Attachment 3 Statement of Work revised.docx

DOCX document 15 KB Posted

Attached to
6520--Copy of RFQ-Dental Laboratory- Knoxville-621
Solicitation number
36C24923Q0060
Issued by

View the file

Other files

File Type Posted
Attachment 5 Knox Dental Lab Layout.pdf PDF
36C24923Q0060_4.docx DOCX document
Attachment 4 Knox Dental Lab Layout -.pdf PDF
36C24923Q0060_3.docx DOCX document
36C24923Q0060_2.docx DOCX document
Attachment 2 Salient Charecteristics.docx DOCX document
36C24923Q0060_1.docx DOCX document
Attachment 1 Price Schedual.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

The James H. Quillen VA Medical Center Knoxville Dental Clinic would like installation of the fundamental components of the Dental Laboratory to occur at an agreed-upon timeframe, projected between install February 2023-April 2023

Contractor shall perform a post-award site visit to fabricate a custom design and cut sheet for electrical and plumbing needs. Site visit shall be arranged with the James H. Quillen VA Medical Center team.

0. Vendor shall ship requirement 30-60 days after contract award.

0. Vendor shall supply requirement/workstations pre-piped and pre-wired.

0. Vendor will arrange shipping of requirement in manner as to prevent damage.

0. Requirement shall ship requirement directly to Knoxville Dental Clinic, 8401 Kingston Pike, Knoxville TN.

0. Vendor will un-pack and inspect all units upon installation of requirement for damage.

0. Vendor will replace any units damaged in shipping at no additional expense to VA.

0. Vendor will finalize assembly and installation of requirement units/workstations within 2 weeks of delivery date-except for final connections.

0. Vendor will work with contractor to identify hardware for final connections for piping and/or electrical purposes, at no additional cost to VA.

0. Vendor will attach lab hand pieces and knee treadles and verify they are functioning properly at time of installation.

0. Vendor will replace any non-functional Lab handpieces and/or knee treadles at time of installation and warrant them for a minimum of one year.

0. Vendor will verify vacuum of workstation is properly functional at time of installation.

0. Vendor shall warrant all individual items of the requirement for one year minimum to be free of damage and to function properly.

0. Need of repair or replacement of any part of a single workstation will extend the warranty of that item an additional 6 months past the two year warranty period.

0. Vendor will remove all debris involved in shipping, unpacking and installation from the VA for disposal.

0. Final walk through will be completed by the vendor after installation at no charge.

File details come from the government source that posted it. Updated .