Attachment 3 - Specifications.pdf

PDF 932 KB Posted

Attached to
Installation of Electrical Drops Bldg 940, Joint Base Elmendorf-Richardson (JBER), AK
Solicitation number
FA500021R0033
Issued by

About this file

This solicitation package includes specifications for the installation of electrical drops at Building 940 on Joint Base Elmendorf-Richardson in Alaska. The specifications cover excavation, trenching, backfilling, cast-in-place concrete, and electrical identification work. Concrete work must meet ACI standards, while excavation work must comply with OSHA requirements. Submittals such as schedules, samples, and test results are required to be provided electronically. The specifications provide detailed requirements for materials, mix designs, testing, curing, and completion of excavation, concrete formwork, finishing, and identification of electrical components. The solicitation number is FA500021R0033 and responses are due by the date specified in the attached documents. The Department of the Air Force Pacific Air Forces is the contracting agency.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 01330 SUBMITTAL PROCEDURES

DIVISION 2 – SITEWORK

SECTION 02200 EXCAVATION, TRENCHING, AND BACKFILLING

FOR UTILITIES SYSTEMS

DIVISION 3 – CONCRETE

03 30 00 Cast-in-Place Concrete

DIVISION 26 – ELECTRICAL

26 07 05.00 00 Electrical Identification

-- END OF SECTION --

FA500021R0033

HJZH 17-1426 Install Electrical Drops

Attachment 3 - Specifications

SECTION 01330

SUBMITTAL PROCEDURES

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Submittal procedures.

B. Construction progress schedules.

C. Proposed products list.

D. Product data.

E. Shop drawings.

F. Samples.

G. Design data.

H. Test reports.

I. Certificates.

J. Manufacturer's instructions.

K. Manufacturer's field reports.

L. Erection drawings.

M. Construction photographs.

1.2 SUBMITTAL PROCEDURES

A. Transmit each submittal with Contracting Officer.

B. Government review time for submittals will normally be 15 calendar days. Submittals with complicated mechanical or electrical items or submittals with a large number of items will require 23 calendar days review time, unless otherwise specified.

C. Identify Project, Contractor, subcontractor and supplier;

pertinent drawing and detail number, and specification section number, appropriate to submittal.

D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with requirements of the Work and Contract Documents.

E. All items such as carpet, resilient flooring, paint, etc., which require the selection of a color as well as verification of performance, shall be submitted inclusive in one submittal

FA500021R0033

HJZH 17-1426 Install Electrical Drops package so that a coordinated color scheme may be maintained.

F. Schedule submittals to expedite Project, and deliver to Contracting Officer. Coordinate submission of related items.

G. Rejection of submittals for technical violations of the drawings or specifications will not be grounds for an extension of the performance period. If resubmits are required, all parts of the original submittal package will be resubmitted together with changes so that coordination may be maintained.

H. All submittals will be submitted electronically.

I. Any certificates required for demonstrating proof of compliance of materials with specification requirements shall be executed in

One copy. Each certificate shall be signed by an official authorized to certify on behalf of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply. Copies of laboratory test reports submitted with certificates shall contain the name and address of the testing laboratory and the date or dates of the test to which the report applies. Certification shall not be construed as relieving the Contractor from furnishing satisfactory material, if, after tests are performed on selected samples, the material is found not to meet the specific requirements.

J. Submittals, unless otherwise designated, are for Government approval. All other submittals shall be submitted to the Government for record purposes only. Submittals shall be reviewed and approved by the Contractor’s Quality Control personnel prior to submission to the Government.

K. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of completed Work.

L. Allow space on submittals for Contractor and Architect/Engineer review stamps.

M. When revised for resubmission, identify changes made since previous submission.

N. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements.

O. Submittals not requested will not be recognized or processed.

P. Approval of substitute materials will not relieve the Contractor of the responsibility for any changes in his own work or in the work of other trades caused by the substitution.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

Q. Approval of Electrical Materials and Equipment will be based on the manufacturer's published data.

1. Underwriters Laboratories Inc. (UL) Publications: The label or listing of the Underwriters Laboratories Inc., will be accepted as evidence that the materials or equipment conform to the applicable standards of that agency. In lieu of this label or listing, the Contractor shall submit a statement from a nationally recognized, adequately equipped testing agency indicating that the items have been tested in accordance with required procedures and that the materials and equipment comply with all contract requirements.

