Attachment 3_Specifications_SOW_Photos.pdf
PDF 6 MB Posted
- Solicitation number
- 1240LU26Q0029
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a solicitation from the United States Department of Agriculture Forest Service-Region One for a membrane roof replacement project at the West Yellowstone Interagency Fire Center Jump Base Office. The project location is approximately 2 miles north of West Yellowstone, Montana, with a price range of $100,000–$250,000. Work is estimated to begin in May 2026 and must be completed within 30 calendar days. The contractor is responsible for all building measurements to determine necessary quantities and sizes of materials, with bidding measurements indicating 6,100 roof square feet for the main building and 200 roof square feet for the tower roof, totaling 6,300 square feet, plus approximately 500 linear feet of perimeter facia/trim.
Base contract items include mobilization, building demolition (removal of existing EPDM roofing system and old cover boards/built-up roof, including removal of two radio antennas), damaged decking repair, installation of 3-inch polyisocyanurate insulation with integrated cover board, and new EPDM roofing membrane system installation with new roof edge flashing/facia. An optional item addresses upper-level wall and window repair involving demolition and reconstruction of an approximately 4-foot by 8-foot wall section with two new windows (approximately 42 inches square each—one fixed lite and one awning-style). The contractor must submit a work schedule, safety plan, and material specifications. No work is permitted on weekends or federal holidays. The contractor must coordinate with the Contracting Officer on staging area location, provide a porta-potty for the project duration, and maintain access to the office. Payment will be made only for items on the schedule of items, and the contractor assumes responsibility for building measurements and protection of equipment, materials, and supplies stored on-site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 1240LU26Q0029
MEMBRANE ROOF REPLACEMENT
United States Department of Agriculture Forest Service-Region One
Custer Gallatin National Forest West Yellowstone Interagency Fire Center
Office Roof Replacement
Approved by: Forest Engineer Date
Recommended by: Fire Staff Officer Date
Approved by: Forest Supervisor Date
PROJECT
LOCATION
Digitally signed by
JEFFERSON FRADY
Date: 2026.01.06 13:53:12 -07'00'
SCOTT SCHUSTER
Digitally signed by
SCOTT SCHUSTER
Date: 2026.01.12 11:56:29 -07'00'
KATHLEEN
MINOR
Digitally signed by
KATHLEEN MINOR
Date: 2026.01.15 14:09:35 -07'00'
Solicitation
1240LU26Q0029
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
FIGURE 1 – VICINITY MAP
Jump Base Office
WEST
YELLOWSONE
Solicitation
1240LU26Q0029
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
FIGURE 2 – JUMP BASE OFFICE ROOF
Solicitation 1240LU26Q0029 WYIFC OFFICE
FIGURE 3A – UPPER LEVEL CONNECTION DETAIL
FIGURE 3B – UPPER LEVEL CONNECTION DETAIL
FIGURE 4A & 4B: ROOF WEST OF TOWER DETAIL VIEW
FIGURE 3C: ROOF EAST OF TOWER FIGURE 3D: FACIA & GUTTER DETAIL
FIGURE 3E & 3F: VIEW OF TOWER
FIGURE 5A & 5B: GUTTER FROM TOWER ROOF.
FIGURE 5B & 5C – RADIO TOWERS TO BE REMOVED
FIGURE 5D – AERIAL VIEW OF JUMPBASE OFFICE
OPTION ITEM 1:
FIGURE 6A – EXTERIOR OF WINDOWS TO BE REPLACED
AND WALL TO BE REFRAMED AND SIDING/TRIM INSTALLED (2 windows apx. 42” sq.)
FIGURE 6B – INTERIOR OF WINDOWS TO BE REPLACED
AND WALL TO REFRAME AND FINISH INSIDE (2 windows apx. 42” sq. ea)
Demolish and re-construct area in RED
FIGURE 7 – JUMP BASE OFFICE ROOF DIMENSIONS
FIGURE 8 – JUMP BASE OFFICE BUILDING PROFILE
SECTION C - DESCRIPTION AND SPECIFICATIONS
C.1 PROJECT DESCRIPTION AND LOCATION
C.1.1 Intent of Contract – The intent of the contract is to provide for the completion of the work described below. The precise details of performing the work are not stipulated, except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
C1.2 Scope of Contract. The intent of the contract is to provide a complete project as described in the contract.
Unless otherwise provided, furnish all labor, materials, equipment, tools, transportation, and supplies to perform all work required to complete the project. The contractor shall be responsible for all building measurements to determine necessary quantities and sizes of material to be supplied. The building measurement is for bidding purposes only.
Bidding measurements – Jump Base Main Building (including second level) – 6,100 Roof Square Feet.
