 E-168A
E-172 E-140
E-139
E-138
E-137
E-170D
E-153
E-148
E-155
E-144
E-145
E-156
NO 4
E-142 E-141A E-132
E-132A
E-131B
E-131A
E-131C
E-131
E-130
E-167A
E-164
E-160A
E-167
E-159
E-159B E-166
E-165
P-3 P-4
S-5
S-6
E-113
E112D
E112E
E-111A
E-113B
E-114
E-
5E-
E-
E-
E-152
E-151
E-150
E-129A
E-129
E-128
E-127
E-124
E-125
E-126
E-123
E-122 E-121
E-120
E-120A
E-119
E-119B
E-119A E-108
E-105
P-2
1W105
P-1
1W102A
NO 1
W-132A
W-132-B
W-132-C
W-134
W-135
W-139
W-140
W-141
E-133
E-133A
E-134AE-134E-135E-135AE-136E-170CE-170A
W-159W-158W-157 W-156
W-155W-154 W-146W-145W-144W-143W-142
E-
W-139A
E-145A
E-148A
E-148B
E-168C
E-168D
W-163
W-128L-1
W-128W
E-107
1W129
1W131 1W139 1W141
1W128A 1W128
1W132
1W133
1W134
1W136
1W137 1W143
1W123 1W135
1W124
1W1421W1401W138
1W102B1W1021W106A
1W103 1W109
1W111A 1W127
1W126
1W111F
1W113
1W1141W121
1W115
1W117 1W118 1W120
1W112
1W119
1W107A
1W108
1W110A
1W107
1W107B
1W104
1W
1W125 1W130E
1W
0D
1W106
1W100
1W101
E- C1
-1 E
1W133B
N/E
N/E
E-C1-1A
N/E
NA
1W111
N/E
FIRE EQUIPMENT CLOSET
CO
MP
UT
ED
TO
MO
GR
AP
HY
RE
AD
IN
G
RO
OM
FAC
ELECTRICAL CLOSET
CONTROL
ROOM
RESTROOM
CONTROL ROOM
TELECOM ROOM
ELECTRICAL CLOSET
BR
EA
KR
OO
M
FIRE EQUIPMENT
SIG AND TEL
CLOSETS
ELECTRICAL ROOM
DIRTY UTILITY
ROOM
(DERMATOLOGY)
DRESSING
ROOM
CORRIDOR
(WOMEN'S HEALTH)
CO
RR
ID
OR
(W
OM
EN
'S
H
EA
LT
H)
FAC
CO
NT
RO
L R
OO
M
TRANSPORTATION RECEPTION
CONTROL ROOM
CORRIDOR (OPMH)
CO
RR
ID
OR
(O
PM
H)
CORRIDOR (OPMH)
CO
RR
ID
OR
CORRIDOR
CORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
CO
RR
ID
OR
CO
RR
ID
OR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
RECEPTION
CORRIDOR
CORRIDOR
CORRIDOR (DERMATOLOGY)
CO
RR
ID
OR
(D
ER
MA
TO
LO
GY
ENTRY LOBBY
SIG AND TEL
PATIENT
ADVOCATE
INTERVENTIONAL
RADIOLOGY
PROCEDURE
ROOM
FLUOROSCOPY ROOM
FLUOROSCOPY ROOM
CO
NT
RO
L R
OO
M
PROCEDURE
ROOM-2
(DERMATOLOGY)
INTERVIEW
ROOM (OPMH)
INTERVIEW
ROOM (OPMH)
EXAM ROOM #3
SVC
ELEVATOR
LOBBY
MAMMOGRAPHY IMAGING
PATIENT ADVOCACY
LOBBY/WAITING
ROOM
BONE DENSITY
HAC
CORRIDOR
(DERMATOLOGY)
CORRIDOR
CORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
CORRIDOR
CO
RR
ID
OR
CO
RR
ID
OR
(W
OM
EN
'S
H
EA
LT
H)
CO
RR
ID
OR
EXAM ROOM
(DERMATOLOGY)
EXAM
ROOM
(DERMATOLOGY)
STAIRWAY
EXAM ROOM
(DERMATOLOGY)
PHOTOTHERAPY
(DERMATOLOGY)STAFF
RESTROOM
(DERMATOLOGY)