2. Non-Underwriters Laboratories Inc. (UL) Publications: For other than equipment and materials specified to conform to UL publications, a manufacturer's statement indicating complete compliance with the applicable Federal Specification, Military Specification, or standard of the American Society of Testing and Materials, National Electrical Manufacturers, or other commercial standard, will be considered for approval upon submittal.

1.3 CONSTRUCTION PROGRESS SCHEDULES

A. Submit schedule in accordance with FAR 52.236-15, Schedule for Construction Contracts and on an AF Form 3064. After review, resubmit required revised data within ten days.

B. Distribute copies of reviewed schedules to Project site file, subcontractors, suppliers, and other concerned parties.

C. Instruct recipients to promptly report, in writing, problems anticipated by projections indicated in schedules.

D. Submit computer generated chart with separate line for each major portion of Work or operation, identifying first workday of each week.

E. Show complete sequence of construction by activity, identifying Work of separate stages and other logically grouped activities.

Indicate early and late start, early and late finish, float dates, and duration.

F. Indicate estimated percentage of completion for each item of Work at each submission.

G. Submit separate schedule of submittal dates for shop drawings, product data, samples, and dates reviewed-submittals will be required from Contracting Officer. Indicate decision dates for selection of finishes.

H. Revisions To Schedules:

1. Indicate progress of each activity to date of submittal, and projected completion date of each activity.

2. Identify activities modified since previous submittal, major changes in scope, and other identifiable changes.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

3. Prepare narrative report to define problem areas, anticipated delays, and impact on Schedule. Report corrective action taken, or proposed, and its effect including effect of changes on schedules of separate contractors.

1.4 PROPOSED PRODUCTS LIST

A. Within 15 days after date of Contracting Officer-Contractor Agreement submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.

B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards.

1.5 PRODUCT DATA

A. Product Data: Submit to Architect/Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.

B. Refer and abide to the Unified Facility Criteria UFC for more information for additional Mechanical and Electrical requirements.

C. Submit a digital copy.

D. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

E. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

F. After review, produce a digital copy and distribute in accordance with SUBMITTAL PROCEDURES article.

1.6 SHOP DRAWINGS

A. Shop Drawings: Submit to Architect/Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.

B. Refer and abide to the Unified Facility Criteria UFC for additional Mechanical and Electrical requirements.

C. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

D. Submit a digital copy to Contracting Officer requires.

E. After review, produce a digital copy and distribute in accordance with SUBMITTAL PROCEDURES.

1.7 SAMPLES

FA500021R0033

HJZH 17-1426 Install Electrical Drops

A. Samples: Submit to Architect/Engineer for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents.

B. Samples For Selection as Specified in Product Sections:

1. Submit to Architect/Engineer for aesthetic, color, or finish selection.

2. Submit samples of finishes textures, and patterns for Architect/Engineer selection.

C. Submit samples to illustrate functional and aesthetic characteristics of Products, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

D. Include identification on each sample, with full Project information.

E. Submit number of samples specified in individual specification sections; Architect/Engineer will retain one sample.

F. Reviewed samples which may be used in the Work are indicated in individual specification sections.

G. Samples will not be used for testing purposes unless specifically stated in specification section.

1.8 DESIGN DATA

A. Submit for Architect/Engineer's knowledge as contract administrator or for Contracting Officer.

B. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

1.9 TEST REPORTS

A. Submit for Architect/Engineer's knowledge as contract administrator or for Contracting Officer.

B. Submit test reports for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

1.10 CERTIFICATES

A. When specified in individual specification sections, submit certification by manufacturer, installation/application subcontractor, or Contractor to Architect/Engineer, in quantities specified for Product Data.

B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

C. Certificates may be recent or previous test results on material or Product, but must be acceptable to Architect/Engineer.

1.11 MANUFACTURER'S INSTRUCTIONS

A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Architect/Engineer for delivery to Contracting Officer in quantities specified for Product Data.

B. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.

1.12 MANUFACTURER'S FIELD REPORTS

A. Submit reports for Architect/Engineer's benefit as contract administrator or for Contracting Officer.

B. Submit report within 30 days of observation to Architect/Engineer for information.

C. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

1.13 ERECTION DRAWINGS

A. Submit drawings for Architect/Engineer's benefit as contract administrator or for Contracting Officer.

B. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.

