Attachment 3 - Statement of Work - 70Z03825QH0000109.pdf
PDF 468 KB Posted
- Attached to
- Overhaul of Aileron Booster Assemblies
- Solicitation number
- 70Z03825QH0000109
About this file
This Statement of Work (SOW) details overhaul services for the U.S. Coast Guard Aviation Logistics Center (ALC), specifically supporting the HC-130J aircraft's Long-Range Surveillance Product Line Division. The contractor must overhaul aircraft components to return them to a ready-for-issue (RFI) condition, with work including repair of failed components, replacement of missing or broken hardware, and removal of foreign matter or corrosion. Contractors must be either an FAA Overhaul Facility, OEM Certified Overhaul Facility, OEM Certified Distributor, or DoD Certified Overhaul Facility.
Key requirements include a 90-day turn-around time for overhauled components, firm fixed pricing at a fully burdened rate, and comprehensive documentation processes. The contractor must maintain a Quality Assurance System, provide airworthiness certification, and submit detailed Component Repair Records (CRR) to the USCG Aviation Logistics Center within five working days of component overhaul completion. The SOW emphasizes mission-critical support for Coast Guard operations including search and rescue, law enforcement, international ice patrol, marine environmental protection, and marine resource conservation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Schedule - 70Z03825QH0000109.xlsx | XLSX spreadsheet | |
| Attachment 2 - Terms and Conditions - 70Z03825QH0000109.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR OVERHAUL
1.0GENERAL
1.lBACKGROUND
The U.S. Coast Guard (USCG) Aviation Logistics Center (ALC) requires overhaul services for the applicable Part Numbers (PIN), National Stock Numbers (NSN), and quantity estimates as specified on the Schedule of Supplies/Services (Schedule). The Contractor shall be required to overhaul components to be returned to USCG in a ready for issue (RFI) condition per section titled Applicable Documents.
The Long-Range Surveillance Product Line Division (LRS) supports the HC-130J aircraft by providing logistics, inventory management, and sustainment support for USCG aviation assets utilized by Air Stations geographically located in and outside the continental United States. As part of this responsibility, the LRS has a requirement for sustainment of numerous components used on the aircraft.
1.2 SCOPE
All overhaul actions shall be In Accordance With (IA W) the applicable technical directive or alternate standard approved in writing by USCG LRS Contracting Officer. Components furnished hereunder shall be returned by the Contractor in an aiiworthy condition and in all respects suitable for installation on the HC-130J aircraft. Certification and documentation requirements apply.
Firm fixed pricing for overhaul shall be at a fully burdened rate. The Contractor shall supply all parts, labor, and materials required to restore these components to a Ready for Issue (RFI) condition.
Incorporation of Service Bulletins (SB) or repairs for Unusual Damage will be priced separately.
The technical requirements in the SOW are identified as the minimum acceptable standards of performance to define an operationally effective system. The Contractor must have access to the applicable technical directives cited in paragraph titled Applicable Documents. In addition to these directives, the Contractor must have access to all performance/test/acceptance criteria and necessary data to ensure the items specified in the Schedule are overhauled, calibrated, and operating IA W the applicable technical directives.
The work required by this SOW is not limited to the installation of overhaul kits. The work shall include repair of all failed components and include replacement of missing hardware, broken parts, and the removal of any foreign matter or corrosion.
1.3 OBJECTIVE
This purchase order will provide an acquisition vehicle for the USCG to maintain an inventory of RFI components to supply depot level maintenance and the field units. It will continue to enhance the USCG's ability to perform the congressionally mandated missions such as search and rescue, law enforcement, international ice patrol, marine environmental protection, and marine resource conservation. With such a demanding operational tempo, aircraft condition and availability are essential to mission success.
1.4 Contractor Facility Certifications
The Contractor shall be either a FAA Overhaul Facility or OEM Certified Overhaul Facility or OEM Certified Distributor or DoD Certified Overhaul Facility to perform overhaul services on the components listed in the Schedule.
1.4.1 FAA-Certified Facility
To demonstrate that the Contractor is properly certified by the FAA, the Contractor must submit their repair station certificate. If the Contractor holds a limited rating, the Contractor must also submit: I) a capabilities list identifying the relevant part numbers specified on the schedule of services IA W 14 CFR 145.215, and 2) a self-evaluation affirming that the repair station has all of the housing, facilities, equipment, material, technical data, processes, and trained personnel in place to perform the work on the articles identified in the schedule of services IA W I 4 CFR I 45 .215. At the request of the
ATTACHMENT 3 - 70Z03825QH0000109
STATEMENT OF WORK -- Overhaul
Contracting Officer, the Contractor may be required to submit a copy of the repair station manual and quality control manual.
1.4.2 OEM Certified Facility
To demonstrate that the Contractor is certified by the OEM, the Contractor must submit documentation from the OEM stating that the Contractor is certified to perform the services required herein. This documentation must specifically identify the part numbers identified in the Schedule.
Otherwise, the Contractor must provide an OEM point of contact that will allow the USCG to independently verify the Contractor is, in fact, certified by the OEM to repair the components listed on the Schedule.
1.4.3 DoD or USCG Certified Facility
To demonstrate that the Contractor is certified by a DoD service or the USCG to perform overhaul services on the components listed on the Schedule, the Contractor must provide a signed repair source approval memo indicating the Contractor is approved to repair the components listed on the Schedule.
1.4.4 Changes Affecting Contractor Certification
If during the period of performance of the contract, the Contractor's certification status changes (e.g.
the FAA suspends the repair station's certificate), the Contractor shall immediately notify the USCG and this may be grounds for contract termination. The USCG will review the circumstances affecting the certification status and make a final determination. The USCG retains the authority to allow work to continue despite a certification change if it is determined that the Contractor is able to meet all other requirements of the SOW.
1.4.S Sub-contractors All potential Sub-contractors shall meet one of the requirements listed in paragraphs 1.4.1 thru 1.4.3 in the applicable category for the items listed in the Schedule. To be found technically acceptable, the Contractor shall submit a list of all Sub-contractors that may perform work on USCG articles. If no Sub-contractors will be used, a statement to this effect is still required. The Sub-contractor list must outline each Sub-contractor's name, location, certification source (e.g., FAA, OEM, DoD, USCG), rating type (if applicable) (e.g. NOi, Specialized Services, etc.), and the nature of the services provided by the Sub-contractor. The Sub-contractor must document the services provided to the Contractor either using an FAA 8130 certification or an equivalent Airworthiness Certificate clearly indicating that the work was performed in accordance with the relevant technical data (e.g., MIL STD, ASTM, CMM, AFTO, etc.). The USCG shall be informed of any changes to the Sub-contractor list during the period of performance. Failure to properly notify the USCG of Sub-contractors performing work on USCG articles may be grounds for contract termination.
1.4.6 Quality Assurance System
The Contractor and all sub-contractors shall maintain a Quality Assurance System, including test component calibration system requirements, and documentation of said requirements, sufficient to ensure that overhaul services conform to Technical Orders or OEM specifications and requirements of this purchase order.
File details come from the government source that posted it. Updated .