Attachment 4 Drawings Merged Set.pdf

PDF 47 MB Posted

Attached to
Site Prep for Hemodialysis Install New Skid Base Heat Treatment RO Water System
Solicitation number
36C2224B0010
Issued by

About this file

This document is a set of drawings related to a federal contract opportunity for the Department of Veterans Affairs Veterans Health Administration to provide site preparation for the installation of a new skid base heat treatment reverse osmosis water system.

The key details include:

  • The solicitation number is 36C2224B0010.
  • The requirement is for site preparation work to install a new skid base heat treatment reverse osmosis water system.
  • The agency involved is the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 22.
  • The drawings provide technical specifications and details for the site preparation work.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 126

U.S. DEPARTMENT OF VETERANS AFFAIRS

SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID BASE

HEAT TREATMENT RO WATER SYSTEM, B126, 3RD AND 9TH

FLOOR

VA PROJECT NUMBER: 600-23-111

VA LONG BEACH HEALTHCARE SYSTEM

5901 E 7TH ST, LONG BEACH, CA 90822

100% CONSTRUCTION DOCUMENTS

01_GENERAL

GI-001 COVER

GI-101A PHASE ONE PLANS

GI-103 INFECTION CONTROL PLANS

GI-102 PHASING PLANS - ELECTRICAL PATHWAY

02_STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES

S-002 GENERAL STRUCTURAL NOTES

S-003 TYPICAL INTERIOR PARTITION WALL LIGHT GAGE FRAMING DETAILS

S-004 EQUIPMENT BRACING AND ANCHORAGE DETAILS

S-005 TYPICAL SEISMIC EQUIPMENT BRACING AND ANCHORAGE DETAILS

SF109 9TH FLOOR FRAMING AND EQUIPMENT PLAN

03_ARCHITECTURAL

AI-103 3RD FLOOR PLANS

AI-108 8TH FLOOR PLANS

AI-109 9TH FLOOR - LOOP PLAN

AI-109.1 9TH FLOOR - LAYOUT PLANS

04_PLUMBING

FD-109

FIRE SPRINKLER THIRD FLOOR

FX-001

FIRE SPRINKLER DEMOLITION NINTH FLOOR

FX-103

FIRE SPRINKLER NINTH FLOORFX-109

FIRE SPRINKLER DETAILSFX-501

PLUMBING ABBREVIATIONS, SYMBOLS, LEGENDS AND GENERAL NOTESP001

PLUMBING DEMOLITION - THIRD FLOORPD103

PLUMBING DEMOLITION PLAN - NINTH FLOORPD109

OVERALL PLUMBING DEMOLITION PLAN - NINTH FLOOR

PLUMBING PLAN - NINTH FLOORP109

PLUMBING DETAILSP501

PLUMBING SCHEDULESP601

05_MECHANICAL

M001 MECHANICAL ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

MD103 MECHANICAL DEMOLITION PLAN - THIRD FLOOR

MD109 MECHANICAL DEMOLITION PLAN - NINTH FLOOR

M103 MECHANICAL PLAN - THIRD FLOOR

M109 MECHANICAL PLAN - NINTH FLOOR

M501 MECHANICAL HVAC DETAILS

M601 MECHANICAL SCHEDULES

06_ELECTRICAL

E-001 ELECTRICAL LEGEND, GENERAL NOTES, AND ABBREVIATIONS

E-901 ELECTRICAL PHOTOGRAPHS

E-902 ELECTRICAL PHOTOGRAPHS

ED103 ELECTRICAL DEMOLITION PLAN - THIRD FLOOR

ED109 ELECTRICAL DEMOLITION PLAN - NINTH FLOOR

EL103 ELECTRICAL LIGHTING PLAN - THIRD FLOOR

EL109 ELECTRICAL LIGHTING PLAN - NINTH FLOOR

EL501 LIGHT FIXTURE CUT SHEETS, SCHEDULE AND DETAILS

EP103 ELECTRICAL POWER PLAN - THIRD FLOOR

EP109 ELECTRICAL POWER PLAN - NINTH FLOOR

EP109A ENLARGED PLAN AND R.O. EQUIPMENT SCHEDULE - NINTH FLOOR

EP501 PARTIAL RISER DIAGRAM EMERGENCY POWER

EP502 RISER DIAGRAM DETAILS

EP601 ELECTRICAL PANEL SCHEDULES EMERGENCY POWER

EP602 ELECTRICAL PANEL SCHEDULES NORMAL POWER

AI-600 ROOM FINISH, DOOR AND FRAME TYPES, SCHEDULES, AND DETAILS

PHASE TWO PLANSGI-101B

PHASE THREE PLANSGI-101C

GI-102A PHASING PLANS - ELECTRICAL PATHWAY

GI-102B PHASING PLANS - ELECTRICAL PATHWAY

PD110

PHASE FOUR PLANSGI-101D1

AD-109 9TH FLOOR DEMOLITION PLANS

FIRE PROTECTION ABBREVIATIONS, SYMBOLS, LEGENDS AND GENERAL NOTES

OVERALL PLUMBING PLAN - NINTH FLOORP110

AREA MAP

VICINITY - AERIAL MAP

SHEET INDEX

APPROVALS

REMODEL OF EXISTING 9TH FLOOR HEMODIALYSIS LOOP SYSTEM.

REPLACEMENT OF WATER LINE FROM THE 3RD FLOOR UP TO THE 9TH

FLOOR. REMODEL OF EXISTING DIALYSIS EQUIPMENT AND SUPPLY ROOM.

NEW LOOP LINE ABOVE CEILING AND REMOVAL OF EXISTING LOOP LINE.

REMODEL OF 3RD FLOOR EXISTING EQUIPMENT ROOM AS WELL AS

UPGRADE ROOF PATH TO REMODELED ROOM. NEW WASTE WATER DRAIN

LINES, ABOVE CEILING, IN THE 8TH FLOOR TO EXISTING WATER DRAIN

LINES, ABOVE CEILING, ON THE SAME FLOOR.

ALL NEW EQUIPMENT IN DIALYSIS EQUIPMENT / STORAGE ROOM.

PHASING OF DEMOLITION AND CONSTRUCTION IS TO KEEP THE EXISTING

DIALYSIS UNIT UP AND RUNNING DURING OPERATIONAL HOURS THROUGH

THE ENTIRE CONSTRUCTION PHASE. MEANS AND METHODS SUB-PHASING

IS REQUIRED TO SUB PHASE THE EXISTING PHASES OF THE

CONSTRUCTION TO ALLOW OPTIMUM USE OF THE FACILITY DURING THE

SCHEDULING OF THE PROJECT.

APPLICABLE CODES

2021 IBC.

2021 IMC.

2021 IFC.

2021 NEC.

2021 NFPA 99

2021 NFPA 60

TRUE

N

TRUE

N

CIVIL: NO SCOPE

STRUCTURAL:

Moon Tree Consulting, LLC 1808 Deep Creek Rd, Oklahoma City, OK David R. Walton SEOR / Blast Engineer david@moontreellc.com

ARCHITECTURAL:

Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Nico Sanchez, Architect john.slattery@paradigmusa.com

FIRE PROTECTION:

Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Rick Inghram rick.inghram@paradigmusa.com

PLUMBING:

Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Tyler Montgomery tyler.montgomery@paradigmusa.com

MECHANICAL:

Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Tyler Montgomery tyler.montgomery@paradigmusa.com

ELECTRICAL:

Paradigm Engineers & Constructors 9000 Wessex Pl. Suite 202, Louisville, KY Wayne Meyer wayne.meyer@paradigmusa.com

DESIGN TEAM

PHASE FOUR PLANSGI-101D2

GI-100 LIFE SAFETY PLAN 9TH FLOOR

GI-103A INFECTION CONTROL PLANS

AI-109.2 9TH FLOOR - CEILING LOOP PLAN

E-903 ELECTRICAL PHOTOGRAPHS

PROJECT SCOPE

GENERAL NOTES:

1. SEE PHASING PLANS FOR SCHEDULE OF PROJECT CONSTRUCTION. GC TO CREATE SUB-PHASING SCHEDULE WITH COR TO STATE WHICH ROOMS/AREAS WILL

BE WORKED UPON, IN WHICH ORDER THEY WILL BE WORKED UPON, TIME TO WORK THROUGH A SUB-PHASE AREA, AND GAIN COR APPROVAL FOR EACH SUB-PHASE.

2. PROJECT IS BASED UPON THE 9TH FLOOR HEMODIALYSIS AREA BRINGING IN A NEW WATER SUPPLY AND REPLACING THE EXISTING LOOP ABOVE CEILING.

3. THE EXISTING HEMODIALYSIS AREA ON THE 9TH FLOOR WILL NOT SHUT DOWN OPERATIONS AT ANY TIME AND ONLY TWO (2) HEADWALL UNITS ATTACHED TO THE

EXISTING LOOP MAY BE SHUT DOWN AT A TIME. PLEASE SEE COR TO IDENTIFY EXACT UNITS AND GAIN APPROVAL FOR SHUT DOWN OF ANY SUCH UNITS.

4. 8TH FLOOR WORK IS FOR PUMBING LINES ONLY ABOVE THE CEILING AND ATTACHING NEW LINES TO THE EXISTING WASTE LINES ON THE AT FLOOR.

5. 3RD FLOOR WORK IS FOR THE REMOVAL OF EXISTING EQUIPMENT AND MACHINERY AS WELL AND UPGRADING THE PATH TO THE EXISTING EQUIPMENT ROOM.