C. Data indicating inappropriate or unacceptable Work may be subject to action by Architect/Engineer or Contracting Officer.

1.14 CONSTRUCTION PHOTOGRAPHS

A. Provide photographs of construction throughout progress of Work produced by an experienced photographer, acceptable to Contracting Officer.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

B. Twice monthly submit photographs.

C. Digital photographs on the daily report is acceptable.

D. Take two site photographs from differing directions and five interior photographs of indicating relative progress of the Work.

E. Identify each print. Identify name of Project, orientation of view, date and time of view, name and address of photographer, and photographer's numbered identification of exposure.

--END OF SECTION--

FA500021R0033

HJZH 17-1426 Install Electrical Drops

[This page intentionally left blank.]

FA500021R0033

HJZH 17-1426 Install Electrical Drops

SECTION 02200

EXCAVATION, TRENCHING, AND BACKFILLING FOR UTILITIES SYSTEMS

PART 1 - GENERAL:

1.1 This section covers the excavation, trenching, and backfilling for utility systems.

1.2 APPLICABLE PUBLICATIONS: The latest edition of the publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

ATM 204 and Test for Determining the Liquid Limit of Soils ATM 205 Test for Determining the Plastic Limit and Plasticity Index of

Soils

ATM 207 Test for Moisture Density Relations of Soils

ATM D 213 In-Place Density and Moisture Content of Soil and Soil- Aggregate by Nuclear Methods

ATM D 215 One-Point Method or Determining Maximum Dry Density and Optimum Moisture

ATM 304 WAQTC FOP for AASHTO T 27/T 11 Sieve Analysis of Fine and Coarse Aggregates

1.3 SUBMITTALS: Contractor shall submit lab reports and certificates of compliance for all density lists performance as per Section 3.4.

PART 2 - PRODUCTS:

2.1 NONFROST SUSCEPTIBLE SOILS: Nonfrost susceptible soil is defined as inorganic soils with less than 6 percent by weight passing the #200 sieve as determined in accordance with ATM

304. Nonfrost susceptible soil shall be used under paved areas.

2.2 CLASSIFIED FILL AND BACKFILL: Classified fill and backfill shall be approved, well-graded nonfrost susceptible materials consisting of sand, gravel, broken stone or other materials and containing not more than 50 percent by weight passing the #4 sieve as determined by ATM 305.

All material shall be free of frozen lumps, and have a plasticity index not greater than 6 as determined by ATM 204. Material shall not exceed a size greater than two-thirds of the specified maximum lift thickness. Classified fill and backfill can be used under lawn areas.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

2.3 UNCLASSIFIED FILL AND BACKFILL: Unclassified fill and backfill shall be approved materials consisting of sand, gravel or other materials, and shall be free of organic materials, frozen lumps, trash, rubber, or other debris. The material may be frost susceptible. Unclassified fill and backfill can be used under lawn areas.

2.4 EXCAVATED MATERIAL: Excavated material is defined as material removed from the trench during excavation for utilities and stockpiled next to the trench. This material shall be used as backfill for utilities, only if it is void of organic matter and other trash, and approved by the Contracting Officer.

PART 3 - EXECUTION:

3.1 EXCAVATION:

3.1.1 General: All excavation of every description and of whatever substances encountered shall be performed to the depths indicated or as required. During excavation, material suitable for backfilling shall be piled in an orderly manner a sufficient distance from the banks of the trench to avoid overloading and to prevent slides or cave-ins. All excavated materials not required or not suitable for backfill shall be removed and disposed of as indicated or as directed. Grading shall be done as may be necessary to prevent surface water from flowing into trenches or other excavations, and any water accumulating therein shall be removed by pumping or by other approved methods. Sheeting and shoring shall be done as may be necessary for the protection of the work and for the safety of personnel. Unless otherwise indicated, excavation shall be by open cut except that short sections of a trench may be tunneled if, in the opinion of the Contracting Officer, the pipe can be safely and properly installed and backfill can be properly tamped in such tunnel sections.

3.1.2 Trench excavation: Trenches shall be of the necessary width for proper laying of pipe and access. All trenching and excavation activities shall conform to the requirements set in 29 CFR 1926 subpart P, Excavations. The use of sloping and benching, or the use of shoring systems are acceptable methods to protect against trench cave-ins. Care shall be taken not to over excavate.

