This solicitation is for construction services to support installation of replacement and new WiFi access points at the Fort Harrison VA Health Care System campus in Montana. The scope of work includes installing 5,000 linear feet of conduit and raceways, horizontal and vertical penetrations, and fire stopping to enable the NextGen WiFi upgrades. The contractor must verify field conditions, perform all work during normal business hours for 90 days after receiving notice to proceed, and complete conduit and penetration work before the new access point installation date. Submittals required are product data and samples, as-built drawings, and the final central drawing set. Privacy and security policies must be followed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Rate_Montana.pdf | ||
| Attachment 2 - VA ENT Fort Harrison Redesign - AP Locations.pdf | ||
| Attachment 1 - 436-21-704 EHRM NextGen WiFi Upgrades.docx | DOCX document | |
| 36C25922R0085_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA ENT Redesign - Survey Report
Fort Harrison
May 26, 2022
Revision: 1.1
VA WIFI NextGen Technology Refresh Project
Prepared for
Department of Veterans Affairs
Redesign Survey Report Template Revised: March 3, 2022
NextGen Technology Refresh Project i Version No: 2.2
Revision History
CREATION
DATE
VERSION
NO.
DESCRIPTION/COMMENTS AUTHOR(S) ISSUE DATE
05/07/2014 1.0 Initial draft Donald James 05/07/2014
11/29/2017 1.1 Created separate document for Heat Maps Donald James 11/01/2017
12/06/2017 1.2 Updated AP Details tables Donald James 12/06/2017
02/20/2018 1.3 Added Sq Footage Donald James 02/20/2018
03/22/2018 1.4 Updating Table 6 for redesign Donald James 03/22/2018
05/18/2018 1.5 Added cover and bracket counts Donald James 05/18/2018
03/05/2019 1.6 Updated for NextGen project to include CLIN buildup Donald James 03/05/2019
12/03/2019 1.7 Updated table 6 to add additional data Donald James 120/3/2019
02/02/2020 1.8 Updated to add information on swap orientation changes and wall mount brackets used
Donald James 02/02/2020
07/19/2021 1.9 Updated CLIN Table Donald James 07/19/2021
08/20/2021 2.0 Updated Section 1.2 and added column to Table 6 for Pre-Installs
Donald James 08/20/2021
02/14/2022 2.1 Updated Table 2 to include Mounting Notes and Section 1.2
Donald James 02/14/2022
03/03/2022 2.2 Updated Section 1.2 Donald James 03/03/2022
Content Revision History
REVISION
NO.
DESCRIPTION/COMMENTS AUTHOR(S) DELIVERY
DATE
1.0 Initial Delivery AT&T / TekSynap Team 05/25/2022
1.1 Updated Table 6 for Building 154 – Floor 4 AT&T / TekSynap Team 05/26/2022
NextGen Technology Refresh Project ii Version No: 2.2
Table of Contents
1 Introduction
1.1 Document Purpose
1.2 Facility Size
1.3 Coverage Areas
2 Full Redesign Package Documents
3 Access Points Not Swapped or Offline After Swap
4 Access Points to be Moved to Correct Coverage
5 APs Added to Meet Coverage Requirements
6 Other Exceptions
7 Non 2800 APs Still Online
8 Installation Work Detailed Breakout
9 CLIN Data and Calculations
Table of Tables
Table 1: Access Points Not Swapped or Not Online
Table 2: Access Points to be Moved
Table 3: Redesign APs
Table 4: Other Coverage Exceptions
Table 5: Online Non 2800 APs
Table 6. Detailed AP / Cable Installation Breakdown
Table 7: CLINs
Table 8: Facility Related CLIN Development
Table 9: AP Install CLIN Development
NextGen Technology Refresh Project 1 Version No: 2.2
1 Introduction
1.1 Document Purpose
This deliverable package contains the information gathered during the physical redesign survey activities after the 1-1 AP swap was completed. This includes information about the APs including placement information.
1.2 Facility Size
The wireless project covers a total of 500,002 square feet and includes 813 APs.
The main campus covers 324,436 square feet and includes the addition of 66 new APs to the base of 380 APs for a total of 446 APs (plus 10 spares). 0 covers are required and 0 were installed to protect the APs in the lockdown mental health ward and other areas as necessary, 0 channel adapters to mount APs and 5 angle brackets to change the orientation of the AP from vertical to horizontal.
We provided 0 Predictive designs for the main campus due to COVID restrictions.
The remote sites requiring a Physical Redesign survey are Billings-Majestic HCS which covers 59,885 square feet and includes the addition of 0 new APs to the base of 36 APs for a total of 36 APs. 0 covers were installed to protect the APs in the lockdown mental health ward and other areas as necessary, 0 channel adapters to mount APs and 1 angle brackets to change the orientation of the AP from vertical to horizontal.
The remote sites requiring Predictive surveys covers 115,681 square feet and includes the addition of 134 new APs to the base of 6 APs for a total of 140 APs. 0 covers were installed to protect the APs in the lockdown mental health ward and other areas as necessary, 0 channel adapters to mount APs and 0 angle brackets to change the orientation of the AP from vertical to horizontal.
At sites Building 172 Floor Basement, Building 172 Floor 1, Billings Spring Creek CBOC, Bozeman CBOC, Butte CBOC, Great Falls CBOC, Havre CBOC, Miles City CBOC and Missoula CBOC there are 181 Pre-Installed APs from previous Activation activities. We are accounting for them in the total counts of APs as seen below in Section 8 and Table 9 found in Section 9.
1.3 Coverage Areas
The areas covered by this redesign effort are included in Table 6 in Section 8.
NextGen Technology Refresh Project 2 Version No: 2.2
2 Full Redesign Package Documents
This redesign package includes diagrams of the APs that were swapped and the required redesign APs (AP locations PDF), the tables that specify the APs that expected to be swapped but could not be and APs that were swapped but did not come online, APs that had changes in their installed location, the necessary redesign APs and any exceptions. The redesign package consists of the following documents.
• VA ENT Fort Harrison Redesign - AP Locations PDF: Redesign AP location graphics
• VA ENT Fort Harrison Redesign - Heatmap Report
The rest of the information including exceptions is contained in this document.
3 Access Points Not Swapped or Offline After Swap
This table lists any access points that were not able to be swapped by the TekSynap Team and any APs that were swapped but did not come online. In addition, a layer was added to the AP locations PDF showing the APs that were not online during the survey.
Table 1: Access Points Not Swapped or Not Online
Building Floor AP Remarks
20 1 AP05
The AP was offline during the survey. AP05 requires a new cable pull. Cable is damaged. 5/23 the
AP was back online. Will monitor.
141 2 AP12
The AP was offline during the survey. AP12 requires a new cable pull.
154 Basement AP07 and AP08 The APs were offline during the survey. AP07 and AP08 require new cable pulls.
154 2 AP16
The AP was not swapped in a sterile area where it is above the hardpan ceiling. Per email from the site, this has been left for the installation team.
NextGen Technology Refresh Project 3 Version No: 2.2
Building Floor AP Remarks
154 4 AP16
The AP was not swapped due to patient care. Left with POC to swap when the room becomes available.
4 Access Points to be Moved to Correct Coverage
Some access points will need to be moved to provide the proper coverage levels rather than adding another AP. This table documents the APs that will need to be moved as part of the installation process. The final location of the access points is updated in the site’s VA ENT For Harrison Redesign - AP Locations PDF file.
Table 2: Access Points to be Moved
Building Floor AP Description Mounting Notes
154 2 AP08
We propose moving AP08 from 226L to
224L to meet VA-ENT requirements.
154 2 AP29
We propose moving AP29 from 227L to
273A to meet VA-ENT requirements.
154A Basement AP05 We propose moving AP05 from B25 to
B1 to meet VA-ENT requirements.
154A Basement AP13 We propose moving AP13 from B11 to
B70 to meet VA-ENT requirements.
154A Basement AP19 We propose moving AP19 from B31O to B31A to meet VA-ENT requirements.
Billings HCC AP29 We propose moving AP29 from SP02 to AAM05 to meet VA-ENT requirements.
NextGen Technology Refresh Project 4 Version No: 2.2
5 APs Added to Meet Coverage Requirements
The following access points were added to provide the required RF coverage.
Table 3: Redesign APs
Building Floor Access Point
Room Number / Location
Mounting Notes
16_16A 1 AP05 Shop Steel header warehouse type, Horizontal bracket - wall, Conduit
16_16A 1 AP06 Garage / Center Steel header warehouse type, Horizontal bracket - wall, Conduit
16_16A 1 AP07 Office & TV Room
17 Basement AP01 Lower left
Steel header warehouse type, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers
17 Basement AP02 Top center
Steel header warehouse type, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers
17 Basement AP03 Upper right
Steel header warehouse type, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers
17 Basement AP04 Lower center
Steel header warehouse type, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers
17 1 AP01
Unnamed room at lower left
17 1 AP02
Unnamed room at center
Concrete header ceiling, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers
17 1 AP03
Unnamed room at upper right
Concrete header ceiling, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers
NextGen Technology Refresh Project 5 Version No: 2.2
Building Floor Access Point
Room Number / Location
Mounting Notes
20 1 AP08
Storage at center/left of center
Concrete header ceiling, 4 11/16" Dual Gang Box, Conduit, Ceiling is made of exposed wooden headers under aluminum sheets
20 1 AP09
Storage at lower center
Concrete header ceiling, 4 11/16" Dual Gang Box, Conduit, Ceiling is made of exposed wooden headers under aluminum sheets
141 Basement AP28 B1-A Steel header warehouse type, Horizontal bracket - wall
141 Basement AP29 Hallway outside B-3
141 Basement AP30 B-37
141 Basement AP31 B-13
141 Basement AP32 Hallway left of B-9 and
B-10 / lower left Concrete header ceiling, Horizontal bracket - wall
141 1 AP24 143
141 1 AP25 148
141 1 AP26 133
141 1 AP27 108
141 1 AP28 109
141 1 AP29 126
141 2 AP27 220
141 2 AP28 239
141 3 AP16 328A
141 3 AP17 303A
150 1 AP09 Hallway below 101
150 1 AP10 106-D
154 Basement AP10 Unnamed room in lower left Concrete header ceiling, 4 11/16"
Dual Gang Box, Conduit
NextGen Technology Refresh Project 6 Version No: 2.2
Building Floor Access Point
Room Number / Location
Mounting Notes
154 Basement AP11 B04 Concrete header ceiling, 4 11/16"
Dual Gang Box, Conduit
154 Basement AP12 Prosthetics Concrete header ceiling, 4 11/16"
Dual Gang Box, Conduit
154 Basement AP13 South Lobby Project Concrete header ceiling, 4 11/16"
Dual Gang Box, Conduit
154 Basement AP14 Sleep Concrete header ceiling, 4 11/16"
Dual Gang Box, Conduit
154 1 AP03 170
Hard pan - drywall, Conduit, this area is the pharmacy vault. The penetration will need to go through concrete.
154 1 AP101
Unnamed area left of
154 1 AP102
Corridor outside of
A187
154 1 AP103 A192
154 1 AP104 A149B
154 1 AP105 A148
154 1 AP106 106
154 1 AP107 130
154 1 AP108 A100
154 1 AP109 A103
154 1 AP110 A120
154 1 AP111 122
154 1 AP112 102K
154 1 AP113 152
154 1 AP114 84
154 1 AP115 A127
NextGen Technology Refresh Project 7 Version No: 2.2
Building Floor Access Point
Room Number / Location
Mounting Notes
154 1 AP116 C-107B
154 2 AP15 211L
154 2 AP35 238D
154 2 AP36 214A Hard pan - drywall
154 2 AP37 219
154 2 AP38 224
154 3 AP10 353
154 3 AP30 349
154 3 AP31 325
154 4 AP32 446
154 5 AP01
Unnamed room center right Concrete header ceiling, Horizontal bracket - wall, Conduit
154 5 AP02
Unnamed room right of center Concrete header ceiling, Horizontal bracket - wall, Conduit
169 1 AP23 Corridor outside 212 Hard pan - drywall, Cable raceway, Accessible ceiling area in corridor through access panel.
171 1 AP01
Unnamed office left of top center
171 1 AP02 Center left/lower left Steel header warehouse type, Horizontal bracket - wall, Conduit
171 1 AP03 Center right Steel header warehouse type, Horizontal bracket - wall, Conduit
NextGen Technology Refresh Project 8 Version No: 2.2
6 Other Exceptions
Table 4: Other Coverage Exceptions
Building Floor Room Number
/ Location Exception
16_16A 1 Gray areas throughout The areas are best effort coverage.
16_16A 1 Gray areas throughout To correct the areas, we propose adding AP05 - AP07 to the design.
20 1 Gray area at center The area is best effort coverage.
20 1 Gray areas throughout To correct the areas, we propose adding AP08 - AP09 to the design.
20 1 White and gray areas at top The areas are due to AP05 being offline during the survey.
141 Basement White and gray areas throughout
The areas are excluded from coverage per the annotated drawing or require
Standard-1 coverage.
141 Basement Gray areas throughout To correct the areas, we propose adding AP28 - AP32 to the design.
141 1 White areas throughout The areas are excluded from coverage per the annotated drawing.
141 1 Gray areas throughout To correct the areas, we propose adding AP24 - AP29 to the design.
141 2 White areas throughout The areas are excluded from coverage per the annotated drawing.
141 2 Gray areas throughout To correct the areas, we propose adding AP27 and AP28 to the design.
141 2 Gray area at center The areas are due to AP12 being offline during the survey.
141 3 White areas throughout The areas are excluded from coverage per the annotated drawing.
141 3 Gray areas throughout To correct the areas, we propose adding AP16 and AP17 to the design.
NextGen Technology Refresh Project 9 Version No: 2.2
Building Floor Room Number
/ Location Exception
150 Basement White and gray areas throughout
The areas are excluded from coverage per the annotated drawing or require
Standard-1 coverage.
150 1 White areas throughout The areas are excluded from coverage per the annotated drawing.
150 1 Gray areas throughout To correct the areas, we propose adding AP09 - AP10 to the design.
154 Basement White and gray areas throughout
The areas are excluded from coverage per the annotated drawing or require
Standard-1 coverage.
154 Basement White areas at left To correct the areas, we propose adding AP10 - AP14 to the design
154 Basement Gray areas at bottom right The areas are due to AP07 and AP08 being offline during the survey.
154 1 White and gray areas throughout
The areas are excluded from coverage per the annotated drawing, are best effort coverage, require Standard-1 coverage or are outside the perimeter of the building.
154 1 Gray areas throughout To correct the areas, we propose adding AP03 and AP101 - AP116 to the design.
154 2 White and gray areas throughout
The areas are excluded from coverage per the annotated drawing or are best effort coverage.
154 2 Gray areas throughout To correct the areas, we propose adding AP15 and AP35 - AP38 to the design.
154 2 Gray areas throughout To correct the areas and to meet the VA-ENT requirements, we propose moving AP08 and AP29 in the design.
154 2 Gray areas at bottom center The areas are due to AP16 being offline during the survey.
NextGen Technology Refresh Project 10 Version No: 2.2
Building Floor Room Number
/ Location Exception
154 3 White and gray areas throughout
The areas are excluded from coverage per the annotated drawing or are best effort coverage.
154 3 Gray areas throughout To correct the areas, we propose adding AP10 and AP30 - AP31 to the design.
154 4 White and gray areas throughout
The areas are excluded from coverage per the annotated drawing or are best effort coverage.
154 4 Gray areas at left center To correct the areas, we propose adding AP32 to the design.
154 5 White areas throughout The areas are excluded from coverage per the annotated drawing.
154A Basement White and gray areas throughout
The areas are excluded from coverage per the annotated drawing, best effort coverage, requires Standard-1 coverage or are outside the perimeter of the building.
154A Basement Gray areas throughout
To correct the areas and to meet the VA-ENT requirements, we propose moving AP05, AP13 and AP19 in the design.
169 1 White and gray areas throughout
The areas are excluded from coverage per the annotated drawing or requires
Standard-1 coverage.
169 1 Gray areas at top left To correct the areas, we propose adding AP23 to the design.
170 1 White area at bottom The area is excluded from coverage per the annotated drawing.
Billings Majestic
HCC
1 White areas throughout
The areas are excluded from coverage per the annotated drawing.
NextGen Technology Refresh Project 11 Version No: 2.2
Building Floor Room Number
/ Location Exception
Billings Majestic
HCC
1 Gray areas at top left
To correct the areas and to meet the VA-ENT requirements, we propose moving AP29 in the design.
7 Non 2800 APs Still Online
This table lists the non 2800 APs that are still online at this facility
Table 5: Online Non 2800 APs
AP Model Remarks
N/A
NextGen Technology Refresh Project 12 Version No: 2.2
8 Installation Work Detailed Breakout
This table contains the detailed list of the AP Swaps, Redesign APs and required cable pulls. The column headers are described after the table.
Table 6. Detailed AP / Cable Installation Breakdown
Bldg Fl Site Type Coverage Pulls Moves
ECU
Swap
ECU
Install Lift
Swap Lift
Install Orient Change
Conduit Angle
Bracket
LMH
Cover APs
Down Base 2802i
Pre- Inst
2802i
Add 2802i
Inst 2802i
Total APs
Comments
Total 210 6 0 0 0 0 1 20 9 0 13 422 181 210 415 813
10 10
16_16A 1 VAMC RF HD 3 0 0 0 0 0 0 2 2 0 0 4 0 3 4 7
17 B VAMC RF HD 4 0 0 0 0 0 0 4 0 0 0 0 0 4 0 4
17 1 VAMC RF HD 3 0 0 0 0 0 0 2 0 0 0 0 0 3 0 3
20 1 VAMC RF HD/LBS
0 0 0 0 0 0 2 0
0 1 7 0 2 7 9 AP05 was offline during the survey and requires a new cable pull. Cable is damaged. 5/23 the AP was back online. Will monitor.
141 B VAMC RF HD/LBS 5 0 0 0 0 0 0 0 2 0 0 27 0 5 27 32
141 1 VAMC RF HD/LBS 6 0 0 0 0 0 0 0 0 0 0 23 0 6 23 29
141 2 VAMC RF HD/LBS 3 0 0 0 0 0 0 0 0 0 1 26 0 2 26 28 AP12 is offline and requires a new cable pull.
141 3 VAMC RF HD/LBS 2 0 0 0 0 0 0 0 0 0 0 15 0 2 15 17
150 B VAMC RF HD/LBS 0 0 0 0 0 0 0 0 0 0 0 15 0 0 15 15
150 1 VAMC RF HD/LBS 2 0 0 0 0 0 0 0 0 0 0 8 0 2 8 10
154 B VAMC RF HD/LBS
0 0 0 0 0 0 5 0
0 2 9 0 5 9 14 AP07 & AP08 are offline and require new cable pulls.
154 1 VAMC RF HD/LBS 17 0 0 0 0 0 0 1 0 0 0 99 0 17 99 116
154 2 VAMC RF HD/LBS
2 0 0 0 0 0
0 0
0 1 33 0 5 32 38
AP16 needs to be swapped. AP is in a sterile room above hatch, need access from FMS. POC requested by email that we move this to redesign phase. AP08 & AP29 moves require new cable pulls.
154 3 VAMC RF HD/LBS 3 0 0 0 0 0 0 0 0 0 0 28 0 3 28 31
154 4 VAMC RF HD/LBS
0 0 0 0 0 0 0 0
0 1 31 0 1 31 32 AP16 needs to be swapped. AP was not swapped due to patient care.
154 5 VAMC RF
Standard-
0 0 0 0 0 0 2 2
0 0 0 0 2 0 2
154A B VAMC RF HD/LBS 3 3 0 0 0 0 0 0 0 0 0 28 0 0 28 28 AP05, AP13 & AP19 moves require new cable pulls.
169 1 VAMC RF HD/LBS 1 0 0 0 0 0 0 0 0 0 0 22 0 1 22 23
170 1 VAMC RF HD 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 5
171 1 VAMC RF S1 3 0 0 0 0 0 0 2 2 0 0 0 0 3 0 3
NextGen Technology Refresh Project 13 Version No: 2.2
Bldg Fl Site Type Coverage Pulls Moves
ECU
Swap
ECU
Install Lift
Swap Lift
Install Orient Change
Conduit Angle
Bracket
LMH
Cover APs
Down Base 2802i
Pre- Inst
2802i
Add 2802i
Inst 2802i
Total APs
Comments
Billings Majestic HCC
Billings
Majestic
HCC
RF HD/LBS 1 1 0 0 0 0 1 0 1 0 0 36 0 0 36 36 AP29 move requires a new cable pull.
Billings Vet Center
Billings Vet
Center Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5
Cut Bank CBOC 1 Cut Bank
CBOC
Pred HD 4 0 0 0 0 0 0 0 0 0 0 0 0 4 0 4
Glasgow CBOC 1 Glasgow
CBOC
Pred HD 4 0 0 0 0 0 0 0 0 0 0 0 0 4 0 4
Glendive CBOC 1 Glendive
CBOC
Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5
Great Falls Vet Center
Great Falls Vet Center
Pred HD 6 0 0 0 0 0 0 0 0 0 0 0 0 6 0 6
Hamilton CBOC 1 Hamilton
CBOC
Pred HD 2 0 0 0 0 0 0 0 0 0 0 0 0 2 0 2
Helena Sleep Lab
Helena
Sleep Lab Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5
Helena Vet 1 Helena Vet Pred HD/LBS 3 0 0 0 0 0 0 0 0 0 0 0 0 3 0 3
Kalispell CBOC 1 Kalispell
CBOC
Pred HD 17 0 0 0 0 0 0 0 0 0 0 0 0 17 0 17
Kalispell Vet Center
Kalispell
Vet Center Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5
Lewistown
CBOC
Lewistown
CBOC
Pred HD 6 0 0 0 0 0 0 0 0 0 0 0 0 6 0 6
Miles City CLC 1AB Miles City
CLC
Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5
Miles City CLC 1C Miles City
CLC
Pred HD/LBS 24 0 0 0 0 0 0 0 0 0 0 0 0 24 0 24
Miles City CLC 1 Miles City
CLC
Pred
Standard-
16 0 0 0 0 0 0 0 0 0 5 5 0 16 0 21
Miles City CLC 2A Miles City
CLC
Pred HD 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1
Miles City CLC 2B Miles City
CLC
Pred HD 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1
Missoula Vet Center
Missoula
Vet Center Pred HD 7 0 0 0 0 0 0 0 0 0 0 0 0 7 0 7
POM 1 POM Pred HD 4 0 0 0 0 0 0 0 0 0 0 0 0 4 0 4
NextGen Technology Refresh Project 14 Version No: 2.2
Bldg Fl Site Type Coverage Pulls Moves
ECU
Swap
ECU
Install Lift
Swap Lift
Install Orient Change
Conduit Angle
Bracket
LMH
Cover APs
Down Base 2802i
Pre- Inst
2802i
Add 2802i
Inst 2802i
Total APs
Comments
Fort Harrison Regional Office
Fort Harrison Regional
Office
Pred 0 14 0 0 0 0 0 0 0 0 0 1 1 0 14 0 15
• Bldg: Building
• Fl: Floor
• Type: Type of activity – Pred = predictive survey, RF = physical survey, Swap = no survey – swap existing APs only
• Coverage: Coverage level
• Pulls: Number of cable pulls needed (remediation APs plus down APs)
• Moves: # APs being moved inside the same room
• HEPA: Number of APs impacted by the use of HEPA carts for install
• Conduit: Number of APs that need conduit runs installed by the site for the AP to be installed
• Angle Bracket: Number of APs that need to have angle brackets installed to be horizontal
• Base 2802i: The original 1-1 design
• Pre-Installed 2802i: 2802i’s that were already installed prior to project kick-off
• Add 2802i: The Redesign APs
• Inst 2802i: The APs actually installed from the 1-1 swap at this point
• Total APs: Total number of APs on that floor including the number installed and the redesign APs
• Comments: Any comments
NextGen Technology Refresh Project 15 Version No: 2.2
9 CLIN Data and Calculations
Based on the actions completed to date and the data contained in this and the previous Predictive Design package the following are the CLINs required for the full execution of this task.
Table 7: CLINs
CLIN Description Qty From
C.1.1 Base AP install trips - first 10 APs 1 Table 9
C.1.1.1 Add on cost for labor and materials to use Cat 6A instead of Cat 5e for the Base Install Task 1 Section 9
C.1.2 AP install Trips - each additional 12 APs 17 Table 9
C.1.2.1 Add on cost for labor and materials to use Cat 6A instead of Cat 5e for each additional 12 APs 17 Section 9
C.1.3 AP swap - 60 AP swaps w/ SM 8 Table 8 total of swap columns
C.1.3.1 AP swaps - 20 AP swaps w/ SM requiring the use of a VA provided and operated ECU 0 Table 9
C.1.4 Remote Facility AP Install/Swap trips- site preparation 16 Table 8
C.1.5 Each 3 AP installs requiring the use of a VA provided and operated ECU 0 Table 6
C.1.6 Each 10 AP Moves inside the same room (includes orientation changes) 0 Table 6
C.1.7 Each 4 APs requiring the use of a contractor provided lift (swap or install) 0 Table 6
C.1.8 AP Support for APs installed by others - each 10 APs 0 Table 9
C.1.10 Repair / use others – 4 cables as part of an AP install trip 0 Table 6
C.2 Single controller (or HA Pair) Install 15 Table 8
C.3.1 Survey, Design, Validation & As Built - First 50k sq ft 1 Table 8
C.3.2 Survey, Design, Validation & As Built Add-on (each additional 50k sq ft) 8 Table 8
C.3.3 Predictive Survey - First 10k Sq Ft 15 Table 8
C.3.4 Predictive Survey - each additional 5k per site 11 Table 8
C.3.5 Remote Facility - Survey, Design, Validation & As Built site preparation 1 Table 8
C.5 Single non-controller appliance Physical Install 0 Table 8
The following sections describes the data used for the clin calculations.
NextGen Technology Refresh Project 16 Version No: 2.2
Table 8: Facility Related CLIN Development
Type Facilities Sq Ft C.1.3 Swap Initial
C.1.3 Swap w/ Install
Added APs
Added Pulls
C.1.4 Rem
Inst/Swap Prep
C.2 Ctrl
C.3.1 Base
Survey
C.3.2 Survey +50k
C.3.3 Pred 1st 10k
C.3.4 Pred +5k
C.3.5 Rem
RF
Prep
C.5
MSE
Totals 500,002 416 6 210 210 16 15 1 8 15 11 1 0
Spare APs 10
RF Main Site Including Greenfield 324,436 380 0 66 75 1 6 0
RF Billings-Majestic HCS 59,885 36 0 1 1 2 1
Predictive Billings Vet Center 5,104 0 5 5 1 1 1
Predictive Cut Bank CBOC 2,890 0 4 4 1 1 1
Predictive Fort Harrison Regional Office 21,524 1 14 14 1 1 1 3
Predictive Glasgow CBOC 3,779 0 4 4 1 1 1
Predictive Glendive CBOC 3,680 0 5 5 1 1 1
Predictive Great Falls Vet Center 5,037 0 6 6 1 1 1
Predictive Hamilton CBOC 1,120 0 2 2 1 1 1
Predictive Helena Sleep Lab 3,779 0 5 5 1 1 1
Predictive Helena Vet 1,942 0 3 3 1 1 1
Predictive Kalispell CBOC 11,720 0 17 17 1 1 1 1
Predictive Kalispell Vet Center 3,656 0 5 5 1 1 1
Predictive Lewistown CBOC 3,301 0 6 6 1 1 1
Predictive Miles City CLC 41,222 5 47 47 1 1 1 7
Predictive Missoula Vet Center 4,776 0 7 7 1 1 1
Predictive POM 2,151 0 4 4 1 1 1
Table 9: AP Install CLIN Development
Added APs
Required
Already Installed
Pulls Required
Lift (Swap) APs
C.1.7 (Lift – swap)
Lift (Install) APs
C.1.7 (Lift – install)
AT&T Team APs to install
C.1.1 Base Install Trip
C.1.2 Added AP install trips
Swaps w/ECUs input
C.1.3.1 Swaps w/
ECUs
AP Installs w/ECU Input
C.1.5 AP
Installs w/ECU
CLIN Count
391 181 210 0 0 0 0 210 1 17 0 0 0 0