6. NO EXISTING EQUIPMENT OR POWER/WATER LINES ARE TO BE TERMINATED UNTIL NEW UTILITY LINES ARE HOOKED UP SO THAT THE HEMODIALYIS DEPARTMENT

ON THE 9TH FLOOR IS KEPT OPERATIONAL AT ALL TIMES.

7. ELECTICAL POWER PATHWAYS THROUGHOUT ALL FLOORS IS TO BE COMPLETED DURING THE PHASE 1 WHEN THE NEW TRANSFORMER IS PLACED UPON THE 9TH

FLOOR AND THE POWER FOR THE NEW/EXISTING EQUIPMENT ON THE 9TH FLOOR IS KEPT POWERED AT ALL TIMES.

8. ALWAYS GAIN APPROVAL OF PHASING AND SUB-PHASING SCHEDULES FRO THE VA COR ON ANY CONSTRUCTION.

9. ALWAYS KEEP THE LIFE SAFETY OF ALL PORTIONS OF ANY FLOOR WORKED UPON UP TO CURRENT EXISTING STATUS IN CASE OF EMERGENCY.

10. ALL WORK IS TO FOLLOW VA ICRA RULES AND GUIDELINES, ALL WORK IN THE REMOVAL AND REPLACEMENT OF WATER OR LOOP LINES IN ANY AREA

IS TO FOLLOW ICRA GUIDELINES AND BE SUFFICIENT IN BARRIERS VS. PASSAGE OF DUST OR OTHER CONTAMINATES. THOSE BARRIERS ARE TO BE CREATED & MAINTAINED ACCORDING TO THE MEANS AND METHODS OF THE CONSTRUCTION PROCESS WHICH WILL BE DEFINED BY THE CONTRACTORS AND APPROVED

BY THE VA.

11. TRANSFPORT OF NEW MATERIALS AND THE REMOVAL OF DEMOLISHED MATERIALS FROM THE WORK AREA TO A SPECIFIED LOCATION IS TO BE COMPLETED WITH VA COR APPROVAL AND TO BE PLANNED OUT IN THE SUB-PHASING PRIOR TO IMPLEMENTATION.

12. STAGING AREAS FOR NEW MATERIALS AND WORK LOCATIONS ARE TO BE DEFINED BY THE GC AND APPROVED BY THE VA COR PRIOR TO THE WORK.

13. MEANS AND METHODS OF CONSTRUCTION PLAYS A LARGE ROLE IN THE REMODEL OF THE HEMODIALYSIS UNIT DUE TO THE FACT THAT THE UNIT MUST STAY

OPERATIONAL AT ALL TIMES IN A CLEAN AND SANITARY CONDITION. GC TO WORK CLOSELY WITH THE VA COR TO OBTAIN THIS GOAL AND ALWAYS GAIN APPROVAL OF ANY CONSTRUCTION DEFINED AS THE IMPLICATIONS OF ANY WORK IS FAR REACHING AND CAN GO BEYOND THE WORK DEFINED HEREIN.

PLUMBING PLAN - THIRD FLOORP103

9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

31 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

JS JS

SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID

BASE HEAT TREATMENT RO WATER SYSTEM, B126,

3RD AND 9TH FLOOR

600-23-111

LONG BEACH VA HEALTHCARE SYSTEM

5901 E 7TH ST, LONG BEACH, CA 90822

01-02-2024

100% CONSTRUCTION DOCUMENTS

FOR CONSTRUCTION

SLA T

Y

T ER

J

J

OH

N

BROKEN ARROW

OKLAHOMA

S

O

ATA

TE

OF

M

OHALK

A

L TICENSED

CETIHCR

AutoCAD SHX Text

MEDICAL CENTER DIRECTOR

AutoCAD SHX Text

DEPUTY DIRECTOR

AutoCAD SHX Text

ACTING ASSOCIATE DIRECTOR

AutoCAD SHX Text

ASSOCIATE DIRECTOR FOR

AutoCAD SHX Text

PATIENT CARE SERVICES CHIEF

AutoCAD SHX Text

CHIEF OF STAFF

AutoCAD SHX Text

CHIEF, ENGINEER

AutoCAD SHX Text

CHIEF QUALITY, SAFETY AND

AutoCAD SHX Text

VALUE SERVICES

AutoCAD SHX Text

COR, PROJECT ENGINEER

AutoCAD SHX Text

CHIEF INFORMATION

AutoCAD SHX Text

CHIEF QUALITY, SAFETY &

AutoCAD SHX Text

CHIEF OCCUPATIONAL SAFETY

AutoCAD SHX Text

& EMERGENCY MANAGEMENT

AutoCAD SHX Text

NURSE EXCECUTIVE

AutoCAD SHX Text

CHIEF MEDICAL HEALTHACRE

AutoCAD SHX Text

GROUP

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

VALUE SERVICES

AutoCAD SHX Text

TECHNOLOGY AREA MANAGER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SERVICES.

AutoCAD SHX Text

CHIEF, NEPHROLOGY SECTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHIEF, SUPPLY CHAIN

AutoCAD SHX Text

DATE

AutoCAD SHX Text

SERVICES

AutoCAD SHX Text

CHIEF, ENVIRONMENTAL

AutoCAD SHX Text

DATE

AutoCAD SHX Text

MANAGEMENT SERVICES

AutoCAD SHX Text 03-10-23

AutoCAD SHX Text 04-14-23

AutoCAD SHX Text 07-14-23

AutoCAD SHX Text 09-15-23

AutoCAD SHX Text 09-29-23

AutoCAD SHX Text 11-03-23

AutoCAD SHX Text

35%%% SCHEMATIC

AutoCAD SHX Text

65%%% DD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% CD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-05-23

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-20-23

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text 01-03-24

FA

C

FA

C

FAC

FAC

DF

UP

UP

EXIST

DOOR

XFMR

TEMP.

DOOR

4'-6"

TEMP.

DOOR

4'-6"

TEMP.

DOOR

4'-6"

NEVER BLOCK

SINGLE DOOR

EGRESS

PATH OF EGRESS

PATH OF EGRESSPATH OF EGRESS

PA

TH

O F

EG

R

ES

S

PA

TH

O F

EG

R

ES

S

PA

TH

O F

EG

R

ES

S

PA

TH

O F

EG

R

ES

S

PA

TH

O F

EG

R

ES

S

PA

TH

O F

EG

R

ES

S

PA

TH

O F

EG

R

ES

S

PA

TH

O F

EG

R

ES

S

EXISTING STAIRWELL

FIRE ENCLOSURE

EXISTING STAIRWELL

FIRE ENCLOSURE

EXSITING 90 MIN DOOR

N.I.C.

EXSITING 90 MIN DOOR

N.I.C.

PA

TH

O F

EG

R

ES

S

D E F G H J K L

W932A

NURSE STATION

W932A

NURSE STATION

W942

FELLOW

WORKROOM

DIALSATE

PREPARATION

RM

W932D

E958D

W920

W941A

W942A

W938A

W939A

944B

W940A

E947A

E954

CC

-9

-1

CC-9-3

W931

W927A

W927

W922

W925

E905

E904A

P-2P-1

E912

E912B

E912A

E913

E913A

W

2B

W931A W932C

W918

W919

W921

CC-9-6 CC-9-8

W924 W923C

W923B

E911

E910

P-3 P-4

S-5

S-6

E909A

E909

W932F W932G W932H

E962

E961

E958B E958C

E958

E956

E955

E954A

E951

E952A

E953

E950

E950B

E9 49E948E947

W944A W944

W

W941B

W941

W941C

W940B

W940

W939

W938

NO 1

NO 3

TOILET

STOR

BREAK

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

FILE

STORAGE

RM

CO

RR

ID

OR

CORRIDOR

CO

RR

ID

OR

CO

RR

ID

OR

CLEAN

UTILITY

COPY RM

CHECK IN

G I PATIENT

WAITING

AREA

TOILET

EQUIP

MAINTENANCE

AREA

SVC

ELEVATORS

BIOHAZARD TRASH

TECH

OFFICE

PASSENGER ELEVATOR

ELEVATORELEVATOR

PATIENT

LOCKER RM

TOILET

WAITING AREA

SOCIAL

WORKERS

OFFICE

TELECOM

CO

RR

ID

OR

SO

ILE

D

UT

ILI

TY

MED RMHEAD

NURSE

SCOPE

WASHING

AREA

SCOPE ROOM

ME

CH

S

HA

FT

HAC EL

EC

TR

IC

AL

CORRIDOR CORRIDOR

SUPPLY RM TELECOM

TELECOM

CO

RR

ID

OR

CO

RR

ID

OR

ME

CH

SH

AF

T

HAC

STORAGE

ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR

EQUIP

STORAGE

TOILET

MED 1

BED RM

MED 1

BED RM SCI 1 BED

RM

STAIR

ISO

OFFICE

PH

YS

IC

IA

N

RM

CO

NF

ER

EN

CE

R

M

FEMALE

LOCKER RM

MALE

LOCKER

RM

AL

CO

VE

STAFF

LOUNGE

CAPD

TRAINING

CAPD PGM

MECH RM

INFUSION

CLINIC

NURSE

STATION

PHYSICIAN OFFICE

GI RECOVERY

RM

NU

RS

ES

ST

AT

IO

N

WAITING RM

PH

AR

MA

CI

ST

O

FF

IC

E

ULTRA

SOUND

G I

RESEARCH

OFFICE

STAIR

SUPPLY RMPREP

EXAM RM

UL

TR

AS

OU

ND

O

MN

IC

EL

L-

ENDOS

PROCEDURE

RM-1

PROCEDURE RM-2

OMNICELL-2

OMNICELL-3

OMNICELL-4

FLEXIBLE

SIGMOIDOSCOPY

ENDOS

PROCEDURE

RM

ALCOVE INFUSION

CHAIR STA.