Jump Base Tower Roof – 200 Roof Square Feet Total: 6,300 SF Perimiter length total apx. 500’ (for facia/trim)
Work shall consist of removing and disposing of the existing EPDM roof system and furnishing and installing a new EPDM roof system on the Jump Base Office. Contractor shall work with the manufacturer’s technical representatives to ensure their work will meet all requirements for a warranted job. Contractor shall be responsible to barricade off area to ensure the safety of those near the work zone.
Base Items on Schedule:
01000, Mobilization: Work shall consist of preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.
022210, Building Demolition: The Contractor shall remove all material to the roof framing. Dispose of all material legally off Government property. The Contractor will inspect the sheeting, vents, skylights, drainage scuppers and general condition of the roof and inform the CO if any components are damaged or in need of replacement before the new roof system is put on. All nails, staples and any protruding objects will be removed as part of demolition.
-Remove two radio antennas from roof behind upper portion of building (see Figures 5B & 5C).
-Remove, salvage, and reattach Starlink antenna after completion of reroofing.
-Roof demolition includes removal of existing EPDM roofing and old cover boards, as well as original Built Up Roof (BUR) underneath.
-Metal facia and trim shall be replaced with new facia and trim.
-Some siding on the upper building attached to main roof may need to be removed and replaced.
See Section 070150.19 - PREPARATION FOR REROOFING of the Specifications for removal procedures and recommendations for cleanup. Contractor shall be responsible for barricading off areas below to ensure the safety of those near the work zone, and for compliance with all OSHA Regulations.
061000, Damaged Decking Repair: Complete repairs to water-damaged decking materials (roof deck is likely to be 3” thick glue-lam panels).
lrakich Highlight
CUSTER GALLATIN
NATIONAL FOREST
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
075323, EPDM Roofing Installation: The work shall consist of furnishing and installing new EPDM roofing membrane system as specified in section 075323 of the specifications on the Jump Base Office.
075323.1, Install 3” PolyIso insulation: Install Composite Polyisocyanurate Board Insulation with integrated cover board per Section 075323 part 2.5.
076200 Install new flashing: New roof edge flashing/facia shall be manufactured and installed to accommodate additional depth of roof due to addition of 3” of insulation.
Option Item 1: Upper Level Wall and Window Repair O1-01000, Mobilization: Work shall consist of preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.
O1-022210, Building Demolition: The Contractor shall demolish the existing wall where the two windows are (apx. 4’x8’). Dispose of all material legally off Government property.
O1-061000, Install new wall, finished: Complete framing and exterior and interior finishing of new 2x4 wall, finishing the interior with insulation, sheetrock, tape/texture, paint, and/or trim. Finish the exterior wall with 24 gauge steel siding and trim. Miratec or similar trim may be used around windows - caulk/seal and paint for a complete and finished product.
O1-085313, New Window Installation: Install new windows in newly framed wall section. Install two windows apx. 42” square (or similar standard window size with CO approval in writing), each. One window shall be fixed lite and one window shall be awning-style. Finish exterior and interior of new windows with trim for a complete, finished project.
C.1.3 Project Location – This project is located about 2 miles North of the Hebgen Lake Ranger District Office of the Custer Gallatin National Forest in West Yellowstone, Montana.
FROM WEST YELLOWSTONE, MT TRAVEL NORTH ON US-191 FOR 2 MILES. TURN LEFT ON AIRPORT
ROAD, THEN RIGHT ON AIR CENTER ROAD, DRIVE ¾ MILE TO OFFICE.
FROM BOZEMAN, MT TRAVEL WEST ON US-191/MT-84 FOR 7 MILES. TURN LEFT ON US 191 S. AND DRIVE 80 MILES. TURN RIGHT ON AIRPORT ROAD, THEN RIGHT ON AIR CENTER ROAD, DRIVE ¾ MILE
TO OFFICE.
C.1.4 Price Range –$100,000 - $250,000.
C.1.5 Pre-bid Tour - No pre-bid tour of the project will be conducted.
Prospective bidders wishing to visit the site on their own may obtain direction information by contacting Zac Hiedeman at the Forest Service Supervisor’s Office, Custer Gallatin National Forest, Bozeman, Montana, telephone (406) 587-6729.
C.1.6 Start Work - It is estimated that work will begin in May 2026.
C.1.7 Period of Performance – Contract to be completed in 30 calendar days.
C.1.8 Government Furnished Materials – NA
C.1.9 Submittals- The contractor shall submit a Work Schedule, Safety Plan, and all Materials to be used on this Project.
lrakich Highlight
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
C.1.10 Disturbances –No work shall be permitted on weekends or Federal Holidays.
C.1.11 Staging Area - The Contractor shall coordinate with the COR on a staging area location. The Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing roads, parking lots, and landscaping. Access must be maintained to the office, and other facilities on the site.
C.1.13 Potable Water- The contractor may use the water on-site.
C.1.14 Wastewater Facilities – The Contractor shall provide a porta-potty for the duration of the project.
C.1.15 Electrical – The Contractor may use on-site electrical service for operation of small power tools.
C.2 – CLEANUP AND DISPOSAL
C.2.1 Cleanup and Disposal – The Contractor shall be responsible for solid waste disposal. The Contractor shall at all times keep the area in a clean, neat, and orderly condition. Construction related debris, including but not limited to used motor oil, oil cans, grease cartridges and refuse shall be removed promptly from the site and disposed of in a lawful manner off National Forest System lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge.
C.3 – SECURITY AND PROTECTION
C.3.1 Security and Protection – Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The Contractor shall be responsible for all costs required to provide such protection.
The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.
C-4 – OTHER RELATED DOCUMENTS AND DRAWINGS
C4.1 The following CSI formatted specifications are part of this solicitation and any resulting contract.
Section Description 01000 Mobilization 01025 Measurement and Payment 01400 Quality Control and Quantity Measurement
022210 Building Demolition 061000 Rough Carpentry
070150.19 Preparation for Reroofing
075323 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing 076200 Sheet Metal Flashing and Trim 085313 Vinyl Windows and Patio Doors
SECTION 01000
MOBILIZATION
PART I: GENERAL
1.1 SUMMARY
A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.
PART II: PRODUCTS
(There are no applicable requirements.)
PART III: EXECUTION
(There are no applicable requirements.)
PART IV: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: Progress payments will be made as follows:
1. When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.
2. When 10% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 10% of the original Contract amount, whichever is lesser, will be paid.
3. Upon completion of work for the project, payment of the amount bid for mobilization in excess of 10% of the original Contract amount will be paid.
4. The total sum of all payments shall not exceed the original Contract amount bid for mobilization, regardless of the fact that the Contractor may have shut down the work on the project or moved equipment away from the project and then back again.
4.2 BASIS OF PAYMENT:
Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the bid price for other items of the Contract. Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
(01000) Mobilization. . . . . . . . . . . . . . . . . Lump Sum
END OF SECTION
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
SECTION 01025
MEASUREMENT AND PAYMENT
PART I - GENERAL
1.1 Measurement and Payment - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment for items shown.
When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any pay item, suffixes will be added to the item number to differentiate between items to be bid.
1.2 Determination of Quantities - The following methods of measurement are used to determine contract quantities for payment.
For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding will be along slope lines.
Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered by the COR in writing to fit field conditions.
For standard manufactured items, such as fence, wire, plates, rolled shapes, pipe conduits, etc., identified by gauge, weight, section dimensions, etc., such identification shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.
1.3 Units of Measurement - Payment will be by units defined and determined according to U.S. Standard measure as follows:
A. Acre – Make longitudinal and transverse measurements for area computations horizontally.
B. Cubic Yard - A measurement computed by one of the following methods:
1. Excavation, Embankment, or Borrow - The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
2. Material in Place or Stockpile - The measurement computed with dimensions of the in-place material.
3. Material in the Delivery Vehicle - The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
C. Cubic Yard Mile - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material 1 mile.
D. Each - One complete unit, which may consist of one or more parts.
E. Gallon – The quantity may be measured by any of the following methods:
1. Measured volume container.
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
2. Metered volume. Use an approved metering system
3. Commercially packaged volumes.
F. Hour – Measurement will be for the actual number of hours ordered and performed by the Contractor.
G. Linear Foot – Measure from end to end, parallel to the base or foundation being measured, or horizontal.
H. MFBM - One thousand board feet measure based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job.
I. Mile – Measure horizontal along the centerline of each roadway, approach road, or ramp.
J. Pound – If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.
K. Square Foot - Measure on a plane parallel to the surface being measured or horizontal.
L. Square Yard – Measure on a plane parallel to the surface being measured or horizontal.
M. Station - One hundred linear feet measured horizontally.
N. Station Yard - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.
O. Thousand Gallons Mile - A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material 1 mile.
P. Ton - Short ton consisting of 2,000 pounds.
Q. Ton Mile - A combination of linear and weight measurement meaning the movement of 1 ton of material 1 mile.
1.4 Methods of Measurement - One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:
A. Contract Quantities (CQ) AND Design Quantities (DQ) - These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:
1. As a result of changes in the work authorized by the Contracting Officer.
2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by more than 15 percent.
