ATTACHMENT 3 Statement of Work 11.22.2023.pdf

PDF 300 KB Posted

Attached to
Reverse Osmosis Water System Maintenance Federal contract opportunity
Solicitation number
12445024Q0004
Issued by
Department of Agriculture Forest Service

About this file

This statement of work outlines the technical requirements for quarterly and yearly maintenance of reverse osmosis water systems at three locations for the US Department of Agriculture Forest Service. The contractor will be responsible for replacing consumables, conducting operational checks, and submitting preventative maintenance reports on a quarterly basis for the large and small greenhouse systems and yearly for the main lab system. Key deliverables include maintaining RO-quality water in the large and small greenhouses and distilled-quality water in the main lab. The location of services will be at the USDA Forest Service Center for Bottomland Hardwoods Research in Stoneville, Mississippi. Facilities and utilities access will be provided by the government.

View the file

Other files for this federal contract opportunity

Other files attached to Reverse Osmosis Water System Maintenance, newest first.
File Type Posted
ATTACHMENT 4 Experience Questionaire.docx DOCX document
ATTACHMENT 1 Pricing Abstract 11.22.2023.xlsx XLSX spreadsheet
12445024Q0004_Reverse-Osmosis_Water_System_Maintenance.pdf PDF
ATTACHMENT 2 Wage Determination 2015-5161 Rev 24 07.14.2023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Reverse Osmosis Systems Quarterly and Yearly Services

November 22, 2023

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

Project

Reverse Osmosis Systems Quarterly and Yearly Services

General Information

1.0 Scope of Work

The Reverse Osmosis (RO) Quarterly and Yearly Maintenance include replacing consumables and evaluating each system to ensure they are performing well and are running properly (operational checks). There are three RO systems, one each in Large Greenhouse #1, Small Greenhouse #2, and the Main Lab. The RO systems in the Large Greenhouse and Small Greenhouse must produce RO-quality water. The RO system in the Main Lab must produce Distilled-quality water.

Maintenance needs outside of the below and associated operation checks are outside of the scope of this contract.

Issues shall be identified to the Contracting Officer’s Representative within 2 weekdays of scheduled maintenance activities. The Government reserves the right to execute identified unscheduled maintenance needs in any manner deemed appropriate per government procurement procedures.

2.0 Background

Three custom built RO systems require quarterly and annual servicing. Service location is the USDA Forest Service, Center for Bottomland Hardwoods Research (CBHR), Southern Research Station, 432 Stoneville Road, Stoneville, MS 38776.

Service buildings include main lab, large greenhouse, and small greenhouse.

Contractor Requirements

3.0 Technical Requirements / Tasks

Quarterly and/or yearly maintenance on RO Systems shall include the following:

QUARTERLY SERVING OF LARGE GREENHOUSE #1 (February, May, August, November)

Operational check to ensure system is performing well and are running properly; report submission 1- 300C 1.2 cubic feet Portable Exchange Carbon Tank- Quarterly 1- 20 in. 5-micron melt blown filter- Quarterly 8- 40# bags of salt pellets – Quarterly

QUARTERLY SERVING OF SMALL GREENHOUSE #2 (February, May, August, November)

Operational check to ensure system is performing well and are running properly; report submission 1- 300C 1.2 cubic feet Portable Exchange Carbon Tank- Quarterly 1- 20 in. 5-micron melt blown filter- Quarterly 8- 40# bags of salt pellets – Quarterly

ANNUAL SERVICING (February)

MAIN LAB

Operational check to ensure system is performing well and are running properly; report submission 1- 300C Portable Exchange Carbon Tank- Yearly 1- 300MB Portable Exchange Mixed Bed Tank- Yearly 1- 20 in. 5-micron melt blown filter- Yearly 1- 10 in. 5-micron filter (Vent filter) Yearly 1- 10 in. 5-micron pleated filter- Yearly 3- 40# bags of salt pellets – Yearly

LARGE GREENHOUSE #1

1- 10 in. 5-micron pleated filter (Vent filter) Yearly

SMALL GREENHOUSE #2

1- 10 in. 5-micron pleated filter (Vent filter) Yearly

4.0 Government Furnished

Service location is the USDA Forest Service, Center for Bottomland Hardwoods Research (CBHR), Southern Research Station, 432 Stoneville Road, Stoneville, MS 38776. Service buildings include main lab, large greenhouse, and small greenhouse. Facility access to include access to water/power utilities will be provided.

Facilities are closed on Federal Holidays including:

• New Year’s Day January 1

• Martin Luther King’s Birthday 3rd Monday in January

• Washington’s Birthday 3rd Monday in February

• Memorial Day last Monday in May

• Juneteenth National Independence Day June 19

• Independence Day July 4

• Labor Day 1st Monday in September

• Columbus Day 2nd Monday in October

• Veterans’ Day November 11

• Thanksgiving Day 4th Thursday in November

• Christmas Day December 25

5.0 Deliverables / Schedule

Item No. Deliverable Objective Due 1 RO-quality water in the

Large Greenhouse Quarterly/yearly replace system components per the technical requirements to maintain deliverable

Quarterly as per agreement with staff of CBHR

2 RO-quality water in the Small Greenhouse

Quarterly/yearly replace system components per the technical requirements to maintain deliverable

Quarterly as per agreement with staff of CBHR

3 Distilled-quality water in the Main Lab

Yearly replace system components per the technical requirements to maintain deliverable

Yearly as per agreement with staff of CBHR

4 Quarterly/Annual Preventative Maintenance Report

Comprehensive report of each system’s maintenance and operational checks.

e-mailed to the COR within 2 weekdays after each Preventive Maintenance visit

6.0 Travel

N/A

7.0 Contractor’s Key Personnel

N/A

8.0 Security Requirements

No Linc Pass Required. Present employee company ID at each visit.

9.0 Data Rights

N/A

10.0 Section 508 – Electronic and Information Technology Standards N/A

Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards