This solicitation is for construction services to support installation of replacement and new WiFi access points at the Fort Harrison VA Health Care System campus in Montana. The scope of work includes installing 5,000 linear feet of conduit and raceways, horizontal and vertical penetrations, and fire stopping to enable the NextGen WiFi upgrades. The contractor must verify field conditions, perform all work during normal business hours for 90 days after receiving notice to proceed, and complete conduit and penetration work before the new access point installation date. Submittals required are product data and samples, as-built drawings, and the final central drawing set. Privacy and security policies must be followed.

View the file

Other files

File Type Posted
Wage Rate_Montana.pdf PDF
Attachment 2 - VA ENT Fort Harrison Redesign - AP Locations.pdf PDF
Attachment 1 - 436-21-704 EHRM NextGen WiFi Upgrades.docx DOCX document
36C25922R0085_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA ENT Redesign - Survey Report

Fort Harrison

May 26, 2022

Revision: 1.1

VA WIFI NextGen Technology Refresh Project

Prepared for

Department of Veterans Affairs

Redesign Survey Report Template Revised: March 3, 2022

NextGen Technology Refresh Project i Version No: 2.2

Revision History

CREATION

DATE

VERSION

NO.

DESCRIPTION/COMMENTS AUTHOR(S) ISSUE DATE

05/07/2014 1.0 Initial draft Donald James 05/07/2014

11/29/2017 1.1 Created separate document for Heat Maps Donald James 11/01/2017

12/06/2017 1.2 Updated AP Details tables Donald James 12/06/2017

02/20/2018 1.3 Added Sq Footage Donald James 02/20/2018

03/22/2018 1.4 Updating Table 6 for redesign Donald James 03/22/2018

05/18/2018 1.5 Added cover and bracket counts Donald James 05/18/2018

03/05/2019 1.6 Updated for NextGen project to include CLIN buildup Donald James 03/05/2019

12/03/2019 1.7 Updated table 6 to add additional data Donald James 120/3/2019

02/02/2020 1.8 Updated to add information on swap orientation changes and wall mount brackets used

Donald James 02/02/2020

07/19/2021 1.9 Updated CLIN Table Donald James 07/19/2021

08/20/2021 2.0 Updated Section 1.2 and added column to Table 6 for Pre-Installs

Donald James 08/20/2021

02/14/2022 2.1 Updated Table 2 to include Mounting Notes and Section 1.2

Donald James 02/14/2022

03/03/2022 2.2 Updated Section 1.2 Donald James 03/03/2022

Content Revision History

REVISION

NO.

DESCRIPTION/COMMENTS AUTHOR(S) DELIVERY

DATE

1.0 Initial Delivery AT&T / TekSynap Team 05/25/2022

1.1 Updated Table 6 for Building 154 – Floor 4 AT&T / TekSynap Team 05/26/2022

NextGen Technology Refresh Project ii Version No: 2.2

Table of Contents

1 Introduction

1.1 Document Purpose

1.2 Facility Size

1.3 Coverage Areas

2 Full Redesign Package Documents

3 Access Points Not Swapped or Offline After Swap

4 Access Points to be Moved to Correct Coverage

5 APs Added to Meet Coverage Requirements

6 Other Exceptions

7 Non 2800 APs Still Online

8 Installation Work Detailed Breakout

9 CLIN Data and Calculations

Table of Tables

Table 1: Access Points Not Swapped or Not Online

Table 2: Access Points to be Moved

Table 3: Redesign APs

Table 4: Other Coverage Exceptions

Table 5: Online Non 2800 APs

Table 6. Detailed AP / Cable Installation Breakdown

Table 7: CLINs

Table 8: Facility Related CLIN Development

Table 9: AP Install CLIN Development

NextGen Technology Refresh Project 1 Version No: 2.2

1 Introduction

1.1 Document Purpose

This deliverable package contains the information gathered during the physical redesign survey activities after the 1-1 AP swap was completed. This includes information about the APs including placement information.

1.2 Facility Size

The wireless project covers a total of 500,002 square feet and includes 813 APs.

The main campus covers 324,436 square feet and includes the addition of 66 new APs to the base of 380 APs for a total of 446 APs (plus 10 spares). 0 covers are required and 0 were installed to protect the APs in the lockdown mental health ward and other areas as necessary, 0 channel adapters to mount APs and 5 angle brackets to change the orientation of the AP from vertical to horizontal.

We provided 0 Predictive designs for the main campus due to COVID restrictions.

The remote sites requiring a Physical Redesign survey are Billings-Majestic HCS which covers 59,885 square feet and includes the addition of 0 new APs to the base of 36 APs for a total of 36 APs. 0 covers were installed to protect the APs in the lockdown mental health ward and other areas as necessary, 0 channel adapters to mount APs and 1 angle brackets to change the orientation of the AP from vertical to horizontal.

The remote sites requiring Predictive surveys covers 115,681 square feet and includes the addition of 134 new APs to the base of 6 APs for a total of 140 APs. 0 covers were installed to protect the APs in the lockdown mental health ward and other areas as necessary, 0 channel adapters to mount APs and 0 angle brackets to change the orientation of the AP from vertical to horizontal.

At sites Building 172 Floor Basement, Building 172 Floor 1, Billings Spring Creek CBOC, Bozeman CBOC, Butte CBOC, Great Falls CBOC, Havre CBOC, Miles City CBOC and Missoula CBOC there are 181 Pre-Installed APs from previous Activation activities. We are accounting for them in the total counts of APs as seen below in Section 8 and Table 9 found in Section 9.

1.3 Coverage Areas

The areas covered by this redesign effort are included in Table 6 in Section 8.

NextGen Technology Refresh Project 2 Version No: 2.2

2 Full Redesign Package Documents

This redesign package includes diagrams of the APs that were swapped and the required redesign APs (AP locations PDF), the tables that specify the APs that expected to be swapped but could not be and APs that were swapped but did not come online, APs that had changes in their installed location, the necessary redesign APs and any exceptions. The redesign package consists of the following documents.

• VA ENT Fort Harrison Redesign - AP Locations PDF: Redesign AP location graphics

• VA ENT Fort Harrison Redesign - Heatmap Report

The rest of the information including exceptions is contained in this document.

3 Access Points Not Swapped or Offline After Swap

This table lists any access points that were not able to be swapped by the TekSynap Team and any APs that were swapped but did not come online. In addition, a layer was added to the AP locations PDF showing the APs that were not online during the survey.

Table 1: Access Points Not Swapped or Not Online

Building Floor AP Remarks

20 1 AP05

The AP was offline during the survey. AP05 requires a new cable pull. Cable is damaged. 5/23 the

AP was back online. Will monitor.

141 2 AP12

The AP was offline during the survey. AP12 requires a new cable pull.

154 Basement AP07 and AP08 The APs were offline during the survey. AP07 and AP08 require new cable pulls.

154 2 AP16

The AP was not swapped in a sterile area where it is above the hardpan ceiling. Per email from the site, this has been left for the installation team.

NextGen Technology Refresh Project 3 Version No: 2.2

Building Floor AP Remarks

154 4 AP16

The AP was not swapped due to patient care. Left with POC to swap when the room becomes available.

4 Access Points to be Moved to Correct Coverage

Some access points will need to be moved to provide the proper coverage levels rather than adding another AP. This table documents the APs that will need to be moved as part of the installation process. The final location of the access points is updated in the site’s VA ENT For Harrison Redesign - AP Locations PDF file.

Table 2: Access Points to be Moved

Building Floor AP Description Mounting Notes

154 2 AP08

We propose moving AP08 from 226L to

224L to meet VA-ENT requirements.

154 2 AP29

We propose moving AP29 from 227L to

273A to meet VA-ENT requirements.

154A Basement AP05 We propose moving AP05 from B25 to

B1 to meet VA-ENT requirements.

154A Basement AP13 We propose moving AP13 from B11 to

B70 to meet VA-ENT requirements.

154A Basement AP19 We propose moving AP19 from B31O to B31A to meet VA-ENT requirements.

Billings HCC AP29 We propose moving AP29 from SP02 to AAM05 to meet VA-ENT requirements.

NextGen Technology Refresh Project 4 Version No: 2.2

5 APs Added to Meet Coverage Requirements

The following access points were added to provide the required RF coverage.

Table 3: Redesign APs

Building Floor Access Point

Room Number / Location

Mounting Notes

16_16A 1 AP05 Shop Steel header warehouse type, Horizontal bracket - wall, Conduit

16_16A 1 AP06 Garage / Center Steel header warehouse type, Horizontal bracket - wall, Conduit

16_16A 1 AP07 Office & TV Room

17 Basement AP01 Lower left

Steel header warehouse type, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers

17 Basement AP02 Top center

Steel header warehouse type, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers

17 Basement AP03 Upper right

Steel header warehouse type, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers

17 Basement AP04 Lower center

Steel header warehouse type, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers

17 1 AP01

Unnamed room at lower left

17 1 AP02

Unnamed room at center

Concrete header ceiling, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers

17 1 AP03

Unnamed room at upper right

Concrete header ceiling, 4 11/16" Dual Gang Box, Conduit, Ceiling type is wood/ wooden headers

NextGen Technology Refresh Project 5 Version No: 2.2

Building Floor Access Point

Room Number / Location

Mounting Notes

20 1 AP08

Storage at center/left of center

Concrete header ceiling, 4 11/16" Dual Gang Box, Conduit, Ceiling is made of exposed wooden headers under aluminum sheets

20 1 AP09

Storage at lower center

Concrete header ceiling, 4 11/16" Dual Gang Box, Conduit, Ceiling is made of exposed wooden headers under aluminum sheets

141 Basement AP28 B1-A Steel header warehouse type, Horizontal bracket - wall

141 Basement AP29 Hallway outside B-3

141 Basement AP30 B-37

141 Basement AP31 B-13

141 Basement AP32 Hallway left of B-9 and

B-10 / lower left Concrete header ceiling, Horizontal bracket - wall

141 1 AP24 143

141 1 AP25 148

141 1 AP26 133

141 1 AP27 108

141 1 AP28 109

141 1 AP29 126

141 2 AP27 220

141 2 AP28 239

141 3 AP16 328A

141 3 AP17 303A

150 1 AP09 Hallway below 101

150 1 AP10 106-D

154 Basement AP10 Unnamed room in lower left Concrete header ceiling, 4 11/16"

Dual Gang Box, Conduit

NextGen Technology Refresh Project 6 Version No: 2.2

Building Floor Access Point

Room Number / Location

Mounting Notes

154 Basement AP11 B04 Concrete header ceiling, 4 11/16"

Dual Gang Box, Conduit

154 Basement AP12 Prosthetics Concrete header ceiling, 4 11/16"

Dual Gang Box, Conduit

154 Basement AP13 South Lobby Project Concrete header ceiling, 4 11/16"

Dual Gang Box, Conduit

154 Basement AP14 Sleep Concrete header ceiling, 4 11/16"

Dual Gang Box, Conduit

154 1 AP03 170

Hard pan - drywall, Conduit, this area is the pharmacy vault. The penetration will need to go through concrete.

154 1 AP101

Unnamed area left of

154 1 AP102

Corridor outside of

A187

154 1 AP103 A192

154 1 AP104 A149B

154 1 AP105 A148

154 1 AP106 106

154 1 AP107 130

154 1 AP108 A100

154 1 AP109 A103

154 1 AP110 A120

154 1 AP111 122

154 1 AP112 102K

154 1 AP113 152

154 1 AP114 84

154 1 AP115 A127

NextGen Technology Refresh Project 7 Version No: 2.2

Building Floor Access Point

Room Number / Location

Mounting Notes

154 1 AP116 C-107B

154 2 AP15 211L

154 2 AP35 238D

154 2 AP36 214A Hard pan - drywall

154 2 AP37 219

154 2 AP38 224

154 3 AP10 353

154 3 AP30 349

154 3 AP31 325

154 4 AP32 446

154 5 AP01

Unnamed room center right Concrete header ceiling, Horizontal bracket - wall, Conduit

154 5 AP02

Unnamed room right of center Concrete header ceiling, Horizontal bracket - wall, Conduit

169 1 AP23 Corridor outside 212 Hard pan - drywall, Cable raceway, Accessible ceiling area in corridor through access panel.

171 1 AP01

Unnamed office left of top center

171 1 AP02 Center left/lower left Steel header warehouse type, Horizontal bracket - wall, Conduit

171 1 AP03 Center right Steel header warehouse type, Horizontal bracket - wall, Conduit

NextGen Technology Refresh Project 8 Version No: 2.2

6 Other Exceptions

Table 4: Other Coverage Exceptions

Building Floor Room Number

/ Location Exception

16_16A 1 Gray areas throughout The areas are best effort coverage.

16_16A 1 Gray areas throughout To correct the areas, we propose adding AP05 - AP07 to the design.

20 1 Gray area at center The area is best effort coverage.

20 1 Gray areas throughout To correct the areas, we propose adding AP08 - AP09 to the design.

20 1 White and gray areas at top The areas are due to AP05 being offline during the survey.

141 Basement White and gray areas throughout

The areas are excluded from coverage per the annotated drawing or require

Standard-1 coverage.

141 Basement Gray areas throughout To correct the areas, we propose adding AP28 - AP32 to the design.

141 1 White areas throughout The areas are excluded from coverage per the annotated drawing.

141 1 Gray areas throughout To correct the areas, we propose adding AP24 - AP29 to the design.

141 2 White areas throughout The areas are excluded from coverage per the annotated drawing.

141 2 Gray areas throughout To correct the areas, we propose adding AP27 and AP28 to the design.

141 2 Gray area at center The areas are due to AP12 being offline during the survey.

141 3 White areas throughout The areas are excluded from coverage per the annotated drawing.

141 3 Gray areas throughout To correct the areas, we propose adding AP16 and AP17 to the design.

NextGen Technology Refresh Project 9 Version No: 2.2

Building Floor Room Number

/ Location Exception

150 Basement White and gray areas throughout

The areas are excluded from coverage per the annotated drawing or require

Standard-1 coverage.

150 1 White areas throughout The areas are excluded from coverage per the annotated drawing.

150 1 Gray areas throughout To correct the areas, we propose adding AP09 - AP10 to the design.

154 Basement White and gray areas throughout

The areas are excluded from coverage per the annotated drawing or require

Standard-1 coverage.

154 Basement White areas at left To correct the areas, we propose adding AP10 - AP14 to the design

154 Basement Gray areas at bottom right The areas are due to AP07 and AP08 being offline during the survey.

154 1 White and gray areas throughout

The areas are excluded from coverage per the annotated drawing, are best effort coverage, require Standard-1 coverage or are outside the perimeter of the building.

154 1 Gray areas throughout To correct the areas, we propose adding AP03 and AP101 - AP116 to the design.

154 2 White and gray areas throughout

The areas are excluded from coverage per the annotated drawing or are best effort coverage.

154 2 Gray areas throughout To correct the areas, we propose adding AP15 and AP35 - AP38 to the design.

154 2 Gray areas throughout To correct the areas and to meet the VA-ENT requirements, we propose moving AP08 and AP29 in the design.

154 2 Gray areas at bottom center The areas are due to AP16 being offline during the survey.

NextGen Technology Refresh Project 10 Version No: 2.2

Building Floor Room Number

/ Location Exception

154 3 White and gray areas throughout

The areas are excluded from coverage per the annotated drawing or are best effort coverage.

154 3 Gray areas throughout To correct the areas, we propose adding AP10 and AP30 - AP31 to the design.

154 4 White and gray areas throughout

The areas are excluded from coverage per the annotated drawing or are best effort coverage.

154 4 Gray areas at left center To correct the areas, we propose adding AP32 to the design.

154 5 White areas throughout The areas are excluded from coverage per the annotated drawing.

154A Basement White and gray areas throughout

The areas are excluded from coverage per the annotated drawing, best effort coverage, requires Standard-1 coverage or are outside the perimeter of the building.

154A Basement Gray areas throughout

To correct the areas and to meet the VA-ENT requirements, we propose moving AP05, AP13 and AP19 in the design.

169 1 White and gray areas throughout

The areas are excluded from coverage per the annotated drawing or requires

Standard-1 coverage.

169 1 Gray areas at top left To correct the areas, we propose adding AP23 to the design.

170 1 White area at bottom The area is excluded from coverage per the annotated drawing.

Billings Majestic

HCC

1 White areas throughout

The areas are excluded from coverage per the annotated drawing.

NextGen Technology Refresh Project 11 Version No: 2.2

Building Floor Room Number

/ Location Exception

Billings Majestic

HCC

1 Gray areas at top left

To correct the areas and to meet the VA-ENT requirements, we propose moving AP29 in the design.

7 Non 2800 APs Still Online

This table lists the non 2800 APs that are still online at this facility

Table 5: Online Non 2800 APs

AP Model Remarks

N/A

NextGen Technology Refresh Project 12 Version No: 2.2

8 Installation Work Detailed Breakout

This table contains the detailed list of the AP Swaps, Redesign APs and required cable pulls. The column headers are described after the table.

Table 6. Detailed AP / Cable Installation Breakdown

Bldg Fl Site Type Coverage Pulls Moves

ECU

Swap

ECU

Install Lift

Swap Lift

Install Orient Change

Conduit Angle

Bracket

LMH

Cover APs

Down Base 2802i

Pre- Inst

2802i

Add 2802i

Inst 2802i

Total APs

Comments

Total 210 6 0 0 0 0 1 20 9 0 13 422 181 210 415 813

10 10

16_16A 1 VAMC RF HD 3 0 0 0 0 0 0 2 2 0 0 4 0 3 4 7

17 B VAMC RF HD 4 0 0 0 0 0 0 4 0 0 0 0 0 4 0 4

17 1 VAMC RF HD 3 0 0 0 0 0 0 2 0 0 0 0 0 3 0 3

20 1 VAMC RF HD/LBS

0 0 0 0 0 0 2 0

0 1 7 0 2 7 9 AP05 was offline during the survey and requires a new cable pull. Cable is damaged. 5/23 the AP was back online. Will monitor.

141 B VAMC RF HD/LBS 5 0 0 0 0 0 0 0 2 0 0 27 0 5 27 32

141 1 VAMC RF HD/LBS 6 0 0 0 0 0 0 0 0 0 0 23 0 6 23 29

141 2 VAMC RF HD/LBS 3 0 0 0 0 0 0 0 0 0 1 26 0 2 26 28 AP12 is offline and requires a new cable pull.

141 3 VAMC RF HD/LBS 2 0 0 0 0 0 0 0 0 0 0 15 0 2 15 17

150 B VAMC RF HD/LBS 0 0 0 0 0 0 0 0 0 0 0 15 0 0 15 15

150 1 VAMC RF HD/LBS 2 0 0 0 0 0 0 0 0 0 0 8 0 2 8 10

154 B VAMC RF HD/LBS

0 0 0 0 0 0 5 0

0 2 9 0 5 9 14 AP07 & AP08 are offline and require new cable pulls.

154 1 VAMC RF HD/LBS 17 0 0 0 0 0 0 1 0 0 0 99 0 17 99 116

154 2 VAMC RF HD/LBS

2 0 0 0 0 0

0 0

0 1 33 0 5 32 38

AP16 needs to be swapped. AP is in a sterile room above hatch, need access from FMS. POC requested by email that we move this to redesign phase. AP08 & AP29 moves require new cable pulls.

154 3 VAMC RF HD/LBS 3 0 0 0 0 0 0 0 0 0 0 28 0 3 28 31

154 4 VAMC RF HD/LBS

0 0 0 0 0 0 0 0

0 1 31 0 1 31 32 AP16 needs to be swapped. AP was not swapped due to patient care.

154 5 VAMC RF

Standard-

0 0 0 0 0 0 2 2

0 0 0 0 2 0 2

154A B VAMC RF HD/LBS 3 3 0 0 0 0 0 0 0 0 0 28 0 0 28 28 AP05, AP13 & AP19 moves require new cable pulls.

169 1 VAMC RF HD/LBS 1 0 0 0 0 0 0 0 0 0 0 22 0 1 22 23

170 1 VAMC RF HD 0 0 0 0 0 0 0 0 0 0 0 5 0 0 5 5

171 1 VAMC RF S1 3 0 0 0 0 0 0 2 2 0 0 0 0 3 0 3

NextGen Technology Refresh Project 13 Version No: 2.2

Bldg Fl Site Type Coverage Pulls Moves

ECU

Swap

ECU

Install Lift

Swap Lift

Install Orient Change

Conduit Angle

Bracket

LMH

Cover APs

Down Base 2802i

Pre- Inst

2802i

Add 2802i

Inst 2802i

Total APs

Comments

Billings Majestic HCC

Billings

Majestic

HCC

RF HD/LBS 1 1 0 0 0 0 1 0 1 0 0 36 0 0 36 36 AP29 move requires a new cable pull.

Billings Vet Center

Billings Vet

Center Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5

Cut Bank CBOC 1 Cut Bank

CBOC

Pred HD 4 0 0 0 0 0 0 0 0 0 0 0 0 4 0 4

Glasgow CBOC 1 Glasgow

CBOC

Pred HD 4 0 0 0 0 0 0 0 0 0 0 0 0 4 0 4

Glendive CBOC 1 Glendive

CBOC

Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5

Great Falls Vet Center

Great Falls Vet Center

Pred HD 6 0 0 0 0 0 0 0 0 0 0 0 0 6 0 6

Hamilton CBOC 1 Hamilton

CBOC

Pred HD 2 0 0 0 0 0 0 0 0 0 0 0 0 2 0 2

Helena Sleep Lab

Helena

Sleep Lab Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5

Helena Vet 1 Helena Vet Pred HD/LBS 3 0 0 0 0 0 0 0 0 0 0 0 0 3 0 3

Kalispell CBOC 1 Kalispell

CBOC

Pred HD 17 0 0 0 0 0 0 0 0 0 0 0 0 17 0 17

Kalispell Vet Center

Kalispell

Vet Center Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5

Lewistown

CBOC

Lewistown

CBOC

Pred HD 6 0 0 0 0 0 0 0 0 0 0 0 0 6 0 6

Miles City CLC 1AB Miles City

CLC

Pred HD 5 0 0 0 0 0 0 0 0 0 0 0 0 5 0 5

Miles City CLC 1C Miles City

CLC

Pred HD/LBS 24 0 0 0 0 0 0 0 0 0 0 0 0 24 0 24

Miles City CLC 1 Miles City

CLC

Pred

Standard-

16 0 0 0 0 0 0 0 0 0 5 5 0 16 0 21

Miles City CLC 2A Miles City

CLC

Pred HD 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1

Miles City CLC 2B Miles City

CLC

Pred HD 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1

Missoula Vet Center

Missoula

Vet Center Pred HD 7 0 0 0 0 0 0 0 0 0 0 0 0 7 0 7

POM 1 POM Pred HD 4 0 0 0 0 0 0 0 0 0 0 0 0 4 0 4

NextGen Technology Refresh Project 14 Version No: 2.2

Bldg Fl Site Type Coverage Pulls Moves

ECU

Swap

ECU

Install Lift

Swap Lift

Install Orient Change

Conduit Angle

Bracket

LMH

Cover APs

Down Base 2802i

Pre- Inst

2802i

Add 2802i

Inst 2802i

Total APs

Comments

Fort Harrison Regional Office

Fort Harrison Regional

Office

Pred 0 14 0 0 0 0 0 0 0 0 0 1 1 0 14 0 15

• Bldg: Building

• Fl: Floor

• Type: Type of activity – Pred = predictive survey, RF = physical survey, Swap = no survey – swap existing APs only

• Coverage: Coverage level

• Pulls: Number of cable pulls needed (remediation APs plus down APs)

• Moves: # APs being moved inside the same room

• HEPA: Number of APs impacted by the use of HEPA carts for install

• Conduit: Number of APs that need conduit runs installed by the site for the AP to be installed

• Angle Bracket: Number of APs that need to have angle brackets installed to be horizontal

• Base 2802i: The original 1-1 design

• Pre-Installed 2802i: 2802i’s that were already installed prior to project kick-off

• Add 2802i: The Redesign APs

• Inst 2802i: The APs actually installed from the 1-1 swap at this point

• Total APs: Total number of APs on that floor including the number installed and the redesign APs

• Comments: Any comments

NextGen Technology Refresh Project 15 Version No: 2.2

9 CLIN Data and Calculations

Based on the actions completed to date and the data contained in this and the previous Predictive Design package the following are the CLINs required for the full execution of this task.

Table 7: CLINs

CLIN Description Qty From

C.1.1 Base AP install trips - first 10 APs 1 Table 9

C.1.1.1 Add on cost for labor and materials to use Cat 6A instead of Cat 5e for the Base Install Task 1 Section 9

C.1.2 AP install Trips - each additional 12 APs 17 Table 9

C.1.2.1 Add on cost for labor and materials to use Cat 6A instead of Cat 5e for each additional 12 APs 17 Section 9

C.1.3 AP swap - 60 AP swaps w/ SM 8 Table 8 total of swap columns

C.1.3.1 AP swaps - 20 AP swaps w/ SM requiring the use of a VA provided and operated ECU 0 Table 9

C.1.4 Remote Facility AP Install/Swap trips- site preparation 16 Table 8

C.1.5 Each 3 AP installs requiring the use of a VA provided and operated ECU 0 Table 6

C.1.6 Each 10 AP Moves inside the same room (includes orientation changes) 0 Table 6

C.1.7 Each 4 APs requiring the use of a contractor provided lift (swap or install) 0 Table 6

C.1.8 AP Support for APs installed by others - each 10 APs 0 Table 9

C.1.10 Repair / use others – 4 cables as part of an AP install trip 0 Table 6

C.2 Single controller (or HA Pair) Install 15 Table 8

C.3.1 Survey, Design, Validation & As Built - First 50k sq ft 1 Table 8

C.3.2 Survey, Design, Validation & As Built Add-on (each additional 50k sq ft) 8 Table 8

C.3.3 Predictive Survey - First 10k Sq Ft 15 Table 8

C.3.4 Predictive Survey - each additional 5k per site 11 Table 8

C.3.5 Remote Facility - Survey, Design, Validation & As Built site preparation 1 Table 8

C.5 Single non-controller appliance Physical Install 0 Table 8

The following sections describes the data used for the clin calculations.

NextGen Technology Refresh Project 16 Version No: 2.2

Table 8: Facility Related CLIN Development

Type Facilities Sq Ft C.1.3 Swap Initial

C.1.3 Swap w/ Install

Added APs

Added Pulls

C.1.4 Rem

Inst/Swap Prep

C.2 Ctrl

C.3.1 Base

Survey

C.3.2 Survey +50k

C.3.3 Pred 1st 10k

C.3.4 Pred +5k

C.3.5 Rem

RF

Prep

C.5

MSE

Totals 500,002 416 6 210 210 16 15 1 8 15 11 1 0

Spare APs 10

RF Main Site Including Greenfield 324,436 380 0 66 75 1 6 0

RF Billings-Majestic HCS 59,885 36 0 1 1 2 1

Predictive Billings Vet Center 5,104 0 5 5 1 1 1

Predictive Cut Bank CBOC 2,890 0 4 4 1 1 1

Predictive Fort Harrison Regional Office 21,524 1 14 14 1 1 1 3

Predictive Glasgow CBOC 3,779 0 4 4 1 1 1

Predictive Glendive CBOC 3,680 0 5 5 1 1 1

Predictive Great Falls Vet Center 5,037 0 6 6 1 1 1

Predictive Hamilton CBOC 1,120 0 2 2 1 1 1

Predictive Helena Sleep Lab 3,779 0 5 5 1 1 1

Predictive Helena Vet 1,942 0 3 3 1 1 1

Predictive Kalispell CBOC 11,720 0 17 17 1 1 1 1

Predictive Kalispell Vet Center 3,656 0 5 5 1 1 1

Predictive Lewistown CBOC 3,301 0 6 6 1 1 1

Predictive Miles City CLC 41,222 5 47 47 1 1 1 7

Predictive Missoula Vet Center 4,776 0 7 7 1 1 1

Predictive POM 2,151 0 4 4 1 1 1

Table 9: AP Install CLIN Development

Added APs

Required

Already Installed

Pulls Required

Lift (Swap) APs

C.1.7 (Lift – swap)

Lift (Install) APs

C.1.7 (Lift – install)

AT&T Team APs to install

C.1.1 Base Install Trip

C.1.2 Added AP install trips

Swaps w/ECUs input

C.1.3.1 Swaps w/

ECUs

AP Installs w/ECU Input

C.1.5 AP

Installs w/ECU

CLIN Count

391 181 210 0 0 0 0 210 1 17 0 0 0 0