3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by more than 15%. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
B. Staked Quantities (SQ) - These quantities are determined from staked measurements prior to construction.
C. Actual Quantities (AQ) - These quantities are determined from measurements of completed work.
D. Vehicle Quantities (VQ) - These quantities are measured or weighed in hauling vehicles.
E. Lump Sum Quantities (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
PART II - PRODUCTS (Not Applicable)
PART III - EXECUTION (Not Applicable)
END OF SECTION
SECTION 01400
QUALITY CONTROL AND QUANTITY MEASUREMENT
PART I - GENERAL
1.1 Scope - This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 Measurement and Payment - No separate payment will be made for the work included under this section.
Payment for this work is considered incidental to other items of work.
PART II - PRODUCTS (Not Applicable)
PART III – EXECUTION (Not Applicable)
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
SECTION 022210 - BUILDING DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes demolition and removal of the following:
1. Buildings and structures.
2. Site improvements [including site utilities].
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or recycled.
B. Remove and Salvage: Detach items from existing construction and deliver them to the Contracting Officer (CO) or preserve for re-use.
C. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or recycled.
1.3 MATERIALS OWNERSHIP
A. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to the CO that may be encountered during building demolition remain the Government’s property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to the CO.
B. Roof Antennas: Existing roof antennas will be removed by Government prior to Contractor starting work.
1.4 SUBMITTALS
A. Qualification Data: For the following:
1. Demolition firm.
2. Roofing installation firm.
B. Proposed Protection and Control Measures: Submit statement or drawing that indicates the measures proposed for use, proposed locations, and proposed time frame for their operation. Identify options if proposed measures are later determined to be inadequate. Include measures for the following:
1. Environmental protection.
2. Dust control.
3. Noise control.
C. Schedule of Building Demolition Activities: Indicate detailed sequence of demolition and removal work, with starting and ending dates for each activity, interruption of utility services, and locations of temporary protection and means of egress.
D. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements, that might be misconstrued as damage caused by building demolition operations. Submit before Work begins.
E. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition.
Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI A10.6 and NFPA 241.
C. Predemolition Conference: Conduct conference at Project site.
1.6 PROJECT CONDITIONS
A. The Government will occupy the building during demolition. Conduct building demolition so Government operations will not be disrupted.
1. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.
2. Maintain access to existing walkways, exits, and other adjacent occupied or used facilities.
a. Do not close or obstruct walkways, exits, or other occupied or used facilities without written permission from authorities having jurisdiction.
B. Government assumes no responsibility for buildings and structures to be demolished.
1. The Government as far as practical will maintain conditions existing at time of inspection for bidding purpose.
2. Before building demolition, the Government will remove the following items:
a. Rooftop satellite and antenna.
C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.
1. The Government before start of the Work will remove hazardous materials.
2. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify the CO. The Government under a separate contract will remove hazardous materials.
D. Hazardous Materials: Hazardous materials are present in buildings and structures to be demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.
1. Hazardous material remediation is specified elsewhere in the Contract Documents.
2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.
3. The Government will provide material safety data sheets for materials that are known to be present in buildings and structures to be demolished because of building operations or processes performed there.
E. Storage or sale of removed items or materials on-site is not permitted.
1.7 COORDINATION
A. Arrange demolition schedule so as not to interfere with the Government’s on-site operations.
PART 2 - EXECUTION
2.1 EXAMINATION
A. Survey existing conditions and correlate with requirements indicated to determine extent of building demolition required.
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
B. Review Project Record Documents of existing construction provided by CO. Government does not guarantee that existing conditions are same as those indicated in Project Record Documents.
C. Inventory and record the condition of items to be removed and salvaged.
D. When unanticipated mechanical, electrical, or structural elements are encountered, investigate and measure the nature and extent of the element. Promptly submit a written report to CO.
E. After roofing demolition, the Government will perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during building demolition operations.
F. Verify that hazardous materials have been remediated before proceeding with building demolition operations.
2.2 PREPARATION
A. Refrigerant: Remove and store refrigerant according to 40 CFR 82 and regulations of authorities having jurisdiction.
B. Existing Utilities: Locate, identify, and protect utilities serving buildings and structures to be demolished.
C. Removed and Salvaged Items: Comply with the following:
1. Clean salvaged items of dirt and demolition debris.
2. Preserve salvaged items for re-use.
2.3 PROTECTION
A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations.
B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during demolition.
When permitted by CO, items may be removed to a suitable, protected storage location during demolition and reinstalled in their original locations after demolition operations are complete.
C. Existing Utilities: Maintain utility services indicated to remain and protect them against damage during demolition operations.
1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by CO and authorities having jurisdiction.
2. Provide temporary services during interruptions to existing utilities, as acceptable to the Government and to authorities having jurisdiction.
a. Provide at least 72 hours' notice to CO if shutdown of service is required during changeover.
D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction, and as indicated. Comply with requirements in Division 1 Section "Temporary Facilities and Controls."
1. Protect existing site improvements, appurtenances, and landscaping to remain.
2. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
3. Provide protection to ensure safe passage of people around building demolition area and to and from occupied portions of adjacent buildings and structures.
4. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to building demolition operations.
2.4 DEMOLITION, GENERAL
A. General: Demolish indicated existing roofing completely. Use methods required to complete the Work within limitations of governing regulations and as follows:
1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.
2. Maintain adequate ventilation when using cutting torches.
3. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Engineering Surveys: Perform surveys as the Work progresses to detect hazards that may result from building demolition activities.
C. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from CO and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction.
2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.
2.5 MECHANICAL DEMOLITION
A. Remove debris from elevated portions by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
2.6 REPAIRS
A. General: Promptly repair damage to adjacent construction caused by building demolition operations.
B. Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.
C. Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.
2.7 RECYCLING DEMOLISHED MATERIALS
A. General: Separate recyclable demolished materials from other demolished materials to the maximum extent possible. Separate recyclable materials by type.
1. Transport recyclable materials off Government’s property and legally dispose of them.
2.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations.
Return adjacent areas to condition existing before building demolition operations began.
END OF SECTION 022210
SECTION 061000 - ROUGH CARPENTRY
PART 3 - GENERAL
3.1 SECTION REQUIREMENTS
A. Submittals: ICC-ES evaluation reports for wood-preservative treated wood, fire-retardant treated wood, engineered wood products.
PART 4 - PRODUCTS
4.1 WOOD PRODUCTS, GENERAL
A. Certified Wood: Wood-based material shall be certified as "FSC Pure" or "FSC Mixed Credit" according to FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship," and to FSC STD-40-004, "FSC Standard for Chain of Custody Certification."
B. Lumber: Provide dressed lumber, S4S, marked with grade stamp of inspection agency.
C. Engineered Wood Products: Acceptable to authorities having jurisdiction and for which current model code research or evaluation reports exist that show compliance with building code in effect for Project.
1. Allowable Design Stresses: Engineered wood products shall have allowable design stresses, as published by manufacturer, that meet or exceed those indicated. Manufacturer's published values shall be demonstrated by comprehensive testing.
4.2 TREATED MATERIALS
A. Preservative-Treated Materials: AWPA U1; Use Category UC2 Use Category UC3b for exterior construction not in contact with the ground.
1. Use treatment containing no arsenic or chromium.
2. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent.
3. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.
B. Provide preservative-treated materials for [all rough carpentry unless otherwise indicated.] [items indicated on Drawings, and the following:]
1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar members in connection with roofing, flashing, vapor barriers, and waterproofing.
2. Wood sills, blocking, [furring,] [stripping,] and similar concealed members in contact with masonry or concrete.
3. Wood framing members that are less than 18 inches above the ground.
4. Wood floor plates that are installed over concrete slabs-on-grade.
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
4.3 FRAMING
A. Certified Wood: Wood framing shall be certified as "FSC Pure" or "FSC Mixed Credit" according to FSC STD-01-001, "FSC Principles and Criteria for Forest Stewardship," and to FSC STD-40-004, "FSC Standard for Chain of Custody Certification."
B. Dimension Lumber:
1. Maximum Moisture Content: 19 percent for 2-inch nominal thickness or less, 19 percent for more than 2-inch nominal thickness.
2. Non-Load-Bearing Interior Partitions: No. 2.
3. Framing Other Than Non-Load-Bearing Interior Partitions: No. 2
4. Retain "Exposed Framing" Subparagraph below for better appearance for exposed work.
C. Laminated-Veneer Lumber: Manufactured with exterior-type adhesive complying with ASTM D 2559.
Allowable design values determined according to ASTM D 5456.
4.4 SHEAR WALL PANELS
A. Manufacturers:
B. Wood-Framed Shear Wall Panels: Prefabricated assembly consisting of wood perimeter framing, tie downs, and Exposure I, Structural I plywood or OSB sheathing.
4.5 MISCELLANEOUS PRODUCTS
A. Fasteners: Size and type indicated. Where rough carpentry is exposed to weather, in ground contact, or in area of high relative humidity, provide fasteners with hot-dip zinc coating complying with
ASTM A 153/A 153M.
1. Power-Driven Fasteners: CABO NER-272.
B. Metal Framing Anchors: Structural capacity, type, and size indicated.
1. Use anchors made from hot-dip galvanized steel complying with ASTM A 653/A 653M, G60 coating designation for interior locations where stainless steel is not indicated.
2. Use anchors made from stainless steel complying with ASTM A 666, Type 304 for exterior locations and where indicated.
C. Sill Sealer: Closed-cell neoprene foam, 1/4 inch thick.
D. Flexible Flashing: Self-adhesive product consisting of a butyl rubber or rubberized-asphalt compound, bonded to a backing sheet to produce an overall thickness of not less than 0.025 inch.
