ATTACHMENT 3 Submittals MBMV222332 Repair Base Road Sealant Striping.pdf
PDF 64 KB Posted
- Attached to
- MBMV222332 Repair Base Road Sealant and Striping
- Solicitation number
- W50S84-23-B-0002
- Issued by
-
Department of the Army National Guard
About this file
This document is a schedule of material submittals for the solicitation MBMV222332 to repair base roads and restripe at Fort Bragg. The solicitation requires submittals for a construction schedule, safety documentation, permits and licenses, quality control plan, paint, and sealant. The submittals are due 14 days after notice to proceed and must be reviewed by the civil engineering department. The related federal contract opportunity is solicitation number W50S84-23-B-0002 from the Department of the Army National Guard for the same road and striping repair project at Fort Bragg.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
MBMV222332
APPROVED DISAPPROVED
1 Submittal Schedule - AF Form 66 1 x
2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1 x
3 Contractor Hazardous Material Identification 1 x
4 Solid Waste Recycling and Disposal Reporting Form 1 x
5 Affirmative Procurement Reporting Form 1 x
6 Construction Schedule 1 x
7 Construction Photos 1
8 Safety Documentation as stated 1 x
9 Permits, Licenses and Certificates 1 x
10 Quality Control Plan 1 x
11 Paint 1 1 1 1 12 Sealant 1 1 1 1
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Base Road Sealant & Striping
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
M
AT
ER
IA
L
O R
D
AT
A
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
R
EC
O M
M
EN
D
AT
IO
N
S
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O
U
T REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
FOLLOW-UP
SUBMITTAL
REQUIRED
BY 14 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
File details come from the government source that posted it. Updated .