This is a Statement of Work for the rental of material handling equipment to support DLA Distribution Oklahoma's warehouse and logistics operations. The contractor shall provide ten (10) vertical lift masts (similar or equal to Genie Model GR-20) and ten (10) 6,000-pound capacity forklifts suitable for indoor warehouse operations for a six-month rental period. All equipment must be fully functional upon delivery, meet manufacturer specifications and industry standards, and be clean and free of defects. The contractor is responsible for delivery to the designated location, coordination with the DLA point of contact, equipment removal at the end of the rental period, preventative maintenance according to manufacturer guidelines, and corrective maintenance as needed.

The contractor must maintain equipment availability of 95% or greater uptime, respond to maintenance issues within 24 hours, and provide replacement equipment within 48 hours if repairs cannot be completed. All equipment shall comply with OSHA requirements and ANSI/ITSDF standards and include required safety features such as alarms, lights, brakes, and visible warning labels. The contractor shall designate a point of contact for service requests and respond to service calls within 4 hours during normal working hours. DLA responsibilities include providing access to the delivery location, designating an equipment staging area, and identifying a coordination point of contact. The equipment will support an extra workforce of 250 personnel engaged in material movement, storage, and distribution activities including order picking, pallet movement, and general material handling tasks.

View the file

Other files

File Type Posted
Attachment 1 - Schedule of Supplies or Services and Prices.xlsx XLSX spreadsheet
SP3300-26-Q-0132.pdf PDF
Attachment 2 - Specifications.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Rental of Material Handling Equipment

1. SCOPE

The contractor shall provide rental, delivery, maintenance, and support of the forklifts and vertical lift masts to support warehouse and logistics operations. The equipment shall be sufficient to support an extra workforce of 250 personnel that will be engaged in material movement, storage, and distribution activities.

2.EQUIPMENT REQUIRMENTS (See Attachment 2 – Specifications)
a.The contractor shall provide:
i.Ten (10) Vertical Lift Masts – Similar or equal to Genie Model GR-20
ii.Ten (10) 6k Forklifts

All equipment shall be suitable for indoor warehouse operations and capable of supporting order picking, pallet movement, and general material handling tasks.

3.GENERAL REQUIREMENTS
a.Equipment Conditions
i.Equipment shall be fully upon delivery
ii.Equipment shall meet manufacture’s specifications and industry standards
iii.Equipment shall be clean, serviceable and free of defects
b.Delivery and Removal
i.Deliver of equipment to the designated location within the agreed timeframe
ii.Coordinate delivery and pickup with DLA Point of Contact
iii.Remove equipment promptly at the end of the rental period
c.Maintenance and Repairs
i.Perform preventative maintenance in accordance with the manufacturer’s guidelines

ii. Provide corrective maintenance as needed

iii.Within 24 hour response time for maintenance issues
iv.Within 48hr provide replacement equipment if repairs cannot be completed
4.SAFETY REQUIREMENTS
i.Equipment shall comply with all the applicable safety standards including:
ii.OSHA Requirements
iii.ANSI/ITSDF Standards
iv.Equipment shall include all required safety features like alarms, lights, brakes
v.All warning labels and placards shall be visible and legible
5.TECHNICAL SUPPORT
i.Provide a point of contact for service request
ii.Respond to service calls within 4 hours during normal working hours
6.DOCUMENTATION
i.Contractor shall prove equipment list
7.PERFORMANCE STANDARD OBJECTIVES
i.Equipment availability greater than or equal to 95% uptime
ii.Maintenance response within 24hrs

iii. Replacement Equipment within 48hrs

iv. 100% safety Compliance

8.DLA RESPOSABILITIES
i.Provide access to delivery location

ii. Designate equipment staging area

iii.Identify a point of contact for coordination
9.CONTRACTOR RESPONSIBLITIES
i.Provide all equipment and associated support
ii.Ensure compliance with applicable regulations
iii.Maintain accountability of all rented equipment
iv.Ensure that equipment remains in a safe working condition

File details come from the government source that posted it. Updated .