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
PART 5 - EXECUTION
5.1 INSTALLATION
A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.
B. Framing Standard: Comply with AF&PA's WCD 1, "Details for Conventional Wood Frame Construction," unless otherwise indicated.
C. Do not splice structural members between supports unless otherwise indicated.
D. Securely attach rough carpentry to substrates, complying with the following:
1. Table 2304.9.1, "Fastening Schedule," in the IBC
END OF SECTION 061000
WYIFC OFFICE
MEMBRANE ROOF REPLACEMENT
SECTION 070150.19 - PREPARATION FOR REROOFING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Full tear-off of roof areas indicated.
2. Removal of base flashings.
1.2 DEFINITIONS
A. Roofing Terminology: Definitions in ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" apply to work of this Section.
B. Full Roof Tear-Off: Removal of existing roofing system from deck.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.4 INFORMATIONAL SUBMITTALS
A. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces that might be misconstrued as having been damaged by reroofing operations. Submit before Work begins.
1.5 QUALITY ASSURANCE
A. Reroofing Conference: Conduct conference at Project site.
1.6 FIELD CONDITIONS
A. Owner will occupy portions of building immediately below reroofing area. Conduct reroofing so Owner's operations are not disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.
1. Coordinate work activities daily with Owner so Owner can place protective dust and water-leakage covers over sensitive equipment and furnishings, shut down HVAC and fire-alarm or -detection equipment if needed, and evacuate occupants from below work area.
2. Before working over structurally impaired areas of deck, notify Owner to evacuate occupants from below affected area. Verify that occupants below work area have been evacuated before proceeding with work over impaired deck area.
B. Protect building to be reroofed, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from reroofing operations.
C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
D. Limit construction loads on roof to 300 POUNDS POINT LOAD for rooftop equipment wheel loads and 150 PSF for uniformly distributed loads.
E. Weather Limitations: Proceed with reroofing preparation only when existing and forecasted weather conditions permit work to proceed without water entering existing roofing system or building.
PART 2 - PRODUCTS
2.1
A.
INFILL AND REPLACEMENT MATERIALS
Use infill materials matching existing roofing system materials unless otherwise indicated.
2.2 COVER BOARDS
A. Cover Board: ASTM C 1177/C 1177M, glass-mat, water-resistant gypsum substrate. 5/8 inch (or as required for warranty), factory primed.
1. Manufacturers: Subject to compliance with requirements, provide products by the following:
a. Georgia-Pacific Building Products, Dens-Deck.
B. Fasteners: Factory-coated steel fasteners, No. 12 or No. 14, and metal or plastic plates listed in FM Global's "Approval Guide," designed for fastening cover boards to deck and acceptable to new roofing system manufacturer.
2.3 AUXILIARY REROOFING MATERIALS
A. General: Use auxiliary reroofing preparation materials recommended by roofing system manufacturer for intended use and compatible with components of existing and new roofing system.
PART 3 - EXECUTION
3.1 PREPARATION
A. Shut off rooftop utilities and service piping before beginning the Work.
B. Protect existing roofing system that is not to be reroofed.
C. Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work. Cover air- intake louvers before proceeding with reroofing work that could affect indoor air quality or activate smoke detectors in the ductwork.
D. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday. Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.
3.2 ROOF TEAR-OFF
A. General: Notify Owner each day of extent of roof tear-off proposed for that day and obtain authorization to proceed.
B. Full Roof Tear-Off: Where indicated, remove existing roofing and other roofing system components down to the existing framing.
1. Remove mechanical fasteners used for existing roof membrane from deck.
2. Remove existing Built Up Roof (BUR) below existing EPDM and cover boards.
3.3 DECK PREPARATION
A. Inspect deck after tear-off of roofing system.
B. If broken or loose fasteners that secure deck panels to one another or to structure are observed, or if deck appears or feels inadequately attached, immediately notify Contracting Officer. Do not proceed with installation until directed by Contracting Officer.
C. If deck surface is unsuitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify Contracting Officer. Do not proceed with installation until directed by Contracting Officer.
3.4 INFILL MATERIALS INSTALLATION
A. Immediately after roof tear-off, and inspection and repair, if needed, of deck, fill in tear-off areas to match existing roofing system construction.
B. Install new roofing patch over roof infill area. If new roofing is installed the same day tear-off is made, roofing patch is not required.
3.5 MOISTURE BARRIER INSTALLATION
A. Install Ice and Water Shield over entire surface of roof deck.
1. Ice and Water Shield or equivalent shall be minimum 60 mils thick.
3.6 COVER BOARD PREPARATION
A. Remove blisters, ridges, buckles, and other substrate irregularities from existing roofing or moisture barrier that inhibit new cover boards from conforming to substrate.
