Attachment 3- Technical Questionnaire.pdf
PDF 105 KB Posted
- Attached to
- Insulator Washing Federal contract opportunity
- Solicitation number
- FA461021Q0051
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA461021Q0051.pdf | ||
| Attachment 2- RFQ Template.xlsx | XLSX spreadsheet | |
| Attachment 4- SCA WD 15-5647 Rev 12.pdf | ||
| Attachment 5 Question and Answer Template.docx | DOCX document | |
| Attachment 1- PWS Hotline Insulator Washing FY21.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY (FOUO) FA461021Q0051
Attachment 3
INSULATOR WASHING FY21
TECHNICAL QUESTIONNAIRE
Source Selection Sensitive (when filled-out) IAW FAR 2.101 and FAR 3.104
INSTRUCTIONS: The offeror’s technical questionnaire is limited to ten (10) pages. For each factor below, in the first table provide a detailed description of specific tasks performed for that factor. Use the reference table to provide up to five (5) references per factor to support the technical experience claimed in the first table.
Factor 1. Three (3) years of experience providing hot line pressurized insulator washing tasks within the last five (5) years preceding the release of this request for proposal. Provide detailed information in performing each of the specific pressurized washing tasks described in factors 1a through 1c inclusive of RFQ Attachment 1, Performance Work Statement. Provide reference and contact information to support the experience claimed by offeror.
To Be Considered Acceptable: The contractor’s responses evidence that the contractor has three (3) years of experience performing each of the specific maintenance tasks described in sub-factors 1a through 1c within the last five (5) years preceding the release of this request for proposal. References provided must support the experience claimed by offeror.
Sub-Factor 1a: At least three (3) years of experience performing the Hot line pressurized washing of Insulators within the last five (5) years preceding the release of this request for proposal. Use the narrative block in the first table to provide a detailed description tasks performed (see PWS section 1.3 – 1.3.3).
Maintenance Task Years of Experience Within the Last Five
(5) Years Hot line pressurized washing of Insulators Narrative:
Reference #1
Contract # Period of Performance Total Value
Contract Type (Firm Fixed Price
[FFP] or Cost)
Performed By (provide name of company)
Performed as Prime
(P) or Sub (S)?
Check as appropriate
P S POC Name:
Phone #:
Email:
Repeat this block as necessary up to maximum of 5 references for sub-factor 1a
INSULATOR WASHING
TECHNICAL QUESTIONNAIRE
Source Selection Sensitive (when filled-out) IAW FAR 2.101 and FAR 3.104
FOR OFFICIAL USE ONLY (FOUO) FA461021Q0051
Attachment 3
Sub-Factor 1b: At least three (3) years of experience performing pressurized washing of associated 12kV distribution circuits identified below within the last five (5) years preceding the release of this request for proposal. Use the narrative block in the first table to provide a detailed description tasks performed (see PWS section 1.3 – 1.3.3).
Maintenance Task Years of Experience Within the Last Five
(5) Years Pressurized washing of associated 12kV distribution circuits Narrative:
Reference #1
Contract # Period of Performance Total Value
Contract Type (Firm Fixed Price
[FFP] or Cost)
Performed By (provide name of company)
Performed as Prime
(P) or Sub (S)?
Check as appropriate
P S POC Name:
Phone #:
Email:
Repeat this block as necessary up to maximum of 5 references for sub-factor 1b
Sub-Factor 1c: At least three (3) years of experience performing pressurized washing of associated 70kV distribution circuits identified below within the last five (5) years preceding the release of this request for proposal. Use the narrative block in the first table to provide a detailed description tasks performed (see PWS section 1.3 – 1.3.3).
Maintenance Task Years of Experience Within the Last Five
(5) Years Pressurized washing of associated 70kV distribution circuits Narrative:
Reference #1
Contract # Period of Performance Total Value
Contract Type (Firm Fixed Price
[FFP] or Cost)
Performed By (provide name of company)
Performed as Prime
(P) or Sub (S)?
Check as appropriate
P S POC Name:
Phone #:
Email:
Repeat this block as necessary up to maximum of 5 references for sub-factor 1c
| Years of Experience Within the Last Five 5 Years: |
| Years of Experience Within the Last Five 5 YearsHot line pressurized washing of Insulators: |
| Narrative: |
| Contract Row1: |
| Period of PerformanceRow1: |
| Total ValueRow1: |
| Contract Type Firm Fixed Price FFP or CostRow1: |
| Performed By provide name of companyRow1: |
| P: Off |
| S: Off |
| POC Name Phone Email: |
| Years of Experience Within the Last Five 5 YearsPressurized washing of associated 12kV distribution circuits: |
| Narrative_2: |
| Contract Row1_2: |
| Period of PerformanceRow1_2: |
| Total ValueRow1_2: |
| Contract Type Firm Fixed Price FFP or CostRow1_2: |
| Performed By provide name of companyRow1_2: |
| P_2: Off |
| S_2: Off |
| POC Name Phone Email_2: |
| Years of Experience Within the Last Five 5 YearsPressurized washing of associated 70kV distribution circuits: |
| Narrative_3: |
| Contract Row1_3: |
| Period of PerformanceRow1_3: |
| Total ValueRow1_3: |
| Contract Type Firm Fixed Price FFP or CostRow1_3: |
| Performed By provide name of companyRow1_3: |
| P_3: Off |
| S_3: Off |
| POC Name Phone Email_3: |
File details come from the government source that posted it. Updated .