ATTACHMENT 3 Submittals MBMV222332 Repair Base Road Sealant Striping.pdf

PDF 64 KB Posted

Attached to
MBMV222332 Repair Base Road Sealant and Striping
Solicitation number
W50S84-23-B-0002
Issued by

About this file

This document is a schedule of material submittals for the solicitation MBMV222332 to repair base roads and restripe at Fort Bragg. The solicitation requires submittals for a construction schedule, safety documentation, permits and licenses, quality control plan, paint, and sealant. The submittals are due 14 days after notice to proceed and must be reviewed by the civil engineering department. The related federal contract opportunity is solicitation number W50S84-23-B-0002 from the Department of the Army National Guard for the same road and striping repair project at Fort Bragg.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

MBMV222332

APPROVED DISAPPROVED

1 Submittal Schedule - AF Form 66 1 x

2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x

3 Contractor Hazardous Material Identification 1 x

4 Solid Waste Recycling and Disposal Reporting Form 1 x

5 Affirmative Procurement Reporting Form 1 x

6 Construction Schedule 1 x

7 Construction Photos 1

8 Safety Documentation as stated 1 x

9 Permits, Licenses and Certificates 1 x

10 Quality Control Plan 1 x

11 Paint 1 1 1 1 12 Sealant 1 1 1 1

SOLICITATION/CONTRACT NO.PROJECT TITLE

Repair Base Road Sealant & Striping

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

O

TH

ER

M

AT

ER

IA

L

O R

D

AT

A

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U

T REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

File details come from the government source that posted it. Updated .