1. Broom clean existing substrate.
2. Verify that existing substrate is dry before proceeding with installation of cover boards. Spot check substrates with an electrical capacitance moisture-detection meter.
3. Remove materials that are wet or damp.
3.7 BASE FLASHING REMOVAL
A. Remove existing base flashings. Clean substrates of contaminants, such as asphalt, sheet materials, dirt, and debris.
B. Do not damage metal counterflashings that are to remain. Replace metal counterflashings damaged during removal with counterflashings specified in Section 076200 "Sheet Metal Flashing and Trim."
C. Remove existing parapet sheathing and replace with new parapet sheathing to comply with Section 061600 "Sheathing." If parapet framing, wood blocking, curbs, or nailers have deteriorated, immediately notify Contracting Officer.
D. When directed by Contracting Officer, replace parapet framing, wood blocking, curbs, and nailers to comply with Section 061053 Miscellaneous Rough Carpentry."
3.8 COVER BOARD INSTALLATION
A. Install cover boards with long joints in continuous straight lines and end joints staggered between rows.
Loosely butt cover boards together and fasten to deck.
1. Tape joints of cover boards if required by roofing manufacturer.
B. Fasten cover boards to resist wind-uplift pressure at corners, perimeter, and field of roof specified in Section 075323 "Ethylene-Propylene-Diene-Monomer (EPDM) Roofing."
3.9 DISPOSAL
A. Collect demolished materials and place in containers. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
B. Transport and legally dispose of demolished materials off Owner's property.
END OF SECTION 070150.19
SECTION 075323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Adhered ethylene-propylene-diene-monomer (EPDM) roofing system.
2. Roof insulation.
3. Metal Accessories.
1.2 RELATED SECTIONS
A. Section 061053 – Miscellaneous Rough Carpentry
B. Section 070150.19 – Preparation for Re-Roofing
C. Section 074646 - Fiber-Cement Siding: Soffit and fascia trim items associated with roofing.
D. Section 076200 – Sheet Metal Flashing and Trim: Counterflashing, hanging gutters, downspouts, parapet scuppers, conductor heads and splash pans.
1.3 DEFINITIONS
A. Roofing Terminology: Definitions in ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" apply to work of this Section.
1.4 PREINSTALLATION MEETINGS
A. Preinstallation Roofing Conference: Conduct conference at Project site.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work.
C. Samples for Verification: For the following products:
1. Sheet roofing, of color required.
1.6 INFORMATIONAL SUBMITTALS
A. Research/Evaluation Reports: For components of roofing system, from ICC-ES.
B. Sample Warranties: For manufacturer's special warranties.
1.7 CLOSEOUT SUBMITTALS
A. Maintenance Data: For roofing system to include in maintenance manuals.
1.8 QUALITY ASSURANCE
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.
B. Perform pull-out tests to determine the number of attachments required for the mechanically attached roof insulation.
C. Flood Test: Perform flood test after installation, followed by thermal investigation the following evening. Minor leaks will show as colder where insulation is saturated.
1. Flood test to be performed by qualified testing firm.
1.9 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 20 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations: Obtain components including roof insulation, adhesive, and fasteners for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.
2.2 PERFORMANCE REQUIREMENTS
A. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when tested according to ASTM G 152, ASTM G 154, or ASTM G 155.
B. Impact Resistance: Roofing system shall resist impact damage when tested according to ASTM D 3746 or ASTM D 4272.
C. Wind Up-Lift: Roofing systems shall have an approval for wind up-lift classification as a complete system. Roof systems shall resist wind up-lift as required by IBC Section 1609.
D. Exterior Fire-Test Exposure: Class C; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.
E. Fire-Resistance Ratings: Comply with fire-resistance-rated assembly designs indicated.
Identify products with appropriate markings from an applicable testing agency.
2.3 EPDM ROOFING
A. EPDM: ASTM D 4637, Type II, scrim or fabric internally reinforced, uniform, flexible EPDM sheet.
1. Basis-of-Design Product: Subject to compliance with requirements, provide Carlisle Syntec Systems “Sure-Tough EPDM Reinforced Membrane” or a comparable product by one of the following:
a. Carlisle Syntec Systems “Sure-Tough EPDM Reinforced Membrane” or equivalent
b. Firestone Building Products; RubberGard EPDM
c. GAF Materials Corporation.
d. GenFlex Roofing Systems.
e. Johns Manville; a Berkshire Hathaway company.
2. Thickness: 60 mils, (0.060” / 1.5 mm), nominal.
3. Exposed Face Color: White.
2.4 AUXILIARY ROOFING MATERIALS
A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with roofing.
1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.