CUBICLE

FLOOR 9

ENTRY POINT

EN

DO

SC

OP

IC

RECOVERY RESTROOM

E950A

E951A

INFUSION CLINIC

RESTROOM

W932E

HEMO

DIALYSIS

NO 1

STAIR

E957

CAPD

CO-ORDR

E957

CAPD

CO-ORDR

E913A

TELECOM

E913B

ELECTRICAL

FA

C

FA

C

FAC

FAC

DF

UP

UP

LEGEND

PATH OF EGRESS

HAZARDOUS AREAS.

EXISTING FIRE RATED

1-HOUR ASSEMBLIES.

NOTES:

1. EGRESS THROUGH EGRESS CORRIDORS TO REMAIN UN-INTERUTPED FOR PUBLIC / STAFF USE.

2. PATH OF EGRESS ADJACENT TO TEMPORARY CONSTRUCTION IN EGRESS CORRDIORS TO ALWAYS ALLOW FOR 1 DOOR OPENING AND USE IN ADDITIONA TO 4'-6" CLEAR SPACE IN THE CORRIDOR MINIMUM.

3. NO CORRIDOR BE REDUCED BELOW ITS EXISTING WIDTH, WITH THE EXEPTION BEING ANY TEMPORARY BARRIERS REQUIRED. COR TO BE MADE FULLY AWARE OF SCHEDULE OF INDIVIDUAL BARRIERS IN EGRESS CORRIDORS AND NO EGRESS CORRDIOR IS TO BE LESSENED LOWER THAN 4'-6" CLEAR BY CLINICAL STAFF AND PUBLIC USE.

4. IF ANY EGRESS CORRIDOR LEADING TO AN OFFICIAL EXIT FROM A FLOOR TO A ENCLOSED FIRE RATED STAIRWELL IS BE CLOSED OFF, DUE TO THE MEANS AND METHODS OF CONSTRUCTION, A NEW EGRESS PATH MUST BE CREATED ALONG WITH ALL EXIT SIGNS, EMERGENCY LIT CORRIDORS AND FULLY EMERGENCY PANIC BAR OPENING OF DOORS AT ALL TIMES.

5. ELEVATORS ARE NEVER TO BE A PART OF ANY EMERGENCY EGRESS PLAN.

EXISTING FIRE RATED

2 HOUR ASSEMBLIES.

N.I.C.

N.I.C.

NEW LOOP ROUTE.

OLD LOOP ROUTE

SHOWN FOR CLARITY.

SHOWN FOR CLARITY.

GI-100

1/8" = 1'-0"2 9TH FLOOR LIFE SAFETY PLAN

N.T.S.1 9TH FLOOR KEY MAP

9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

31 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

JS JS

SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID

BASE HEAT TREATMENT RO WATER SYSTEM, B126,

3RD AND 9TH FLOOR

600-23-111

LONG BEACH VA HEALTHCARE SYSTEM

5901 E 7TH ST, LONG BEACH, CA 90822

01-02-2024

100% CONSTRUCTION DOCUMENTS

FOR CONSTRUCTION

SLA T

Y

T ER

J

J

OH

N

BROKEN ARROW

OKLAHOMA

S

O

ATA

TE

OF

M

OHALK

A

L TICENSED

CETIHCR

LIFE SAFETY PLAN, 9TH FLOOR

AutoCAD SHX Text 03-10-23

AutoCAD SHX Text 04-14-23

AutoCAD SHX Text 07-14-23

AutoCAD SHX Text 09-15-23

AutoCAD SHX Text 09-29-23

AutoCAD SHX Text 11-03-23

AutoCAD SHX Text

35%%% SCHEMATIC

AutoCAD SHX Text

65%%% DD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% CD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-05-23

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-20-23

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

FA

C

FAC

FAC

DF

UP

UP

LEGEND

AREA OF WORK, PHASE 1

NEW LOOP (SHOWN FOR CLARITY ) PHASE 2

OLD LOOP (SHOWN FOR CLARITY) PHASE 4

REMOVAL.

TEMPORARY

WALL, TO REMAIN

EXIST

DOOR

PROPOSED

NEW LOOP

PHASE 3

PROPOSED

NEW LOOP

PHASE 3

SHOWN FOR

CLARITY

SHOWN FOR

CLARITY

PHASE 1A

DEMOLITION, REMOVE

ALL EQUIPMENT

NEW DOOR

NEW DOOR

XFMR

'-0

TEMP WALL

NEW WALL

TEMP

WALL

3'-6"

NEW ELEC.

PANEL

TEMP.

DOORNEW

TRANSFORMER

4'-6"

TEMP.

DOOR

4'-6"

TEMP

WALL

3'-6"

6' -6

NEVER BLOCK

SINGLE DOOR

EGRESS

NEVER BLOCK

SINGLE DOOR

EGRESS

RMV. BOOK CASE

PREP FOR NEW FLOOR,

WALLS, CEILING.

DIALSATE

PREPARATION

RM

W932D

CC-9-11

CC-9-3

W931

W927

E912A

W931A W932C

CORRIDOR

CORRIDOR

CLEAN

UTILITY

CHECK IN

WAITING AREA

MED RMHEAD

NURSE

TEMPORARY

WALL.

EXIST

DOOR

TEMP.

DOOR

4'-6"

TEMPORARY LOCATION OF DRUMS.

3'-6"

6' -6

REMODELED ROOM WITH NEW

FLOORING, GYP.BD. & CEILING

REMAIN

XFMR

NEW

DOOR

NEW

DOOR

NEW WALL

NEW ELEC.

PANEL

NEW

DOOR

COMPLETE & USABLE.

DIALYSIS CHECK IN TO BE

DIALSATE

PREPARATION

RM

W932D

CC-9-11

CC-9-3

W931

W927

E912A

CORRIDOR

CORRIDOR

CLEAN

UTILITY

CHECK IN

WAITING AREA

MED RM

HEAD

NURSE

BASEMENT

88'-5"

BASEMENT88'-5"

3RD FLOOR

124'-5"

3RD FLOOR124'-5"

8TH FLOOR

184'-5"

8TH FLOOR184'-5"

9TH FLOOR

196'-5"

9TH FLOOR196'-5"

9TH FLOOR WORK AREA

8TH FLOOR WORK AREA

3RD FLOOR WORK AREA

ROOF WORK AREA

PHASE 3

PHASE 1, 2, 3, 4.

PHASE 4

PHASE 4

SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION

WORK FOR ALL PHASES:

ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE

DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR

NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE

BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO

PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE

PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO

GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.

IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER

HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT

THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND

PLANNING.

PHASE 1 - DEMOLITION AND REMODEL 9TH FLOOR.

1. ERECT TEMPORARY WALL INSIDE EXSTING DIALYSATE ROOM BISECTING ROOM PER

LOCATION ON DRAWINGS.

2. ERECT TEMPORARY WALL ON WEST SIDE OR EXISTING DIALYSATE ROOM TO STOP

DUST CONTAMINATION INFILTRATING INTO PATIENT / STAFF OCCUPIED AREAS. ADD

TEMPORARY DOOR.

3. DEMOLITION OF EXISTING STORAGE ROOM W932d (LEFT PORTION) WALLS, DOORS, CEILINGS, ETC.

4. PREP AND RENOVATE WEST SIDE OF THE EXISTING DIALYSATE ROOM. EAST SIDE OF

EXISTING DIALYSATE ROOM WILL REMAIN OPERATIONAL WITH THE DIALSATE 55 GALLON

DRUMS IN PLACE FOR STAFF ACCESS USING THE EAST ENTRANCE.

5. MOVEMENT OF EXISTING ACIDIC DRUMS TO THE WEST SIDE SPACE SHALL OCCUR ONCE

THE WEST SIDE AREA HAS BEEN COMPLETED.

6. NEW ELECTRICAL ROOM TEMPORARY WALLS/BARRIERS IN CORRIDOR AND INSIDE GI CHECK

IN AREA TO BE CONSTRUCTED PRIOR TO START OF ANY WORK.

7. NEW ELECTICAL ROOM PERMENANT WALL TO BE CONSTRUCTED.

8. DEMOLITON OF EXISTING BUILT-IN BOOKCASES LOCATED ON THE SOUTH WALL OF THE

GI CHECK IN AREA.

9. NEW ELECTRICAL ROOM POWER PANELS AND TRANSFORMER TO BE INSTALLED.

10. INSTALL NEW DOOR & FINISHES FOR THE ELECTRICAL ROOM.

11. REPLACE EXISTING DOOR TO HEMODIALYSIS UNIT WITH NEW ONE AFTER HOURS. PATCH

AND PAINT TO MATCH EXISTING.

12. TEMPORARY WALLS AROUND NEW ELECTICAL ROOM AND NEW PANELS TO BE REMOVED

AFTER ALL WORK IS COMPLETED TO INCLUDE FINISHES. PAINT AND TOUCH UP SURROUNDING

SURFACES DAMAGED BY BARRIER.

13. VALB FOLLOWS STRICK PROCEDURES FOR ALL ELECTRICAL. ALL ELECTRICAL WORK

SURFACES DAMAGED BY BARRIER.

HEMODIALYSIS STATION NOTE:

1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.

GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE

AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A

SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.

CEILING TILE REMOVAL NOTE:

1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING

MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.

MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE

REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.

CEILING TILE REMOVAL NOTE:

1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING

MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.

MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE

REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.

N.T.S.1 9TH FLOOR R0 TREATMENT AREA

N.T.S.4 3D KEY PLAN

1/4" = 1'-0"2 ENLARGED 9TH FLOOR WORK AREA PHASE PLAN

1/4" = 1'-0"3 ENLARGED 9TH FLOOR FINISH PHASE PLAN

WORK AREA

LEGEND:

LEGEND:

GI-101A9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

31 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

JS JS

SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID

BASE HEAT TREATMENT RO WATER SYSTEM, B126,

3RD AND 9TH FLOOR

600-23-111

LONG BEACH VA HEALTHCARE SYSTEM

5901 E 7TH ST, LONG BEACH, CA 90822

01-02-2024

100% CONSTRUCTION DOCUMENTS

FOR CONSTRUCTION

SLA T

Y

T ER

J

J

OH

N

BROKEN ARROW

OKLAHOMA

S

O

ATA

TE

OF

M

OHALK

A

L TICENSED

CETIHCR

PHASE ONE PLANS

E F G H

E F G H

AutoCAD SHX Text 03-10-23

AutoCAD SHX Text 04-14-23

AutoCAD SHX Text 07-14-23

AutoCAD SHX Text 09-15-23

AutoCAD SHX Text 09-29-23

AutoCAD SHX Text 11-03-23

AutoCAD SHX Text

35%%% SCHEMATIC

AutoCAD SHX Text

65%%% DD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% CD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-05-23

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-20-23

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

FA

C

FAC

FAC

DF

UP

UP

FA

C

FA

C

FAC

DF

UP

UP

LEGEND

AREA OF WORK.

NEW LOOP TO BE INSTALLED.

OLD LOOP (SHOWN FOR CLARITY) PHASE 4.

D.C.W. DROP

TO 3RD FLOOR.

NEW WATER LINE

REMOVE CEILING TO INSTALL NEW WATER LINE EXISTING LOOP LINE

REMOVE CEILING TO

INSTALL NEW LOOP

REMOVE CEILING TO

INSTALL NEW LOOP

REMOVE CEILING TO

INSTALL NEW LOOP

SHOWN FOR CLARITY.

EXISTING LOOP LINE

SHOWN FOR CLARITY.

EXISTING LOOP LINE

SHOWN FOR CLARITY.

EXISTING LOOP LINE

SHOWN FOR CLARITY.

EXISTING LOOP LINE

SHOWN FOR CLARITY.

D E F G H J K L

W932A

NURSE STATION

W932A

NURSE STATION

W942

FELLOW

WORKROOM

DIALSATE

PREPARATION

RM

W932D

E958D

W920

W941A

W942A

W938A

W939A

944B

W940A

E947A

E954

CC-9-11

CC-9-3

W931

W927A

W927

W922

W925 E905

903 E904A

P-2P-1

E912

E912B

E912A

E913

E913A

W

2B

W931A W932C

W918

W919

W921

CC-9-6

CC-9-8

W924 W923C

W923B

E904

E911

E910

P-3 P-4

S-5

S-6

E909A

E909

W932F W932G W932H

E962

E961

E958B E958C

E958

E956

E955

E954A

E951

E952A

E953

E950

E950B

E9 49E948E947

W944A

W944W

W941B

W941

W941C

W940B

W940

W939

W938

NO 1

NO 3

TOILET

STOR

BREAK

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

FILE

STORAGE

RM

CORRIDOR

CORRIDOR

CO

RR

ID

OR

CO

RR

ID

OR

CLEAN

UTILITY

COPY RM

CHECK IN

G I PATIENT

WAITING

AREA

TOILET

EQUIP

MAINTENANCE

AREA

SVC

ELEVATORS

BIOHAZARD TRASH

TECH

OFFICE

PASSENGER ELEVATOR

ELEVATORELEVATOR

PATIENT

LOCKER RM

TOILET

WAITING AREA

SOCIAL

WORKERS

OFFICE

TELECOM

CO

RR

ID

OR

SO

ILE

D

UT

ILI

TY

MED RMHEAD

NURSE

SCOPE

WASHING

AREA

SCOPE ROOM

ME

CH

S

HA

FT

HAC EL

EC

TR

IC

AL

CORRIDOR

CORRIDOR

SUPPLY RM TELECOM

TELECOM

SOLUTION AREA

CO

RR

ID

OR

CO

RR

ID

OR

ME

CH

SH

AF

T

HAC

STORAGE

ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR

EQUIP

STORAGE

TOILET

MED 1

BED RM

MED 1

BED RM SCI 1 BED

RM

STAIR

ISO

OFFICE

PH

YS

IC

IA

N

RM

CO

NF

ER

EN

CE

R

M

FEMALE

LOCKER RM

MALE

LOCKER

RM

AL

CO

VE

STAFF

LOUNGE

CAPD

TRAINING

CAPD PGM

MECH RM

INFUSION

CLINIC

NURSE

STATION

PHYSICIAN OFFICE

GI RECOVERY

RM

NU

RS

ES

ST

AT

IO

N

WAITING RM

PH

AR

MA

CI

ST

O

FF

IC

E

ULTRA

SOUND

G I

RESEARCH

OFFICE

STAIR

SUPPLY RM

PREP

EXAM RM

UL

TR

AS

OU

ND

O

MN

IC

EL

L-

ENDOS

PROCEDURE

RM-1

PROCEDURE RM-2

OMNICELL-2

OMNICELL-3

OMNICELL-4

FLEXIBLE

SIGMOIDOSCOPY

ENDOS

PROCEDURE

RM

ALCOVE INFUSION

CHAIR STA.

CUBICLE

EN

DO

SC

OP

IC

RECOVERY RESTROOM

E950A

E951A

INFUSION CLINIC

RESTROOM

W932E

HEMO

DIALYSIS

NO 1

STAIR

E957

CAPD

CO-ORDR

E957

CAPD

CO-ORDR

E913A

TELECOM

E913B

ELECTRICAL

PHASE 2 - DEMOLITION AND RENOVATION 9TH FLOOR.

1. CORE DRILL AND INSTALL OF NEW WATER LINE FROM THE 3RD FLOOR, UN-ATTACHED TO THE

EXISTING ALLOWING THE EXISTING LINE TO CONTIUE TO SUPPLY WATER.

2. REMOVAL OF CEILING TILE FROM ENTRY POINT OF THE NEW WATER LINE (DRY) ON 9TH FLOOR

TO THE LOCATION OF ITS USE (HEMODIALYSIS EQUIPMENT / SUPPLY ROOM). INSTALL OF THE

REMAINDER OF THE NEW WATER LINE HORIZONTALLY ABOVE THE CEILING AND CLOSE UP

(REPLACE) SUSPENDED CEILING. SUB-PHASE OF WATER PIPE INSTALL TO BE USED IN THE MORNING

EACH DAY BY THE FACILITY AND STAFF WITHIN ROOM/CORRIDORS AND READY FOR USE TO BE

COORDINATED WITH THE COR FOR DAILY USE.

3. REMOVAL OF CEILING TILES FROM THE "LOOP" PIPE. CEILING TILES TO BE REMOVED ALONG WITH T-BAR ALLWOING ACCESS TOABOVE CEILING SPACE AND SINTALL NEW "RO LOOP" PIPE. LOOPE PIPE TO BEGIN AND END AT HEMODIALYSIS EQUIPMENT / SUPPLY ROOM. ALL PORTIONS OF DEMOLITION AND NEW INSTALL OF "LOOP" PIPE TO B E AFTER HOURS AND AT THE BEINIGN OF EACH DAY THE CEILING IS TO BE PLACED BACK AND AREA(S) CLEANED ACCORDINGLY TO ALLOW FOR CLINICAL STAFF WORK. TWO STATIONS CAN BE CLOSED AT A TIME FOR A PERIOD LONGER THAN A SHIFT.

CONTRACTOR TO PROPOSE PHASING OF "LOOP" INSTALL IN THE HEMODIALYSIS UNIT WITH THIER

PHASING PLAN PRIPOR TO ANY WORK STARTED, PENDING VA APPROVAL.

4. SUB-PHASING, BY CONTRACTOR, TO BE CREATED FOR WORK PER DAY FOR VA APPROVAL.

5. ALL SPACES WORKED UPON AFTER HOURS TO BE CLEANED AND CEILINGS , WALLS, FLOORS TO BE

REPLACED PRIOR TO MORNING SHIFT BY VA CLINICAL STAFF. 3RD PARTY CONTRACTOR REQUIRED TO

PERFORM TERMINAL CLEANING OF ALL PUBLIC SPACES AT END OF SHIFT.

SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION

WORK FOR ALL PHASES:

ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE

DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR

NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE

BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO

PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE

PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO

GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.

IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER

HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT

THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND

PLANNING.

HEMODIALYSIS STATION NOTE:

1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.

GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE

AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A

SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.

CEILING TILE REMOVAL NOTE:

1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING

MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.

MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE

REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.