Except as hereinafter specified for wet or otherwise unstable material, over depths shall be backfilled as and with materials specified for backfilling the lower portion of trenches. Open trenches shall be kept free of standing water at all times. If dewatering of trench is necessary, contractor shall provide pumps to dewater, and he shall check with the contracting officer to determine where the water can be disposed. Most soils on Joint Base Elmendorf Richardson are previously disturbed and subject to vibrations from aircraft/roadway activity. These soils are considered Type B as defined in 29 CFR 1926 subpart P.

3.2 REMOVAL OF UTILITY LINES: When utility lines that are to be removed are encountered within the area of operations, the Contracting Officer shall be notified in ample time for the necessary measures to be taken to prevent interruption of the service.

3.3 BACKFILLING: The trenches shall not be backfilled until all required pressure tests are performed and the results are accepted by the Contracting Officer. Except as otherwise specified for special conditions of over depths, trenches shall be backfilled to the ground surface with

FA500021R0033

HJZH 17-1426 Install Electrical Drops selected material that is suitable for the specified compaction and as herein specified. Trenches improperly backfilled shall be reopened to the depth required for proper compaction, then refilled and compacted as specified. The ground surface shall be restored to its original condition and ground surface elevation as hereinafter specified.

3.3.1 Bedding materials in lower portion of trench: The sand bedding material shall be uniform throughout, material as recommended by the pipe manufacturer. As a minimum, the sand bedding material shall be non-frost susceptible and shall be well-graded non-angular sand with no material greater than 3/8" diameter. Sand backfill material shall be deposited in six-inch maximum thickness layers and compacted until there is a cover of not less than six (6) inches above the pipe.

3.3.2 Remainder of trench: The remainder of the trench shall be backfilled with material shown on the drawings that is free of stones larger than three inches diameter. Backfill material shall be deposited in layers not exceeding the thickness specified, and each layer shall be compacted to the minimum density specified as applicable to the particular area. Degree of compaction shall be as follows, expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 (Modified Proctor Test):

3.3.2.1 Under pavements: Twelve inch layers, 95 percent maximum density.

3.3.2.2 Under turf or seeded lawn areas or open areas: 24 inch layers, 90 percent maximum density.

3.3.2.3 Under sidewalks, curbs and gutters, and gravel shoulders: One foot layers, 95 percent maximum density.

3.4 DETERMINATION OF DENSITY: Testing shall be the responsibility of the Contractor.

Testing shall be performed by an approved commercial testing laboratory at the expense of the Contractor. Tests shall be performed in sufficient number to insure that the specified density is being obtained; a minimum of one test every two hundred feet per lift is required under lawn and open areas, and at least one test every hundred feet per lift under roadways, sidewalks and other areas. Every road crossing shall be tested twice per lift. In addition, the Contracting Officer or his authorized representative reserve the right to require up to three additional tests per day at locations of his choosing at no additional cost to the Government. Laboratory tests for moisture-density relations shall be determined in accordance with ASTM D1557 (Modified Proctor). Determination of density shall be in conformity with the requirements of ASTM D2922 (Nuclear Method), ASTM D2167 (Rubber Balloon Method) or ASTM D1556 (Sand Cone Method). Copies of the test results shall be furnished to the Contracting Officer within 3 days of the performance of field tests. Failed tests must be re-accomplished at no additional cost to the Government.

3.5 EXCAVATED BACKFILL: Material excavated from lawn areas, open areas, and gravel shoulder areas shall be used as excavated backfill in these areas only and shall not be used under pavements, sidewalks, and curbs and gutters. Materials excavated from streets, sidewalks, and curbs and gutters shall be used as excavated backfill in these areas only.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

3.6 Carefully maintain all bench marks, monuments, and other survey reference points. If it is necessary to disturb or destroy a benchmark, monuments, or survey reference point, notify the 773 CES/CEOER Engineering Assistance Unit at 552-0050 before proceeding. Any benchmark, monument, or other survey reference point already disturbed or destroyed requires immediate notification by the contractor to the Engineering Assistance Unit. If the contractor by negligence disturbs or destroys benchmarks, monuments, or other survey reference points, he shall restore them at his expense to their original location as nearly as possible, or as otherwise directed by the Contracting Officer. The specific location of all new relocated survey marks shall be tied to monuments using NAD 83 as the datum and results reported in Alaska State Plane coordinates.

When a benchmark, monument, or other survey reference point is restored, the record of the survey shall indicate the deviation from the original location. Field notes shall be recorded in hardbound field books which shall become the property of the Government.

3.7 PAVEMENT, BASE COURSE AND COMPACTED SUBGRADE disturbed by trenching operations shall be replaced in accordance with the drawings and specifications sections: 02605 - Crushed Aggregate Base Course, 02610 - Tack and Prime Coat and 02600 - Asphaltic Concrete Pavement.

END OF SECTION

FA500021R0033

HJZH 17-1426 Install Electrical Drops

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1. DESCRIPTION:

1.1 Work covered in this Section includes, but is not limited to:

1.1.1 All cast-in-place concrete.

2. QUALITY ASSURANCE:

2.1 American Concrete Institute (ACI) Specifications, latest edition. Concrete work shall conform to all requirements of ACI 301 Specifications for Structural Concrete for Building, except as modified by the following Supplemental Requirements.

2.2 American Society for Testing Materials Standards and Specifications as noted in ACI 301.

2.3 Concrete Reinforcing Steel Institute: CRSI Manual of Standard Practice "Monolithic Reinforced Concrete"

2.6.1 Reinforcing Bars

a. Reinforcing bars must be deformed, except spirals, load-transfer dowels, and welded wire reinforcement, which may be plain.

b. ASTM A615/A615M with the bars marked A, Grade 60; or ASTM A996/A996M with the bars marked R, Grade 60, or marked A, Grade 60.

c. Reinforcing bars may contain post-consumer or post-industrial recycled content.

d. Plain welded wire reinforcement must conform to ASTM A1064/A1064M, with welded intersections spaced no greater than 12 in. apart in direction of principal reinforcement.

3. SUBMITTALS:

3.1 Manufacturer's Literature for:

3.1.1 Admixtures.

3.2 The selection of concrete proportions shall be in accordance with ACI 301, Article 3.8. Before any concrete is placed for the Project, the Contractor shall submit to the Contracting Officer for review all necessary data showing the method used for determining the proposed concrete mix design, including fine and coarse aggregate gradations; location of all borrow pits and stockpiles to be used in concrete production; proportions of all ingredients; water-cement ratio; slump; air content; 28-day cylinder breaks and other required data for each different concrete type specified. Mix designs and strength test results must be prepared by a qualified materials testing laboratory. (See also 8.2, Durability)

3.3 All ready-mixed concrete dispatched from a batch plant must be accompanied by dispatch slip showing concrete strength, slump, additives, time of introduction of mixing water, and must be signed by plant dispatcher. Truck driver's signature will not meet this requirement.

3.4 Placement Notification: Notify Contracting Officer’s representative 24 hours in advance of each intended concrete placement, and four days prior to scheduled first concrete pour.

3.5 Provide manufacturer's written recommendation for installation of his product.

3.6 Mix design showing entrained air content, cement content, maximum water content, slump range, cement type, and the estimated compressive strength.

3.7 Field and lab test results.

3.8 Submit an anchors design and layout plan.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

4. PRODUCT HANDLING:

4.1 Storage of Materials: ACI 304.

5. ENVIRONMENTAL CONDITIONS:

5.1 Cold Weather: ACI 306R. Cold weather is defined as a period when for more than consecutive days the mean daily temperatures drop below 40 F (5 C). When temperatures above 50F (10 C) occur during more than half of any 24-hour period, the concrete should no longer be regarded as winter concrete. Heating of concrete should not exceed 90 F.

5.2 Inclement Weather: Protect freshly placed concrete against damage by infiltration of any adverse weather. When damage might occur, terminate placing against nearest construction joint bulkhead and cover at once with waterproof protection until concrete has set.

5.3 Sprayed-on Protective Coatings: Apply when air temperature is between 50 F (10 C) and 80 F (27 C), relative humidity below 80 percent. Do not apply when rain is forecast within 24 hours.

5.4 Hot weather: ACI 305. work plans must include preparation to limit the temperature affects on concrete. As the selected limiting temperatures, usually but not always between 75 F to 100 F (24C to 38 C) is approached and exceeded, it is likely that the unfavorable effects of high temperature will occur.

PART 2 - PRODUCTS

6. MATERIALS:

6.1 Concrete, General:

6.1.1 Portland Cement: ASTM C 150.

6.1.2 Aggregates: ASTM C 33.

6.1.3 Water: Potable.

6.2 Admixtures:

6.2.1 Air Entrainment: ASTM C 260.

6.2.2 Chemical Admixtures: ASTM C 494.

6.2.3 Pozzolanic Admixtures: ASTM C 494.

6.3 Expansion Joints:

6.3.1 Premolded Filler Strips: ASTM D 1751.

6.4 Control Joints: Non-Staining Material, Wood, Plastic, Metal: Formed to be removed without sampling concrete.

6.5 Curing Materials:

6.5.1 Moist Curing:

6.5.1.1 Mats.

6.5.1.2 Burlap.

6.5.2 Impervious Sheet Covering:

6.5.2.1 Polyethylene Sheeting: ASTM C 171, four (4) mil minimum thickness.

Exterior: black. Interior: white or clear.

6.5.3 Liquid Membrane-Forming Compound: ASTM C 309.

7. MIXES:

FA500021R0033

HJZH 17-1426 Install Electrical Drops

7.1 Concrete Mix:

7.1.1 Strength: Strength of concrete shall be as noted or scheduled on the plans.

Concrete shall be 5000 psi concrete minimum, at 28 days.

7.1.2 Aggregate Size:ACI 211-1.

7.1.3 Proportions: ASTM C33, Table 2.

7.1.4 Cement: Five sacks per cy minimum, type I/II or type III.

7.1.5 Maximum aggregate size to be 3/4" minus for finished slabs, 3/4 of minimum clear space between steel or between steel and forms in formed concrete, and 3/8" for grouting concrete masonry.

7.1.6 Air Entrainment: 5% to 7%.

7.1.7 Slump: 2" to 4".

7.2 Job Mixed Concrete:

7.2.1 Mix only in equipment designed for concrete mixing and capable of proportioning components by weight batching.

7.2.2 Mix in power operated drum-type mixer.

7.2.3 Proportions: Same as mix design submitted under requirements of 3.2.

8. ADMIXTURES:

8.1 General:

8.1.1 Other than specified herein, or by reference, admixtures may be used only on written approval of the Contracting Officer.

8.1.2 Submit in Writing: Brand name, description, mix of concrete (including any other admixture), purpose for which used and location in which this concrete is to be placed;

for approval.

8.1.3 All admixtures shall be used in strict conformance with manufacturer's written instructions.

8.2 Durability (ACI 302, Article 3.4):

8.2.1 Air-entrained concrete shall be obtained by the use of an approved air entraining admixture only.

8.3 Calcium Chloride: Shall not be used.

8.4 Chemical Admixtures: Must receive approval by Contracting Officer.

8.5 Pozzolanic Admixtures: Must receive approval by Contracting Officer.

PART 3 - EXECUTION

9. PREPARATION:

9.1 General: ACI 318, Chapter 6.

9.2 Forms: Complete, obtain Contracting Officer's approval before placing concrete.

9.3 Concrete shall be produced in accordance with ACI 301, Chapter 7. Concrete transported by truck mixer or agitator shall be completely discharged within one and one half (1-1/2) hours (1 hour for hot weather concreting) after water has been added to the cement or cement has been added to the aggregate.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

9.4 Give Contracting Officer minimum four (4) days notice prior to scheduled first concrete pour.

10. PLACING:

10.1 General: All concrete shall be placed in accordance with ACI 304.

10.2 Construction Joint: Follow ACI 318, Section 6.4, with maximum spacing between joints to be forty (40) feet for interior concrete work where not specified otherwise on the drawings. See EXPANSION & CONTRACTION JOINTS in this Section for jointing details.

10.3 Do not add water to mix after initial mixing.

10.4 Maximum slump for concrete shall be as shown in 7.1.7 above. Where field conditions require slump to exceed that shown, Contractor shall obtain written approval from the Contracting Officer who may require an adjustment to the mix.

10.5 The temperature of the concrete as placed shall not exceed 90 F without the approval of the Contracting Officer. All costs for any precautionary measures required by the Contracting Officer shall be borne by the Contractor. Cold weather concrete must meet the requirements of ACI 301 or ACI 306.1 unless otherwise specified. Do not allow concrete temperature to decrease below 50 degrees F. Obtain approval prior to placing concrete when the ambient temperature is below 40 degrees F or when concrete is likely to be subjected to freezing temperatures within 24 hours. Cover concrete and provide sufficient heat to maintain 50 degrees F minimum adjacent to both the formwork and the structure while curing. Limit the rate of cooling to 37 degrees F in any 1 hour and 50 degrees F per 24 hours after heat application.

11. TESTS:

11.1 Contractor to make a minimum of three test cylinders for each concrete compression test set.

11.2 Cylinders will be stored at job site 24 hours in a specially prepared wooden storage box before delivery to testing laboratory. Contractor to provide wooden box and a safe storage out of direct sunlight. Do not subject cylinders to freezing temperatures.

11.3 A compressive test will be taken at the rate of one test set per 20 CY with at least one test set per day of concrete placed. In any event, not less than one test for each individual pour unless requirement is waived by the Contracting Officer. Additional tests may be required by the Contracting Officer at the Contractor's expense if, in the Contracting Officer's opinion, there appears to be excessive variation in the concrete between loads or the concrete is watered or otherwise mishandled during placement.

11.3.1 Strength tests per ACI 39.

11.3.2 Air content per ASTM C 231.

11.3.3 Slump test per ASTM C 143. Slump for all concrete to conform to ACI 211.1, Table 5.3.1(c).

11.4 Within seven (7) days following date of concrete placement, Contractor shall transport test cylinders to a testing laboratory. Use care in transporting cylinders to preclude damage.

11.5 Contractor will pay for testing cylinders.

11.6 Quality of concrete to be based on average of three 28-day-old test cylinders or two 28 day old test cylinders if a 7-day break is requested by the Contracting Officer.

11.6.1 Adjust mix quantities immediately when results show strengths less than those required.

11.6.2 Test apparent problem areas in accordance with ASTM C-39.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

11.6.2.1 Load tests at Contractor's expense where serious doubt exists as to quality of material.

11.6.3 All tests for and corrections of deficiencies at Contractor's expense.

11.7 Deficiencies:

11.7.1 Strength Tests: Where testing laboratory reports on breakage of cylinders shows concrete does not comply with specifications, the Contracting Officer may request further testing of concrete to determine strength of in-place concrete. Such further testing will be obtained by the Contracting Officer and the Contractor shall pay for all such further testing.

11.7.2 Air Content and Slump Tests: Make necessary corrections to bring concrete to specification requirements before placing.

11.8 Replacement Testing: If any rejected concrete is removed, the testing of concrete placed to replace the rejected material will be obtained and paid for by the Contractor.

12. FORM REMOVAL:

12.1 General: Forms shall remain in place for time recommended per ACI 347, Article 3.6.

12.2 Removal: Remove forms with care to avoid damage to concrete.

12.3 Surface defects shall be repaired in accordance with ACI 301, Chapter 9. Proprietary compounds used for adhesion or patching ingredients shall be submitted to the Contracting Officer for approval.

13. FINISHED, FORMED SURFACED:

13.1 General: Perform finishing immediately following form removal. Keep concrete damp until finishing is complete.

13.2 Patching: (Required for all Surfaces)

13.2.1 Cut honeycomb, gravel pockets and voids over 3/4-inch diameter back to solid concrete.

13.2.2 Fill prepared voids with 1:2 cement sand patching mortar.

13.2.3 Fill form tie holes with a non-shrinking patching concrete on exposed faces, patch shall match concrete wall finish.

13.2.4 Slush wetted surface to be patched with 1:1 cement sand grout.

13.2.5 Finish patch flush to and matching adjacent wall surface.

13.2.6 Curing: Damp cure patch for 7 days.

14. FINISHING, EXTERIOR SITE WORK:

14.1 Work includes thrust blocks and anchors as required by plans.

14.2 Finish to true, even lines and leave surfaces free from defects.

15. CURING:

15.1 General:

15.1.1 Concrete shall be protected from premature drying, excessive hot or cold temperature, mechanical injury, or injury from rain or flowing water for 7 days following placing (3 days for Type III cement).

15.1.2 Maintain moist condition throughout curing period.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

15.1.3 Commence curing as soon as finishing is complete and moisture has disappeared from surface.

15.2 Curing: Concrete shall be maintained in a continuously moist condition for at least 7 days after placement. Curing shall begin as soon as possible after concrete has been placed and finished.