B. Sheet Flashing: 60-mil-thick EPDM, partially cured or cured, according to application.
C. Bonding Adhesive: Manufacturer's standard, water based.
D. Seaming Material: Manufacturer's standard, synthetic-rubber polymer primer and 3-inch-wide minimum, butyl splice tape with release film.
E. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion- resistance provisions in FM Global 4470, designed for fastening membrane to substrate, and acceptable to roofing system manufacturer.
F. Miscellaneous Accessories: Provide lap sealant, water cutoff mastic, metal termination bars, metal battens, pourable sealers, preformed cone and vent sheet flashings, molded pipe boot flashings, preformed inside and outside corner sheet flashings, reinforced EPDM securement strips, T-joint covers, in-seam sealants, termination reglets, cover strips, and other accessories.
2.5 ROOF INSULATION
A. Composite Polyisocyanurate Board Insulation: ASTM C 1289, with factory-applied facing board on one major surface, as indicated below by type, and felt or glass-fiber mat facer on the other.
1. Basis-of-Design Product: Subject to compliance with requirements, provide Carlisle SecurShield HD Composite PolyIso Insulation Board or comparable product.
B. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated.
2.6 INSULATION ACCESSORIES
A. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion- resistance provisions in FM Global 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.
2.7 ASPHALT MATERIALS
A. Roofing Asphalt: ASTM D 312, Type III or Type IV.
B. Asphalt Primer: ASTM D 41/D 41M.
2.8 WALKWAYS
A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, solid-rubber, slip-resisting, surface- textured walkway pads, approximately 3/16 inch thick and acceptable to roofing system manufacturer. (If Required)
2.9 METAL ACCESSORIES
A. Metal Roof Edging: Continuous metal edge member serving as termination of roof membrane and retainer for metal fascia; watertight with no exposed fasteners; mounted to roof edge nailer.
1. Wind Performance:
a. Membrane Pull-Off Resistance: 100 lbs/ft, minimum, when tested in accordance with ANSI/SPRI ES-1 Test Method RE-1, current edition.
b. Fascia Pull-Off Resistance: At least the minimum required when tested in accordance with ANSI/SPRI ES-1 Test Method RE-2, current edition.
c. Provide product listed in current Factory Mutual Research Corporation
Approval Guide with at least FM 1-270 rating.
2. Description: Two-piece; 45 degree sloped galvanized steel sheet edge member securing top and bottom edges of formed metal fascia; EdgeGard.
4. Edge Member Height Above Nailer: 1-1/4 inches.
5. Fascia Material and Finish: 24 gage, 0.024 inch galvanized steel with Kynar 500 finish in manufacturer's standard color; matching concealed joint splice plates;
factory-installed pro- tective plastic film.
6. Length: 144 inches.
7. Functional Characteristics: Fascia retainer supports while allowing for free thermal cycling of fascia.
8. Aluminum Bar: Continuous 6063-T6 alloy aluminum extrusion with pre-punched slotted holes; miters welded; injection molded EPDM splices to allow thermal expansion.
9. Anchor Bar Cleat: 20 gage, 0.036 inch G90 coated commercial type galvanized steel with pre-punched holes.
10. Fasteners: Factory-provided corrosion resistant fasteners, with drivers; no exposed fas- teners permitted.
11. Special Shaped Components: Provide factory-fabricated pieces necessary for complete installation, including miters, scuppers, and end caps; minimum 14 inch long legs on corner pieces.
12. Scuppers: Welded watertight.
13. Accessories: Provide matching brick wall cap, downspout, extenders, and other special fabrications as shown on the drawings.
B. Parapet Copings: Formed metal coping with galvanized steel anchor/support cleats for capping any parapet wall; watertight, maintenance free, without exposed fasteners; butt type joints with concealed splice plates; mechanically fastened as indicated.
1. Wind Performance:
a. At least the minimum required when tested in accordance with ANSI/SPRI ES-1 Test Method RE-3, current edition.
b. Provide product listed in current Factory Mutual Research Corporation Approval Guide with at least FM 1-90 rating.
2. Description: Coping sections allowed to expand and contract freely while locked in place on anchor cleats by mechanical pressure from hardened stainless steel springs factory at- tached to anchor cleats; 8 inch wide splice plates with factory applied dual non-curing sealant strips capable of providing watertight seal.
3. Material and Finish: 24 gage, 0.024 inch thick galvanized steel with Kynar 500 finish in manufacturer's standard color; matching concealed joint splice plates;
factory-installed pro- tective plastic film.
4. Dimensions:
a. Wall Width: As indicated on the drawings.
b. Piece Length: Minimum 144 inches.
c. Curved Application: Factory fabricated in true radius.
5. Anchor/Support Cleats: 20 gage, 0.036 inch thick prepunched galvanized cleat with 12 inch wide stainless steel spring mechanically locked to cleat at 72 inches on center.
6. Special…