PHASE TWO PLANS

GI-101B

N.T.S.1 9TH FLOOR KEY MAP

1/8" = 1'-0"2 9TH FLOOR WORK AREA PHASIN PLAN

9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

31 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

JS JS

SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID

BASE HEAT TREATMENT RO WATER SYSTEM, B126,

3RD AND 9TH FLOOR

600-23-111

LONG BEACH VA HEALTHCARE SYSTEM

5901 E 7TH ST, LONG BEACH, CA 90822

01-02-2024

100% CONSTRUCTION DOCUMENTS

FOR CONSTRUCTION

SLA T

Y

T ER

J

J

OH

N

BROKEN ARROW

OKLAHOMA

S

O

ATA

TE

OF

M

OHALK

A

L TICENSED

CETIHCR

AutoCAD SHX Text 03-10-23

AutoCAD SHX Text 04-14-23

AutoCAD SHX Text 07-14-23

AutoCAD SHX Text 09-15-23

AutoCAD SHX Text 09-29-23

AutoCAD SHX Text 11-03-23

AutoCAD SHX Text

35%%% SCHEMATIC

AutoCAD SHX Text

65%%% DD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% CD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-05-23

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-20-23

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

PHASE 3 - DEMOLITION AND RENOVATION 8TH & 9TH FLOOR

8TH FLOOR:

1. CEILING TO BE REMOVED TO ALLOW FOR NEW CONSTRUCTION OF DRAINAGE PIPES.

2. NEW DRAINAGE PIPESFROM DRAINS IN NEW HEMODIALYSIS EQUIPMENT / STORAGE ROOM

TO BE INSTALLED ABOVE CEILING ON THE 8TH FLOOR AND CONNECTED TO THE MAIN

WASTE WATER LINES.

3. ALL CEILINGS TO BE PLACED BACK NEW AND FINAL CLEANING OF 8TH FLOOR WHEN

WORK IS COMPLETE FOR NEW WASTE LINES

4. ROOMS WORKED WITHIN TOBE WORKED ONLY AFTER HOURS AND ALL CEILINGS AND

ROOMS TO BE CLEANED PRIOR TO MORNING ARRIVAL OF CLINICAL STAFF FOR USE OF ROOMS

UNLESS THE VA COR ALLOWS OTHERWISE.

9TH FLOOR:

1. ERECT TEMPORARY WALL ON EAST SIDE TO STOP DUST FROM DEMOLITION FROM INFILTRATING

INTO PATIENT / STAFF OCCUPAIDE SPACES. ADD TEMPORARY DOOR.

2. MOVE ALL DIALYSATE ACID DRUMS TO THE WEST SIDE OF RENOVATED PORTION OF DIALYSTATE

EXISTING ROOM.

3. COMPLETE FINISH OUT OF EAST SIDE DEMOLITION OF DIALASYS EQUIPMENT / SUPPLY ROOM

PER PLAN.

4. ONCE WORK IS COMPETE ON EAST SIDE, THE TEMPORARY WALL BISECTING THE PROPOSED

HEMODIALYSIS EQUIPMENT / STORAGE ROOM TO BE REMOVED.

5. ALL DIALYSATE 55 GALLON DRUMS TO BE PLACED IN FINAL OCATION PER PLANS TO ALLOW

FOR THE INSTALLATION OF NEW RO EQUIPMENT IN THE NORTH SIDE PORTION OF THE ROOM.

6. NEW EQUIPMENT TO BE PLACED IN HEMODIALYSIS EQUIPMENT /STORAGE ROOM.

AFTER HOURS TO AVOID DISRUPTIONS TO AOPERATIONS SINCE THE STAFF NEEDS TO ACCESS

ACID DRUMS DURING WORK HOURS.

7. HEMODIALYSIS EQUPMENT / STORAGE ROOM TO BE FINISHED OUT AND CLEANED.

8. NEW ELECTRICAL POWER TO BE CONNECTED AND TURNED ON PRIOR TO EXISTING POWER

SUPPLY TO OLD EQUIPMENT TURNED OFF. ALL CONNECTIONS TO NEW EQUIPMENT ON 9TH FLOOR TO BE MADE FROM NEW ELECTRICAL PANELS. SEE GI-102, GI-102A, AND GI-102B FOR ELECT. PATHS.

9. ALL NEW WATER AND LOOP LINE TESTS ARE TO BTAKE PLACE TO CONFIRM FULL FUNCTION OF

LINES AND SUPPLY.

10. AL LNEW EQUIPMENT TO BER TESTED AND FOUND TOBE IN GOOD WORKING ORDER PRIOR TO

MORNING SHIFT OF CLINICAL STAFF SO ENTIRE WATER / POWER / EQUIPMENT SYSTEM IS

WORKING FOR ENTIRE FLOOR.

11. ALL EXISTING LOOP LINES ARE TO BE DISCONENCETE AND NEW LOOP AND WATER LINES TO BE

CONNECTED AND TURNED ON. SWITCH FROM ALL SYSTEMS TO NEW SYSTEM TO OCCUR AFTER

HOURS TO AVOID IMPACT TO PATIENT CARE.

12. TEMPORARY WALLS IN CORRIDORS FOR HEMODIALYSIS EQUPMENT / STORAGE ROOM TO BE

REMOVED INCLUDING DOORS. REPAIR OF FLOOR, WALLS AND CEILING TO BE ACCOMPLISHED

WHERE TEMPORARY WALL WERE. ENTIRE AREA TO BE CLENED AND PATCHED / REPAIRED.

VA COR TO APPROVE.

PREP ROOM FOR FINAL PREP ROOM FOR NEW EQUIPMENT

REMODEL OF ENTIRE PATCH, REPAIR, PAINT.

REMOVE

TEMPORARY WALL

NEW

DOORTEMP.

DOOR

TEMP.

DOOR

4'-6" 4'-6"

DIALYSIS EQUIPMENT / STORAGE

TEMPORARY LOCATION OF DRUMS.

ROOM COMPLETION.

MOVE DRUMS WITH COR APPROVAL.

TEMP WALL.

ELECT. ROOM

DIALISYS CHECK IN

DIALSATE

PREPARATION

RM

W932D

CC-9-11

CC-9-3

W931

W927

W931A W932C

CORRIDOR

CORRIDOR

CLEAN

UTILITY

CHECK IN

MED RMHEAD

NURSE

AREA OF PHASE 3 SHOWN AREA OF PHASE 3 SHOWN

WHEN COMPLETE WHEN COMPLETE

NEW

DOORNEW

DOOR

PH-1

PH-3

ELECT. ROOM

DIALISYS CHECK IN

CC-9-11

CC-9-3

W931

W927

W931A W932C

CORRIDOR

CORRIDOR

CLEAN

UTILITY

CHECK IN

MED RMHEAD

NURSE

LINE OF WORK AREA ABOVE ON

9TH FLOOR, EQUIPMENT ROOM.

AREA OF WORK ON 8TH FLOOR

CEILING & SANITARY LINES.

CORRIDOR

C126-8-13

CO

RR

ID

OR

C1

-8 -4

C1

-8 -2

RECEPTION

NURSE MANAGER

(TEMP)/ FUTURE

EQUIPMENT

EQUIPMENT

CO

RR

ID

OR

FE

C

FEC

FEC

LOCKER

DN

UP

UP

LEGEND

AREA OF WORK, SEE 6 / GI-101C.

LINE OF WORK AREA ABOVE ON 9TH FLOOR.

SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION

WORK FOR ALL PHASES:

ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE

DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR

NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE

BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO

PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE

PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO

GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.

IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER

HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT

THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND

PLANNING.

FA

C

FA

C

FAC

FAC

DF

UP

UP

LEGEND

AREA OF WORK, SEE 3 & 5 / GI-101C

NEW LOOP (SHOWN FOR CLARITY ) PHASE 2

OLD LOOP TO BE REMOVED (SHOWN FOR CLARITY) PHASE 4.

HEMODIALYSIS STATION NOTE:

1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.

GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE

AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A

SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.

CEILING TILE REMOVAL NOTE:

1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING

MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.

MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE

REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.

PHASE THREE PLANS

GI-101C

1/4" = 1'-0"2 9TH FLOOR WORK AREA PHASE PLAN

1/4" = 1'-0"3 9TH FLOOR FINISH PHASEPLAN

N.T.S.4 8TH FLOOR WORK AREA

N.T.S.5 8TH FLOOR KEY MAP.

N.T.S.1 9TH FLOOR KEY MAP OF WORK

9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

31 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

JS JS

SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID

BASE HEAT TREATMENT RO WATER SYSTEM, B126,

3RD AND 9TH FLOOR

600-23-111

LONG BEACH VA HEALTHCARE SYSTEM

5901 E 7TH ST, LONG BEACH, CA 90822

01-02-2024

100% CONSTRUCTION DOCUMENTS

FOR CONSTRUCTION

SLA T

Y

T ER

J

J

OH

N

BROKEN ARROW

OKLAHOMA

S

O

ATA

TE

OF

M

OHALK

A

L TICENSED

CETIHCR

E F G

F G

H

AutoCAD SHX Text 03-10-23

AutoCAD SHX Text 04-14-23

AutoCAD SHX Text 07-14-23

AutoCAD SHX Text 09-15-23

AutoCAD SHX Text 09-29-23

AutoCAD SHX Text 11-03-23

AutoCAD SHX Text

35%%% SCHEMATIC

AutoCAD SHX Text

65%%% DD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% CD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-05-23

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-20-23

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

FA

C

FAC

FAC

DF

UP

UP

PHASE 4 - DEMOLITION AND REMODEL 3RD & 9TH FLOOR

1. PHASE 4 BEGINS AFTER ALL EQUIPMENT, POWER AND WATER FROM PHASE 3 IS IN GOOD

WORKING ORDER. NO DEMOLITON TO BEGIN UNTIL THE NEW RO SYSTEM IS COMPLETELY

3RD FLOOR:

OPERATIONAL.

2. DEMOLITON OF ALL 3RD FLOOR ITEMS INCLUDINGREMOVAL OF ALL EQUIPMENT FROM

THE 3RD FLOOR ROOM ACCESSIBLE FROM THE ROOF. ALL ELECTRICAL PANELS WITHIN

3RD FLOOR ROOM TO BE REMOVED BUT NEVER SHUT DOWN PRIOR TO NEW POWER BEING

PROVIDED ON THE 9TH FLOOR.

3. ALL ROOF PADS TO BE PLACED AND ANY RAMPS CREATED AS WELL AS NEW DOORS

INSTALLED.

4. FINAL ACT IS TO DISCONNECT THE MACHINERYAND POWER, AND REMOVED THOSE ITEMS,

AFTER POWER AND EQUIPMENT PLACED WITHIN 9TH FLOOR HEMODIALYSIS EQUIPMENT /

STORAGE ROOOM AS WELL AS NEW ELCTRICAL ROOM.

5. 3RD FLOOR ROOM TO BE REMODELD PER PLANS.

9TH FLOOR:

1. CEILINGS AND T-BAR TO BE REMOVED IN AND AROUND EXISTING LINE OF OLD LOOP

PIPE, SUB-PHASED INTO SMALLER AREAS THAT CAN BE REMOVED, PIPE REMOVED, AND

NEW CEILING TILE PLACED BACK PRIOR TO MORNING SHIFT OF CLINICAL STAFF USERS

EACH DAY.

2. OLD LOOP PIPE TO BE REMOVED AND PROPERLY DISPOSED OF.

3. ALL AREAS ARE TO HAVE TERMINAL CLEANING BY A 3RD PARTY CONTRACTOR THE END

OF EACH WORK NIGHT SHIFT IN PREPARATION FOR CLINCIAL STAFF USE OF THE FLOOR

DURING THE DAY.

4. INFECTION CONTROLS PROCEDURES SHALL BE PUT IN PLACE TO CONTAIN AND DUST

FROM DEMOLITION OPERATIONS IN CORRDIROS, OFFICES AND ROOMS PER

THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PERMIT. no WORK SHALL START

PRIOR TO BARRIERS BEING PUT IN PLACE ALONG WITH PROPER NEGATIVE PRESSURE.

5. ALL ROOMS HAVING DEMOLITION AND REMOVAL OF OLD LOOP TO BE WORKED UPON

EITHER ONE AT A TIME OR IN GROUPS AS COORDINATED WITH THE VA COR AND CO.

ROOMS AND OFFICES WILL BE NEEDE TO BE CLEANED AT THE END OF SHIFT SINCE IT

WILL BE USED THE NEXT DAY FOR PATIENT CARE.IF SHUTDOWN OF A ROOM/OFFICE

IS NEEDED FOR MORE T HAN ONE SHIFT, CONTRACTOR SHALL COORDINATE WITH THE

COR AND PROPOSE AN ALTERNATIVE THAT MINIMUMIZES IMPACT TO PATIENT CARE FOR

VA APPROVAL.

FA

C

FA

C

FAC

FAC

DF

UP

UP

LEGEND

AREA OF WORK.

OLD LOOP TO BE REMOVED.

D.C.W. DROP

TO 3RD FLOOR.

REMOVE CEILING TO REMOVE EXISTING LOOP LINE.

D E F G H J K L

W932A

NURSE STATION

W932A

NURSE STATION

W942

FELLOW

WORKROOM

DIALSATE

PREPARATION

RM

W932D

E958D

W920

W941A

W942A

W938A

W939A

944B

W940A

E947A

E954

CC-9-11

CC-9-3

W931

W927A

W927

W922

W925

E905

E904A

P-2P-1

E912

E912B

E912A

E913

E913A

W

2B

W931A W932C

W918

W919

W921

CC-9-6

CC-9-8

W924 W923C

W923B

E904

E911

E910

P-3 P-4

S-5

S-6

E909A

E909

W932F W932G W932H

E962

E961

E958B E958C

E958

E956

E955

E954A

E951

E952A

E953

E950

E950B

E9 49E948E947

W944A W944

W

W941B

W941

W941C

W940B

W940

W939

W938

NO 1

NO 3

TOILET

STOR

BREAK

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

FILE

STORAGE

RM

CORRIDOR

CORRIDOR

CO

RR

ID

OR

CLEAN

UTILITY

COPY RM

CHECK IN

G I PATIENT

WAITING

AREA

TOILET

EQUIP

MAINTENANCE

AREA

SVC

ELEVATORS

BIOHAZARD TRASH

TECH

OFFICE

PASSENGER ELEVATOR

ELEVATORELEVATOR

PATIENT

LOCKER RM

TOILET

WAITING AREA

SOCIAL

WORKERS

OFFICE

TELECOM

CO

RR

ID

OR

SO

ILE

D

UT

ILI

TY

MED RMHEAD

NURSE

SCOPE

WASHING

AREA

SCOPE ROOM

ME

CH

S

HA

FT

HAC EL

EC

TR

IC

AL

CORRIDOR

CORRIDOR

SUPPLY RM TELECOM

TELECOM

SOLUTION AREA

CO

RR

ID

OR

CO

RR

ID

OR

ME

CH

SH

AF

T

HAC

STORAGE

ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR

EQUIP

STORAGE

TOILET

MED 1

BED RM

MED 1

BED RM SCI 1 BED

RM

STAIR

ISO

OFFICE

PH

YS

IC

IA

N

RM

CO

NF

ER

EN

CE

R

M

FEMALE

LOCKER RM

MALE

LOCKER

RM

AL

CO

VE

STAFF

LOUNGE

CAPD

TRAINING

CAPD PGM

MECH RM

INFUSION

CLINIC

NURSE

STATION

PHYSICIAN OFFICE

GI RECOVERY

RM

NU

RS

ES

ST

AT

IO

N

WAITING RM

PH

AR

MA

CI

ST

O

FF

IC

E

ULTRA

SOUND

G I

RESEARCH

OFFICE

STAIR

SUPPLY RMPREP

EXAM RM

UL

TR

AS

OU

ND

O

MN

IC

EL

L-

ENDOS

PROCEDURE

RM-1

PROCEDURE RM-2

OMNICELL-2

OMNICELL-3

OMNICELL-4

FLEXIBLE

SIGMOIDOSCOPY

ENDOS

PROCEDURE

RM

ALCOVE INFUSION

CHAIR STA.

CUBICLE

FLOOR 9

ENTRY POINT

EN

DO

SC

OP

IC

RECOVERY RESTROOM

E950A

E951A

INFUSION CLINIC

RESTROOM

W932E

HEMO

DIALYSIS

NO 1

STAIR

E957

CAPD

CO-ORDR

E957

CAPD

CO-ORDR

E913A

TELECOM

E913B

ELECTRICAL

SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION

WORK FOR ALL PHASES:

ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE

DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR

NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE

BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO

PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE

PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO

GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.

IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER

HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT

THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND

PLANNING.

HEMODIALYSIS STATION NOTE:

1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.

GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE

AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A

SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.

CEILING TILE REMOVAL NOTE:

1. FOR CEILING TILES REMOVED IN AREAS WERE START OF SHIFT TO BEGIN THE FOLLOWING

MORNING: IF TILES CAN NOT BE REPLACED PRIOR TO STAFF SHIFT START THE SPRINKLER SYS.

MAY BE CONSIDERED OUT OF SERVICE & 1 HOUR FIRE RATED SEPARATION WALLS WILL BE

REQUIRED BETWEEN CONSTRUCTION AREA AND OCCUPIED PORTIONS OF THE BUILDING.

PHASE FOUR 9TH FLOOR PLANS

GI-101D1

N.T.S.1 9TH FLOOR KEY MAP

1/8" = 1'-0"2 9TH FLOOR WORK AREA PHASE PLAN

9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

31 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

JS JS

SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID

BASE HEAT TREATMENT RO WATER SYSTEM, B126,

3RD AND 9TH FLOOR

600-23-111

LONG BEACH VA HEALTHCARE SYSTEM

5901 E 7TH ST, LONG BEACH, CA 90822

01-02-2024

100% CONSTRUCTION DOCUMENTS

FOR CONSTRUCTION

SLA T

Y

T ER

J

J

OH

N

BROKEN ARROW

OKLAHOMA

S

O

ATA

TE

OF

M

OHALK

A

L TICENSED

CETIHCR

AutoCAD SHX Text 03-10-23

AutoCAD SHX Text 04-14-23

AutoCAD SHX Text 07-14-23

AutoCAD SHX Text 09-15-23

AutoCAD SHX Text 09-29-23

AutoCAD SHX Text 11-03-23

AutoCAD SHX Text

35%%% SCHEMATIC

AutoCAD SHX Text

65%%% DD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% CD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-05-23

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-20-23

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

RAMP DN

DNUP

UP

MICU-MECH-1

PHASE 4 - DEMOLITION AND REMODEL 3RD & 9TH FLOOR

1. PHASE 4 BEGINS AFTER ALL EQUIPMENT, POWER AND WATER FROM PHASE 3 IS IN GOOD

WORKING ORDER. NO DEMOLITON TO BEGIN UNTIL THE NEW RO SYSTEM IS COMPLETELY

3RD FLOOR:

OPERATIONAL.

