Attachment 3 Task Order One PWS.docx

DOCX document 35 KB Posted

Attached to
Wastewater Treatment Hauling Services; Jacobs Creek Job Corps Center; Bristol, TN.
Solicitation number
1282A725Q0006
Issued by

About this file

This document is a Performance Work Statement (PWS) for a task order to provide wastewater hauling services at the Jacobs Creek Job Corps Center in Bristol, Tennessee. The task order is anticipated to run from December 3, 2024 through December 2, 2025. The contractor shall provide labor, equipment, and transportation to pump and haul excess influent from the wastewater treatment plant, as well as haul in seeding material and/or sludge. The typical monthly hauling volume is 10,000 gallons, but daily hauling may be required if the plant is taken offline for maintenance. All sludge and wastewater must be disposed of in accordance with regulations, and the contractor must provide samples, volume reports, and disposal manifests. This PWS is associated with Solicitation Number 1282A725Q0006 for Wastewater Treatment Hauling Services at the Jacobs Creek Job Corps Center, issued by the Department of Agriculture Forest Service.

View the file

Other files

File Type Posted
Sol_1282A725Q0006_Amd_0002.pdf PDF
Sol_1282A725Q0006_Amd_0001.pdf PDF
Attachment 4 Task Order One Pricing.xlsx XLSX spreadsheet
Attachment 5 Wage Determination.pdf PDF
1282A725Q0006 Final Copy.pdf PDF
Attachment 2 IDIQ Pricing Model.xlsx XLSX spreadsheet
Attachment 1 WWTP Hauling IDIQ SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jacobs Creek Job Corps Center Wastewater Hauling Task Order One (1) SOW

Introduction The contractor shall provide all labor, material, equipment, and transportation to pump and haul excess influent to prevent overflow from the Jacobs Creek wastewater treatment plant, hauling in seeding material, and/or sludge pumping.

Period of Performance This task order is anticipated to include hauling needs from December 3, 2024 through December 2, 2025.

Background The wastewater treatment plant is a Titan Membrane Filtration plant. In a typical year, sludge must be periodically removed. During heavy rain events or when the membranes are undergoing routine cleaning, excess influent must be pumped and hauled to a municipal plant. Additionally, municipal waste may need to be hauled into the plant to provide seeding to allow the plant to operate more efficiently.

When the plant is operating normally, it is anticipated that the hauling volume will be average 10,000 gallons per month. In the event the plant is taken out of operation for maintenance or repair, daily hauling of sewage will be required.

Location Jacobs Creek Job Corps Center 984 Denton Valley Road Bristol, TN 37620 Center Point of Contact: Anthony Colobro 423-217-6417 anthony.colobro@usda.gov Contracting Officer Representative: Deborah Valles 720-450-6191 deborah.valles@usda.gov

Technical Requirements All sludge and wastewater removed from the Center under this task order shall be disposed of by the contractor in accordance with Federal, State of Tennessee, and local regulations. For each truck load pumped, the contractor shall grab and provide a sample to the wastewater treatment operator to submit for State required testing.

The contractor shall provide copies of manifest from the location(s) at which the sludge is disposed at the time of invoicing.

On the day of completion of pumping, the contractor shall provide notification to the Contracting Officer's Representative by email reporting the number of gallons hauled. Designated Points of Contact at the Center will be allowed to schedule the pumping.

Deliverables

· Samples: For each truck load pumped, the contractor shall grab and provide a sample to the wastewater treatment operator to submit for State required testing.

· Volume reporting: On the day of completion of pumping, the contractor shall provide notification to the Contracting Officer's Representative by email reporting the number of gallons hauled.

· Manifests: The contractor shall provide copies of manifest from the location(s) at which the sludge is disposed at the time of invoicing.