FAMILY RESTROOM
TELECOM ROOM
TRANSPORTATION OFFICE
TRANSPORTATION BREAKROOM
ELECTRICAL ROOM
HAC
TELECOM
ROOM
RADIOLOGY
CONFERENCE
ROOM
BREAKROOM
(RADIOLOGY)
RECEPTION /
LOBBY
INTERVIEW
ROOM (OPMH)
QUIET ROOM
EXAM
ROOM
(DERMATOLOGY)
EXAM
ROOM
(DERMATOLOGY)
CLINIC NURSE
(DERMATOLOGY)
WAITING
ROOM
(OPMH)
EXAM
ROOM
(DERMATOLOGY)
RESTROOM
INTERVIEW
ROOM (OPMH)
INTERVIEW
ROOM (OPMH)
STORAGE
INTERVIEW
ROOM (OPMH)
INTERVIEW
ROOM (OPMH)
BREAKROOM (OPMH)
WOMEN'S HEALTH
WAITING ROOM
WOMEN'S
HEALTH
RECEPTION
AND CHECK IN
SOCIAL WORKER'S
OFFICE
SOCIAL WORKER'S
OFFICE
(SPECIALITY CLINIC)
WOMEN'S
HEALTH
TEAMLET ROOM
EXAM ROOM
EXAM ROOM #2
STORAGE (DERMATOLOGY)
EXAM
ROOM # 1
W
OM
EN
'S
R
ES
TR
OO
M
WOMEN'S
RESTROOM
PET / CT
SCANNER
CLEAN
ROOM
STAIRWAY
ACUPUNCTURE
MICROSCOPE ROOM
(DERMATOLOGY)
PROCEDURE
ROOM1
(DERMATOLOGY)
RESIDENT
STORAGE
WAITING ROOM
(DERMATOLOGY/ONCOLOGY/HEMATOLOGY
ULTRASOUND
EXAM ROOM
ULTRASOUND
EXAM ROOM
ULTRASOUND
EXAM ROOM
CO
NT
RO
L R
OO
MDIGITAL
RADIOGRAPHIC
CHEST ROOM
RESTROOM
STORAGE
READING ROOM
OFFICE
READING
ROOM
WOMEN'S TOILET
MEN'S TOILET
PATIENT
ADVOCATE
X-RAY RM-1
DRESSING
ROOM
X-RAY RM-2
CONTROL ROOM
DRESSING
ROOM
EXAM ROOM
STAIRWAY
READING
ROOM STORAGE READING
ROOM
INTERVENTIONAL
PATIENT
HOLDING
RADIOLOGY/
IMAGING FILE
ROOM
ADVANCED
IMAGING ROOM
GENERAL
DIAGNOSTIC
READING ROOM
WET READ
READING ROOM
STAFF
RADIOLOGIST
STORAGE
TRASH
CHUTE
SUPPLY ROOM
GURNEY
AREA
QUALITY
CONTROL
COPY
ROOM
SUPERVISOR
AND
RADIOLOGIST
OFFICE
ELEVATOR ELEVATOR
ELEVATOR
ELEVATOR
NUTRITION
ELECTRICAL
TELE
CLOSET
COMPUTED
TOMOGRAPHY
READING
ROOM
CT
SUPERVISOR
OFFICE
STRESS ROOM
RE
ST
RO
OMDE
CA
Y
W
OM
EN
'S
T
OI
LE
T
ME
N'
S
TO
ILE
T
CT SCAN ROOM
CT CONTROL
ROOM
CT EXAM
STAFF
RADIOLOGIST
STAFF
RADIOLOGIST
STAFF
RADIOLOGIST
SOILED
UTILITY
ROOM
READING ROOM
ADMINISTRATIVE ASSISTANT OFFICE
LEAD CLERK /
TIME KEEPER
GAMMA CAMERA
GAMMA
CAMERA
GAMMA
CAMERA
SUPERVISOR OFFICE
WAITING
ROOM
PATIENT
DOSING
HOT LAB
RADIOPHARMACYFIRE
ALARM
ROOM
RECEPTION
ELEVATOR
MEN'S RESTROOM
ELEVATOR
STAIRWAY
SPECIALITY
CLINIC
RECEPTION
SOCIAL WORKER'S
OFFICE (ED)
SOCIAL
WORKER'S
OFFICE (ED)
WOMEN'S
HEALTH
TEAMLET ROOM
WOMEN'S
HEALTH
TEAMLET ROOM
VA STAFF
LACTATION
ROOM
BATH
ACUPUNCTURE
ACUPUNCTURE
NEURO
RADIOLOGY
READ…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .