This document is a Statement of Work (SOW) for a Jacobs Creek Job Corps Center Wastewater Hauling Indefinite Delivery Indefinite Quantity (IDIQ) contract. The contractor shall provide all labor, material, equipment, and transportation to pump and haul sludge, excess influent, and provide seeding of the wastewater treatment plant, with an estimated yearly volume of 100,000 to 2,500,000 gallons. The contractor must provide documentation of certified disposal facilities, manifests, and samples for state testing. The pricing shall be a fixed cost per gallon, with 24-hour or 3-business day notice for pumping services.
The related federal contract opportunity is for Wastewater Treatment Hauling Services at the Jacobs Creek Job Corps Center in Bristol, TN, solicitation number 1282A725Q0006. One site visit will be held on October 24, 2024, and quotes are due by November 8, 2024. The contracting agency is the Department of Agriculture Forest Service. Wage determination 2015-4339 Revision 24 applies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_1282A725Q0006_Amd_0002.pdf | ||
| Sol_1282A725Q0006_Amd_0001.pdf | ||
| Attachment 4 Task Order One Pricing.xlsx | XLSX spreadsheet | |
| Attachment 5 Wage Determination.pdf | ||
| 1282A725Q0006 Final Copy.pdf | ||
| Attachment 3 Task Order One PWS.docx | DOCX document | |
| Attachment 2 IDIQ Pricing Model.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Jacobs Creek Job Corps Center Wastewater Hauling IDIQ Statement of Work
Project Jacobs Creek Job Corps Center Wastewater Hauling IDIQ
General Information
1.0 Scope of Work
The contractor shall provide all labor, material, equipment, and transportation to successfully provide the following services at Jacobs Creek Job Corps Center, as described below:
· Pumping and hauling of sludge
· Pumping and hauling of excess influent to prevent overflow
· Seeding the wastewater treatment plant for improved treatment process. This task includes obtaining wastewater from a municipal wastewater treatment plant and hauling and pumping into the Jacobs Creek plant.
Estimated yearly pumping: 100,000-2,500,000 gallons Minimum yearly pumping: 100,000 gallons
Higher volume of hauling requirements typically occurs during the winter rain/snow season: September – April.
2.0 Background
The wastewater treatment plant is a Titan Membrane Filtration plant. In a typical year, sludge must be periodically removed. During heavy rain events or when the membranes are undergoing routine cleaning, excess influent must be pumped and hauled to a municipal plant. Additionally, municipal waste may need to be hauled into the plant to provide seeding to allow the plant to operate more efficiently.
When the plant is operating normally, there is a need to pump 30,000 gallons of sludge, and 100,000 gallons of excess influent. In the years 2020-2022 pumping volumes ranged from 500,000-720,000 gallons per year due to filtration issues and high rain events. In November 2022, the plant experienced a total membrane failure and was non-operational. The volume hauled during the plant failure was 4.6 million in 2023, and 2.2 million from January-June 2024. The plant was repaired and returned to normal service in June 2024.
Contractor Requirements
3.0 Technical Requirements
Prior to any work being accomplished on this contract, the contractor will provide documentation to the Contracting Officer of the locations and names of the Certified Wastewater Treatment Facilities that will receive the pumped wastewater. The contractor shall provide copies of manifest from the location(s) at which the sludge is disposed at the time of invoicing.
All sludge and wastewater removed from the Center under this contract shall be disposed of by the contractor in accordance with Federal, State of Tennessee, and local regulations. For each truck load pumped, the contractor shall grab and provide a sample to the wastewater treatment operator to submit for State required testing.
The contractor shall consider in their unit pricing that notification for pumping may occur within twenty-four (24) hours. For routine sludge removal or seeding, the center will give the contractor three business days’ notice. The price per gallon will be the same regardless of the notification time and the type of waste (sludge, excess influent or seeding). The per gallon cost shall be inclusive of all activities necessary to remove waste, including, but not limited to drive time, fuel, vehicle maintenance, Personal Protective Equipment, licensing, safety and spill prevention plan development, and disposal costs. The vendor shall bill for services solely as a cost per gallon, and no other costs will appear on the submitted invoices.
On the day of completion of pumping, the contractor shall provide notification to the Contracting Officer's Representative by email reporting the number of gallons hauled. Designated Points of Contact at the Center will be allowed to schedule the pumping.
4.0 Deliverables
· Samples: For each truck load pumped, the contractor shall grab and provide a sample to the wastewater treatment operator to submit for State required testing.
· Volume reporting: On the day of completion of pumping, the contractor shall provide notification to the Contracting Officer's Representative by email reporting the number of gallons hauled.
· Manifests: The contractor shall provide copies of manifest from the location(s) at which the sludge is disposed at the time of invoicing.