Attachment 4- Appendix A.pdf

PDF 181 KB Posted

Attached to
Elevator Repair and PM Services for the Albuquerque Service Unit
Solicitation number
75H70726Q00070
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for elevator maintenance and emergency response services at a healthcare facility. The document outlines the Government's approach to monitoring contractor performance and verifying compliance with the underlying Performance Work Statement (PWS).

The QASP establishes six key performance objectives with specific standards and acceptance quality levels (AQL). Preventive Maintenance requires 100% completion of monthly services for each elevator annually, monitored through monthly Contracting Officer's Representative (COR) review of maintenance logs and random inspections, with reperformance at no cost as the remedy for non-compliance. Emergency Response to entrapment must occur within 1 hour with a 95% AQL, verified through incident logs and COR verification, requiring a corrective action plan if deficient. Routine Repairs must be completed within agreed timeframes (typically 24–72 hours unless parts are required) at 95% AQL, monitored through work order tracking with reperformance or schedule adjustment as remedy. Healthcare Environment Compliance maintains a zero-tolerance standard for disruptions to patient care and violations of infection control requirements, with ongoing COR observation and immediate corrective action or possible site removal as remedy. Safety Compliance requires adherence to OSHA, ASME, NFPA, and facility safety requirements with zero-tolerance for violations, enforced through inspection reports and incident logs with possible work stoppage. Documentation requires 100% on-time submission of complete and accurate monthly maintenance and service reports, with invoice withholding as the remedy for non-compliance. All deficiencies must be corrected at no additional cost prior to Government acceptance.

View the file

Other files

File Type Posted
Attachment 2- IHS IEE Representation Form.pdf PDF
Attachment 1- Fillable Table.docx DOCX document
Sol_75H70726Q00070.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. PURPOSE

This QASP defines the Government’s approach to monitoring contractor performance and verifying compliance with the PWS.

2. SURVEILLANCE METHODS

• Review contractor-submitted monthly maintenance logs for each elevator

• Verify completion dates, technician signatures, and tasks performed

• Conduct random spot-check inspections of elevators after maintenance

• Compare logs against scheduled maintenance plan

3. PERFORMANCE STANDARDS AND INSPECTION CRITERIA

Performance

Objective Standard Performance

Metric Acceptable

Quality Level

(AQL)

Surveillance Method

Frequency Remedy

Preventive Maintenance

Monthly maintenance completed for each elevator

12/12 scheduled services completed per elevator annually

100% COR review of maintenance logs; random inspections

Monthly Re-performance at no cost;

document in CPARS if recurring

Emergency Response –

ASU

Response to entrapment within 1 hour

% of emergency calls responded to within required timeframe

95% Incident logs;

COR

verification

As needed Corrective action plan required

Routine Repairs

Repairs completed within agreed timeframe (typically 24– 72 hours unless parts required)

% of repairs completed within timeframe

95% Work order tracking; COR review

As needed Re-performance or schedule adjustment

Healthcare Environment

Compliance

No disruption to patient care;

compliance with infection control and facility requirements

Number of disruptions, complaints, or violations

100% (Zero tolerance)

COR

observation;

facility feedback

Ongoing Immediate corrective action;

possible removal from site

Safety Compliance

Compliance with OSHA, ASME, NFPA, and facility safety requirements

Number of safety violations or incidents

100% (Zero tolerance)

Inspection reports;

incident logs

Ongoing Immediate corrective action;

possible work stoppage

Documentati on

Complete and accurate maintenance and service reports submitted monthly

% of reports submitted on time and complete

100% COR review Monthly Invoice withholding until compliant

4. CORRECTIVE ACTIONS

Any failure to meet an equipment acceptance criterion constitutes non-acceptance. All deficiencies shall be corrected at no additional cost prior to Government acceptance.