Attachment_4_-_Bidder_Cost_Sheet.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Request for Proposal 2526-09 Statewide Site Monitoring Services
Solicitation number
0000039220
Issued by
California

About this file

This is a bidder cost sheet attachment for a Request for Proposal issued by the California Department of Toxic Substances Control (DTSC) for statewide site monitoring services. The proposal solicits qualified firms to provide personnel, materials, supplies, facilities, and equipment to monitor between 400 and 1,000 DTSC sites throughout California that have institutional controls in place. The scope of work is divided into two main tasks: Task 1 requires monitoring activation for current DTSC sites at a cost of $400 per site, with an additional task for activation of additional DTSC sites at an unknown cost; Task 2 comprises maintenance and operation of notification and reporting capabilities through seven subtasks, with overhead costs to be included in the monthly rates for these subtasks.

The cost sheet specifies monthly rates for seven monitoring subtasks ranging from $5 to $400 per site per month. Subtask 2a, reviewing Underground Service Alerts, carries the highest monthly cost at $400 per site, while Subtasks 2c and 2d (reviewing dredging permits and real estate listings, respectively) are the lowest at $5 per site per month. Additional subtasks include reviewing building permits ($30 per month), sensitive use permits ($50 per month), CEQANet database ($50 per month), and water well permits ($20 per month). The cost sheet indicates that DTSC has provided approximate site numbers for immediate enrollment in most monitoring types, though projections for Task 1b and Subtask 2h are dependent on other variables and were not specified in the bidding documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Sheet

Task #DescriptionCost ($) per siteNumber of sitesInstructions
Task 1a)Monitoring Activation for all current DTSC Sites400In the blank cells, please enter the estimated costs to carry out each task/subtask comprising the Scope of Work. Overhead costs associated with operating and maintaining the systems needed to perform the monitoring should be included in the rates for Subtasks 2a-2h.
Task 1b)Monitoring Activation for additional DTSC SitesUnknown
Task 2)Maintenance and Operation of required notification and reporting capabilitiesIncluded in Subtasks 2a-2h.N/A
Task #DescriptionCost ($) per site per monthNumber of sitesApproximate numbers of sites that DTSC will wish to immediately enroll in each type of monitoring have been provided where applicable. No projected site numbers are given for Task 1b) and Subtask 2h) as these will depend on other variables.
Subtask 2aReview Underground Service Alerts400
Subtask 2bReview Building Permits30
Subtask 2cReview Dredging Permits5
Subtask 2dReview Real Estate Listings5
Subtask 2eReview Sensitive Use Permits50
Subtask 2fReview CEQANet Database50
Subtask 2gReview Water Well Permits20

File details come from the government source that posted it. Updated .