ATTACHMENT 3 - SUBMITTAL REGISTER.pdf

PDF 69 KB Posted

Attached to
Repair of Leaking Baseboard Heater Pipe - National Agricultural Library
Solicitation number
1232SA26Q0795
Issued by

About this file

This is a Submittal Register for a federal construction project dated April 19, 2026, documenting contractor submissions for the installation and repair of leaking perimeter heat piping at the National Agricultural Laboratory (NAL) in Beltsville, Maryland 20705.

The register tracks three submittal items referenced in the Statement of Work (SOW). Item 1 requires submission of a construction schedule (SOW Page 10) classified as a schedule document. Item 2 requires specification sheets for pipe materials (SOW Page 4) submitted as data documentation. Item 3 requires specification sheets for mortar mix (SOW Page 4) also submitted as data documentation. All three items are designated for government approval, though the register does not indicate specific approval deadlines, material delivery dates, or submission dates. The document serves as a control mechanism to monitor contractor compliance with contractual submittal requirements and government review timelines, though most action date fields remain unfilled as of the register creation date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL REGISTER 4/19/2026 JOB NO.:

TITILE AND LOCATION:

To install repair leaking perimeter heat piping at NAL, Beltsville, MD 20705.

CONTRACTOR.: CONTRACT NO.:

A C

TI

V

IT

Y

N O

TR

A

N

SM

IT

TA

L N

O

IT

EM

N O

SP

EC

IF

IC

A

TI

O N

PA

R A

G R

A

PH

DESCRIPTION OF

ITEMS SUBMITTED

TYPE OF SUBMITTAL

CLASSI-

FICATION

R

EV

IE

W

ER

CONTRACTOR

SCHEDULE

DATES

CONTRACTOR

ACTION

GOV’T.

ACTION

REMARKS

D

TA

A W

IN

G

S

IN

ST

R U

C

TI

SC

H

ED

U

LE

S

ST

A

TE

M

EN

TS

EP

O

TS

C

ER

TI

FI

C

TE

SA

M

PL

ES

EC

O R

D S

O

M M

A N

U

LS

IN

FO

R M

A

TI

LY

G

V

ER

N M

EN

T

A

PP

R O

V

ED

SU

B

M

IT

PP

R O

V . N

EE

ED

Y

M A

TE

R

IA

L

N

EE

D

ED

B Y

C O

D E

D

SU

M

IT

T

G

V

ER

N

M

EN

T

C O

D E

D

1 1 1 SOW

Pg 10

Schedule X Schedule

2 2 2 SOW

Pg 4

Pipe materials X Spec.

Sheets

3 3 3 SOW

Pg 4

Mortar mix X Spec.

Sheets

*END*

SUBMITTAL REGISTER 4/19/2026

File details come from the government source that posted it. Updated .