Attachment 3 Supplemental SOW 2_19_25 Bolan.pdf
PDF 142 KB Posted
- Solicitation number
- 12760425Q0052
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Supplementary Statement of Work (SOW) for the installation of a new communications shelter at Bolan Mountain on the Wild Rivers Ranger District, Rogue Siskiyou National Forest. The contractor must provide all materials and services to install a PEPRO LLC 8'x8'x8' shelter with an integrated 40' articulating mast at coordinates Lat 42N 0' 59.34" Long 123W 27' 33.68". The shelter must include specific equipment such as two 19" x 84" equipment racks, overhead cable ladder rack, LED lighting with timer switch, rack-mounted battery trays for NorthStar 210ah AGM batteries, bus bars, filtered DC entry ports, surge protection devices for 12VDC solar arrays, passive ventilation ports, solar panel mounting provisions, RF entry panel with 9 ports supporting three ½" Heliax cables, and antenna mounts for five Command 150-5N antennas at heights of 40', 35', 30', 25', and 20'. The shelter must incorporate a faraday cage for equipment protection, comply with TIA-222 standards and national building codes, be deployable on bare land without excavation, use Ufer pad grounding, and include an OSHA-compliant roof anchor point rated for 5,000 lbs.
The contractor must deliver the shelter to 26568 Redwood Hwy, Cave City Junction, OR 97523 at least four weeks prior to installation, then coordinate installation at the Forest Service-marked location on Bolan Mountain. The scope includes demolishing and disposing of an existing 8'x8'x8' shelter, with asbestos testing required prior to disposal and test results provided as a contract deliverable. The contractor is responsible for safe removal without damaging remaining structures/equipment, proper disposal in accordance with environmental regulations, and repairing any damage caused during removal. Access to the site is via good road conditions, though lowboy transport may be challenging due to tight switchbacks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended-Attachment 1 BOM.xlsx | XLSX spreadsheet | |
| RFQ 12760425Q0052.pdf | ||
| Attachment 1 BOM.xlsx | XLSX spreadsheet | |
| Attachment 2 Shelter PWS.pdf | ||
| Competition Requirement_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7.1 Supplementary Statement of Work (SOW)
The contractor must provide all materials and services for work required to complete the installation of a new communications shelter at Bolan Mountain. The site is located on the Wild Rivers Ranger District, Rogue Siskiyou National Forest at the following coordinates: Lat 42N 0’ 59.34” Long 123W 27’ 33.68”. The work provided by the contractor shall satisfy the following:
7.1.1 Shelter Design Requirements
A. The Manufacturer of the shelter shall comply with all applicable nationally recognized building and electrical codes.
B. The shelter shall be a PEPRO LLC. 8’x8’x8’ shelter with an integrated 40’ mast. The mast shall articulate to allow access to the antennas while in the horizontal position.
C. The shelter shall include the following equipment.
a. (2) 19” x 84” equipment racks
b. Overhead cable ladder rack to allow for the distribution of power and RF cables from their respective entry points to the equipment rack
c. Standard 8’x8’ Pepro DC lighting fixtures with LED bulbs, connected to a 1-hour rotary timer switch installed near the shelter entrance
d. (2) Rack mounted battery trays, each capable of supporting NorthStar 210ah
AGM batteries
e. (1) Rack mounted bus bar
f. (1) Main Ground Bus bar (MGB) installed below the RF entry panel
g. (2) Filtered DC entry port tied to the faraday cage
h. (2) Surge protection devices (SPD) for solar array connections, SPDs shall be rated for a 12VDC Solar array
i. (2) Passive ventilation ports that include hoods, louvers, and screens to prevent insects from entering the shelter
j. Previsions to mount solar panels to both the roof and south face of the shelter
k. Solar panel mounts designed to work with the building attachment points
l. The door shall be installed on the East face of the shelter
m. The integrated mast shall be attached to the West side of the shelter and shall articulate to the East over the top of the shelter
n. The manufacturer shall provide (2)18” and (1) 4” mounts to attach (5) Command
150-5N antennas to the mast at each of the following heights: 40’, 35’,30’,25’,20”.
D. The shelter design shall include a faraday cage to protect the equipment from transient voltage spikes
E. The shelter shall include an RF entry panel with 9 ports, the appropriate quantity of boots and cushion inserts to support (3) ½” Heliax cables. The RF entry port, boots, and cushion inserts shall be integrated into the faraday cage. The remaining unused RF entry ports shall be capped with covers that are integrated into the faraday cage.
F. The shelter design shall be such that it can be deployed on bare unimproved land without the need for excavation or foundation construction.
G. The shelter shall be grounded through Ufer pads placed on native surface; due to the no ground disturbance requirements a traditional ground system cannot be part of the solution.
H. The shelter shall be anchored to the land without the use of guy wires or stakes.
I. The shelter and mast system shall be designed on a site-specific basis and must comply with the current version of TIA-222. The mast system shall be designed to support the following antennas and feedlines:
a. Commander 1505N, 40’, feedline LDF4-50, 4” standoff, USFS
b. Commander 1505N, 35’, feedline LDF4-50, 18” standoff, USFS
c. Commander 1505N, 30’, feedline LDF4-50, 18” standoff, USFS
d. Commander 1505N, 20’, feedline LDF4-50, 18” standoff, Cooperator
e. Commander 1505N, 25’, feedline LDF4-50, 18” standoff, Cooperator
J. The roof of the shelter shall include an integrated anchor point that meets OSHA standard 29 CFR 1926.502(d)(15) capable of sustaining 5,000lbs. (22.2KN) of force.
K. The contractor shall also reference the provided PWS, BOM, Shelter Request Form, and this document for design details.
7.1.2 Shelter Delivery and Installation
A. Prior to installation the shelter shall be delivered to:
26568 Redwood Hwy Cave City Junction, Or. 97523
B. The shelter shall be delivered at a minimum of 4 weeks prior to installation.
C. The contractor shall schedule and provide the means to safely offload the shelter at the delivery location.
D. The contractor shall schedule, coordinate, and install the new shelter at the Bolan
Mountain communication site.
E. The road system used to access the Bolan Mountain communications site is in good condition. However, the use of a lowboy to transport to and from the site may be a challenge due to tight switch backs.
F. The shelter shall be installed in the location marked out on the ground by the Forest Service Land Mobile Radio staff.
7.1.3 Demolition of Existing Shelter
A. The contractor shall demolish and dispose of (1) 8’x8’x8’ shelter.
B. The contractor shall have the existing shelter tested for asbestos prior to backhaul and disposal. The test results shall be provided to the Forest Service as a contract deliverable.
The contractor will need to present the test results at the local landfill to prove the shelter does not contain asbestos.
C. The removal of the existing telecommunications shelter will be done in a way that no damage will occur to remaining structures/equipment.
D. Any damage caused by the removal of the structure will be the responsibility of the contractor to repair.
E. Disposal of all demolition debris is the responsibility of the contractor and shall be discarded in accordance with state, federal environmental regulations as applicable.
| 7.1 Supplementary Statement of Work (SOW) |
| a. Commander 1505N, 40’, feedline LDF4-50, 4” standoff, USFS |
| b. Commander 1505N, 35’, feedline LDF4-50, 18” standoff, USFS |
| c. Commander 1505N, 30’, feedline LDF4-50, 18” standoff, USFS |
| d. Commander 1505N, 20’, feedline LDF4-50, 18” standoff, Cooperator |
| e. Commander 1505N, 25’, feedline LDF4-50, 18” standoff, Cooperator |
| J. The roof of the shelter shall include an integrated anchor point that meets OSHA standard 29 CFR 1926.502(d)(15) capable of sustaining 5,000lbs. (22.2KN) of force. |
| K. The contractor shall also reference the provided PWS, BOM, Shelter Request Form, and this document for design details. |
| 7.1.2 Shelter Delivery and Installation |
| A. Prior to installation the shelter shall be delivered to: |
| 26568 Redwood Hwy |
| Cave City Junction, Or. 97523 |
| B. The shelter shall be delivered at a minimum of 4 weeks prior to installation. |
| C. The contractor shall schedule and provide the means to safely offload the shelter at the delivery location. |
| D. The contractor shall schedule, coordinate, and install the new shelter at the Bolan Mountain communication site. |
| E. The road system used to access the Bolan Mountain communications site is in good condition. However, the use of a lowboy to transport to and from the site may be a challenge due to tight switch backs. |
| F. The shelter shall be installed in the location marked out on the ground by the Forest Service Land Mobile Radio staff. |
| 7.1.3 Demolition of Existing Shelter |