2. DEMOLITON OF ALL 3RD FLOOR ITEMS INCLUDINGREMOVAL OF ALL EQUIPMENT FROM

THE 3RD FLOOR ROOM ACCESSIBLE FROM THE ROOF. ALL ELECTRICAL PANELS WITHIN

3RD FLOOR ROOM TO BE REMOVED BUT NEVER SHUT DOWN PRIOR TO NEW POWER BEING

PROVIDED ON THE 9TH FLOOR.

3. ALL ROOF PADS TO BE PLACED AND ANY RAMPS CREATED AS WELL AS NEW DOORS

INSTALLED.

4. FINAL ACT IS TO DISCONNECT THE MACHINERYAND POWER, AND REMOVED THOSE ITEMS,

AFTER POWER AND EQUIPMENT PLACED WITHIN 9TH FLOOR HEMODIALYSIS EQUIPMENT /

STORAGE ROOOM AS WELL AS NEW ELCTRICAL ROOM.

5. 3RD FLOOR ROOM TO BE REMODELD PER PLANS.

9TH FLOOR:

1. CEILINGS AND T-BAR TO BE REMOVED IN AND AROUND EXISTING LINE OF OLD LOOP

PIPE, SUB-PHASED INTO SMALLER AREAS THAT CAN BE REMOVED, PIPE REMOVED, AND

NEW CEILING TILE PLACED BACK PRIOR TO MORNING SHIFT OF CLINICAL STAFF USERS

EACH DAY.

2. OLD LOOP PIPE TO BE REMOVED AND PROPERLY DISPOSED OF.

3. ALL AREAS ARE TO HAVE TERMINAL CLEANING BY A 3RD PARTY CONTRACTOR THE END

OF EACH WORK NIGHT SHIFT IN PREPARATION FOR CLINCIAL STAFF USE OF THE FLOOR

DURING THE DAY.

4. INFECTION CONTROLS PROCEDURES SHALL BE PUT IN PLACE TO CONTAIN AND DUST

FROM DEMOLITION OPERATIONS IN CORRDIROS, OFFICES AND ROOMS PER

THE INFECTION CONTROL RISK ASSESSMENT (ICRA) PERMIT. no WORK SHALL START

PRIOR TO BARRIERS BEING PUT IN PLACE ALONG WITH PROPER NEGATIVE PRESSURE.

5. ALL ROOMS HAVING DEMOLITION AND REMOVAL OF OLD LOOP TO BE WORKED UPON

EITHER ONE AT A TIME OR IN GROUPS AS COORDINATED WITH THE VA COR AND CO.

ROOMS AND OFFICES WILL BE NEEDE TO BE CLEANED AT THE END OF SHIFT SINCE IT

WILL BE USED THE NEXT DAY FOR PATIENT CARE.IF SHUTDOWN OF A ROOM/OFFICE

IS NEEDED FOR MORE T HAN ONE SHIFT, CONTRACTOR SHALL COORDINATE WITH THE

COR AND PROPOSE AN ALTERNATIVE THAT MINIMUMIZES IMPACT TO PATIENT CARE FOR

VA APPROVAL.

EXISTING

NEW ROOF TILES

REMOVE ALL EQUIP. FROM ROOM

EXISTIN CONCRETE RAISED FLOOR LINE

UPGRADE RAMP

NEW MICU-MECH-1

7'-0"24'-5"

5' -0

EXISTING RAMP,

N.I.C. NO WORK.

NEW DOOR

AREA OF WORK

EXISTING DOOR

TO REMAIN

DISCONNECT EQUIPMENT.

AREA OF WORK

LEGEND

NEW

RAMP DN

PATCH AND REPAIR WALLS & DOOR

NEW RAMP

RE: 6F/AI-103

RE: 5F/AI-103

3/ G

I-

1D

POTENTIALINFILL CONCRETE FLOOR TO LEVEL

OF EXISTING CONC. RAISED FLOOR

FOR A COMPLETE LEVEL FLOOR

3" GC. TO CONFIRM.

PATCH & REPAIR AS REQUIRED.

EXISTING CONC. RAISED FLOOR TO REMAIN.

SUB-PHASING FOR ALL DEMOLITION AND CONSTRUCTION

WORK FOR ALL PHASES:

ALL WORK OUTSIDE OF THE NEW RO/DIALYSATE ROOM DURING DEMO AND INSTALL TO BE

DONE AFGTER HOURS WHEN PATIENTS AND STAFF HAVE LEFT FOR THE DAY AS CONTRACTOR

NEEDS TO ERECT TEMPORARY BARRIERS TO PERFORM WORK IN THE PUBLIC AREAS. THE

BARRIERS ARE TO BE REMOVED PRIOR TO END OF SHIFT. CONTRACTOR TO HIRE A 3rd PARTY TO

PERFORM TERMINAL CLEANING OF THE PUBLIC AREAS. ALL PHASING AND SUB PHASING TO BE

PROVIDED TO THE VA PRIOR TO THE START OF WORK. A MEETING SHALL BE SCHEDULED TO

GO OVER PHASING PLANS TO ENSURE THEY ARE ACCEPTABLE TO THECOR AND END USERS.

IF IT IS EXPECTED THAT ANY WORK IN ROOMS AND OFIFCES NEEDS TO BE PERFORMED AFTER

HOURS ONLY AND OFFICE/ROOM WILL BE SHUTDOWN FOR MORE THAN AN AFTER HOURS SHIFT

THIS NEEDS TO BE INCLUDED IN THE PHASING SUB-PLANS FOR PROPER DISCUSSION AND

PLANNING.

EXISTING SLAB

EXISTING SLAB

EXISTING

EXTERIOR WALL

EXISTING

PARAPET

EXISTING

ROOF

EXISTING 2ND

FLOOR SPACE

NEW VOID

INFILL AS REQ.

EXISTING DOOR

BEYOND

NEW RAMP

BEYOND

ALL VOIDS TO BE

FILLED.

ROOF ROOF

INTERIOR

3RD FLOOR

EXISTINGEXISTING

EXISTING

RAISED FLOOR

HEMODIALYSIS STATION NOTE:

1. NO MORE THAN TWO (2) HEMODIALYSIS STATIONS CAN BE DOWN (NON OPERABLE) AT A TIME.

GC TO CONFIRM WITH COR ANY HEMODIALYSIS STATIONS THAT ARE TO BE TAKEN OFF LINE

AND GAIN APPROVAL PRIOR TO TAKING ANY SUCH SYSTEM DOWN AND GIVE THE COR A

SCHEDULE FOR WHEN EXACT STATIONS WILL BE NON OPERABLE AND FOR HOW LONG.

PHASE FOUR, 3RD FLOOR PLAN

GI-101D2

N.T.S.1 3RD FLOOR KEY MAP

1/4" = 1'-0"2 ENLARGED 3RD FLOOR WORK PHASE PLAN 3 SECTION

1/4" = 1'-0"

9000 Wessex Place, Suite 202, Louisville, KY 40222 www.paradigmusa.com

FULLY SPRINKLERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

31 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

JS JS

SITE PREP FOR HEMODIALYSIS INSTALL NEW SKID

BASE HEAT TREATMENT RO WATER SYSTEM, B126,

3RD AND 9TH FLOOR

600-23-111

LONG BEACH VA HEALTHCARE SYSTEM

5901 E 7TH ST, LONG BEACH, CA 90822

01-02-2024

100% CONSTRUCTION DOCUMENTS

FOR CONSTRUCTION

SLA T

Y

T ER

J

J

OH

N

BROKEN ARROW

OKLAHOMA

S

O

ATA

TE

OF

M

OHALK

A

L TICENSED

CETIHCR

D

E

AutoCAD SHX Text 03-10-23

AutoCAD SHX Text 04-14-23

AutoCAD SHX Text 07-14-23

AutoCAD SHX Text 09-15-23

AutoCAD SHX Text 09-29-23

AutoCAD SHX Text 11-03-23

AutoCAD SHX Text

35%%% SCHEMATIC

AutoCAD SHX Text

65%%% DD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% CD

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-05-23

AutoCAD SHX Text

95%%% RESUBMISSION NFC

AutoCAD SHX Text 12-20-23

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

100%%% CONSTRUCTION DOCUMENTS

TO BLDG

126-OP

M E D

IC

IN

E S

MEDICINES

FAC

FAC

FAC

WAITING AREA

TO BUILDING

CONNECTING

CORRIDOR

TO BUILDING

126-OP

TO BUILDING

126-OP

N U C

LE

A R

NUCLEAR

8'-0 3_ 4"

7"

3'- 1_

59.51°

COUNTER

MW

MG

ME

MK

MA

MB

MS

PBK

WD

ATL

CS

WS

AC

UPS

EBS

UPS

WS

WT

JB1

CS2

CS1

JB2

FEC

FEC

FE

C

FEC

DF

DFDF

E-12D

E-

3A

W-146B

E-146A E-157

E-143A

E-104

E-

0B

W-147

W-163B

E-154A

WC-C2

W C-

C3

E-

3A

E-155A

W-169

E-156A

PC-C2

PC

-C

PC-C3

DC

-C

DC-C5

E-C-R4

E-

2D

MC

-C

MC

-C

E- C-

R7

E-C-R6

W-C1-9

E-C-R2

E-C-R1

E-C-C2

E-116

E-C-C1

E-C1-1

DC

-C

MC-C-7

DC

-C

2 E-170E

E-143

E-146

E-147

E-

7A

W-148C

W-128G

W-128E W-131C

E-160

E-170

E-141

E-128

DC-C3

MC-C6

MC-C4

E- C-

R5

E- C-

C3

E-C-R3

MC

-C

W C-

C1

W -1

W-164

W-161

NO 3

W-160

W-162

W-163A

W-168

W-128 V

W-169A

W-169B

W-169C

W-128X

W-128M

W-128UW-128L

W-128K W-128J

W-149

W-151

W-161A

W-128

W-150

W-128I

W-128H

W-128F

W-128D

W-128BW-128C

W-128AW-131

W-131A

W-132E

W-132D

W-131-G

#4

W-131D

W-148B

W-131E

W -1

F

W136

E-149

W-131J

NO 2

W-138

W-147

W-148

W-152

W-153W-170

E-172A

E-172B

E-172C

E-

8B

E-168

E-171 E-168A

E-172 E-140

E-139

E-138

E-137

E-170D

E-153

E-148

E-155

E-144

E-145

E-156

NO 4

E-142 E-141A E-132

E-132A

E-131B

E-131A

E-131C

E-131

E-130

E-167A

E-164

E-160A

E-167

E-159

E-159B E-166

E-165

P-3 P-4

S-5

S-6

E-113

E112D

E112E

E-111A

E-113B

E-114

E-

5E-

E-

E-

E-152

E-151

E-150

E-129A

E-129

E-128

E-127

E-124

E-125

E-126

E-123

E-122 E-121

E-120

E-120A

E-119

E-119B

E-119A E-108

E-105

P-2

1W105

P-1

1W102A

NO 1

W-132A

W-132-B

W-132-C

W-134

W-135

W-139

W-140

W-141

E-133

E-133A

E-134AE-134E-135E-135AE-136E-170CE-170A

W-159W-158W-157 W-156

W-155W-154 W-146W-145W-144W-143W-142

E-

W-139A

E-145A

E-148A

E-148B

E-168C

E-168D

W-163

W-128L-1

W-128W

E-107

1W129

1W131 1W139 1W141

1W128A 1W128

1W132

1W133

1W134

1W136

1W137 1W143

1W123 1W135

1W124

1W1421W1401W138

1W102B1W1021W106A

1W103 1W109

1W111A 1W127

1W126

1W111F

1W113

1W1141W121

1W115

1W117 1W118 1W120

1W112

1W119

1W107A

1W108

1W110A

1W107

1W107B

1W104

1W

1W125 1W130E

1W

0D

1W106

1W100

1W101

E- C1

-1 E

1W133B

N/E

N/E

E-C1-1A

N/E

NA

1W111

N/E

FIRE EQUIPMENT CLOSET

CO

MP

UT

ED

TO

MO

GR

AP

HY

RE

AD

IN

G

RO

OM

FAC

ELECTRICAL CLOSET

CONTROL

ROOM

RESTROOM

CONTROL ROOM

TELECOM ROOM

ELECTRICAL CLOSET

BR

EA

KR

OO

M

FIRE EQUIPMENT

SIG AND TEL

CLOSETS

ELECTRICAL ROOM

DIRTY UTILITY

ROOM

(DERMATOLOGY)

DRESSING

ROOM

CORRIDOR

(WOMEN'S HEALTH)

CO

RR

ID

OR

(W

OM

EN

'S

H

EA

LT

H)

FAC

CO

NT

RO

L R

OO

M

TRANSPORTATION RECEPTION

CONTROL ROOM

CORRIDOR (OPMH)

CO

RR

ID

OR

(O

PM

H)

CORRIDOR (OPMH)

CO

RR

ID

OR

CORRIDOR

CORRIDOR

CO

RR

ID

OR

CO

RR

ID

OR

CO

RR

ID

OR

CO

RR

ID

OR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

RECEPTION

CORRIDOR

CORRIDOR

CORRIDOR (DERMATOLOGY)

CO

RR

ID

OR

(D

ER

MA

TO

LO

GY

ENTRY LOBBY

SIG AND TEL

PATIENT

ADVOCATE

INTERVENTIONAL

RADIOLOGY

PROCEDURE

ROOM

FLUOROSCOPY ROOM

FLUOROSCOPY ROOM

CO

NT

RO

L R

OO

M

PROCEDURE

ROOM-2

(DERMATOLOGY)

INTERVIEW

ROOM (OPMH)

INTERVIEW

ROOM (OPMH)

EXAM ROOM #3

SVC

ELEVATOR

LOBBY

MAMMOGRAPHY IMAGING

PATIENT ADVOCACY

LOBBY/WAITING

ROOM

BONE DENSITY

HAC

CORRIDOR

(DERMATOLOGY)

CORRIDOR

CORRIDOR

CO

RR

ID

OR

CO

RR

ID

OR

CORRIDOR

CO

RR

ID

OR

CO

RR

ID

OR

(W

OM

EN

'S

H

EA

LT

H)

CO

RR

ID

OR

EXAM ROOM

(DERMATOLOGY)

EXAM

ROOM

(DERMATOLOGY)

STAIRWAY

EXAM ROOM

(DERMATOLOGY)

PHOTOTHERAPY

(DERMATOLOGY)STAFF

RESTROOM

(DERMATOLOGY)

FAMILY RESTROOM

TELECOM ROOM

TRANSPORTATION OFFICE

TRANSPORTATION BREAKROOM

ELECTRICAL ROOM

HAC

TELECOM

ROOM

RADIOLOGY

CONFERENCE

ROOM

BREAKROOM

(RADIOLOGY)

RECEPTION /

LOBBY

INTERVIEW

ROOM (OPMH)

QUIET ROOM

EXAM

ROOM

(DERMATOLOGY)

EXAM

ROOM

(DERMATOLOGY)

CLINIC NURSE

(DERMATOLOGY)

WAITING

ROOM

(OPMH)

EXAM

ROOM

(DERMATOLOGY)

RESTROOM

INTERVIEW

ROOM (OPMH)

INTERVIEW

ROOM (OPMH)

STORAGE

INTERVIEW

ROOM (OPMH)

INTERVIEW

ROOM (OPMH)

BREAKROOM (OPMH)

WOMEN'S HEALTH

WAITING ROOM

WOMEN'S

HEALTH

RECEPTION

AND CHECK IN

SOCIAL WORKER'S

OFFICE

SOCIAL WORKER'S

OFFICE

(SPECIALITY CLINIC)

WOMEN'S

HEALTH

TEAMLET ROOM

EXAM ROOM

EXAM ROOM #2

STORAGE (DERMATOLOGY)

EXAM

ROOM # 1

W

OM

EN

'S

R

ES

TR

OO

M

WOMEN'S

RESTROOM

PET / CT

SCANNER

CLEAN

ROOM

STAIRWAY

ACUPUNCTURE

MICROSCOPE ROOM

(DERMATOLOGY)

PROCEDURE

ROOM1

(DERMATOLOGY)

RESIDENT

STORAGE

WAITING ROOM

(DERMATOLOGY/ONCOLOGY/HEMATOLOGY

ULTRASOUND

EXAM ROOM

ULTRASOUND

EXAM ROOM

ULTRASOUND

EXAM ROOM

CO

NT

RO

L R

OO

MDIGITAL

RADIOGRAPHIC

CHEST ROOM

RESTROOM

STORAGE

READING ROOM

OFFICE

READING

ROOM

WOMEN'S TOILET

MEN'S TOILET

PATIENT

ADVOCATE

X-RAY RM-1

DRESSING

ROOM

X-RAY RM-2

CONTROL ROOM

DRESSING

ROOM

EXAM ROOM

STAIRWAY

READING

ROOM STORAGE READING

ROOM

INTERVENTIONAL

PATIENT

HOLDING

RADIOLOGY/

IMAGING FILE

ROOM

ADVANCED

IMAGING ROOM

GENERAL

DIAGNOSTIC

READING ROOM

WET READ

READING ROOM

STAFF

RADIOLOGIST

STORAGE

TRASH

CHUTE

SUPPLY ROOM

GURNEY

AREA

QUALITY

CONTROL

COPY

ROOM

SUPERVISOR

AND

RADIOLOGIST

OFFICE

ELEVATOR ELEVATOR

ELEVATOR

ELEVATOR

NUTRITION

ELECTRICAL

TELE

CLOSET

COMPUTED

TOMOGRAPHY

READING

ROOM

CT

SUPERVISOR

OFFICE

STRESS ROOM

RE

ST

RO

OMDE

CA

Y

W

OM

EN

'S

T

OI

LE

T

ME

N'

S

TO

ILE

T

CT SCAN ROOM

CT CONTROL

ROOM

CT EXAM

STAFF

RADIOLOGIST

STAFF

RADIOLOGIST

STAFF

RADIOLOGIST

SOILED

UTILITY

ROOM

READING ROOM

ADMINISTRATIVE ASSISTANT OFFICE

LEAD CLERK /

TIME KEEPER

GAMMA CAMERA

GAMMA

CAMERA

GAMMA

CAMERA

SUPERVISOR OFFICE

WAITING

ROOM

PATIENT

DOSING

HOT LAB

RADIOPHARMACYFIRE

ALARM

ROOM

RECEPTION

ELEVATOR

MEN'S RESTROOM

ELEVATOR

STAIRWAY

SPECIALITY

CLINIC

RECEPTION

SOCIAL WORKER'S

OFFICE (ED)

SOCIAL

WORKER'S

OFFICE (ED)

WOMEN'S

HEALTH

TEAMLET ROOM

WOMEN'S

HEALTH

TEAMLET ROOM

VA STAFF

LACTATION

ROOM

BATH

ACUPUNCTURE

ACUPUNCTURE

NEURO

RADIOLOGY

READ…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .