This solicitation is for conduit, raceway, penetration and firestopping installation services to support a WiFi upgrade project at the Fort Harrison VA Medical Center in Montana. The scope of work includes installing 5,000 linear feet of conduit and raceways, horizontal and vertical penetrations, junction boxes, pull cords and firestopping throughout the medical center to support replacement and new WiFi access point installation by a separate contractor. Offerors must verify field conditions via a pre-bid site walk. All work must be completed within 90 days of notice to proceed and prior to the new access point installation date. The asbestos abatement and conduit work must also be completed beforehand.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installation Requirements and Checklist

Fort Harrison

VA WiFi NextGen Project

Version 3.6 May 17, 2022

Revision History

Creation Date
Version No.
Description/Comments
Author(s)
Issue Date
11/6/18
1.0
Initial Document
Matt Dzoba
11/6/18
11/5/19
2.0
Added description of conduit timeline
Don James
11/5/19
12/3/19
3.0
Removed requirement for switch port configuration by site. Currently performed by LAN team.
Matt Dzoba
12/3/19
7/28/20
3.1
Added VA LAN team port assessment task to checklist
Matt Dzoba
7/28/20
1/29/21
3.2
Added port assessment Incident ticket submission guidance from VA PM Team
Matt Dzoba
1/29/21
11/8/21
3.3
Updated per meeting with VA PM Team
Eddie Wilson
11/8/21
12/17/21
3.4
Updated 2.2.2 heading
Eddie Wilson
12/17/21
5/13/22
3.5
Updated 2.2.2 port assessment steps
Nikki Palmer
5/13/22
5/17/22
3.6
Revised ICRA and ECU checklist sections
Matt Dzoba
5/17/22

Table of Contents

1Installation Requirements1
2Pre-Installation Checklist2
2.1General2
2.2IT Closet Switch Ports and PoE3
2.2.1IT Closet PoE Switch Ports Required3
2.2.2Incident Ticket Submission3
2.3Pre-Installation Assessment Issues4
VA WiFi NextGenCreated: July 28, 2020
Installation Requirements and ChecklistiiiVersion No: 3.3

Installation Requirements The following is a list of the items that the local VA needs to provide prior to and during the AP installation onsite. Preparations for these requirements need to be completed prior to the installation teams arriving.

IT authorized escorts for the AT&T Teams onsite. The AP installation technicians will need to enter a multitude of spaces throughout the installation to run cabling and install the new APs per the site design. The teams will need IT authorized escorts with the appropriate access rights and keys for all rooms in all buildings for the APs that will be installed that day. There is not sufficient time for just 1 or 2 shared key sets.

Any permits required for the AP/cable installation have been obtained and uploaded to the VA Wireless SharePoint site VA personnel and ECU/barrier placement. The site is responsible for sterile area containment procedures and supplying the personnel to perform them. The options are:

Provide, install, set up, and move Environmental Containment Units (ECUs) at the pace of the installation Arrange for a sterile area cleaning crew to come in after the install team has finished their work in the area Any site-specific restrictions on the movements of the AT&T teams should have been communicated in advance via the Pre-Site Survey Questionnaire and Readiness Calls.

An e-mail alerting the entire facility and all tenants to the installation team’s presence onsite. It should advise personnel on what each team will be doing while onsite. Copies of this email should be provided to the IT authorized escorts for each of the AT&T teams. We recommend that this be done at the following intervals:

1 day prior to the team’s arrival Second full day of onsite work An area will need to be designated for the initial meeting that will occur first thing on the first day that the teams arrive onsite for the AP installation.

A daily work area/meeting place will need to be designated for the teams coming onsite.

Secure storage space for APs, cabling, and associated installation materials and tools will need to be identified prior to the start of the installation. In addition, there needs to be outlets to plug in rechargeable installation tools.

Arrangements made for the installation teams to work more than 8 hours per day. To complete the site on schedule it will most likely require the teams to work 10-hour days. Recommended hours are 12PM-10PM Monday – Friday to help avoid high patient traffic times.

Pre-Installation Checklist General

Yes |_|
VLANs created and active for sites where enterprise wireless is being added for the first time (configuration sample for each site sent to WiFiCore@TekSynap.com)
Yes |_|
DHCP scopes created (with proper option 43 set up) and active for sites where enterprise wireless is being added for the first time (screen captures sent to WiFiCore@TekSynap.com as verification)
Yes |_|
Upon completion of Section 2.2, creation of Service Now Request to the IO.Network.FO.LAN.TRIAGE team to conduct a port assessment of the switches which will be impacted by the redesign installation.

Provide Ticket # here:

Yes |_|
Sufficient 802.3af PoE ports are available in every closet per the design document
Yes |_|
Daily meeting/workspace identified for the site manager and installation team
Yes |_|
Sufficient VA IT authorized escorts with appropriate keys have been arranged for all installation teams
Yes |_|
Has the Infection Control Risk Assessment (ICRA) for the Redesign installation been completed?
Yes |_|
ECUs and personnel to man ECUs or sterile area cleaning arrangements have been made by the VA site for the installation if necessary
Yes |_|
Any areas containing asbestos related to the site design and AP installation requirements have been abated or, if not, will be installed by the VA at a later date
Yes |_|
Any conduit required in areas not a designated mechanical space will be installed by the VA according to the site design and AP placement requirements prior to the team installing in that location
Yes |_|
A secure storage area with power outlets has been identified
Yes |_|
Initial meeting location identified
Yes |_|
An email was sent out to all personnel and tenants of the facility alerting them of the upcoming installation
Yes |_|
All necessary arrangements have been made for the installation teams to work 10-hour days (recommended hours M-F, 12PM – 10PM)
Yes |_|
Any required permits and paperwork have been completed, approved and posted to the VA Wireless SharePoint site (e.g. ICRA)

IT Closet Switch Ports and PoE

1.1.1 IT Closet PoE Switch Ports Required

Site
Wiring Closet Name and Number
Switch IP (last two octets)
Total Access Points
Necessary PoE in Closet

TOTALS

VAMC
B16_16A-F1-1
3
Yes |_|
VAMC
B17-FB-IT Closet
7
Yes |_|
VAMC
B20-F1-0
2
Yes |_|
VAMC
B141-FB-B1A
5
Yes |_|
VAMC
B141-F1-124
6
Yes |_|
VAMC
B141-F3-313
4
Yes |_|
VAMC
B154A-FB-B30
2
Yes |_|
VAMC
B154-FB-B1A
10
Yes |_|
VAMC
B154-FB-B9
5
Yes |_|
VAMC
B154-F1-102
2
Yes |_|
VAMC
B154-F2-272
7
Yes |_|
VAMC
B154-F2-218B
3
Yes |_|
VAMC
B154-F3-368
4
Yes |_|
VAMC
B154-F4-468
2
Yes |_|
VAMC
B169-F1-164
1
Yes |_|
VAMC
B171-F1-IT Closet
3
Yes |_|

Service Now Request Ticket Submission Per Checklist email, once you have completed the table in section 2.2.1, please use verbiage under “REQUEST TEMPLATE FOR LAN TRIAGE” below to input your Service Now REQUEST to the LAN Triage Team for port assessment at your Medical Center for the Redesign installation. The Category of “General Request” should be used - General Request - VA. Please attach the Installation Requirements and Checklist to the SCTASK that is generated by the REQ and RITM.

*******************REQUEST TEMPLATE FOR LAN TRIAGE*******************

(Site Code)- Site Readiness: #Wireless Next-GEN Pre-work: (Service Area Name) Description: (Site Code)- Site Readiness: #Wireless Next-GEN Pre-work: (Service Area Name)

Need by Date:

Site:

Site POC:

Project: NextGen WiFi Request: Port Assessment See attached pdf/word/excel document containing switch hostname/IP address and total AP count required for completing port assessment.