Materials and methods of curing shall be submitted to the Contracting Officer for approval. Unless specific methods are specified otherwise, any of the following curing methods will be allowed:

15.2.1 Moist Curing: Cover with burlap, mats or 1-inch sand, completely cover surface, lap sheet materials 3 inches. Thoroughly saturate cover with water and keep wet.

15.2.2 Impervious Sheet Curing: Thoroughly wet surfaces with a fine water spray.

Completely cover surfaces with waterproof sheet material. Lap all edges 4 inches or more and seal with adhesive or tape. Weight to prevent displacement. Repair or replace when damaged.

15.2.3 Liquid membrane-forming compound (not permitted where hardeners are specified unless specifically required for hardening progress).

15.2.3.1 Use only upon approval of Contracting Officer.

15.2.4 Do not allow surfaces to be alternately wet and dry.

16. CLEAN-UP: Remove all forms and materials and leave project site clear of all debris.

END OF SECTION

FA500021R0033

HJZH 17-1426 Install Electrical Drops

SECTION 260705

ELECTRICAL IDENTIFICATION

SECTION 26 07 05.00 00

ELECTRICAL IDENTIFICATION

PART 1 GENERAL

1.1 IDENTIFICATION

A. Provide engraved nameplates, directories, termination points schedules, color-coding, and other identification as shown on Drawings and required in Specifications.

B. Provide identification labels, methods, and materials in submittals. Provide a list of all labels proposed for this Project. All items of the system shall be identified clearly with descriptions indicating purpose, origination, termination, subsystem, and characteristics.

1.2 RELATED WORK

A. Division 15: Mechanical.

PART 2 PRODUCTS

2.1 GENERAL

A. Provide all materials for complete identification of components, equipment, wire, cable, raceways, enclosures, operators, terminations, relays, contacts, controllers, etc., as noted in the following sections.

B. All materials for nameplates and other materials shall be specifically manufactured for use as identification devices.

2.2 MATERIALS

A. Nameplates:

1. Engraved nameplates of laminated plastic with black letters on a white background shall be provided for all enclosures, cabinets, and panels. Nameplates shall identify the individual enclosure, cabinet, or panel. Sizes of nameplates and text may vary depending on application, but in no case shall letters be smaller than 1/4 inch for any engraved nameplate. Nameplates shall be made from heavy-duty laminated plastic.

2.3 ACCEPTABLE MANUFACTURERS

A. Nameplates shall be manufactured by a company regularly engaged in the production of engraved plastic labels, such as Seton or Brady.

FA500021R0033

HJZH 17-1426 Install Electrical Drops

16075-1

SECTION 260705

ELECTRICAL IDENTIFICATION

B. Other manufacturer's products may be acceptable if characteristics, quality, appearance, etc. match those of named manufacturers.

PART 3 EXECUTION

3.1 GENERAL

A. All new panels, main, distribution, and branch circuit panelboards, cabinets, enclosures, equipment, contactors, enclosed switches for mechanical equipment, selector switches for mechanical equipment, operators, and controllers shall be labeled with engraved plastic nameplates consisting of a minimum of 3/8 inch tall letters. Affix nameplates to enclosures with countersunk machine screws with lock washers and hexhead nuts. B.

All conductors passing through pull boxes and junction boxes shall be labeled with durable tags having clearly legible data containing appropriate representation, identifying where the conductors originate and the device or equipment served by the conductors.

C. Terminals on terminal strips shall be numbered with durable printed nameplates and typed directories with clear plastic protective covers shall be provided in terminal enclosure which identifies the origin, function, and destination of each conductor.

D. Provide engraved nameplates and other identification as shown on Drawings and specified in other Sections of this Division.

-- END OF SECTION --

16075-2

FA500021R0033

HJZH 17-1426 Install Electrical Drops

00 Index
01 01330-SUBMITTAL PROCEDURES
2 02200 Excavation, Trenching & Backfill for Utilities
03 30 00 CAST-IN-PLACE CONCRETE
6 26 07 05.00 00 ELECTRICAL IDENTIFICATION
ELECTRICAL IDENTIFICATION
ELECTRICAL IDENTIFICATION

File details come from the government source that posted it. Updated .