1. Please complete port assessment for the site per attached documentation.

1. Identify switch stacks that need additional switches and ship switches to the site if required.

1. If 9300, request to use EHRM provided switches from Charles Pfenninger via email.

1. If 3850, submit SNOW request to Austin or Landover Staging center to ship switches where there are port/power deficiencies

1. Upon delivery of switches if shipped, EUO will open a ticket with LAN to have switches configured.

VA WIFI Next-GEN Wireless Deliverables Tracking Sheet URL

Pre-Installation Assessment Issues Conduit to be completed prior to the installation team working in that area. Other items must be completed prior to the installation readiness call.

Site
Bldg.
Floor
Area
Issue to be Addressed
Complete
VAMC
16_16A
1
Shop
VA to provide conduit pathway from IT closet B16_16A-F1-1 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated vertically on wall at AP05 location for room containing hard ceiling
Yes |_|
VAMC
16_16A
1
Garage/Center
VA to provide conduit pathway from IT closet B16_16A-F1-1 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated vertically on wall at AP06 location for room containing hard ceiling
Yes |_|
VAMC
17
B
Lower Left
VA to provide conduit pathway from IT Closet to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP01 location for room containing hard ceiling
Yes |_|
VAMC
17
B
Top Center
VA to provide conduit pathway from IT Closet to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP02 location for room containing hard ceiling
Yes |_|
VAMC
17
B
Upper Right
VA to provide conduit pathway from IT Closet to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling
Yes |_|
VAMC
17
B
Lower Center
VA to provide conduit pathway from IT Closet to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP04 location for room containing hard ceiling
Yes |_|
VAMC
17
1
Unnamed Room at Center
VA to provide conduit pathway from basement IT Closet to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP02 location for room containing hard ceiling
Yes |_|
VAMC
17
1
Unnamed Room at Upper Right
VA to provide conduit pathway from basement IT Closet to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling
Yes |_|
VAMC
20
1
Storage at Center/Left of Center
VA to provide conduit pathway from IT closet B20-F1-0 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP08 location for room containing hard ceiling
Yes |_|
VAMC
20
1
Storage at Lower Center
VA to provide conduit pathway from IT closet B20-F1-0 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP09 location for room containing hard ceiling
Yes |_|
VAMC
154
B
Unnamed Room in Lower Left
VA to provide conduit pathway from IT closet B154-FB-B9 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP10 location for room containing hard ceiling
Yes |_|
VAMC
154
B
B04
VA to provide conduit pathway from IT closet B154-FB-B9 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP11 location for room containing hard ceiling
Yes |_|
VAMC
154
B
Prosthetics
VA to provide conduit pathway from IT closet B154-FB-B9 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP12 location for room containing hard ceiling
Yes |_|
VAMC
154
B
South Lobby Project
VA to provide conduit pathway from IT closet B154-FB-B9 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP13 location for room containing hard ceiling
Yes |_|
VAMC
154
B
Sleep
VA to provide conduit pathway from IT closet B154-FB-B9 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP14 location for room containing hard ceiling
Yes |_|
VAMC
154
1
170
VA to provide conduit pathway from IT closet B154-FB-B1A to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated horizontally at AP03 location for room containing hard ceiling
Yes |_|
VAMC
154
5
Unnamed Room Center Right
VA to provide conduit pathway from IT closet B154-F4-468 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated vertically on wall at AP01 location for room containing hard ceiling
Yes |_|
VAMC
154
5
Unnamed Room right of Center
VA to provide conduit pathway from IT closet B154-F4-468 to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated vertically on wall at AP02 location for room containing hard ceiling
Yes |_|
VAMC
171
1
Center Left/Lower Left
VA to provide conduit pathway from IT Closet to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated vertically on wall at AP02 location for room containing hard ceiling
Yes |_|
VAMC
171
1
Center Right
VA to provide conduit pathway from IT Closet to designed AP location, in open and hard ceiling area, with 4-11/16” dual gang box situated vertically on wall at AP03 location for room containing hard ceiling
Yes |_|

Area Manager or Deputy Signature: _______________________________

Completion Date: ____________________________ image4.png image5.png image6.png image7.png image8.jpeg